Loading...
HomeMy WebLinkAboutDrainage Report - PLN General - 2/2/2021 Engineered Abbreviated Drainage Report PLANMNG Weldon Garage RECEIVED 286 E. Cronquist Rd. s APR 19 2021 Allyn, WA 98524 15 W. A/der Street TPN 12232-40-01140 Mason County Project No. Olympic Engineering No. 20058 February 2, 2021 Prepared by: OLYMPIC ENGINEERING PO Box 12690 Olympia WA 98508 360.705.2474 www.olyeng.com Project Overview The proposal is to construct a detached garage on a developed f0.54-acre parcel off E. Cronquist Rd. on Puget Sound. All existing improvements (e.g. house, sheds, garage, septic, well) will remain. Access will be taken from an existing driveway off Cronquist Rd. The parcel and surrounding area are zoned RR5 (Rural Residential 5 Acres). The parcel abuts Puget Sound on the east side. There are no other known critical areas (wetlands, steep slopes etc.) on-site or within the immediate vicinity of the site and all improvements are proposed outside of the 100' fish & wildlife habitat conservation area. Current.site vegetation consists mostly of maintained lawn/landscape. The Natural Resource Conservation Service (MRCS) classifies the soils within the project area as Alderwood Gravelly Sandy Loam(HSG B) (see enclosed NRCS soils report). The parcel is bordered by Puget Sound to the east and by developed residential parcels on all other sides. The project has a single-threshold discharge area(TDA). The majority of stormwater runoff from the subject parcel is collected in catch basins and tightlined to Puget Sound. Stormwater runoff from the proposed roof and approximately one- half of the driveway area will also be collected and tightlined to Puget Sound. Stormwater runoff from the other half of the driveway area will be sheet flow dispersed. See Minimum Requirement 45 below for additional information. Project Areas Parcel Area: f0.54 ac (f23,522 sf) Existing Hard Surface Area: Roof: ±2,360 sf Driveway: ±1,520 sf Concrete/Misc.: ±1,085 sf Total: t4,965 sf New/Replaced Hard Surface Area: Roof: 1,300 sf Driveway: 2,400 sf Total: 3,700 sf Total Hard Surface Area after Project Completion: Roof: 3,660 sf Driveway: 3,920 sf Concrete/Misc.: 920 sf 1 of 3 Total: 8,500 sf Hard Surface Coverage: 36% Total Area to be Cleared/Graded: ±5,100 sf Minimum Requirements The total "new and/or replaced" hard surface area is greater than 2,000 sf but less than 5,000 sf; therefore, this project is required to address Minimum Requirements (MR) #1-5 per Volume I, Section 1-2.4 of Volume I of the WSDOE Stormwater Management Manual for Western Washington, 2014 edition (Stormwater Manual). These Minimum Requirements have been addressed as follows: Minimum Requirement#1 —Preparation of Stormwater Site Plans An Engineered Abbreviated Drainage Plan has been prepared (see enclosed). Minimum Requirement#2—Construction Stormwater Pollution Prevention (SWPP) A Short Form SWPP plan has been prepared (see enclosed). Minimum Requirement #3—Source Control of Pollution A Residential Pollution Source Control Program will be prepared, if required. Minimum Requirement 44—Preservation of Natural Drainage Systems and Outfalls No new discharge points, changes to existing drainage patterns, or revisions to any existing discharge locations are being proposed; therefore, this Minimum Requirement is not applicable. Minimum Requirement#5—On-Site Stormwater Management Per Section 1-2.5.5 and I-2.5.7 in Volume I of the Stormwater Manual, this project is exempt from flow control; therefore, it is not required to achieve the LID Performance Standard or consider bioretention,rain gardens, permeable pavement, and full dispersion. The project will provide Post-Construction Soil Quality and Depth (BMP T5.13) and Sheet Flow Dispersion(BMP T5.12)to the maximum extent possible. The proposed BMP's are as follows: Lawn and Landscape Areas: • All disturbed and/or new lawn and landscape areas will contain soils meeting the Post-Construction Soil Quality and Depth (BMP T5.13)requirements. 2 of 3 Roof Areas: • Downspouts from the roof gutters will be tightlined to Puget Sound. Other Hard Surface Areas: • Stormwater runoff from the western portion of the driveway will be sheet flow P Y dispersed (BMP T5.12) onto adjacent lawn/landscape areas containing soils meeting the Post-Construction Soil Quality and Depth (BMP T5.13) requirements. • Stormwater runoff from the eastern portion of the driveway will be collected and tightlined to Puget Sound. Additional Reauirements Financial Liability This is a single-family residential project; therefore, a Financial Guarantee is not required. Off-Site Analysis and Mitigation It appears some off-site drainage enters the western portion of the parcel and a portion of this is collected in an existing catch basin and routed to Puget Sound. This is proposed to remain as-is. There does not appear to be any other noticeable stormwater run-on from adjacent parcels or noticeable runoff from the subject parcel. All stormwater runoff generated by the new improvements will be dispersed on-site and/or routed directly to Puget Sound. Therefore, a quantitative off-site analysis or mitigation is not warranted. 2/2/2021 "I hereby state that this Engineered Abbreviated Drainage E`ER M. Report for the Weldon Garage project has been prepared by me or under my supervision and meets the requirements of � Mason County and normal standards of engineering practice. I hereby agree that Mason County does not and will not assume liability for the sufficiency,suitability, orperformance 7401 w4 of drainage facilities designed by me. ssloxal.E�° 3 of 3