Loading...
HomeMy WebLinkAboutSHX2022-00010 JARPA - SHX Application - 3/15/2022 a ® - -,. ; - - - -- ��WAS H I N GTO N STATE o,E 9; Date received: MAR 15 2022 Seattle District , Joint Aquatic Resources Permit Agency refere MOOY-- ld Street Application (JARPA) Form' �2 hel j �}jX lSDO l USE BLACK OR BLUE INK TO ENTER ANSWERS IN THE WHITE SPACES BELOW. ' t � Tax Parcel#(s): t ---------------------------------------- Part 1—Project Identification 1. Project Name A name for your project that you create. Examples:Smith's Dock or Seabrook Lane Development) el 1 � Y P P ) hL.PI Weldon bulkhead repair Part 2—Applicant The person and/or organization responsible for the project. hel 2a. Name (Last, First, Middle) Weldon, Linda E 2b. Organization (If applicable) 2c. Mailing Address (Street or PO Box) PO Box 653 2d. City, State, Zip S anawa WA 98387 P Y� 2e. Phone(1) 2f. Phone(2) 2g. Fax 2h. E-mail 253.686.1460 lindasoptions@yahoo.com 'Additional forms may be required for the following permits: • If your project may qualify for Department of the Army authorization through a Regional General Permit(RGP),contact the U.S.Army Corps of Engineers for application information(206)764-3495. • Not all cities and counties accept the JARPA for their local Shoreline permits.If you need a Shoreline permit,contact the appropriate city or county government to make sure they accept the JARPA. 2To access an online JARPA form with[help]screens,go to hftp://www.epermitting.wa.goy/site/alias resourcecenter/iarpa 0arpa form/9984/jarpa form aspx. For other help,contact the Governor's Office for Regulatory Innovation and Assistance at(800)917-0043 or help(CDOria.Wa.goy. ORIA-revised 0212020 Page 1 of 14 Part 3—Authorized Agent or Contact Person authorized to represent the applicant about the project. (Note: Authorized agent(s) must sign 11 b of this application.) n[ M 3a. Name (Last, First, Middle) 3b. Organization (If applicable) 3c. Mailing Address (Street or Po Box) 3d. City, State, Zip �I 3e. Phone(1) 3f. Phone(2) 3g. Fax 3h. E-mail �7_ Part 4—Property Owner(s) Contact information for people or organizations owning the property(ies)where the project will occur. Consider both upland and aquatic ownership because the upland owners may not own the adjacent aquatic land. aeI ID Same as applicant. (Skip to Part 5.) ❑ Repair or maintenance activities on existing rights-of-way or easements. (Skip to Part 5.) ❑ There are multiple upland property owners. Complete the section below and fill out ,DARPA Attachment A for each additional property owner. ❑ Your project is on Department of Natural Resources (DNR)-managed aquatic lands. If you don't know, contact the DNR at (360) 902-1100 to determine aquatic land ownership. If yes, complete DARPA Attachment E to apply for the Aquatic Use Authorization. 4a. Name (Last, First, Middle) 4b. Organization (If applicable) 4c. Mailing Address (street or Po Box) 4d. City, State, Zip 4e. Phone(1) 0. Phone(2) 4g. Fax 4h. E-mail ORIA-revised 02/2020 Page 2 of 14 Part 5—Project Location(s) Identifying information about the property or properties where the project will occur. hf elp] ❑ There are multiple project locations (e.g. linear projects). Complete the section below and use Attachment B for each additional project location. 5a. Indicate the type of ownership of the property. (Check all that apply.) [ ] El Private ❑ Federal ❑ Publicly owned (state,county,city, special districts like schools, ports,etc.) ❑ Tribal ❑ Department of Natural Resources (DNR)—managed aquatic lands (Complete JARPA Attachment E) 51b. Street Address (Cannot be a PO Box. If there is no address,provide other location information in 5p.) hel 286 E Cronquist Rd 5c. City, State, Zip(If the project is not in a city or town, provide the name of the nearest city or town.) [helpl Allyn, WA 98524 5d. County [ ] Mason 5e. Provide the section, township, and range for the project location. hel '/4 Section Section Township Range 32 22N 01 W 5f. Provide the latitude and longitude of the project location. [ ] • Example:47.03922 N lat./-122.89142 W long. (Use decimal degrees-NAD 83) 47.34956/-122.82718 5g. List the tax parcel number(s)for the project location. het • The local county assessor's office can provide this information. 1 2232-40-01 1 40 5h. Contact information for all adjoining property owners. (If you need more space, use JARPA Attachment C.) ftelp Name Mailing Address Tax Parcel #(if known) David & Nancy Kirkbride PO Box 476 12232-40-90100 -- ..-_._ ..... ---.........._. .