HomeMy WebLinkAboutHabitat Management Plan - HMP Habitat Managment Plan - 4/30/2006 Lee Boad Habitat Management Planning and Wetland Services
Wedand Delineation•Habitat Management Plans• Riparian Restoration•Mitigation•Biological Evaluation
ROCK WALL CONSTRUCTION PROJECT
HABITAT MANAGEMENT PLAN
4710 SR 302 E
Belfair,WA 98528
Parcel: 12228-244*020
Mason County
Prepared for:
Jim Yates
2908 N.Vista View Dr.
Tacoma,WA 98407-1027
Prepared by:
Lee Boad
April,2006
TABLE OF CONTENTS
INTRODUCTION........................................................................Error!Bookmark not defined.
PROJECTDESCRIPTION.........................................................................................................I
PROPERTYDESCRIPTION......................................................................................................I
APPLICABLESETBACKS........................................................................................................3
SPECIESINFORMATION.............................................................................................................................3
POTENTIAL DEVELOPMENT IMPACTS............................................................................4
MITIGATION MEASURES.......................................................................................................5
MONITORNG............................................................................................................6
CONCLUSION.............................................................................................................................7
Appendices
Appendix A:Vicinity Map
Appendix B: Site Map
Appendix C. WDFW Priority Species Map
Appendix D. National Wedand Inventory Map
Lee Boad Habitat Management Planning and Wetland Services
WIT-
Wetland Delineation•Habitat Management Plans-Riparian Restoration•Mitigation•Biological Evaluation
LBHMPWS243
Page 1 of 11
1.0 Introduction
At the request of Jim Yates a Habitat Management Plan has been prepared for a proposal to construct a
retaining wall adjacent to the marine shoreline associated with parcel 12228-24-OW20 in Mason County,
Washington. Approximately 125-feet of rock wall will be constructed adjacent to the shoreline of Case
Inlet.
Project mitigation includes the application of Best Management Practices(BMP's)and shoreline
restoration. BMP's will consist of common measures necessary to avoid unnecessary erosion,
contamination,and siltation of waters during construction. Shoreline restoration will include removal of
a rockery located within the intertidal area.
The site is mapped in Section 28 of Township 22 North,Range 1 West. All field work and reporting
associated with this report has been conducted by Lee Boad. All observations relate to the above
mentioned project site unless otherwise stated.
i
2.0 Project Description
The majority of the proposed rock wall will be located just landward of the existing Ordinary High
Water Mark(OHWM)where the face of an eroding bank currently exists. The wall will parallel the
shoreline with the exception of two voids. One will be left open to maintain foot access while the other
will be left to maintain existing boat launch access. The wall will be 4-feet high at the northern most
point and taper gradually to just less than two feet at the southern point. No filling or grading is
proposed.
Avoidance mitigation includes positioning a portion of the wall landward approximately 15 feet from the
(OHWM)to preserve a gradual upland/tideland transition area. Compensatory mitigation includes the
removal of a remnant man-made rockery located within the intertidal area of the southern portion of the
property. Removing such a feature is intended to restore shoreline function. Additional mitigation
includes the planting of overstory trees and the incorporation of Large Woody Debris into the wall.
3.0 Property Description
The site is approximately Yz an acre of open grass bordered to the west by the Case Inlet shoreline. The
State Route 302 corridor represents the eastern boundary while similar sized private ownerships are
adjacent to the north and south. The site is encompassed by open lawn and includes a 2,600 square foot
house. The area is zoned R-5 while the shoreline is designated as Type 1 Conservancy. Landscape
topography slopes downward towards a 3-4-foot vertical drop adjacent to the shoreline The OHWM is
located at the toe of the eroding bank. The intertidal area is predominately rocky shoreline with minimal
salt tolerant vegetation and mudflat area.
I
PO Box 2854 Belfair,Washington 98528•Cell Phone 360-620-0619.Office Phone 360-372-2421•boad4o®peoplepc.com
Habitat Management Plan
Mason County,Washington
LBHMPWS243
Page 2 of 11
..y r
i
ao m I
Figure 1. The intertidal area associated with the property is predominately rocky shoreline.
i -
zw
Figure 2. The rock wall will be located landward of the existing OHWM against the eroding bank.
PO Bo
x 2854 Belfair,WA 98528 cell:360-620-0618,Office:360-372-2421 e-mail:boad4O@peoplepc.com k .com
Habitat Management Plan
Mason County,Washington
LBHMPWS243
Page 3 of 11
4.0 Applicable Setbacks
This project site is within the jurisdiction of Mason County. The applicable FWHCA setback for this
project is as follows:
Habitat Type Buffer Building Setback
Type 1 Conservancy Shoreline 100, 15,
5.0 Species Information
The following descriptions relate to federally listed species with potential relevancy to the project area
Puget Sound Chinook(Oncorhynchus is tsha)-Threatened
Listed as threatened since March 24, 1999,adult Puget Sound Chinook spawn in several rivers and
streams flowing into Puget Sound. No significant spawning areas exist in proximity to the project site.
