HomeMy WebLinkAboutCOM2009-00076 Final Pump Station #3 - COM Permit / Conditions - 10/13/2011 MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Inspection Line(360)427-7262
Mason County Bldg. 3 426 W. Cedar P.O. Box 186 Phone: (360)427-9670,ext.352
Shelton,WA 98584
COMMERCIAL BUILDING PERMIT COM2009-00076
OWNER: MASON COUNTY UTILITIES AND WASTE RECEIVED: 7/22/2009
CONTRACTOR: LICENSE: EXP: ISSUED: 11/4/2009
SITE ADDRESS: 131 NE SUNLIT CANYON BELFAIR EXPIRES: 5/4/2010
PARCEL NUMBER: 1233210
LEGAL DESCRIPTIOlt-SE NE LYING WLY OF R.R. R/W
PROJECT DESCRIPTION: DIRECTIONS TO SITE:
PUMP STATION (#3) AND CONVEYANCE FOR NEW PUMP STATION IS ACCESSED FROM NE SUNLIT CANYON ROAD OFF OF
WASTEWATER TREATMENT FACILITY ROMANCE HILL ROAD
General Information Construction &Occupancy Information
Type of Use: Insp.Area:
No. of Units: Type of Constr.:
of Bathrooms: Occ.Group:
Type of Work: NEW Fire Dist.: 2 No.No. of Stories: Occ. Load:
Valuation:
Building Height:
Pre-Manufactured Unit Information Square Footage Information
Make: Length: Lot Size:
Model: Width: Building:
Year: Serial No.: Basement: Parking Spaces:
Setback Information Shoreline&Planning Information
Front: N 125.00 Ft. Shoreline: Ft.
Rear: S 16.00 Ft. Slope: 35.00 Ft. Water Body: Shoreline Desig.: Not Applicable
Side 1: W 22.00 Ft. SEPA?:Yes Comp. Plan Desig.: Urban Growth Area
Side 2: E 30.00 Ft.
Fire Protection System Information
Auto Fire Alarm System?: Emergency Key Box?: Standpipe?:
Auto Fire Sprinkler System?: Access Road?: Fire Extinguishers?:
Fixed Fire Suppression System?: Fire Hydrants?: Fire Lanes?:
COM2009-00076 Please refer to the following pages for conditions of this permit. 1 of 5
' Plumbing Fixtures Mechanical Fixtures FEES
Type Qty. Type Qty. Type By Date Amount Receipt
Total
CASE NOTES FOR
COM2009-00076
CONDITIONS FOR
COM2009-00076
1) Ownqrn s responsible to post the assigned address and/or purchase and post private road signs in accordance with Mason County Title
7ontractor
—
2) registrati q s are erned under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance
Division. There are poteyftial r' s d monetary liabilities to the homeowner for using an unregistered contractor. Further information can be
obtained at 1-8-O 98 a person signing this condition is either the homeowner, agent for the owner or a registered contractor according to
WA state law. X
3) Temporary erosion/control measures must be implemented to prevent water ual" ation of adjacent waters or wetlands. Silt fencing must
be instal d maintained until upland vegetation has become established-X
4) 1imensions and setbacks on submitted site plan. Setbacks are easured from the furthest projection of the structure.
5) IE5RTIT�LE 14 MASON COUNTY BUILDING CODE-CHAPTER 14.17, STANDARDS FOR FIRE APPARATUS ACCESS ROADS- 14.17.110:
`A fire apparatus access road in excess of 14% grade and more than 150'to new residential or commercial structures will require an automatic fire
s installed. Contact the Mason County Fire Marshal at(360) 427-9670, extension 273, for further information.
x ��~+
6) stal ox per section 506 of the 2006 International Fire Code. Please contact the local fire district for more information and inspection.
A a om a Sfir alarm system is required to be installed to NFPA 72 standards. The system is required to be fully monitored by a UL certified
m' any. A separate permit application is required to be submitted and approved prior to the installation of the system.
X
Fir- are required to be installed per chapter 9 of the 2006 International Fire Code and NFPA 10, 4A606C required.
X jRf
COM2009-00076 2 of 5
7) All approved plans are required to be on-site for inspection purposes. If inspection is called for and plans are not on site, Approval WILL NOT be
• granted. In addition, a reinspection fee, based on the current fee schedule, minimum one-hour will be charged and collected by the Mason County
Building Department prior to any further inspections being performed or approvals granted. X
8) A structural observation report, as defined in Chapter 17 of the International Code, shall be provided to the Mason County Building Department.
Reports shall be prepared by the engineer or architect of record responsible for the structural design or another engineer or architect designated by
the engineer or architect or record.
Reports shall be submitted to the Mason County Building Department within 2 weeks following each structural observation. A final observation
report shall be submitted prior to the final inspection of the structure. Written statements shall indicate the permit number, type of inspection, and
identify any reported deficiencies.
Strom ebservation is defined as the visual observation of the structural system by a registered design professional for general conformance to
the ap roved conformance to the approved construction documents at significant construction stages and at the completion of the structural
Insm., G-I.9) addition to�theinspections required in IBC, Section 109, the owner, the engineer or architect of record acting as the owner's agent shall employ
one or more special inspectors who shall provide inspections during construction on the types of work listed under Chapter 17 and as specified by
the design professional. The special inspectors duties & responsibilities shall be as specified in Chapter 17.
Special inspection reports shall be submitted to the Mason County Building Department, PO Box 186, Shelton WA 98584 and available for
inks ction reports shall be completed and submitted to the dept. in a timely manner and shall be submitted prior to the framing and
final cy inspections.
