Loading...
HomeMy WebLinkAboutArmy Corps Engineers LOP - PLN General - 9/24/2012 a \ DEPARTMENT OF THE ARMY j 1 SEATTLE DISTRICT,CORPS OF ENGINEERS P.O. BOX 3755 _ y��, SEATTLE,WASHINGTON 98124-3755 w15112 �"4,4,14Vbapp5 7 \. Jr -- / REPLY TO / mn �M ` _ ��f� ATTENTION OF / 5�-L�/e s N0( G�� rE;��-�-Cy Sd-/IQ'K Regulatory Branch � y✓e�df�0 ! "`�o� ro�s�/z September 24, 2012 NWSE Holdings, LLC. 1001 Cooper Point Road, Suite 140-266 Olympia, Washington 98502 Reference: NWS-2012-309 NWSE Holdings, LLC. Ladies and Gentlemen: We have reviewed your application to install an 8-foot by 30-foot grated float that will be anchored via helical screw type anchors in Pickering Passage, Puget Sound at Harstine Island, Mason County, Washington. Based on the information you provided to us, this"Letter of Permission"(LOP)permit authorizes your proposal as depicted on the enclosed drawings dated April 16, 2011, which are made part of this permit. In order for this LOP authorization to be valid,you must ensure that the work is performed in accordance with the enclosed Letter of Permission General Conditions and the following special conditions: a. You must provide a copy of the permit transmittal letter,the permit form, and drawings to all contractors performing any of the authorized work. b. In order to meet the requirements of the Endangered Species Act(ESA) and for the protection of Puget Sound Chinook salmon,Puget Sound steelhead, Coastal Puget Sound Bull trout and Surf smelt, you may conduct the authorized activities from July 16 through October 14 in any year this permit is valid. You shall not conduct work authorized by this permit from October 15 through July 15 in any year this permit is valid. c. You must implement and abide by the ESA requirements and/or agreements set forth in your Appendix A, Application form for RGP-6 you submitted on April 16, 2012. The National Marine Fisheries Service (NMFS) concurred with a finding of"not likely to adversely affect' based on this document on July 19, 2012 (NMFS Reference Number 2012/02346). The U.S. Fish and Wildlife Service (USFWS) concurred with a finding of not likely to adversely affect' based on this document on August 2, 2012 (USFWS Reference Number 01EWFW00-20124- 0260). Failure to comply with the commitments made in this document constitutes non-compliance with the ESA and your U.S. Army Corps of Engineers Corps (Corps)permit. The USFWS/NMFS is the appropriate authority to determine compliance with ESA. .'CEIVEAD "? 2 5 7012 t -2- d. Surf smelt may be spawning in the project area during the allowed work window. In order to meet the requirements of the Endangered Species Act and for the protection of surf smelt,prior to construction,the applicant must have a qualified biologist confirm, in writing,that no surf smelt are spawning in the area. If a Washington Department of Fish and Wildlife (WDFW)Habitat Biologist has volunteered to conduct a survey as part of the Hydraulic Project Approval,this survey may be submitted to the Corps. The letter or memorandum from the qualified biologist or the WDFW Habitat Biologist must include the date of the inspection,the surf smelt findings, and must be provided to the Corps, Seattle District,Regulatory Branch,FAX (206) 764-6602,prior to construction. Address the letter or memorandum to Darren Habel and include the reference number NWS-2012-309. If the qualified biologist or WDFW Habitat Biologist confirms that no surf smelt are spawning in the project area, you have one week from the date of the inspection to complete all work below mean high water. We have reviewed your project pursuant to the requirements of the ESA and the Magnuson- Stevens Fishery Conservation and Management Act in regards to Essential Fish Habitat. The Corps has determined that this project will comply with the requirements of the above laws. Puget Sound is a water of the U.S. If you believe this is inaccurate, you may request a preliminary or approved jurisdictional determination(JD). If one is requested, please be aware that we may require the submittal of additional information to complete the JD and work authorized in this letter may not occur until the JD has been completed. Any change in the plans for this work will require that you submit revised drawings to this office and receive our written approval of those changes prior to conducting the work. If you object to any terms or conditions of this LOP or the jurisdictional determination, you may request an administrative appeal under our regulations (33 CFR Part 331)as described in the enclosed Appeal Process Fact Sheet and the Notification of Administrative Appeal Options and Process and Request for Appeal form. Your authorization to conduct the proposed work under this permit expires 3 years from the date of this letter. Within 30 days of completing the authorized work,you must fill out and return the enclosed Certificate of Compliance with Department of the Army Permit form to the address indicated on the form. Your signature on this form is our assurance you have conducted the work and any required mitigation in accordance with the terms and conditions of this LOP, including all special conditions. Please remember that failure to comply with the terms and conditions of this LOP, including any special conditions, will invalidate your authorization and could result in a violation of Federal law. Thank you for your cooperation during the permitting process. We are interested in your experience with our Regulatory Program and encourage you to complete a customer service survey form. This form and information about our program is available on our website at: www.nws.usace.army.mil (select"Regulatory"and then"Regulatory/Permits"). -3- While this project will not require further authorization from us,please note that it must comply with all State, local, and other Federal requirements that may apply. A copy of this letter without enclosures is being furnished to Ms. Key McMurray of Key Environmental Solutions, LLC at 550 Mill Creek Road, Raymond, Washington 98577. If you have any questions about this letter or our regulatory program,please contact Mr. Darren Habel at(206) 764-6883 or by email at darren.habel@usace.army.mil. BY AUTHORITY OF THE SECRETARY OF THE ARMY: Bruce A. Estok Pe Colonel, Corps of Engineers District Engineer Enclosures Puget Sound Vicinity Map 7%NJ D 1 ; i r n ' 1 1 j \ i Legend Corps Reference# /� r`�� �'t W E Miles Date f1 „'�(J v/�_J 0 5 10 20 s Sheet of 30' ENVIROTUFF Too DOCK SYSTEM MOISTURESHIELD RPL DECKING FIBERGLASS GRATING ao MHHW 14.4' GALVINIZED CHAIN FIRST 10' V NYLON LINE MLLW 0' -4' INSTALL MIDLINE FLOATS DEPTH -11' HELIX ANCHOR SYSTEM SECTION VIEWZOIZ— IG see,I Zit( Lattitude: 47deg 15'1.37"N Scale: 1 =1 0' Longitude: 122deg 55'14.1' 30' 5' 8' 4' 8' 5' pp N� (1) OF (2) 2.5X7.5 STRINGERS (1) OF (4) 1.5X7.5 (1) OF (2) 1.5X7.5 STRINGERS SPLICE BOARDS (1) OF (2) 2.5X7.5 WALERS (1) OF (2) 2.5X9.5 FASCIA CALCULATION OF GROSS GRATED AREA CALCULATION OF GROSS FRAMING AREA 5'X2' = 10 SO. FT X 2 SECTIONS = 20 SO. FT. 2.5'X30' STRINGER = 6 SO. FT X 2 = 12 SO. FT. 8'X8' = 64 SO. FT. X 2 SECTIONS = 128 SO. FT. 1.5'X8' STRINGER = 1 SO. FT. X 4 = 4 SO. FT. 4'X2' = 8 SO. FT. (MIDDLE SECTION) 2.5'X8' WALERS = 1.7 SO. FT. X 4 = 6.8 SO. FT. 20 + 128 + 8 = 156 SO. FT GROSS AREA 2.5'X8' FASCIA = 1.7 SO. FT. X 4 = 6.8 SO. FT. 1.5'X6'-B' SPLICE BOARD = .8 SO. FT. X 4 = 3.2 SO. F TOTAL FRAMING = 32.8 SO. FT. CALCULATION OF FUNCTIONAL GRATED AREA GROSS GRATED AREA 156 SO. FT. - GR❑SS FRAMING AREA - 32.8 SO. FT. TOTAL = 123.2 S0. FT. FUNCTI❑NAL GRATING 123.2 S0. FT. GROSS FLOAT AREA : 240 SO. FT. TOTAL = 51.3% GRATING CALCULATIONS N6VS -24/2 � 3�j 16 ,aP,�tl r� Lattitude: 47deg 15137"N Scale: NTS Longitude: 122deg 55'14.1' TAKEGAMI AND WENNEMARK FLOAT PROJECT. Distance and corrected tidal elevation(MLLW) in feet 250 --16.0 240— v ( I w' -12.0 fo � Will W� �X z _ 210 - 220 V5 1 -9.0 200 180 -3.6 _ 160 22� -3.0 140 -2.3 120 -1.0 - 100 - 80 - 60 - 40 - 20 Distance and corrected tidal elevation(M[-LW) in feet 0 BASELINE intersection of 11J ( 'JV the beach and 7 bluff PL MS&A Takegami and Wennemark Float Project • 14 APPENDIX A Application Form For RGP b Version: July 9, 2007 Revised December 21, 2007 Please fully complete this form and attach vicinity,plan and elevation drawings and any other relevant information. Submit the information to: U.S. Army Corps of Engineers,Regulatory Branch,P.O.Box 3755, Seattle,Washington 98124-3755. This application is for residential overwater structures in inland marine waters in Washington State. You may use this application whether or not your project meets all requirements of Regional General Permit 6(RGP 6). However,projects not meeting all requirements must undergo Section 7 Endangered Species Act(ESA) consultation with the National Marine Fisheries Service(NMFS)and U.S.Fish and Wildlife Service(USFWS). Section 7 ESA consultation could require a more conservative design or additional mitigation. Therefore,projects