The portion of the property most significant to Chinook is the nearshore area as it represents migration
and foraging habitat. Chinook have been documented in both Coulter Creek and Sherwood Creek.
These fish are assumed to be of hatchery origin and not managed as a wild stock by state or tribal
fisheries managers. No modifications to the shoreline are proposed that would cause any loss in
shoreline habitat.
Surf Smelt(Hypomesus pretiosus)
Surf smelt spawn year round on high intertidal beaches of sand and gravel. Juvenile surf smelt rear in
nearshore areas while feeding on plankton. Surf smelt are the food source for a variety of other marine
species such as Chinook salmon. The renewal of fine beach sediments is important to surf smelt habitat.
The Washington Administrative Code Hydraulic Code Rules now include consideration of surf smelt
habitat in the permitting of in-water construction activities,which this proposal is not.Identified surf
smelt spawning sites have been given"no net loss"protection. Construction of bulkheads and other
such shoreline armoring can bury spawning habitat,increase erosion at the base of the bulkhead,and
prevent the renewal of fine beach sediments.
As this project is located landward of Ordinary high Water,no loss in habitat will occur. Shifting a
portion of the wall landward to protect an upland/tideland transition area is recommended to maintain
renewal of fine sediments to the beach.
Bull Trout(Salvelinus confluentis)-Threatened
The Coastal-Puget Sound distinct population segment(DPS)of bull trout is the only anadromous(utilize
fresh and marine habitats)population of bull trout within the continental United States.Bull trout within
this DPS rear in natal streams and then migrate to the saltwater environment to mature.Bull trout require
clean cold water associated with mountain streams and need an unobstructed passage both upstream and
downstream.These habitat requirements have made the bull trout very susceptible to habitat change and
degradation. Bull Trout are not documented in proximity to the project site. Given that Bull Trout are
not present,no impacts to Bull Trout are predicted to result from this project.
Bald Eagle(Haliaeetus leucocephalus)-Threatened
PO Box 2854,Belfair,WA 98528 cefl:360-620-0619,Office:360-372-2421 a-mail:boad40Qpeoplepc.com
Habitat Management Plan
Mason County,Washington
LBHMPWS243
Page 4 of 11
Habitat areas associated with Bald Eagle include uneven aged coniferous stands with some old-growth
components. Nests are typically constructed in larger trees with dead or broken tops providing an
unobstructed view of nearby water. Snags and trees with exposed lateral limbs,or dead tops are used as
perches and defense stations. The northern portion of Case Inlet as well as the Sherwood Creek
watershed support important nesting and roosting habitat due to proximity to marine foraging areas and
presence of intact forested habitat. The project site is of sufficient distance from these areas to avoid any
impact to Bald Eagle associated with construction activities. One large Douglas fir will be removed.
This tree supports potential roosting habitat but has been eroded to the point where it will not survive or
stand for much longer. Planting of overstory tree species is recommended to mitigate for removal of the
large Douglas fir.
Marbled Murrelet(BrachvraWhus marmoratus)-Threatened
Marbled Murrelets are typically associated with coastal habitats and nest in old-growth forests.
Murrelets may fly as far as 50 miles inland to nest,however the average distance is roughly 5-miles from
nest to sea. It is only during the summer breeding months that they are commonly found inland. During
non-nesting seasons they live at sea. Murrelets require tall mossy trees in coniferous old growth forests
with thick branches where they can construct a cup nest 20-40 meters above the forest floor.
Muneletts have been documented laying eggs on rocky ground habitats only when a sufficient forest is
unavailable.
There are no documented nesting sites in vicinity to the project site. No potential nesting sites occur
within the project area. Given the lack of use of the site and no proposed removal of habitat suitable for
nesting,this project will have no adverse impact on Marbled Murrelet.
Northern Spotted Owl(Stria occidentalis caurina)-Threatened
Spotted owls require a large amount of land for their nesting and hunting grounds;pairs may occupy up
to 58 sq.km. They are territorial and do not migrate,but they may shift their ranges slightly in response
to seasonal changes
Suitable spotted owl habitat includes trees relatively large in diameter in the stand,multi-layered forest
canopy with a moderate to high canopy closure in overstory,midstory,and understory,large,tall,live
trees with cavities,broken tops,mistletoe,or platforms of branches capable of holding accumulated
organic matter suitable for use as a nest. Dead standing trees and fallen decayed trees supporting
abundant populations of prey species are critical to spotted owl populations. The open lawn and high
level of human activity associated with this site are not representative of potential habitat for spotted owl
and none are documented within or in proximity to the site. No impacts to spotted owl or their habitats
are predicted to result from this project.