-- ...... Grapeview, WA 98546 Eric & Claudia Hansen 1424 NW ELGIN AVENUE 12232-40-001090 _..........__.................... ._._...._.....--...._..._..__...._....._........ ---........_....... BEND OR 97703 ORIA-revised 02/2020 Page 3 of 14 51i. List all wetlands on or adjacent to the project location. hL elpi None 5j. List all waterbodies (other than wetlands) on or adjacent to the project location. [LeM Case Inlet 5k. Is any part of the project area within a 100-year floodplain? n( elal ❑ Yes El No ❑ Don't know 51. Briefly describe the vegetation and habitat conditions on the property. n[ elp] Residence with grass, cedar, fir, rhododendrons, azaleas and various other trees and bushes. There are not wetlands or streams on the property. 5m. Describe how the property is currently used. [Leipl Was a rental residence, will be primary residence soon. 5n. Describe how the adjacent properties are currently used. neI Property to south is a residence, property to north is a vacation property. 50. Describe the structures (above and below ground) on the property, including their purpose(s) and current condition. heAl Property contains a home, garage, shop and three sheds. The garage is newly constructed, all other structures are older in average condition. 5p. Provide driving directions from the closest highway to the project location, and attach a map. hei From Hwy 3 turn east onto Grapeview Loop Road. Turn east onto Cronquist. Turn south at mailbox labeled 286 onto gravel drive. Folo drive to the end, arriving in front of shop. ORIA-revised 0212020 Page 4 of 14 I Part 6—Project Description 6a. Briefly summarize the overall project. You can provide more detail in 6b. nel Repair existing bulkhead that has cracked and is failing. Install new wingwall and deadman anchors buried landward. Backfill and compact area behind bulkhead. Work to be completed by hand, no heavy equipment to be on the beach. 6b. Describe the purpose of the project and why you want or need to perform it. nei Existing bulkhead is failing and dirt is eroding behind it. Repair is needed to stabilize hillside and prevent further erosion into Case Inlet. 6c. Indicate the project category. (check all that apply) tLpet,t ❑ Commercial 0 Residential ❑ Institutional ❑ Transportation ❑ Recreational ❑ Maintenance ❑ Environmental Enhancement 6d. Indicate the major elements of your project. (check all that apply) (help) ❑ Aquaculture ❑ Culvert ❑ Float ❑ Retaining Wall ❑ Bank Stabilization ❑ Dam/Weir ❑ Floating Home (upland) ❑ Boat House ❑ Dike/ Levee/Jetty ❑ Geotechnical Survey ❑ Road ❑ Boat Launch ❑ Ditch ❑ Land Clearing ❑ Scientific Measurement Device ❑ Boat Lift ❑ Dock/ Pier ❑ Marina/ Moorage ❑ Stairs ❑ Bridge ❑ Dredging ❑ Mining ❑ Stormwater facility S Bulkhead ❑ Fence ❑ Outfall Structure ❑ Swimming Pool ❑ Buoy ❑ Ferry Terminal ❑ Piling/Dolphin ❑ Utility Line ❑ Channel Modification ❑ Fishway ❑ Raft ❑ Other: ORIA-revised 0212020 Page 5 of 14 6e. Describe how you plan to construct each project element checked in 6d. Include specific construction methods and equipment to be used. [ ) • Identify where each element will occur in relation to the nearest waterbody. • Indicate which activities are within the 100-year floodplain. Repair to be completed as per engineer's plans, except for removal of approximately 4 feet of the bulkhead at the northern end. All work on the beach to be completed with hand tools only. New buried wingwall and deadman anchors will only extend landward from the face of the existing bulkhead. Any materials excavated will be placed upward of bulkhead. 6f. What are the anticipated start and end dates for project construction? (Month/Year) [help] • If the project will be constructed in phases or stages, use .;ARPA Attachment D to list the start and end dates of each phase or stage. Start Date: Feb 2022 End Date: Feb 2022 ❑ See JARPA Attachment D 6g. Fair market value of the project, including materials, labor, machine rentals, etc. hel $8,000 6h. Will any portion of the project receive federal funding? [ • If yes, list each agency providing funds. -9--yes ❑ No ❑ Don't know Part 7—Wetlands: Impacts and Mitigation ❑ Check here if there are wetlands or wetland buffers on or adjacent to the project area. (if there are none, skip to Part 8.)