not meeting all requirements should provide a greater amount of mitigation than is required by RGP 6 in order to offset impacts to the aquatic environment. Eligibility for RGP a. Corps reference number: [To be completed by the Corps] b. This application: ® Meets all of the requirements of RGP 6. ❑ Does not meet all of the requirements of RGP 6. This form constitutes an application for an individual permit and a reference biological evaluation in association with NMFS reference: 2003/00214&2006/07415 USFWS reference:04-PI-0803& 1-3-05-I-0675 1. Applicant's name,address,telephone and fax number,and email: Single or Joint Use: If joint use,you must list the other waterfront property owners:name,address, and telephone number,as co-applicants.You must also provide a joint use agreement(Agreement) signed by all involved property owners;the Agreement must state that each property owner voluntarily agrees to build no overwater structures on their property except for the maintenance or modification of the authorized joint use overwater structure(Note:upon issuance of the permit for the joint use overwater structure,all property owners must record this Agreement on their deeds.) Single 2. Authorized agent's name,address,telephone and fax number,and email: Key Environmental Solutions,LLC. Key McMurry-Owner/Professional Stream and Wildlife Biologist 550 Mill Creek Road Raymond,WA 98577 360-942-3184-Office 360-562-5763-Cell 360-942-0260-Fax key@ keyenvironmentalsolutions.com 3. Contractor name,address,telephone and fax number,and email,and point of contact: Marine Floats Corporation CENWS-OD-RG-RGP-6,Revised July 9,2007 Page 2 of 12 4. Specific location of project area: Name of Waterway Pickering Passage Street Address 181 Bergeson Section 3 Township 20 N Range 2 W Latitude 47.25891 Longitude 122.91355 City/County Mason County (with Shoreline jurisdiction)Washington State Parcel Number 220031290120 Adjacent Property Owners(names and addresses) ROSALYN LEE ET AL JANE LEE 455 RICHMOND RD LA CANADA CA 91000-3536 220031290130 SANDRA J KRAMER 450 E BERGESON RD SHELTON WA 98584 220031290021 5. Description of work and drawings(attach drawings on 8'h-by 11-inch sheets,including a vicinity map,a plan view,and an elevation view;the drawings must include information as detailed on Appendix E — Drawing Checklist). The drawings must clearly show the factors detailed in the project description section of this RGP. If joint use,the location of the other waterfiont property(ies)must be shown on a map submitted to the Corps as part of the application. Install an 8'X 30'float in Pickering Passage Endangered Species Act(ESA)Information: Specific Project Information Conservation Measures and Construction Specifications: In order to meet all ESA requirements for authorization under this Regional General Permit(RGP),all applicable Conservation Measures and Construction Specifications summarized below must be implemented. The entire text of the Conservation Measures and Construction Specifications are listed in the RGP document. Check each item that you agree to implement. Check each item"not applicable"if they do not apply to your project. For example,if you will not install piling,check "not applicable"next to the item listing the piling requirements. You must also complete the column on the right with your specific project information. I(We) I(We) Not Conservation Measure and Construction Specification Specific Project Information Will Will Not Applicable Implement Implement La. Piers: Pier width must not exceed 6 feet. Width of proposed pier: feet ® b. Compass orientation of pier and the required%of General compass functional grating,and location of grating on the orientation of pier: pier: General Specific %of Location of Specific Degrees of Compass Degrees Functional Grating on compass orientation of pier Orientation (North= Grating on the Pier based on true north: of Pier and 0) the Pier Pier Width True square feet of North functional grating N/S 338 to 30 Along the 22 length of the 158 to Only if pier for the %functional grating to be 202 width is entire length installed: greater of the pier (attach calculations) CENWS-OD-RG-RGP-6,Revised July 9,2007 Page 2 of 12 4. Specific location of project area: Name of Waterway Pickering Passage Street Address 181 Bergeson Section 3 Township 20 N Range 2 W Latitude 47.25891 Longitude 122.91355 City/County Mason County (with Shoreline jurisdiction)Washington State Parcel Number 220031290120 Adjacent Property Owners(names and addresses) ROSALYN LEE ET AL JANE LEE 455 RICHMOND RD LA CANADA CA 91000-3536 220031290130 SANDRA J KRAMER 450 E BERRGESON RD SHELTON WA 98584 220031290021 5. Description of work and drawings(attach drawings on 8'h-by 11-inch sheets,including a vicinity map, a plan view,and an elevation view;the drawings must include information as detailed on Appendix E — Drawing Checklist). The drawings must clearly show the factors detailed in the project description section of this RGP. If joint use,the location of the other waterfront property(ies)must be shown on a map submitted to the Corps as part of the application. Install an 8'X 30'float in Pickering Passage Endangered Species Act(ESA)Information: Specific Project Information Conservation Measures and Construction Specifications: In order to meet all ESA requirements for authorization under this Regional General Permit(RGP),all applicable Conservation Measures and Construction Specifications summarized below must be implemented. The entire text of the Conservation Measures and Construction Specifications are listed in the RGP document. Check each item that you agree to implement. Check each item"not applicable"if they do not apply to your project. For example,if you will not install piling,check "not applicable"next to the item listing the piling requirements. You must also complete the column on the right with your specific project information. 1(we) l(we) Not Conservation Measure and Construction Specification Specific Project Information Will Will Not Applicable Implement Implement ❑ ❑ La. Piers: Pier width must not exceed 6 feet. Width of proposed pier: feet ® ❑ ❑ b. Compass orientation of pier and the required%of General compass functional grating,and location of grating on the orientation of pier: pier: General Specific %of Location of Specific Degrees of Compass Degrees Functional Grating on compass orientation of pier Orientation (North= Grating on the Pier based on true north: of Pier and 0) the Pier Pier Width True square feet of North functional grating N/S 338 to 30 Along the 22 length of the 158 to Only if pier for the %functional grating to be 202 width is entire length installed: eater of the pier (attach calculations) L CENWS-OD-RG-RGP-6,Revised July 9,2007 Page 3 of 12 I(We) I(we) Not Conservation Measure and Construction Specification Specific Project Information will Will Not Applicable Implement Implement than 4 feet NE/SW 23 to 30 Along the Orientation of grating on NW/SE 157 width of the pier: And E/W 203 to Only if pier, 337 width is interspersed greater along the than 4 feet entire length of the pier c. The pier must be linear. New finger piers and"ell" and`"I"'piers are not authorized El 2.a. Floats: For a single use residential structure—the Width of proposed float: float width must not exceed 8 feet and the length 8 feet cannot exceed 30 feet. — Length of proposed float: 30 feet El a. Option 1: Float width is 6 feet or less. Functional square feet of grating on at least 30%of surface. functional grating (attach calculations) Percent cover of surface with functional grating: % Option 2: Float width greater than 6 feet(up to 8 square feet of feet). Functional grating on at least 50%of the functional grating surface. (attach calculations) Percent cover of surface with functional grating: 50 b.For a joint use residential structure—the float width square feet of must not exceed 8 feet and the length cannot exceed functional grating 60 feet. Functional grating must be installed on 50 (attach calculations) percent of the surface area of the float Percent cover of surface with functional grating: c. The float will be installed in a north-south direction, If float is not installed, to the maximum extent practicable. lengthwise in a north-south direction,please explain why: / d. If the float is seasonally removed,it must be stored Will float seasonally? c at a Corps approved location. on y? A�-- If yes,where will it be stored? CENWS-OD-RG-RGP-6,Revised July 9,2007 Page 4 of 12 I(We) I(we) Not Conservation Measure and Construction Specification Specific Project Information Will Will Not Applicable Implement Implement e. The flotation for the float shall be fully enclosed and contained in a shell. f. The floats cannot rest on the tidal substrate. Float stoppers will be Stoppers or float support piling must be used such installed such that the that the bottom of the floatation device is at least 1 bottom of the flotation (one)foot above the level of the