Loading...
HomeMy WebLinkAboutHPA for BLD2022-00333 - PLN General - 9/8/2020r PWashington Department of L � 9 Fish&Wildlife HYDRAULIC PROJECT APPROVAL PO Box43234 n �,!4--N Olympia, WA 98504-3234 " L-0 (360)902-2200 Issued Date: January 27, 2022 as 15 2022 Permit Number: 2022-6-47+01 Project End Date: February 27, 202 FPA/Public Notice Number: N/A 2615 W. Alder Sfir. Application ID: 27464 PERMITTEE ' AUTHORIZED AGENT OR CONTRACTOR Linda Weldon 1813 174th St E, PO Box 653 Spanaway, WA 98387-7602 Project Name: Expedited -Weldon bulkhead repair Project Description: Remove four feet of bulkhead from northern end of bulkhead. Install new wingwall and anchors buried landward at new northern cut-end of bulkhead. Hand tools only on beach, no heavy equipment on beach. PROVISIONS 1. TIMING LIMITATION: Work for this project may begin immediately and must be completed within 30 days of issuance. 2. APPROVED PLANS: Work must be accomplished per plans and specifications submitted with the application and approved by the Washington Department of Fish and Wildlife, entitled "Bulkhead repair drawing1.pdf'and "Bulkhead repair drawing2.pdf', received on 1/24/2022, EXCEPT AS MODIFIED BY THIS HYDRAULIC PROJECT APPROVAL. You must have a copy of these plans available on site during all phases of the project construction. 3. FISH KILL/WATER QUALITY PROBLEM NOTIFICATION: If a fish kill occurs or fish are observed in distress at the job site, immediately stop all activities causing harm. Immediately notify the Washington Department of Fish and Wildlife of the problem. If the likely cause of the fish kill or fish distress is related to water quality, also notify the Washington Military Department Emergency Management Division at 1-800-258-5990. Activities related to the fish kill or fish distress must not resume until the Washington Department of Fish and Wildlife gives approval. The Washington Department of Fish and Wildlife may require additional measures to mitigate impacts. NOTIFICATION 4. PRE-AND POST-CONSTRUCTION NOTIFICATION: You, your agent, or contractor must contact the Washington Department of Fish and Wildlife by e-mail at HPAapplications@dfw.wa.gov; mail to Post Office Box 43234, Olympia, Washington 98504-3234; or fax to (360)902-2946 at least one day before starting work, and again within seven days after completing the work. The notification must include the permittee's name, project location, starting date for work or date the work was completed, and the permit number. The Washington Department of Fish and Wildlife may conduct inspections during and after construction; however, the Washington Department of Fish and Wildlife will notify you or your agent before conducting the inspection. STAGING, JOB SITE ACCESS AND EQUIPMENT 5. Establish the staging area (used for activities such as equipment storage, vehicle storage, fueling, servicing, and hazardous material storage) in a location and manner that will prevent contaminants like petroleum products, hydraulic fluid, fresh concrete, sediments, sediment-laden water, chemicals, or any other toxic or harmful materials from entering waters of the state. 6. Clearly mark boundaries to establish the limit of work associated with site access and construction. 7. All work on the beach must be accomplished using hand tools only and is limited to a 25-foot work corridor Page 1 of 5 1 Washington Department of Fish &Wildlife HYDRAULIC PROJECT APPROVAL PO Box43234 FISI1-d 41LDLIFF Olympia,WA 98504-3234 (360)902-2200 Issued Date: January 27, 2022 Permit Number: 2022-6-47+01 Project End Date: February 27, 2022 FPA/Public Notice Number: N/A Application ID: 27464 waterward of the face of the bulkhead. Construction material must not touch the beach outside this work corridor. 8. Retain all natural habitat features on the beach larger than twelve inches in diameter including trees, stumps, logs, and large rocks. These natural habitat features may be moved during construction but they must be placed near the preproject location before leaving the job site. 9. Do not operate motorized equipment on the beach below the ordinary high water line. 10. Do not stockpile construction material waterward of the ordinary high water line. CONSTRUCTION-RELATED SEDIMENT, EROSION AND POLLUTION CONTAINMENT 11. Do not conduct project activities when the work area is inundated by tidal waters. CONSTRUCTION MATERIALS 12. Do not use native bed material, other than material excavated for bulkhead footings or placement of bulkhead base, for project construction or fills. 13. Use tarps or other methods to prevent treated wood, sawdust, trimmings, drill shavings and other debris from contacting the bed or waters of the state. 14. To prevent leaching, construct forms to contain any wet concrete. Place impervious material over any exposed wet concrete that will come in contact with waters of the state. Forms and impervious materials must remain in place until the concrete is cured. 15. Do not use wood treated with oil-type preservative (creosote, pentachlorophenol) in any hydraulic project. Wood treated with waterborne preservative chemicals (ACZA, ACQ) may be used if the Western Wood Preservers Institute has approved the waterborne chemical for use in the aquatic environment. The manufacturer must follow the Western Wood Preservers Institute guidelines and the best management practices to minimize the preservative migrating from treated wood into aquatic environments. To minimize leaching, wood treated with a preservative by someone other than a manufacturer must follow the field treating guidelines. These guidelines and best management practices are available at www.wwpinstitute.org. BULKHEAD REPAIR 16. Remove the northern approximately four linear feet of bulkhead from the site, dispose of upland above the limits of high water. *Note: this provision is modifying the approved plans. 