[ ] 7a. Describe how the project has been designed to avoid and minimize adverse impacts to wetlands. hei El Not applicable 7b. Will the project impact wetlands? hf eiA ❑ Yes EI No ❑ Don't know 7c. Will the project impact wetland buffers? heI I ❑ Yes E1 No ❑ Don't know ORIA-revised 02/2020 Page 6 of 14 7d. Has a wetland delineation report been prepared? heel • If Yes,submit the report, including data sheets,with the JARPA package. ❑ Yes 0 No 7e. Have the wetlands been rated using the Western Washington or Eastern Washington Wetland Rating System? EtLeM • If Yes,submit the wetland rating forms and figures with the JARPA package. ❑ Yes ❑ No 0 Don't know 7f. Have you prepared a mitigation plan to compensate for any adverse impacts to wetlands? nel • If Yes,submit the plan with the JARPA package and answer 7g. • If No,or Not applicable,explain below why a mitigation plan should not be required. ❑ Yes 0 No ❑ Don't know There are not wetlands and all work to be completed on the landward side of the bulkhead. 7g. Summarize what the mitigation plan is meant to accomplish, and describe how a watershed approach was used to design the plan. hel none 7h. Use the table below to list the type and rating of each wetland impacted, the extent and duration of the impact, and the type and amount of mitigation proposed. Or if you are submitting a mitigation plan with a similar table, you can state (below) where we can find this information in the plan. [help.] Activity (fill, Wetland Wetland Impact Duration Proposed Wetland drain, excavate, Name' type and area (sq. of impact3 mitigation mitigation area flood, etc.) rating ft. or type (sq.ft. or category2 Acres) acres none 'If no official name for the wetland exists,create a unique name(such as"Wetland 1"). The name should be consistent with other project documents, such as a wetland delineation report. 2 Ecology wetland category based on current Western Washington or Eastern Washington Wetland Rating System.Provide the wetland rating forms with the JARPA package. 3 Indicate the days,months or years the wetland will be measurably impacted by the activity.Enter"permanent"if applicable. 4 Creation C,Re-establishment/Rehabilitation R,Enhancement E,Preservation P, Mitigation Bank/In-lieu fee B Page number(s)for similar information in the mitigation plan, if available: ORIA-revised 02/2020 Page 7 of 14 71i. For all filling activities identified in 7h, describe the source and nature of the fill material, the amount in cubic yards that will be used, and how and where it will be placed into the wetland. hei none 7j. For all excavating activities identified in 7h, describe the excavation method, type and amount of material in cubic yards you will remove, and where the material will be disposed. hei none Part 8—Waterbodies (other than wetlands): Impacts and Mitigation In Part 8, "waterbodies" refers to non-wetland waterbodies. (See Part 7 for information related to wetlands.) [help) 0 Check here if there are waterbodies on or adjacent to the project area. (If there are none, skip to Part 9.) 8a. Describe how the project is designed to avoid and minimize adverse impacts to the aquatic environment. hel 0 Not applicable All construction to be on landward side of existing bulkhead, and will be by hand. There will be no heavy equipment on the beach. 8b. Will your project impact a waterbody or the area around a waterbody? hel ❑ Yes 0 No ORIA-revised 02/2020 Page 8 of 14 8c. Have you prepared a mitigation plan to compensate for the project's adverse impacts to non-wetland waterbodies? [help] • If Yes, submit the plan with the JARPA package and answer 8d. • If No,or Not applicable,explain below why a mitigation plan should not be required. ❑ Yes 0 No ❑ Don't know All work to be completed on the landward side of bulkhead, none on the beach. 8d. Summarize what the mitigation plan is meant to accomplish. Describe how a watershed approach was used to design the plan. • If you already completed 7g you do not need to restate your answer here. [ ] 8e. Summarize impact(s)to each waterbody in the table below. heI ] Activity (clear, Waterbody Impact Duration Amount of material Area (sq. ft. or dredge, fill, pile name' location of impact3 (cubic yards) to be linear ft.) of drive, etc.) placed in or removed waterbody from waterbody directlyaffected none If no official name for the waterbody exists,create a unique name(such as"Stream 1")The name should be consistent with other documents provided. z Indicate whether the impact will occur in or adjacent to the waterbody. If adjacent,provide the distance between the impact and the waterbody and indicate whether the impact will occur within the 100-year flood plain. 3Indicate the days,months or years the waterbody will be measurably impacted by the work. Enter"permanent"if applicable. 