substrate. device will be feet above the level of the substrate. g Floats can be held in place with lines anchored with Will piling be used: a helical screw or"duckbill"anchor,piling,piling with stoppers and/or float support/stub pilings. Will a helical screw anchor will be used: El g. 1) For a single,residential use float,a maximum of 4 How many piling will be piling(not including stub piling)or anchors can be used: installed to hold the float in place. How many anchors will be used: g.2)For a joint use float system a maximum of 8 piling How many piling will be or anchors can be installed to hold the float in place. used: How many anchors will be used: g.3)If anchors and anchor lines need to be utilized,the If an anchor will be used, anchor lines shall not rest on the substrate at any describe the method used to time. prevent the line from resting on the substrate: g.4) In rocky substrates where a helical screw or If a helical screw or "duckbill"anchor cannot be used a Corps approved "duckbill'anchor cannot anchor of another type may be installed. be used,explain why and what type of anchor is proposed: h. If the float is positioned perpendicular to the ramp,a Dimensions of small float: small float may be installed to accommodate the movement of the ramp due to tidal fluctuations. The dimensions of the small float cannot exceed 6 feet in width and 10 feet in length. 3.Ramps and Marine Rails: Will a ramp be installed: if yes,what is the CENWS-OD-RG-RGP-6,Revised July 9,2007 Page 4 of 12 I(We) I(We) Not Conservation Measure and Construction Specification Specific Project Information Will Will Not Applicable Implement Implement ® ❑ ❑ e. The flotation for the float shall be fully enclosed and contained in a shell. ® ❑ ❑ f. The floats cannot rest on the tidal substrate. Float stoppers will be Stoppers or float support piling must be used such installed such that the that the bottom of the floatation device is at least 1 bottom of the flotation (one)foot above the level of the substrate. device will be feet above the level of the substrate. ® ❑ ❑ g Floats can be held in place with lines anchored with Will piling be used: a helical screw or"duckbill"anchor,piling,piling with stoppers and/or float support/stub pilings. Will a helical screw anchor will be used: ® ❑ g. 1) For a single,residential use float,a maximum of 4 How many piling will be piling(not including stub piling)or anchors can be used: installed to hold the float in place. How many anchors will be used: ❑ ❑ ® g.2)For a joint use float system a maximum of 8 piling How many piling will be or anchors can be installed to hold the float in place. used: How many anchors will be used: ® ❑ g.3)If anchors and anchor lines need to be utilized,the If an anchor will be used, anchor lines shall not rest on the substrate at any describe the method used to time. prevent the line from resting on the substrate: ❑ ❑ ® g.4) In rocky substrates where a helical screw or If a helical screw or "duckbill"anchor cannot be used a Corps approved "duckbill"anchor cannot anchor of another type may be installed. be used,explain why and what type of anchor is proposed: ❑ ❑ ® h. If the float is positioned perpendicular to the ramp,a Dimensions of small float: small float may be installed to accommodate the movement of the ramp due to tidal fluctuations. The dimensions of the small float cannot exceed 6 feet in width and 10 feet in length. ❑ 3.Ramps and Mazine Rails: Will a ramp be installed: if yes,what is the CENWS-OD-RG-RGP-6,Revised July 9,2007 Page 5 of 12 I(we) I(We) Not Conservation Measure and Construction Specification Specific Project Information Will Will Not Applicable Implement Implement length of the ramp: Will a marine rail be installed: a. The width of the ramp cannot exceed 4 feet. Width of ramp feet b. Grating shall cover the entire surface area of the ramp. TT- El c. A detailed description of the entire marine rail Describe the marine rail system must be included with the application and system: construction measures must be incorporated to ensure that the marine rail is not a barrier for littoral drift_ El 4. Grating must have at least 60%open area. Grating Proposed grating has must be oriented to maximize the amount of light 69%open area penetration and cannot be blocked by any objects above or below the grating. 5.a. Piling: Replacement or proposed new piling can be Type of material for piling: steel,concrete,plastic or untreated or treated wood. Treated wood pilings associated with the float(s) must incorporate design features(e.g.,plastic or Diameter of piling: metal bands)to minimize abrasion from the contact Type of pile driver(e.g., between the treated wood and the float(s)or vibratory): attachments to the float(s). The design features must cover the entire portion of the piling in Type of anti-abrasion contact with the float or attachments during all tidal device: elevations. b. Piling supporting a new pier must be spaced no Number of proposed piling closer than 20 feet apart_ supporting the new pier: c. If the activity is only the replacement of existing Number of existing piling piling on an existing pier: the piling can be to be replaced: replaced in the same general location and must not extend beyond the footprint of the existing structure (e.g.,pier). The 20 foot spacing between piling is not required but the number of piling cannot be increased. Existing piling can be partially cut with a new piling secured directly on top,fully extracted, or cut 2-feet below the mudline. If treated piling are fully extracted or cut 2-feet below the mudline, the holes or piling must be capped with appropriate material. Hydraulic water jets cannot be used to remove piling. 7rd. aximum of 2(two)moorage piling may be Number of proposedalled to accommodate the moorage of boats mooring piling:eeding the length of the floats. I CENWS-OD-RG-RGP-6,Revised July 9,2007 Page 6 of 12 I(We) I IWe) Not Conservation Measure and Construction Specification Specific Project Information Will Will Not Applicable Implement Implement e. If an impact hammer pile driver is used to drive or Diameter of steel piling: proof steel piling,a sound attenuation device or inches system must be implemented during pile driving. Steel piling cannot exceed a 12-inch diameter. EJ Li l. Piling with diameter of 10 inches or less—one Type of sound attenuation Corps approved sound attenuation device is device: required 2. For piling with a diameter greater than 10 Type of sound attenuation inches,up to 12 inches,two Corps approved devices: sound attenuation devices are required El f. Vibratory or impact pile driving must not be initiated if ESA-listed marine mammals(killer whales or Steller sea lions)are present within 300 feet of the work site. Pile driving must be temporarily suspended if an ESA-listed marine mammal approaches the operation to within 300 feet,and shall only continue once the animal departs to beyond 300 feet. El 6. Treated Wood: No creosote,pentachlorophenol, If treated wood will be used, CCA,or comparably toxic compounds not approved list type of treatment: for marine use,shall be used for any portion of the You must also submit over water structure. ACZA treated wood must meet certification that the wood Post-Treatment Procedures. was treated by the No treated wood shall be used for the decking on the appropriate and approved overwater structure. Treated wood can be used for all Post Treatment Procedures structural elements of the overwater structure. before authorized work can commence. 7.a. Skirting: New or replacement skirting is not authorized by this RGP. El El 8.a. The repair,maintenance,or replacement of existing structures,or the construction of new structures, such as,but not limited to,buildings,planters, storage sheds or boxes on the pier,ramp,or float is not authorized by this RGP. Electrical utility boxes can be repaired,maintained or replaced by this RGP. 9. Watercraft Moorage: Describe watercraft(include length and width of the watercraft): a. Watercraft Moorage: Watercraft cannot rest on the At what water depth would tidal substrate at any time. moored watercraft ground out? MLLW b. Under this RGP,only one uncovered watercraft grid Number of proposed or lift can be installed at a single use overwater watercraft grid(s): structure and a maximum of two uncovered Number of r A water ialem peso i ;o-mgtzan1l palanoaun oml3o uanurtxsua s pus wMawls :(s)pu2 ugioaalsm aajsmiano asn aPu!s s TO pallelsui aq uea 13g io pm&.Id3o taqu nN put gecnraiem paiaeonun auo gluo dDU stgp-iapufl •q ® ❑ M"Tll�l L; no punoji�pju,anialem pojoout -auacl Aus lu alsipsgns Ispip pinom gldap aalsm;sqm ly agl uo lsai louusa geiaaalsM :a9saoOW:P.casalsM -s ❑ ❑ :(IlsJ3ialsm aqp 3o glpYA pus m5uol apnlauc)1lscniapsm aquasaQ :05230on 4RE)JOIUM '6 ADU sup Xq poasldaa so pauiepuceua`pajisdai aq uea saxoq klgnn ImM=lg •d U sttjp,tq pozuocpns lou si peog io`durea`.laid otp uo saxoq io spags a5e.mis `saaluuld`s2uiplmq`ol palIl poa lnq`ss gans `saanlntuls