17. The new buried wingwall and deadman anchors must only extend landward from the face of the existing bulkhead, no waterward expansion is authorized. DEMOBILIZATION/CLEANUP 18. Reshape beach area depressions created during project activities to preproject beach level upon project completion. 19. Remove all trash and unauthorized fill in the project area, including concrete blocks or pieces, bricks, asphalt, metal, treated wood, glass, floating debris, and paper, that is waterward of the ordinary high water line and deposit upland. 20. Remove all debris or deleterious material resulting from construction from the beach area or bed and prevent from entering waters of the state. LOCATION #1: Site Name: Weldon bulkhead repair 286 E Cronquist Rd, Allyn, WA 98524 WORK START: January 27, 2022 WORK END: February 27, 2022 Page 2 of 5 Washington Department of Fish&Wildlife HYDRAULIC PROJECT APPROVAL PO Box43234 xan �ix� o Olympia,WA 98504-3234 FLSHaa WILDLIFE (360)902-2200 Issued Date: January 27, 2022 Permit Number: 2022-6-47+01 Project End Date: February 27, 2022 FPA/Public Notice Number: N/A Application ID: 27464 WRIA Waterbody: Tributary to: 14 - Kennedy- Goldsborough Other Other 1/4 SEC: Section: Township: Range: Latitude: Longitude: County: 32 22 N 01 W 47.34956 -122.82718 Mason Location#1 Driving Directions Grapeview Loop Rd to Cronquist, east on Cronquist to mailbox#286, turn right onto gravel drive, folo down to end, drive straight into driveway next to barn red colored shop/garage. APPLY TO ALL HYDRAULIC PROJECT APPROVALS This Hydraulic Project Approval pertains only to those requirements of the Washington State Hydraulic Code, specifically Chapter 77.55 RCW. Additional authorization from other public agencies may be necessary for this project. The person(s)to whom this Hydraulic Project Approval is issued is responsible for applying for and obtaining any additional authorization from other public agencies (local, state and/or federal)that may be necessary for this project. This Hydraulic Project Approval shall be available on the job site at all times and all its provisions followed by the person (s)to whom this Hydraulic Project Approval is issued and operator(s) performing the work. This Hydraulic Project Approval does not authorize trespass. The person(s)to whom this Hydraulic Project Approval is issued and operator(s)performing the work may be held liable for any loss or damage to fish life or fish habitat that results from failure to comply with the provisions of this Hydraulic Project Approval. Failure to comply with the provisions of this Hydraulic Project Approval could result in civil action against you, including, but not limited to, a stop work order or notice to comply, and/or a gross misdemeanor criminal charge, possibly punishable by fine and/or imprisonment. All Hydraulic Project Approvals issued under RCW 77.55.021 are subject to additional restrictions, conditions, or revocation if the Department of Fish and Wildlife determines that changed conditions require such action. The person(s) to whom this Hydraulic Project Approval is issued has the right to appeal those decisions. Procedures for filing appeals are listed below. Page 3 of 5 I Washington Department of Fish&Wildlife HYDRAULIC PROJECT APPROVAL PO Box 43234 Olympia,WA 98504-3234 (360)902-2200 Issued Date: January 27, 2022 Permit Number: 2022-6-47+01 Project End Date: February 27, 2022 FPA/Public Notice Number: N/A Application ID: 27464 MINOR MODIFICATIONS TO THIS HPA: You may request approval of minor modifications to the required work timing or to the plans and specifications approved in this HPA unless this is a General HPA. If this is a General HPA you must use the Major Modification process described below.Any approved minor modification will require issuance of a letter documenting the approval. A minor modification to the required work timing means any change to the work start or end dates of the current work season to enable project or work phase completion. Minor modifications will be approved only if spawning or incubating fish are not present within the vicinity of the project. You may request subsequent minor modifications to the required work timing. A minor modification of the plans and specifications means any changes in the materials, characteristics or construction of your project that does not alter the project's impact to fish life or habitat and does not require a change in the provisions of the HPA to mitigate the impacts of the modification. If you originally applied for your HPA through the online Aquatic Protection Permitting System (APPS), you may request a minor modification through APPS.A link to APPS is at http://wdfw.wa.gov/licensing/hpa/. If you did not use APPS you must submit a written request that clearly indicates you are seeking a minor modification to an existing HPA. Written requests must include the name of the applicant, the name of the authorized agent if one is acting for the applicant, the APP ID number of the HPA, the date issued, the permitting biologist, the requested changes to the HPA, the reason for the requested change, the