10) ny changes in construction shall be reviewed by engineer of record and submitted in writing to the Mason County Building Department prior to
construction. All engineering documents are a part of the approved set of plans and must remain attached thereto. If engineering documents are
re R3vaI will not be granted. In addition, a reinspection fee, based on the current fee schedule, minimum one-hour will be charged and
collet 6d b 'th ason County Building Department prior to any further inspections being performed or approvals granted.
11) AL CONSTRUCTION MUST MEET OR EXCEED ALL LOCAL CODES AND THE INTERNATIONAL COD—E—P75MIREMENTS AND
CCUPANCY IS LIMITED TO THE PERMITTED AND APPROVED CLASSIFICATION. ANY CHAN F S CCUPANCY WOULD
11RES IT REVOCATION. CHANGE OF USE MUST BE APPROVED PRIOR TO CHANGE. x
12) Chan s t 7appreleled building plans that affect compliance to the current Washington State Energy Cod (WSEC), ventilation and Indoor Air
IAQ), Building/Plumbing/Mechanical Codes and/or Mason County Regulations shall be approved prior to construction.
13) ONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE
ADOPTED BUILDING CODE.
The_onstruction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in
conforryfance with the international codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a
Mas Co uilding Inspector shall be made prior to requesting additional insp ,
J
14) 1 property lines shall be clearly identified at the time of foundation inspection. 'V
COM2009-00076 3 of 5
15) All buildin ��cjnits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The
ur tore u t a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being
pliant with Mason County ordinances and building regulations.
16), II permits ire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may extend the
time or ac n r a period not exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control
o it holder have prevented action from being taken. No more than one extension may be granted.
X
17) T e approval of this project is subject to the recommendations and specifications outlined in the a ed otechnical report or assessment.
Structures and /or land modifications (grading, cuts, fills, etc.) required in the geotechnical re ssment, may require a seperate permit.
The geotechincal report/assessment shall remain attached to the approved building ptans.
18) An inspection performed by a representative of the geologist, their authorized representativ , or engineer of record, shall be completed on-site prior
to the footing pour to verify that earthwork and foundation installation activities comply with he Geotechnical report or assessment
recommendations.
In addition a final inspection report, prepared by a representative of the geologist, their authorized representative, or engineer of record shall be
required to verify that erosion control, drainage and final work is completed in accordance to the Geotechnical report or assessment
recommendations.
Repo sWI submitted to the Mason County Building Dept., PO Box 186, Shelton, WA 98584, prior to the footing and final inspections and
_ or inspection.
19) ress a tr to wood manufactured after January 1, 2004 may contain high concentrations of copper which could quickly corrode metal
fast nectors, and flashing. Install metal connectors approved for contact with the new types of pressure treated material.
This pe it becomes null and void if work orconstruction authorized is not commenced within 180 days,or if construction or work is suspended for a period of 180 days at any time after work is
commend. Evidence of continuation of work is a progress inspection within the 180 day period. Final inspection must be approved before building can be occupied. Proof of continuation of
work is by means of a press spe- ThO owner or the agent on the owners behalf, represents that the information provided is accurate and grants employees of Mason County access to
the above described grope nd st ouwror review an spection.
OWNER OR AGENT: l-? DATE: //
COM2009-00076 4 of 5
CONCRETE MECHANICAL MANUFACTURED HOME D
----p Dale B y 0
co Footings !Setbacks Gas Piping Ribbons Z
o Interior Date By interior-Date By _ Date By 0
Exterior Date By Exterior-_Date: GABSot-� C
Point Load/Isolated Footings INSULATION Date By Z
BG/SLAB INSULATION ________._ --I
Date _ By Data By FIRE DEPARTMENT '<
Foundation Walls Floors Date By . I
Date By Data By DECKS r
FRAMING wails __-Z/� ! Date By m
Date 3—/7— / By�� Data �/ By n PROPANE TANKS Cn
PLUMBING vault Date Bv___.____.______ Z
Date By OTHER
Groundwork Attic
Type.
Date By Date By Data By
D.w.v DRYWALL Type- n
Date B Int.Brace Wall Date Bya y 0
y Dal e FINAL INSPECTION N
Water Line Fire Separation p
Date By Date By Date �_/3 —,l By
O
Pass or Request Inspect. c
Type of insp. Fail Date Date Done By Comments a,
�r -14 - -
1 -
-Z R_V Oi 7il?u G T
ASS 7,v4( -Iwf F
�s OL
f/"/ lwv. Ki )�v
U, p s�i _ShrO c
0
f- � L
1-0FiIn
L•'17
(2/1/2011) Debbera Coker- Building III pump station Page 1
From: Mark Core
To: Tom Moore
CC: Debbera Coker; Larry Waters
Date: 2/1/2011 8:52 AM
Subject: Building III pump station
Attachments: Mark Core1.vcf
Tom,
Building III pump station wall insulation is approved to be revised to 1" rigid on the inside of the cmu walls
and furred out with 2"x 4" @ 24" o/c with R-15 insulated batts. Omit the insulation inside the cmu blocks
and use 100% grout filled cavities.
Please have your contractor call me if they have any questions.
Thank you,
Mark Core
Permit Center Manager/Building Official
Co-Manager, DCD
Mason County
P.O. Box 186
Shelton, WA. 98584
(360)427-9670 Ext.357
The information transmitted is intended only for the person or entity to which it was originally addressed
and may contain confidential and/or privileged material. Any review, retransmission, dissemination or
other use of, or taking of any action in reliance upon, this information by persons or entities other than the
intended recipient is prohibited. If you received this in error, please contact the sender and delete the
material from any computer.