mau jo uogangsuoa aql.w`sainlnnns 2miszxa 3o luaut=ldw.to aouvuoju!uw`mudoi aiLL -s•g ❑ dJ2I sigp Xq pazr-cotpns you st 2up pls luoumuldal ao marl JIU94 lS •e'L ❑ •aauautmon uen aliom pazuoglne aio;aq •ampnnAs.tapemaano oqp jo sluouiala IsinpnnAs sampaaocd luatulsary lsod Ilu aoj posn oq uea poom papealZ ;)jwnAs ialsmiano panoidde pus oluudoidds oql uo 2upinap aqp jo3 pm aq tisqs poom poirail ON agp Aq palsasl sum -sampaaoid puau mit-lsod pOom aql lugl uo!imgp-m laatu psnur poom poIM4 VZDV 'ainlan-4s.capem JOAO ptucgns osls lsnua noA agp;o uotp cod Cue lo3 pasn aq hugs`asn ouuem to; :puampsaal3o ad,il 1sR panoidds you spanodtuoo ntxol,(Igeiudtaon 1O`VDZ) `pass aq IIpb poom paluaal3I `louagdoiolgnepaad`aposW-m ON TOOM paleaty q ® ❑ ❑ 7aa3 OO£puo,Caq of spcsdap Iemtas aql aouo anatluoa Aluo llsgs pue`laaj ON unp!m of uonsiodo aql sagasoadds leuamsua aumm paM-VSg us p papuad ms Spmoduaal oq lsnui gumup alyd ails 3Iiom aql jo laa; OO£uitprm puasacd aas(suoil eas aallalS ao salegm .tallry slsummua auusui papsq-ysg3i palumuc oq you lsnm i?uuup opd pnedan so f tolu.tgtA 3 ❑ ❑ pannbai aie=iAap uorpunuapps punos :saatnap panoidds sdtoo omp`sagnuc ZI of do`sogout nocpunuaus punos}o adMy OI uugl iaanaa2.aapauaetp e g1uA 2uTltd iod -Z ® ❑ pannbw :aa!Aap sc anrnap uozpsnuoue punos panoidde sdioa uo►punuopps punos 3o o(KI auo—ssal io sagnat OI 3o.aalau !p gpim 2ugq •I ® El ❑ •aap m!p gntn-ZI a paanxa loam 2lutlld IaalS •gumup alcd�uunp papuautalduti aq psnua uaalsds sagnui so omap uopsnuappe punos a`�uq!d lams 3ooid :Euclid laaps 3o ralauasiQ so anup op posn si.aanup altd iaunueq pnsdaai ue 'a El t�tdacl laamapdail atgwgMv ION WJA IPAA aouutuio;ul poofoid oginadS uorpeagiaadS uorporuisuoD pas omswW uou I ZI 3o 9 a2sd LOOZ`6 f-Inf pastAa2l`9-dDd-)-d-(IO-SMKgD CENWS-OD-RG-RGP-6,Revised July 9,2007 Page 7 of 12 I(We) I(we) Not Conservation Measure and Construction Specification Specific Project Information Will Will Not Applicable Implement Implement watercraft grids or lifts can be installed at a joint use craft lift(s): overwater structure. c. A maximum of 2 additional piling may be used to Number of proposed piling attach the grid to the piling used for the floats. to attach grid: d. The bottom of the watercraft grid shall be at least The bottom of the one foot above the level of the substrate. watercraft grid will be feet above the level of the substrate. El El e. If a floating watercraft lift is installed,the lift cannot rest on the tidal substrate at any time. ❑ 10.a. No eelgrass/macroalgae survey is required for the replacement of decking or a ramp,if the replacement structure is within the same footprint as the original. [Ell b. For all other activities,the applicant must submit a Attach appropriate survey preliminary/intermediatelintensive results or HPA to this eelgrass/macroalgae survey,as appropriate. application form. El C. No overwater structures can be constructed within Distance from proposed 25 feet(horizontally)measured in all directions of overwater structure to macroalgae beds or eelgrass. nearest surveyed macroalgae bed or eelgrass: feet ® El d. No floats or float support piling can be constructed Elevation from float to elevation between the t within a 4-foot depth e op of the nearest surveyed float stopper and macroalgae bed and eelgrass. This macroalgae bed or eelgrass: restriction applies only to a zone 25 feet wide on feet both sides of the float. El L1 1 La. Forage Fish Habitat-If piers and ramps need to be constructed over documented surf smelt and/or sand lance spawning habitat,they should span the spawning habitat to the maximum extent practicable. El El 0 b. The number of piling in documented sand lance If piling are placed in surf and surf smelt spawning habitat must be smelt and/or sand lance minimized. The diameter of piling in this type of spawning habitat,explain habitat must not be more than 8 inures and the why piling must be located piling cannot be treated wood. in this area and list the number and size of the piling: c. Floats,float support piling,helical anchors and watercraft grids or lifts cannot be installed in documented Pacific herring,surf smelt and/or sand lance spawning habitat. I CENWS-OD-RG-RGP-6,Revised July 9,2007 Page 8 of 12 1(we) I(We) Not Conservation Measure and Construction Specification Specific Project Information Will will Not Applicable Implement Implement d. No structures can be constructed or installed within a 4-foot depth elevation between the bottom edge of the horizontal surface of the structures and the landward most edge of documented Pacific herring spawning habitat. This restriction applies to a zone 25 feet wide on both sides of the float projecting waterward from the float. e. Information on the substrate types in the project Describe substrate types area must be submitted as part of the permit and note the elevation (e.g. application. If the Corps determines that there is mud,sand,fine cobble, potential undocumented surf smelt,Pacific large rock;at+5 feet above herring,or sand lance spawning habitat,the Corps MLLW,etc.) may request additional information from the iattach photographs if applicant and the Corps will consult with the available) appropriate resource agencies. Project revisions may be required if undocumented surf smelt, Pacific herring,or sand lance spawning habitat is located in the project area. El El 12.a. Work Windows: The required RGP fish work The required RGP fish work window will be met. Note: The RGP fish work window at this project window may be different than the HPA work location is(per Corps' window. For the work to be authorized by this website): RGP,the RGP fish work window must be met. ❑ b. If there is documented surf smelt or sand lance Is there documented Surf habitat at the project site and there is no approved Smelt or Sand Lance work window for surf smelt or sand lance at the habitat: project site,prior to construction,the applicant must have a qualified biologist or biologist certified by the Washington Department of Fish and Wildlife(WDFW)confirm,in writing,that no surf smelt or sand lance are spawning in the project area during the proposed project construction. Address the letter or memorandum to the project manager and include the RGP authorization reference number.If the qualified or certified biologist confirms that no surf smelt or sand lance are spawning in the project area,the permittee has 48 hours to begin the work and two weeks from the date of the inspection to complete all work contacting the substrate waterward of mean higher high water. If this confirmation is made,the permittee does not need to wait for approval from the Corps. c_ The required bald eagle work window will be met, The required bald eagle as applicable to the project location. work window at this project location will be determined General work prohibition times: by the Corps January 1 through August 15(nesting areas) November 1 through March 31 (wintering areas) To be Completed by Corps: CENWS-OD-RG-RGP-6,Revised July 9,2007 Page 8 of 12 1(We) I(We) Not Conservation Measure and Construction Specification Specific Project Information Wilt will Not Applicable Implement Implement ® ❑ ❑ d. No structures can be constructed or installed within a 4-foot depth elevation between the bottom edge of the horizontal surface of the structures and the landward most edge of documented Pacific herring spawning habitat. This restriction applies to a zone 25 feet wide on both sides of the float projecting waterward from the float. ❑ e. Information on the substrate types in the project Describe substrate types area must be submitted as part of the permit and note the elevation (e.g. application. If the Corps determines that there is mud,sand,fine cobble, potential undocumented surf smelt,Pacific large rock;at+5 feet above herring,or sand lance spawning habitat,the Corps MLLW,etc.) may request additional information from the Jattach photographs if applicant and the Corps will consult with the available) appropriate resource agencies. Project revisions may be required if undocumented surf smelt, Pacific herring,or sand lance spawning habitat is located in the project area. ® El El 12.a. Work Windows: The required RGP fish work The required RGP fish work window will be met. Note: The RGP fish work window at this project window may be different than the HPA work location is(per Corps' window. For the work to be authorized by this website): RGP,the RGP fish work window must be met. ❑ ❑ b. If there is documented surf smelt or sand lance Is there documented Surf habitat at the project site and there is no approved Smelt or Sand Lance work window for surf smelt or sand lance at the habitat: project site,prior to construction,the applicant must have a qualified biologist or biologist certified by the Washington Department of Fish and Wildlife(WDFR)confirm,in writing,that no surf smelt or sand lance are spawning in the project area during the proposed project construction. Address the letter or memorandum