8f. For all activities identified in 8e, describe the source and nature of the fill material, amount (in cubic yards) you will use, and how and where it will be placed into the waterbody. heI none ORIA-revised 02/2020 Page 9 of 14 8g. For all excavating or dredging activities identified in 8e, describe the method for excavating or dredging, type and amount of material you will remove, and where the material will be disposed. [ none Part 9—Additional Information Any additional information you can provide helps the reviewer(s) understand your project. Complete as much of this section as you can. It is ok if you cannot answer a question. 9a. If you have already worked with any government agencies on this project, list them below. h[ elw Agency Name Contact Name Phone Most Recent Date of Contact WA Dept of Fish &Wildlife Noll Steinweg 360.628.2173 Jan. 27, 2022 9b. Are any of the wetlands or waterbodies identified in Part 7 or Part 8 of this JARPA on the Washington Department of Ecology's 303(d) List? [ • If Yes,list the parameter(s)below. • If you don't know,use Washington Department of Ecology's Water Quality Assessment tools at: httns://ecology.wa.gov/Water- Shorelines/W ater-quality/W ater-improvement/Assessment-of-state-waters-303d. ❑ Yes 0 No 9c. What U.S. Geological Survey Hydrological Unit Code (HUC) is the project in? 0eI • Go to http://cfj)ub.epa.gov/surf/locate/index.cfm to help identify the HUC. , f .O 9d. What Water Resource Inventory Area Number(WRIA#) is the project in? net • Go to ntt s://ecol .wa. ovNVater-Shorelines/Water-su I /Water-availabilit /Watershed-look-u to find the WRIA#. Iq ORIA-revised 0212020 Page 10 of 14 9e. Will the in-water construction work comply with the State of Washington water quality standards for turbidity? het • Go to h,ttps://ecology.wa.gov/Water-ShorelinesANater-Quality/Freshwater/Surface-water-quality-standards/Criteria for the standards. ❑ Yes ❑ No El Not applicable 9f. If the project is within the jurisdiction of the Shoreline Management Act, what is the local shoreline environment designation? hel • If you don't know,contact the local planning department. • For more information,go to: hfti)s://ecology.wa.gov/Water-Shorelines/Shoreline-coastal-management/Shoreline-coastal- planning/Shoreline-laws-rules-and-cases. ❑ Urban ❑ Natural ❑ Aquatic ❑ Conservancy 0 Other: Residential 9g. What is the Washington Department of Natural Resources Water Type? [ • Go to http://www.dnr.wa.gov/forest-practices-water-typing for the Forest Practices Water Typing System. El Shoreline ❑ Fish ❑ Non-Fish Perennial ❑ Non-Fish Seasonal 9h. Will this project be designed to meet the Washington Department of Ecology's most current stormwater manual? [heipl • If No, provide the name of the manual your project is designed to meet. 0 Yes ❑ No Name of manual: 9i. Does the project site have known contaminated sediment? hel • If Yes, please describe below. ❑ Yes [a No 9j. If you know what the property was used for in the past, describe below. hel Residence 9k. Has a cultural resource (archaeological) survey been performed on the project area? he► • If Yes,attach it to your DARPA package. ❑ Yes 0 No ORIA-revised 02/2020 Page 11 of 14 91. Name each species listed under the federal Endangered Species Act that occurs in the vicinity of the project area or might be affected by the proposed work. hel None 9m. Name each species or habitat on the Washington Department of Fish and Wildlife's Priority Habitats and Species List that might be affected by the proposed work. hei None Part 10—SEPA Compliance and Permits Use the resources and checklist below to identify the permits you are applying for. • Online Project Questionnaire at http://apps.oria.wa.gov/opast. • Governor's Office for Regulatory Innovation and Assistance at(800) 917-0043 or help(c)-oria.wa.gov. • For a list of addresses to send your JARPA to, click on agency addresses for completed JARPA. 