date of the request, and the requestor's signature. Send by mail to: Washington Department of Fish and Wildlife, PO Box 43234, Olympia, Washington 98504-3234, or by email to HPAapplications@dfw.wa.gov. You should allow up to 45 days for the department to process your request. MAJOR MODIFICATIONS TO THIS HPA: You may request approval of major modifications to any aspect of your HPA. Any approved change other than a minor modification to your HPA will require issuance of a new HPA. If you originally applied for your HPA through the online Aquatic Protection Permitting System (APPS), you may request a major modification through APPS. A link to APPS is at http://wdfw.wa.gov/licensing/hpa/. If you did not use APPS you must submit a written request that clearly indicates you are requesting a major modification to an existing HPA. Written requests must include the name of the applicant, the name of the authorized agent if one is acting for the applicant, the APP ID number of the HPA, the date issued, the permitting biologist, the requested changes to the HPA, the reason for the requested change, the date of the request, and the requestor's signature. Send your written request by mail to: Washington Department of Fish and Wildlife, PO Box 43234, Olympia, Washington 98504-3234. You may email your request for a major modification to HPAapplications@dfw.wa.gov. You should allow up to 45 days for the department to process your request. APPEALS INFORMATION If you wish to appeal the issuance, denial, conditioning, or modification of a Hydraulic Project Approval (HPA), Washington Department of Fish and Wildlife (WDFW) recommends that you first contact the department employee who issued or denied the HPA to discuss your concerns. Such a discussion may resolve your concerns without the need for further appeal action. If you proceed with an appeal, you may request an informal or formal appeal. WDFW encourages you to take advantage of the informal appeal process before initiating a formal appeal. The informal appeal process includes a review by department management of the HPA or denial and often resolves issues faster and with less legal complexity than the formal appeal process. If the informal appeal process does not resolve your concerns, you may advance your appeal to the formal process. You may contact the HPA Appeals Coordinator at(360)902-2534 for more information. A. INFORMAL APPEALS: WAC 220-660-460 is the rule describing how to request an informal appeal of WDFW actions taken under Chapter 77.55 RCW. Please refer to that rule for complete informal appeal procedures. The following information summarizes that rule. Page 4 of 5 v Washington Department of Fish&Wildlife HYDRAULIC PROJECT APPROVAL PO Box 43234 or Olympia,WA 98504-3234 F7.SH.w WILDLN (360)902-2200 Issued Date: January 27, 2022 Permit Number: 2022-6-47+01 Project End Date: February 27, 2022 FPA/Public Notice Number: NIA Application ID: 27464 A person who is aggrieved by the issuance, denial, conditioning, or modification of an HPA may request an informal appeal of that action. You must send your request to WDFW by mail to the HPA Appeals Coordinator, Department of Fish and Wildlife, Habitat Program, PO Box 43234, Olympia, Washington 98504-3234; e-mail to HPAapplications@dfw.wa.gov; fax to(360)902-2946; or hand-delivery to the Natural Resources Building, 1111 Washington St SE, Habitat Program, Fifth floor. WDFW must receive your request within 30 days from the date you receive notice of the decision. If you agree, and you applied for the HPA, resolution of the appeal may be facilitated through an informal conference with the WDFW employee responsible for the decision and a supervisor. If a resolution is not reached through the informal conference, or you are not the person who applied for the HPA, the HPA Appeals Coordinator or designee may conduct an informal hearing or review and recommend a decision to the Director or designee. If you are not satisfied with the results of the informal appeal, you may file a request for a formal appeal. B. FORMAL APPEALS: WAC 220-660-470 is the rule describing how to request a formal appeal of WDFW actions taken under Chapter 77.55 RCW. Please refer to that rule for complete formal appeal procedures. The following information summarizes that rule. A person who is aggrieved by the issuance, denial, conditioning, or modification of an HPA may request a formal appeal of that action. You must send your request for a formal appeal to the clerk of the Pollution Control Hearings Boards and serve a copy on WDFW within 30 days from the date you receive notice of the decision. You may serve WDFW by mail to the HPA Appeals Coordinator, Department of Fish and Wildlife, Habitat Program, PO Box 43234, Olympia, Washington 98504-3234; e-mail to HPAapplications@dfw.wa.gov; fax to (360)902-2946; or hand-delivery to the Natural Resources Building, 1111 Washington St SE, Habitat Program, Fifth floor. The time period for requesting a formal appeal is suspended during consideration of a timely informal appeal. If there has been an informal appeal, you may request a formal appeal within 30 days from the date you receive the Director's or designee's written decision in response to the informal appeal. C. FAILURE TO APPEAL WITHIN THE REQUIRED TIME PERIODS: If there is no timely request for an appeal, the WDFW action shall be final and unappealable. Habitat Biologist Noll.Steinweg@dfw.wa.gov for Director Noll Steinweg 360-628-2173 ` WDFW Page 5of5