to the project manager and include the RGP authorization reference number.If the qualified or certified biologist confirms that no surf smelt or sand lance are spawning in the project area,the permittee has 48 hours to begin the work and two weeks from the date of the inspection to complete all work contacting the substrate waterward of mean higher high water. If this confirmation is made,the permittee does not need to wait for approval from the Corps. c. The required bald eagle work window will be met, The required bald eagle as applicable to the project location. work window at this project General work prohibition times: location will be determined January 1 through August 15(nesting areas) by the Corps November 1 through March 31 (wmtenng areas) To be Completed by Corps: CENWS-OD-RG-RGP-6,Revised July 9,2007 Page 9 of 12 I(We) I(we) trot Conservation Measure and Construction Specification Specific Project Information will Will Not Applicable Implement Implement Distance to Bald Eagle nest: ❑ 13.a. Work in the Dry: Work that involves the excavation of the substrate,bank,or shore shall occur in the dry whenever practicable. ® 14.a. Operation of Equipment: Use of equipment on the beach shall be held to a minimum,confined to a single access point,and limited to a 12-foot work corridor on either side of the proposed work. To the maximum extent practicable,equipment shall be operated from the top of the bank,temporary work platform,barge,or similar out-of-water location. El b. Equipment shall be operated in a manner that minimizes suspended particulates from entering the water column. El El c. The required methods to identify problems and maintain and clean equipment will be implemented. d. Barges may not ground on the substrate at any time. e. Depressions or trenches in beach areas,waterward of MHHW,created by construction equipment, shall be immediately restored to the original pre- project conditions(e.g.,elevation and substrate material type). f. Any disturbance of the beach area by construction activities or equipment,which leaves exposed hardpan or clay,shall be restored to the original pre-project conditions(e.g.,elevation and substrate material type)upon the immediate completion of construction and mitigation work. El El 15.a. Disturbance of Vegetation: Existing habitat features shall not be removed from the aquatic environment. b. Disturbance of bank vegetation shall be limited to If bank vegetation will be a work area strip no wider than twice the width of disturbed,what is the width the pier. There is no length requirement. of the disturbance area: feet c. Removal of woody bank vegetation with a DBH of If woody bank vegetation 4-inches or greater within the work area strip with a DBH of 4-inches or must receive prior approval from the CoTs,. And greater is planned to be CENWS-OD-RG-RGP-6,Revised July 9,2007 Page 10 of 12 I(We) I(We) Not Conservation Measure and Construction Specification Specific Project Information Will Will Not Applicable Implement Implement removed trees,to the maximum extent practicable, removed,explain why it must be placed on the beach onsite and anchored needs to be removed and securely in place.If removed trees will not be describe where the cut placed on the beach,the applicant must explain woody vegetation will be why this is not practicable. placed: (attach photographs) El Ll d. Disturbed bank vegetation shall be replaced with If bank vegetation will be equivalent native species appropriate for the site. disturbed,list the species A planting plan must be provided. Plantings must name of the replacement be installed at the appropriate time of the year for vegetation: the selected species and within one year of project construction. El 0 Mitigation. Required number of Mitigation Points(see Table 2): (show your calculations) List selected Mitigation Measure Options(s)(see Table 1): Is the mitigation onsiteloffsite? If offsite, provide a justification: If mitigation is not an option onsite or offsite, provide a justification: Mitigation Timing: The selected and approved mitigation measures,except plantings,must be completed within 6 months from the date of construction of the approved overwater structure. Plantings will occur during the appropriate time of year for the selected species and within one year of project construction. Mitigation Plantings: The authorized species, If plantings are proposed, number of plants,and correct spacing of plants will be attach planting plan. utilized. El Mitigation Planting Performance Standards: The r uired orroance standards will be met for the 5- CENWS-OD-RG-RGP-6,Revised July 9,2007 Page 10 of 12 I(we) I(We) Not Conservation Measure and Construction Specification Specific Project Information Will Will Not Applicable Implement Implement removed trees,to the maximum extent practicable, removed,explain why it must be placed on the beach onsite and anchored needs to be removed and securely in place.If removed trees will not be describe where the cut placed on the beach,the applicant must explain woody vegetation will be why this is not practicable. placed: (attach photographs) T1 El ® d. Disturbed bank vegetation shall be replaced with If bank vegetation will be equivalent native species appropriate for the site. disturbed,list the species A planting plan must be provided. Plantings must name of the replacement be installed at the appropriate time of the year for vegetation: the selected species and within one year of project construction. El 0 ® Mitigation. Required number of Mitigation Points(see Table 2): (show your calculations) List selected Mitigation Measure Options(s)(see Table 1): Is the mitigation onsiteloffsite? If offsite, provide a justification: If mitigation is not an option onsite or offsite, provide a justification: Mitigation Timing. The selected and approved mitigation measures,except plantings,must be completed within 6 months from the date of construction of the approved overwater structure. Plantings will occur during the appropriate time of year for the selected species and within one year of project construction. ® Mitigation Plantings: The authorized species, If plantings are proposed, number of plants,and correct spacing of plants will be attach planting plan. utilized. [] Mitigation Planting Performance Standards: The required performance standards will be met for the 5- CENWS-0D-RG-RGP-6,Revised July 9,2007 Page l 1 of 12 1(we) I(We) Not Conservation Measure and Construction Specification Specific Project Information will Will Not Applicable Implement Implement year monitoring period. Mitigation Reports: A report on mitigation completion or a status report on the project and mitigation,including as-built drawings,must be submitted to the Corps within 12 months from the date the Corps issues an RGP to the permittee. If plantings are implemented:Mitigation planting monitoring reports will be due annually for 5 years from the date the Corps accepts the as-built drawings. All General Conditions will be met. ❑ ❑ A copy of this permit,permit drawings,mitigation planting plan (if applicable),and final authorization letter shall be recorded with the Registrar of Deeds, within 60 days after final Corps authorization,to ensure that subsequent property owners are aware of the construction,use,and mitigation requirements. Proof of this must be provided to the Corps within 65 days after the date of the Corps'RGP verification letter to the permittee. U the pier is joint use,all co-applicants must voluntarily agree to build no additional overwater structures on their property,except for the maintenance or modification of the proposed joint use overwater structure. This voluntary agreement and the documentation described above must be recorded on the deeds of all involved properties.