10a. Compliance with the State Environmental Policy Act(SEPA). (check all that apply.) net • For more information about SEPA,go to https:Hecology.wa.gov/regulations-permits/SEPA-environmental-review. B A copy of the SEPA determination or letter of exemption is included with this application. ❑ A SEPA determination is pending with (lead agency). The expected decision date is ❑ I am applying for a Fish Habitat Enhancement Exemption. (check the box below in 10b.) hel ❑ This project is exempt(choose type of exemption below). ❑ Categorical Exemption. Under what section of the SEPA administrative code (WAC) is it exempt? ❑ Other: ❑ SEPA is pre-empted by federal law. ORIA-revised 0212020 Page 12 of 14 I 10b. Indicate the permits you are applying for. (Check all that apply.) hem LOCAL GOVERNMENT Local Government Shoreline permits: ❑ Substantial Development ❑ Conditional Use ❑ Variance ❑ Shoreline Exemption Type (explain): Other City/County permits: ❑ Floodplain Development Permit ❑ Critical Areas Ordinance STATE GOVERNMENT Washington Department of Fish and Wildlife: El Hydraulic Project Approval (HP A) ❑ Fish Habitat Enhancement Exemption—Attach Exemption Form Washington Department of Natural Resources: ❑ Aquatic Use Authorization Complete JARPA Attachment E and submit a check for$25 payable to the Washington Department of Natural Resources. Do not send cash. Washington Department of Ecology: ❑ Section 401 Water Quality Certification ❑ Non-Federally Regulated Waters FEDERAL AND TRIBAL GOVERNMENT United States Department of the Army(U.S. Army Corps of Engineers): ❑ Section 404 (discharges into waters of the U.S.) ❑ Section 10 (work in navigable waters) United States Coast Guard: For projects or bridges over waters of the United States,contact the U.S.Coast Guard at: dl3-pf-dl3bridges@uscg.mil ❑ Bridge Permit ❑ Private Aids to Navigation (or other non-bridge permits) United States Environmental Protection Agency: ❑ Section 401 Water Quality Certification (discharges into waters of the U.S.)on tribal lands where tribes do not have treatment as a state (TAS) Tribal Permits: (Check with the tribe to see if there are other tribal permits,e.g.,Tribal Environmental Protection Act,Shoreline Permits, Hydraulic Project Permits,or other in addition to CWA Section 401 WQC) ❑ Section 401 Water Quality Certification (discharges into waters of the U.S.)where the tribe has treatment as a state (TAS). ORIA-revised 02/2020 Page 13 of 14 Part 11—Authorizing Signatures Signatures are required before submitting the JARPA package. The JARPA package includes the JARPA form, project plans, photos, etc. k 11a. Applicant Signature (required) hei I certify that to the best of my knowledge and belief, the information provided in this application is true, complete, and accurate. I also certify that I have the authority to carry out the proposed activities, and I agree to start work only after I have received all necessary permits. I hereby authorize the agent named in Part 3 of this application to act on my behalf in matters related to this application. (initial) By initialing here, I state that I have the authority to grant access to the property. I also give my consent to the permitting agencies entering the property where the aa I is at to inspect the project site or any work related to the project. (initial) � �_ C --- /XXXo 2 2 App icant Printed Name Ap c ignature Dat 11 b. Authorized Agent Signature Lei] I certify that to the best of my knowledge and belief, the information provided in this application is true, complete, and accurate. I also certify that I have the authority to carry out the proposed activities and I agree to start work only after all necessary permits have been issued. Authorized Agent Printed Name Authorized Agent Signature Date 11 c. Property Owner Signature (if not applicant) hf M Not required if project is on existing rights-of-way or easements (provide copy of easement with JARPA). I consent to the permitting agencies entering the property where the project is located to inspect the project site or any work. These inspections shall occur at reasonable times and, if practical, with prior notice to the landowner. Property Owner Printed Name Property Owner Signature Date 18 U.S.0§1001 provides that:Whoever, in any manner within the jurisdiction of any department or agency of the United States knowingly falsifies,conceals,or covers up by any trick,scheme,or device a material fact or makes any false,fictitious,or fraudulent statements or representations or makes or uses any false writing or document knowing same to contain any false,fictitious,or fraudulent statement or entry,shall be fined not more than$10,000 or imprisoned not more than 5 years or both. If you require this document in another format,contact the Governor's Office for Regulatory Innovation and Assistance(ORIA)at(800) 917-0043. People with hearing loss can call 711 for Washington Relay Service. People with a speech disability can call(877)833- 6341. ORIA publication number: ORIA-16-011 rev.09/2018 ORIA-revised 0212020 Page 14 of 14