6.0 Potential Project Impacts
Vegetation Disturbance
One overstory Douglas fir will be removed. The area around the tree has eroded to the point where the
tree will not survive under the current natural circumstances. It is recommended that the tree be
segmented into manageable logs and anchored to the rock wall to provide LWD habitat along the
shoreline.
PO Box 2854,Belfair,WA 98528 cell:360-620-0618,Office:360-372-2421 e-mail:boad40@peoplepc.com
Habitat Management Plan
Mason County,Washington
LBHMPWS243
Page 5 of 11
Noise Pollution
An increase in noise from construction activities is anticipated during daylight construction hours. The
project site is not within the radii of concern for any listed species that may be affected by increased
noise from construction.No impacts from noise are expected to occur.
Temporary Increase in Sediment and Turbidity
The proposed work has potential to temporarily increase turbidity and suspended sediment within the
project area.Best Management Practices and tactical construction timing are recommended to minimize
this impact.
7.0 Mitigation Measures
7.1 Recommended Best Management Practices
Best Management Practices for this project are as follows:
• Perform work during dry weather.
• Install silt fencing down slope of the work area to prevent erosion and siltation of waters.
• Any work recommended within the intertidal zone should be done at low tide.
• Minimize amount of erodible soils at any given time to the maximum extent feasible.
• Check all equipment daily for leaks. Refueling and lubrication of equipment should occur off
site. Do not store any fuel,lubricants,chemicals,or hazardous substances outside overnight
within the project area.
• Do not apply any chemicals when there is a possibility of rain.
7.2 Removal Remnant Rock Wall
The existing rock wall located
within the intertidal area should
be removed to restore natural
shoreline processes. Although
this particular feature individually may seem of insignificant impact
to the shoreline,it is one of many 0
shoreline modifications that `may
collectively play a significant - . .
impact to the nearshore t
environment. Observed impacts
of shoreline modification
associated with this site is :Y '
primarily the hindrance of _
sediment movement. Such
conditions have resulted in a
buildup of material on one side of
the wall and depletion on the
opposite side.
PO Box 2954,Belfair,WA 98528 ce11:360-620-0618,Office:360-372-2421 e-mail:boad4O@peoplepc.com
Habitat Management Plan
Mason County,Washington
LBHMPWS243
Page 6 of 11
73 Preservation of upland/tideland transition area
The southern most portion of the shoreline area associated with the property consists of a more gradual
gently sloped upland/tideland transition area. The rock wall will be tapered down and shifted east of this
area to preserve sediment recruitment and natural landscape.
1
fi
Figure 3.Gradual uplond/tideland transition area to be preserved
Within the upland tideland transition area,it is recommended that natural plant succession be allowed to
transpire in place of any supplemental planting. Invasive species such as Himalayan blackberry,reed
canary grass,Japanese knotweed,and English Ivy may invade this area These species are stubborn
competitors for light and nutrients and limit success of native plants. Invasive species should be
removed from this area should they invade.
7.4 Compensation for Overstory Tree Removal
It is recommended that 6-Douglas fir be planted within the upland area landward of the rock wall. The
trees should be planted within 25 feet of the shoreline at spacings no less than 10-feet between each tree.
The trees should be flagged for maintenance and monitoring. The optimum time for planting is during
winter months.
7.5 Incorporation of Woody Debris(LWD)in Rock Wall Design
It is recommended that the rock wall be designed to include the use of anchored LWD. This can be done
using the large Douglas fir and root wad that will be removed. Each log would be anchored to a buried
concrete block measuring 2'x 2'x 6'(commonly termed"ecology blocks")with a steel eye for chain
connection- Chains will be galvanized lashing chains.
Existing driftwood located along the toe of the bank can be placed at the toe of the wall once the project
is complete. It is not recommended that the natural driftwood be anchored to the wall.
PO Box 2854,Belfair,WA 98528 cell:360-620-0618,Office:360-372-2421 e-mail:boad40@peoplepc.com
Habitat Management Plan
Mason County,Washington
LBHMPWS243
Page 7 of 11
8.0 Monitoring
Monitoring of the site may be required as a condition of permit approval. If so,monitoring will begin
the first fall following project completion and maintained on an annual basis for three years. The
information gathered will provide the following: 1)condition of the shoreline area restored and planted
trees;2)the use of the site by wildlife species;3)any unforeseen effect on the shoreline caused by the
project;4)any occurrence of exotic species within the upland/tideland transition area;5)any corrective
measures that may be deemed necessary to provide desired conditions. This monitoring will be in effect
for the duration of three years. The information gathered will be provided in an annual report and
submitted to the Director of Mason County Department of Community Development.