(General Condition 3) If the applicant has checked "Will Not Implement"for any of the above items,then the following items must be completed by the applicant: ❑ You must attach a completed Coastal Zone Management form.Note: This form can be found on the Corps' web page:A, w.nws.Mace.armv.n3iiSelectRegulatory—Regulatory/Permits—Forms. ❑ Explain why you cannot meet all of the above items: ❑ Based on the existing environmental conditions and the proposed work,the applicant is proposing additional mitigation (beyond the Mitigation requirements)as described below: APPLICATION IS HEREBY MADE FOR A PERMIT OR PERMITS TO AUTHORIZE THE ACTIVITIES DESCRIBED HEREIN. I CERTIFY THAT I AM FAMILIAR WITH THE INFORMATION CONTAINED IN THIS APPLICATION,AND THAT TO THE BEST OF MY KNOWLEDGE AND BELIEF,SUCH INFORMATION IS TRUE,COMPLETE,AND ACCURATE. I FURTHER CERTIFY THAT I POSSESS THE AUTHORITY TO UNDERTAKE THE PROPOSED ACTIVITIES. I HEREBY GRANT TO THE AGENCIES TO WHICH THIS APPLICATION IS MADE,THE RIGHT TO ENTER THE ABOVE-DESCRIBED LOCATION TO INSPECT THE PROPOSED, IN-PROGRESS,OR COMPLETED WORK. I VOLUNTARILY AGREE TO MEET ALL REQUMMENTS OF THIS RGP. I AGREE TO START WORK ONLY AFTER ALL NECESSARY PERMITS HAVE BEEN RECEIVED. CENWS-OD-RG-RGP-6,Revised July ,2007 Page 12 of 12 -'a 0 Signat a of Applicant Date Signature of Authorized Agent Date Signature of Contractor(if Contractor is known) Date CENWS-OD-RG-RGP-6,Revised July 2007 Page 12 of 12 Signat&e of Applicant Date Signature of Authorized Agent Date Signature of Contractor(if Contractor is known) Date t. RECEIVED APPENDIX A MAY 18 2011 Application Form For RGP 6 426 W. CEDAR ST. Version:July 9, 2007 Revised December 21, 2007 Please fully complete this form and attach vicinity,plan and elevation drawings and any other relevant information. Submit the information to:U.S.Army Corps of Engineers,Regulatory Branch,P.O.Box 3755,Seattle,Washington 98124-3755. This application is for residential overwater structures in inland marine waters in Washington State. You may use this application whether or not your project meets all requirements of Regional General Permit 6(RGP 6). However, projects not meeting all requirements must undergo Section 7 Endangered Species Act(ESA)consultation with the National Marine Fisheries Service(NMFS)and U.S.Fish and Wildlife Service(USFWS). Section 7 ESA consultation could require a more conservative design or additional mitigation. Therefore,projects not meeting all requirements should provide a greater amount of mitigation than is required by RGP 6 in order to offset impacts to the aquatic environment. Eligibility for RGP a. Corps reference number: [To be completed by the Corps] b. This application: ® Meets all of the requirements of RGP 6. ❑ Does not meet all of the requirements of RGP 6. This form constitutes an application for an individual permit and a reference biological evaluation in association with NMFS reference: 2003/00214&2006/07415 USFWS reference:04-PI-0803& 1-3-054-0675 1. Applicant's name,address,telephone and fax number,and email: Single or Joint Use: If joint use,you must list the other waterfront property owners:name,address, and telephone number,as co-applicants.You must also provide a joint use agreement(Agreement) signed by all involved property owners;the Agreement must state that each property owner voluntarily agrees to build no overwater structures on their property except for the maintenance or modification of the authorized joint use overwater structure(Note:upon issuance of the permit for the joint use overwater structure,all property owners must record this Agreement on their deeds.) Single 2. Authorized agent's name,address,telephone and fax number,and email: Key Environmental Solutions,LLC. Key McMuny-Owner/Professional Stream and Wildlife Biologist 550 Mill Creek Road Raymond,WA 98577 360-942-3184-Office 360-562-5763-Cell 360-942-0260-Fax key@keyenvironmentalsolutions.com 3. Contractor name,address,telephone and fax number,and email,and point of contact: Undecided at this time 4. Specific location of project area: C EN W S-OD-RG-RGP-6,Revised July 9,2007 Page 2 of 11 Name of Waterway Pickering Passage Street Address 181 Ber eg_son Section 3 Township 20 N Range 2 W Latitude 47.25891 Longitude 122.91355 City/County Mason County (with Shoreline jurisdiction)Washington State Parcel Number 220031290120 Adjacent Property Owners(names and addresses) ROSALYN LEE ET AL JANE LEE 455 RICHMOND RD LA CANADA CA 91000-3536 220031290130 SANDRA J KRAMER 450 E BERGESON RD SHELTON WA 98584 220031290021 5. Description of work and drawings(attach drawings on 8 ''/2-by 11-inch sheets,including a vicinity map,a plan view,and an elevation view;the drawings must include information as detailed on Appendix E — Drawing Checklist). The drawings must clearly show the factors detailed in the project description section of this RGP. If joint use,the location of the other waterfront property(ies)must be shown on a map submitted to the Corps as part of the application. Install an 8'X 8'float in Pickering Passage Endangered Species Act(ESA)Information: Specific Project Information Conservation Measures and Construction Specifications: In order to meet all ESA requirements for authorization under this Regional General Permit(RGP),all applicable Conservation Measures and Construction Specifications summarized below must be implemented. The entire text of the Conservation Measures and Construction Specifications are listed in the RGP document. Check each item that you agree to implement. Check each item"not applicable"if they do not apply to your project. For example,if you will not install piling,check"not applicable"next to the item listing the piling requirements. You must also complete the column on the right with your specific project information. I(WC) I(we) Not Conservation Measure and Construction Specification Specific Project Information Will Will Not Applicable Implement Implement ❑ l.a. Piers: Pier width must not exceed 6 feet. Width of proposed pier: feet ❑ 0 b. Compass orientation of pier and the required%of General compass orientation functional grating,and location of grating on the of pier. pier: General Specific %of Location of Specific Degrees of Compass Degrees Functional Grating on compass orientation of pier Orientation (North= Grating on the Pier based on true north: of Pier and 0) the Pier Pier Width True square feet of North functional grating N/S 338 to 30 Along the 22 length of the 158 to Only if pier for the %functional grating to be 202 width is entire length installed: greater of the pier (attach calculations) than 4 feet NE/SW 23 to 30 Along the NW/SE 157 width of the Orientation of grating on CENWS-OD-RG-RGP-6,Revised July 9,2007 Page 3 of 11 I(We) I(We) Not Conservation Measure and Construction Specification Specific Project Information Will Will Not Applicable Implement Implement And E/W 203 to Only if pier, pier: 337 width is interspersed greater along the than 4 feet entire length of the pier ❑ ❑ ® c. The pier must be linear. New finger piers and"ell" and"T"piers are not authorized ❑ ❑ 2.a. Floats: For a single use residential structure—the Width of proposed float: float width must not exceed 8 feet and the length 8 feet cannot exceed 30 feet. — Length of proposed float: 01 4 feel✓' 30 � ❑ ❑ ® a. Option 1: Float width is 6 feet or less. Functional square feet of grating on at least 30%of surface. functional grating (attach calculations) Percent cover of surface with functional grating: ❑ ❑ ® Option 2: Float width greater than 6 feet(up to 8 square feet of feet). Functional grating on at least 50%of the functional grating surface. (attach calculations) Percent cover of surface with functional grating: ❑ ❑ ® b.For a joint use residential structure—the float width square feet of must not exceed 8 feet and the length cannot exceed functional grating 60 feet. Functional grating must be installed on 50 (attach calculations) percent of the surface area of the float. Percent cover of surface with functional grating: ® ❑ c. The float will be installed in a north-south direction, If float is not installed, to the maximum extent practicable. lengthwise in a north-south direction,please explain why: ❑ d. If the float is seasonally removed,it must be stored at Will float be removed a Corps approved location. seasonally? �Q If yes,where will it be stored? ® ❑ e. The flotation for the float shall be fully enclosed and contained in a shell. ® ❑ ❑ f. The floats cannot rest on the tidal substrate. Stoppers Float stoppers will be CENWS-OD-RG-RGP-6,Revised July 9,2007 Page 4 of 11 I(We) I(We) Not Conservation Measure and Construction Specification Specific Project Information Will Will Not Applicable Implement Implement or float support piling must be used such that the installed such that the bottom of the floatation device is at least 1 (one)foot bottom of the flotation above the level of the substrate. device will be feet above the level of the substrate. ® ❑ ❑ g Floats can be held in place with lines anchored with a Will piling be used: helical screw or"duckbill"anchor,piling,piling with stoppers and/or float support/stub pilings. Will a helical screw anchor will be used: ® ❑ ❑ g. 1) For a single,residential use float,a maximum of 4 How many piling will be piling(not including stub piling)or anchors can be used: installed to hold the float in place. How many anchors will be used: ❑ ❑ ® g.2)For a joint use float system a maximum of 8 piling or How many piling will be anchors can be installed to hold the float in place. used: How many anchors will be used: ® ❑ ❑ g.3)If anchors and anchor lines need to be utilized,the If an anchor will be used, anchor lines shall not rest on the substrate at any describe the method used to time. prevent the line from resting on the substrate: ❑ ❑ ® g.4) In rocky substrates where a helical screw or If a helical screw or "duckbill"anchor cannot be used a Corps approved "duckbill"anchor cannot be anchor of another type may be installed. used,explain why and what type of anchor is proposed: ❑ ❑ h. If the float is positioned perpendicular to the ramp,a Dimensions of small float: small float may be installed to accommodate the movement of