Loading...
HomeMy WebLinkAboutMIS96-0121 Mobile Home Storage - BLD Application - 3/11/1996 MASON COUNTY / J Mason County Bldg. III 426 W. Cedar N P.O. Box 186 Shelton, Washington 98584 M I C C- L._ t— ^N FF C1t lJ'Sl 1:'" rm R IKA 1 ` - FOR INSPECTIONS CALL 427 -9670 M I S96-0121 PARCEL : 123.'3151001 30 PE.AT :BE PLO DIVT BLK : LOT : 130 JOB ADDR>=SS : NE 1070 LARSON BLVD BELT`A I R APPLICANT , MARLE 2.75--4452 OWNER : MARLE AV I S 2.75-445 pERMI? LEGAL : BEA#$$ COVE BIV 1 BLK: I.OT: t341 NULL & VO1Q By EXPIRp� PROJECT E>E SCR I P1 1 ON r DATE By MOBILE HOME STORAGE/CONDITIONAL INSTALLATION PROJECT I.00ATIONs NORTH SHORE RIGHT TO :ANDH 11..I. 10 [,ARSON BL.VD RIGHT SIDE 1070 MARKED AT WT PROJECT NOTE S : 'TYPE AMOUNT BY DATE RECEIPT STI+E: * 4 .50 TIN 03/ 1 1 19E 41427 mIiSO $ 15 ,00 TIN 03/ 1 1 /96 41427 TOTAL, : 19 .50 OWNER OR`-AGFkT DATE " II I S_11111, rev, 84 i 11-92 COMPLIANCE TO ATTACHES' CONDITIONS IS REOU I RED CONCRETE MECHANICAL MOBILE HOME Footings-Setback date by Ribbons date by Gas Piping date b Foundation Walls date by Set Up date by INSULATION date by BG/SLAB Insulation Floors Final date by date by date by FRAMING Walls FIRE DEPT. date by date by date by PLUMBING OTHER Groundwork Attic date by date by D.W.V. WALLBOARD NAILING date by date by Water Line FINAL INSPECTION date by date by date by MASON COUNTY Mason County Bldg. 111 426 W. Cedar P.O, Box 186 Shelton, Washington 98584 R M I r C" 4D N 11"I I _r I C1 N Case No . t MIS96-0121 Fort MARLEN DAVIS Pages I 1 � .6,7proved per dimensions and setbacks on submitted site--plan. 2 ) Proposed structure or any portion -thereof greater than 30" In height from grade line, t maintain a minimum of 5 ' setback from all property lines , easements and right of y 13 • A, 3 ) This permit Is being Issued to the applicant to allow the moving of this, mobile home onto his/her private property to perform the necessary corrections to this unit to bring It into oompliance with HUD Standards , and get. the unit recertified by the State of Washington Department of Labor and Industries . This ern it Is not to be occupied . No utilities are to be nonnected to the unit . No permanent got up is to begin . This permit is valid for sixty (60) days only . No extensions will be granted . Any violation of the conditions of this permit or the denial of a permanent installation permit will result In the determination that the unit must be removed from the property at the expense of the owner , CONCRETE MECHANICAL MOBILE HOME Footings-Setback date by Ribbons date by Gas Piping date b Foundation Walls date by Set Up date by INSULATION date by BG/SLAB Insulation Floors Final date by date by date by FRAMING Walls FIRE DEPT. date by date by date by PLUMBING OTHER Groundwork Attic date by date by D.W.V. WALLBOARD NAILING date by date by Water Line FINAL INSPECTION date by date by date by MASON COUNTY Mason County Bldg. 111 426 W. Cedar P.O. Box 186 Shelton, Washington 98584 4 ) PURSUANT TO 1991 UNIFORM BUILDING CODF ., " ECTION 305(C) AND SECTION 513 , ALL, SITFS MUST HAVE: APPROVED N(104BERS OR ADDRESSES PROVIDED IN SUCH A POSITION AS TO BE PLAINLY VISIBLE AND I. FCC IBLE FROM THE STRFFT OR ROAD FRONTING THE PROPFRTY . MASON COUNTY Bull- DING DEPARTMENT REQUIRES THAT THIS BE COMPLETED PRIOR TO CALLING FOR ANY SITE INSPECTIONS . A REINSPECTION FFF , BASED ON RATES IN TABLE 3A OF THE 1991 UNIFORM RUIiDING CODE WIIL BE ASSESSED IF OWNER/CONTRACTOR FAILS TO POST ADDRESS ON SITE PRIOR TO REQUESTING; INSPFCTIONS - 5) ALL CONSTRUCTION MUST MEET OR EXCEED ALL LOCAL CODES AND UBC REQUIREMENTS 6) Proposed structure or any portion thereof greater than 30" in height from grade 10)e, must maintain a minimum of 6 ' setback from all property lines , easements and right of ways . 7) Proposed structure or portions thereof with an projection over 30" in height from grade line, must maintain a 5 ' separation distOnfe between adjacent structures and that furthest projeotion . 8 ) CONSTRUCTION PROCESS TO BE FIELD CORRECTED A.$r- REQUIRED Pfn MASON COUNTY BUILDING DEPARTMENT AND ON I FORM BUILDING CODE 9) Maintain 15 foot set-back between Mobile Home and any and all structures . CONCRETE MECHANICAL MOBILE HOME Footings-Setback date by Ribbons date by Gas Piping date b Foundation Walls date by Set Up sate by INSULATION date by BG/SLAB Insulation Floors Final date FRAMING by date by date by Walls FIRE DEPT. date by date by date by PLUMBING OTHER Groundwork Attic date by date by D.W.V. WALLBOARD NAILING date by date by Water Line FINAL INSPECTION date by date by date by