9.0 Conclusion
The project consists of constructing a rock wall necessary to prevent further erosion of an existing
upland area adjacent to the Case Inlet shoreline. The site is currently maintained as an open lawn area
used for private residential activity. Best Management Practices are recommended to insure no negative
impacts to aquatic habitat associated with construction activities. Avoidance mitigation includes shifting
a portion of the wall to preserve a gradual upland/tideland transition area. Compensatory mitigation
includes the removal of an existing intertidal rockery which will allow natural processes to restore
sediment movement along the shoreline. No impacts to water quality,shoreline habitat,or the use of the
site by listed species are predicted to result from this project.
Mitigation Measures,Restoration Measures,and Best Management Practices have been identified to
avoid and compensate for impacts associated with the proposed construction. A site map in Appendix B
shows locations of project components in relation to property lines.
I trust this information is sufficient for your needs at this time. Thank you for choosing Lee Boad
Habitat Management Planning and Wetland Services as your environmental consultant.
Lee Boad
Senior Ecologist
Attached: Appendix A:Site Map
Appendix B:Site Vicinity Map
Appendix C:WDFW Priority Habitat and Species Map
Appendix D:National Wetlands Inventory Map
PO Box 2854,Belfair,WA 98528 cell:360-620-0618,Office:360-372-2421 e-mail:boad40Qpeoplepc.com
APPENDIX A: VICINITY MAP
.� ) Beefs
aT ) I }
i f i
} l
} r
�. Site location
ids } 1
1 t }
} � � Ally 1
WashogtM
i
} Case Inlet Vaughr ' -
;
Fox Isla
�r Gra�rviauv�
} 1
U..cenlar.47'22' ,122W W
Lee Road Habitat Management Planning and Wetland Services Appendix A• Vicinity Map
Wetland Delineation • Habitat Management Plans• Riparian Restoration• - -
Mitigation•Biological Evaluation Project Name: Retaining Wall
Location: Case Inlet
Project: LBHMWS171
Client: Murphy
Date: 4/06
PO Box 2854 Belfair.Washington 98528•Cell Phone 360-620-0618.Office Phone 360-372-2421•boad40na.oeooleoc.com
Lee Poad Habitat Maweement Plarnyard Weiland 5ervice5 Appendix D
Client,Jim Yates - — 5►te map
f arcel#12228240O02O
4110 5P 302 E
Delfair,WA 98528
State Pake 302 East
149, L
xzle:1"-!50'-O"
Exi9tlnq Hare
192' 156'
Open Death Access
track 5tep5
Fropmd kock Wall ,-,��
(approx.125') DOW Upland fidlad fralsitlon
DOj to 6c Preserved
ExistN Extent of Ordinary Nita Water 0
Artificially Caistru cl 0
P.ockery to be P-- w 0
Habitat Management Plan
Mason County,Washington
LBHMPWS243
Page 10 of 11
APPENDIX C: WDFW PRIORITY HABITAT AND SPECIES MAP
.41
sr
-f T
vicinity
r •
Lee Boad Habitat Management Planning and Wetland Services Appendix C: PHS Map
Wetland Delineation • Habitat Management Plans • Riparian Restoration
Mitigation • Biological Evaluation Project Name: Retaining Wall
Location: Case Inlet
Project: LBHMWS171
Client: Murphy
Date: 4/06
PO Box 2854.Belfair.WA 98528 ce11:360-620-0618.Office:360-372-2421 e-mail:twad40na oeonlece.com
Habitat Management Plan
Mason County,Washington
LBHMPWS243
Page 11 of 11
Appendix D: National Wetland Inventory
F:[xa. M. III
Puim" EZ
lUiy
,a
u�sr4
r PEAK
�02
/PUSH P f2f
let
W" r.. '22- '.N,422'48 57'W
[E] Estuarine - The Estuarine System describes deepwater tidal
habitats and adjacent tidal wetlands with low energy and variable
salinity, influenced and often semi-enclosed by land.
(2) Intertidal - This is defined as the area from extreme low water to
extreme high water and associated splash zone.
[US] Unconsolidated Shore - Includes all wetland habitats having three
characteristics: (1) unconsolidated substrates with less than 75%
areal cover of stones, boulders, or bedrock; (2) less than 30% areal
cover of vegetation other than pioneering plants; and 3) any of the
following water regimes: irregularly exposed, regularly
flooded,irregularly flooded, seasonally flooded, temporarily flooded,
intermittently flooded, saturated, seasonal-tidal, temporary-tidal,or
artificially flooded. Intermittent or intertidal channels of the
Riverine System or intertidal channels of the Estuarine System are
classified as Streambed. Landforms such as beaches, bars, and flats
are included in the Unconsolidated Shore class.
[N] Regularly Flooded - Tidal water alternately floods and exposes
land surface at least once daily.
PO Box 2854.Belfair_WA 98528 cW360-620-0618.ntfice:360-372-2421 a-mail:boad40naoeookoc.com