the ramp due to tidal fluctuations. The dimensions of the small float cannot exceed 6 feet in width and 10 feet in length. ❑ ❑ ® 3.Ramps and Marine Rails: Will a ramp be installed: if yes,what is the length of the ramp: Will a marine rail be installed: ❑ ❑ ® a. The width of the ramp cannot exceed 4 feet. Width of ramp feet CEN WS-OD-RG-RGP-6,Revised July 9,2007 Page 5 of 11 I(We) I(We) Not Conservation Measure and Construction Specification Specific Project Information Will Will Not Applicable Implement Implement ❑ b. Grating shall cover the entire surface area of the ramp- ❑ ❑ c. A detailed description of the entire marine rail Describe the marine rail system must be included with the application and system: construction measures must be incorporated to ensure that the marine rail is not a barrier for littoral drift. ❑ ❑ ® 4. Grating must have at least 60%open area. Grating Proposed grating has must be oriented to maximize the amount of light penetration and cannot be blocked by any objects %open area above or below the grating. ❑ ❑ ® 5.a. Piling: Replacement or proposed new piling can be Type of material for piling: steel,concrete,plastic or untreated or treated wood. Treated wood pilings associated with the float(s) must incorporate design features(e.g.,plastic or Diameter of piling: metal bands)to minimize abrasion from the contact Type of pile driver(e.g., between the treated wood and the float(s)or vibrato attachments to the float(s). The design features must vibratory): cover the entire portion of the piling in contact with Type of anti-abrasion the float or attachments during all tidal elevations. device: ❑ ❑ ® b. Piling supporting a new pier must be spaced no Number of proposed piling closer than 20 feet apart. supporting the new pier: ❑ ❑ ® c. If the activity is only the replacement of existing Number of existing piling to piling on an existing pier:the piling can be replaced be replaced: in the same general location and must not extend beyond the footprint of the existing structure(e.g., pier). The 20 foot spacing between piling is not required but the number of piling cannot be increased. Existing piling can be partially cut with a new piling secured directly on top,fully extracted,or cut 2-feet below the mudline. If treated piling are fully extracted or cut 2-feet below the mudline,the holes or piling must be capped with appropriate material. Hydraulic water jets cannot be used to remove piling. ❑ ❑ ® d. A maximum of 2(two)moorage piling may be Number of proposed installed to accommodate the moorage of boats mooring piling: exceeding the length of the floats. ❑ ❑ ® e. If an impact hammer pile driver is used to drive or Diameter of steel piling: proof steel piling,a sound attenuation device or inches system must be implemented during pile driving. Steel piling cannot exceed a 12-inch diameter. ❑ ❑ ® 1. Piling with diameter of 10 inches or less—one Type of sound attenuation Corps approved sound attenuation device is device: required CENWS-OD-RG-RGP-6,Revised July 9,2007 Page 6 of I I I(We) I(We) Not Conservation Measure and Construction Specification Specific Project Information Will Will Not Applicable Implement Implement ❑ 2. For piling with a diameter greater than 10 inches, Type of sound attenuation up to 12 inches,two Corps approved sound devices: attenuation devices are required El f. Vibratory or impact pile driving must not be initiated if ESA-listed marine mammals(killer whales or Steller sea lions)are present within 300 feet of the work site. Pile driving must be temporarily suspended if an ESA-listed marine mammal approaches the operation to within 300 feet,and shall only continue once the animal departs to beyond 300 feet. ® ❑ ❑ 6. Treated Wood: No creosote,pentachlorophenol, If treated wood will be used, CCA,or comparably toxic compounds not approved list type of treatment: for marine use,shall be used for any portion of the You must also submit over water structure. ACZA treated wood must meet certification that the wood Post-Treatment Procedures. was treated by the No treated wood shall be used for the decking on the appropriate and approved overwater structure. Treated wood can be used for all Post Treatment Procedures structural elements of the overwater structure. before authorized work can commence. ® ❑ ❑ 7.a. Skirting: New or replacement skirting is not authorized by this RGP. ❑ S.a. The repair,maintenance,or replacement of existing structures,or the construction of new structures, such as,but not limited to,buildings,planters, storage sheds or boxes on the pier,ramp,or float is not authorized by this RGP. Electrical utility boxes can be repaired,maintained or replaced by this RGP. 9. Watercraft Moorage: Describe watercraft(include length and width of the watercraft): ❑ ❑ ® a. Watercraft Moorage: Watercraft cannot rest on the At what water depth would tidal substrate at any time. moored watercraft ground out? MLLW ❑ ❑ ® b. Under this RGP,only one uncovered watercraft grid Number of proposed or lift can be installed at a single use overwater watercraft grid(s): structure and a maximum of two uncovered watercraft Number of proposed water grids or lifts can be installed at a joint use overwater craft lift(s): structure. ❑ ❑ ® c. A maximum of 2 additional piling may be used to Number of proposed piling attach the grid to the piling used for the floats. to attach grid: ❑ ❑ ® d. The bottom of the watercraft grid shall be at least The bottom of the watercraft one foot above the level of the substrate. grid will be feet above the level of the substrate. CENWS-OD-RG-RGP-6,Revised July 9,2007 Page 7 of 11 I(We) I(we) Not Conservation Measure and Construction Specification Specific Project Information Will Will Not Applicable Implement Implement ❑ e. If a floating watercraft lift is installed,the lift cannot rest on the tidal substrate at any time. ❑ 10.a. No eelgrass/macroalgae survey is required for the replacement of decking or a ramp,if the replacement structure is within the same footprint as the original. ❑ ❑ b. For all other activities,the applicant must submit a Attach appropriate survey preliminary/intermediate/intensive results or HPA to this eelgrass/macroalgae survey,as appropriate. application form. ® ❑ c. No overwater structures can be constructed within 25 Distance from proposed feet(horizontally)measured in all directions of overwater structure to macroalgae beds or eelgrass. nearest surveyed macroalgae bed or eelgrass: feet ® ❑ d. No floats or float support piling can be constructed Elevation from float to within a 4-foot depth elevation between the top of the nearest surveyed macroalgae float stopper and macroalgae bed and eelgrass. This bed or eelgrass: feet restriction applies only to a zone 25 feet wide on both sides of the float. ❑ ❑ ® 1 La. Forage Fish Habitat-If piers and ramps need to be constructed over documented surf smelt and/or sand lance spawning habitat,they should span the spawning habitat to the maximum extent practicable. ❑ ❑ ® b. The number of piling in documented sand lance and If piling are placed in surf surf smelt spawning habitat must be minimized. smelt and/or sand lance The diameter of piling in this type of habitat must spawning habitat,explain not be more than 8 inches and the piling cannot be why piling must be located treated wood. in this area and list the number and size of the piling: ® ❑ ❑ c. Floats,float support piling,helical anchors and watercraft grids or lifts cannot be installed in documented Pacific herring,surf smelt and/or sand lance spawning habitat. ❑ ❑ d. No structures can be constructed or installed within a 4-foot depth elevation between the bottom edge of the horizontal surface of the structures and the landward most edge of documented Pacific herring spawning habitat. This restriction applies to a zone 25 feet wide on both sides of the float projecting waterward from the float. ® ❑ ❑ e. Information on the substrate types in the project Describe substrate types area must be submitted as part of the permit and note the elevation(e.g. application. If the Corps determines that there is mud,sand,fine cobble, potential undocumented surf smelt,Pacific herring, large rock;at+5 feet above or sand lance spawning habitat,the Corps may MLLW,etc.) request additional information from the applicant CENWS-OD-RG-RGP-6,Revised July 9,2007 Page 8 of 11 I(we) I(We) Not Conservation Measure and Construction Specification Specific Project Information Will Will Not Applicable Implement Implement and the Corps will consult with the appropriate (attach photographs if resource agencies. Project revisions may be available) required if undocumented surf smelt,Pacific herring,or sand lance spawning habitat is located in the project area. ❑ ❑ 12.a. Work Windows: The required RGP fish work The required RGP fish work window will be met. Note: The RGP fish work window at this project window may be different than the HPA work location is(per Corps' window. For the work to be authorized by this website): RGP,the RGP fish work window must be met. ® ❑ b. If there is documented surf smelt or sand lance Is there documented Surf habitat at the project site and there is no approved Smelt or Sand Lance work window for surf smelt or sand lance at the habitat: project site,prior to construction,the applicant must have a qualified biologist or biologist certified by the Washington Department of Fish and Wildlife(WDFW)confirm,in writing,that no surf smelt or sand lance are spawning in the project area during the proposed project construction. Address the letter or memorandum to the project manager and include the RGP authorization reference number.If the qualified or certified biologist confirms that no surf smelt or sand lance are spawning in the project area,the permittee has 48 hours to begin the work and two weeks from the date of the inspection to complete all work contacting the substrate waterward of mean higher high water. If this confirmation is made,the permittee does not need to wait for approval from the Corps. ® ❑ ❑ c. The required bald eagle work window will be met, The required bald eagle as applicable to the project location. work window at this project General work prohibition times: location will be determined January 1 through August 15(nesting areas) by the Corps November l through March 31 (wintering areas) To be Completed by Corps: Distance to Bald Eagle nest: ❑ ❑ ® 13.a. Work in the Dry: Work that involves the excavation of the substrate,bank,or shore shall occur in the dry whenever practicable. ❑ ❑ ® 14.a. Operation of Equipment: Use of equipment on the beach shall be held to a minimum,confined to a single access point,and limited to a 12-foot work corridor on either side of the proposed work. To the maximum extent practicable,equipment shall be operated from the top of the bank,temporary work platform,barge,or similar out-of-water location. CENWS-OD-RG-RGP-6,Revised July 9,2007 Page 9 of 11 I(We) I(We) Not Conservation Measure and Construction Specification Specific Project Information Will Will Not Applicable Implement Implement ❑ b. Equipment shall be operated in a manner that minimizes suspended particulates from entering the water column. ❑ El 0 c. The required methods to identify problems and maintain and clean equipment will be implemented. ❑ ® d. Barges may not ground on the substrate at any time. ❑ ❑ ® e. Depressions or trenches in beach areas,waterward of MHHW,created by construction equipment, shall be immediately restored to the original pre- project conditions(e.g.,elevation and substrate material type). ❑ ❑ f. Any disturbance of the beach area by construction activities or equipment,which leaves exposed hardpan or clay,shall be restored to the original pre-project conditions(e.g.,elevation and substrate material type)upon the immediate completion of construction and mitigation work. ❑ ❑ ® 15.a. Disturbance of Vegetation: Existing habitat features shall not be removed from the aquatic environment. ❑ ❑ ® b. Disturbance of bank vegetation shall be limited to a If bank vegetation will be work area strip no wider than twice the width of the disturbed,what is the width pier. There is no length requirement. of the disturbance area: feet ❑ ❑ ® c. Removal of woody bank vegetation with a DBH of If woody bank vegetation 4-inches or greater within the work area strip must with a DBH of 4-inches or receive prior approval from the Corps. And greater is planned to be removed trees,to the maximum extent practicable, removed,explain why it must be placed on the beach onsite and anchored needs to be removed and securely in place.If removed trees will not be describe where the cut placed on the beach,the applicant must explain woody vegetation will be why this is not practicable. placed: (attach photographs) ❑ ❑ ® d. Disturbed bank vegetation shall be replaced with If bank vegetation will be equivalent native species appropriate for the site. disturbed,list the species A planting plan must be provided. Plantings must name of the replacement be installed at the appropriate time of the year for vegetation: the selected species and within one year of project construction. ❑ ❑ ® Mitigation. Required number of CENWS-OD-RG-RGP-6,Revised July 9,2007 Page 10 of I I 1(We) I(we) Not Conservation Measure and Construction Specification Specific Project Information Will Will Not Applicable Implement Implement Mitigation Points(see Table 2):(show your calculations) List selected Mitigation Measure Options(s)(see Table 1): Is the mitigation offite/offsite? If offsite, provide a justification: If mitigation is not an option offite or offsite,provide a justification: Mitigation Timing: The selected and approved mitigation measures,except plantings,must be completed within 6 months from the date of construction of the approved overwater structure. Plantings will occur during the appropriate time of year for the selected species and within one year of project construction. ❑ ❑ ® Mitigation Plantings: The authorized species,number If plantings are proposed, of plants,and correct spacing of plants will be utilized. attach planting plan. ❑ ❑ ® Mitigation Planting Performance Standards: The required performance standards will be met for the 5- year monitoring period. ❑ ❑ ® Mitigation Reports: A report on mitigation completion or a status report on the project and mitigation, including as-built drawings,must be submitted to the Corps within 12 months from the date the Corps issues an RGP to the permittee. If plantings are implemented:Mitigation planting monitoring reports will be due annually for 5 years from the date the Corps accepts the as-built drawings. ® ❑ ❑ All General Conditions will be met. ® ❑ ❑ A copy of this permit,permit drawings,mitigation planting plan(if applicable),and final authorization letter shall be recorded with the Registrar of Deeds,within 60 days after final Corps authorization,to ensure that subsequent property owners are aware of the construction, use,and mitigation requirements. Proof of this must be provided to the Corps within 65 days after the date of the 'R P verification letter to the rmittee. If the Corps G e pe ier is joint use,all co-applicants must voluntarily agree i CENWS-OD-RG-RGP-6, Revised July 9,2007 Page 11 of 11 I(We) I(We) Not Conservation Measure and Construction Specification Specific Project Information Will Will Not Applicable Implement Implement to build no additional overwater structures on their property,except for the maintenance or modification of the proposed joint use overwater structure. This voluntary agreement and the documentation described above must be recorded on the deeds of all involved properties. (General Condition 3) If the applicant has checked"Will Not Implement"for any of the above items, then the following items must be completed by the applicant: ❑ You must attach a completed Coastal Zone Management form.Note: This form can be found on the Corps'web page:www.nws.usace.army.mil Select Regulatory—Regulatory/Permits—Forms. ❑ Explain why you cannot meet all of the above items: ❑ Based on the existing environmental conditions and the proposed work,the applicant is proposing additional mitigation(beyond the Mitigation requirements)as described below: APPLICATION 1S HEREBY MADE FOR A PERMIT OR PERMITS TO AUTHORIZE THE ACTIVITIES DESCRIBED HEREIN. I CERTIFY THAT I AM FAMILIAR WITH THE INFORMATION CONTAINED IN THIS APPLICATION,AND THAT TO THE BEST OF MY KNOWLEDGE AND BELIEF,SUCH INFORMATION IS TRUE,COMPLETE,AND ACCURATE. I FURTHER CERTIFY THAT I POSSESS THE AUTHORITY TO UNDERTAKE THE PROPOSED ACTIVITIES. I HEREBY GRANT TO THE AGENCIES TO WHICH THIS APPLICATION IS MADE,THE RIGHT TO ENTER THE ABOVE-DESCRIBED LOCATION TO INSPECT THE PROPOSED,IN-PROGRESS,OR COMPLETED WORK. I VOLUNTARILY AGREE TO MEET ALL REQUIREMENTS OF THIS RGP. I AGREE TO START WORK ONLY AFTER ALL NECESSARY PERMITS HAVE BEEN RECEIVED. Signa a of Applicant Date 1'y q 1,9 s- I 1 Si Authorized Agent Date Signature of Contractor(if Contractor is known) Date L - 7�!1/2010' Untitled Document Mason County Map t L t E BERGESON RD ffi h �1 it z i .t^ �► y DISCLAIMER AND LIMITATION OF LIABILITY: The data used to make this map have been tested for accuracy, and every efFort has been made to ensure that these data are timely, accurate and reliable. However, Mason r County makes no guarantee or warranty to its accuracy as tolabeling, dimensions, or placement or location of any map features contained herein. The boundaries depicted by these LEGEND data are approximate, and are not necessarily accurate to F Is F:-IjKl, 1,Mill surveying or engineering standards, and are intended for H,g-,an Ckr�of shettcn informational purposes only. Mason County does not assume R,vers'q rl .o:rt y E- ur-iary rt any legal liability or responsibility arising from the use ofthis FL«Wts vmrnsstn;rr E,StnO map in a manner not intended by Mason County. In no event �ectinns shall Mason County be liable for direct, indirect, incidental, r i-llys?'ini alr,f.Mal", ! n. 1/2