HomeMy WebLinkAboutMIS96-0121 Mobile Home Storage - BLD Application - 3/11/1996 MASON COUNTY
/ J
Mason County Bldg. III 426 W. Cedar N
P.O. Box 186 Shelton, Washington 98584
M I C C- L._ t— ^N FF C1t lJ'Sl 1:'" rm R IKA 1 ` - FOR INSPECTIONS CALL 427 -9670
M I S96-0121 PARCEL : 123.'3151001 30 PE.AT :BE PLO DIVT BLK : LOT : 130
JOB ADDR>=SS : NE 1070 LARSON BLVD BELT`A I R
APPLICANT , MARLE 2.75--4452
OWNER : MARLE AV I S 2.75-445 pERMI?
LEGAL : BEA#$$ COVE BIV 1 BLK: I.OT: t341 NULL & VO1Q By EXPIRp�
PROJECT E>E SCR I P1 1 ON r DATE By
MOBILE HOME STORAGE/CONDITIONAL INSTALLATION
PROJECT I.00ATIONs
NORTH SHORE RIGHT TO :ANDH 11..I. 10 [,ARSON BL.VD RIGHT SIDE 1070 MARKED AT WT
PROJECT NOTE S :
'TYPE AMOUNT BY DATE RECEIPT
STI+E: * 4 .50 TIN 03/ 1 1 19E 41427
mIiSO $ 15 ,00 TIN 03/ 1 1 /96 41427
TOTAL, : 19 .50 OWNER OR`-AGFkT DATE "
II I S_11111, rev, 84 i 11-92 COMPLIANCE TO ATTACHES' CONDITIONS IS
REOU I RED
CONCRETE MECHANICAL MOBILE HOME
Footings-Setback date by Ribbons
date by Gas Piping date b
Foundation Walls date by Set Up
date by INSULATION date by
BG/SLAB Insulation Floors Final
date by date by date by
FRAMING Walls FIRE DEPT.
date by date by date by
PLUMBING OTHER
Groundwork Attic
date by date by
D.W.V. WALLBOARD NAILING
date by date by
Water Line FINAL INSPECTION
date by date by date by
MASON COUNTY
Mason County Bldg. 111 426 W. Cedar
P.O, Box 186 Shelton, Washington 98584
R M I r C" 4D N 11"I I _r I C1 N
Case No . t MIS96-0121
Fort MARLEN DAVIS
Pages I
1 � .6,7proved per dimensions and setbacks on submitted site--plan.
2 ) Proposed structure or any portion -thereof greater than 30" In height from grade line,
t maintain a minimum of 5 ' setback from all property lines , easements and right of
y 13 •
A,
3 ) This permit Is being Issued to the applicant to allow the moving of this, mobile home
onto his/her private property to perform the necessary corrections to this unit to bring
It into oompliance with HUD Standards , and get. the unit recertified by the State of
Washington Department of Labor and Industries . This ern it Is not to be occupied . No
utilities are to be nonnected to the unit . No permanent got up is to begin . This
permit is valid for sixty (60) days only . No extensions will be granted . Any violation
of the conditions of this permit or the denial of a permanent installation permit will
result In the determination that the unit must be removed from the property at the
expense of the owner ,
CONCRETE MECHANICAL MOBILE HOME
Footings-Setback date by Ribbons
date by Gas Piping date b
Foundation Walls date by Set Up
date by INSULATION date by
BG/SLAB Insulation Floors Final
date by date by date by
FRAMING Walls FIRE DEPT.
date by date by date by
PLUMBING OTHER
Groundwork Attic
date by date by
D.W.V. WALLBOARD NAILING
date by date by
Water Line FINAL INSPECTION
date by date by date by
MASON COUNTY
Mason County Bldg. 111 426 W. Cedar
P.O. Box 186 Shelton, Washington 98584
4 ) PURSUANT TO 1991 UNIFORM BUILDING CODF ., " ECTION 305(C) AND SECTION 513 , ALL, SITFS MUST
HAVE: APPROVED N(104BERS OR ADDRESSES PROVIDED IN SUCH A POSITION AS TO BE PLAINLY VISIBLE
AND I. FCC IBLE FROM THE STRFFT OR ROAD FRONTING THE PROPFRTY . MASON COUNTY Bull- DING
DEPARTMENT REQUIRES THAT THIS BE COMPLETED PRIOR TO CALLING FOR ANY SITE INSPECTIONS . A
REINSPECTION FFF , BASED ON RATES IN TABLE 3A OF THE 1991 UNIFORM RUIiDING CODE WIIL BE
ASSESSED IF OWNER/CONTRACTOR FAILS TO POST ADDRESS ON SITE PRIOR TO REQUESTING;
INSPFCTIONS -
5) ALL CONSTRUCTION MUST MEET OR EXCEED ALL LOCAL CODES AND UBC
REQUIREMENTS
6) Proposed structure or any portion thereof greater than 30" in height from grade 10)e,
must maintain a minimum of 6 ' setback from all property lines , easements and right of
ways .
7) Proposed structure or portions thereof with an projection over 30" in height from grade
line, must maintain a 5 ' separation distOnfe between adjacent structures and that
furthest projeotion .
8 ) CONSTRUCTION PROCESS TO BE FIELD CORRECTED A.$r- REQUIRED Pfn MASON COUNTY BUILDING
DEPARTMENT AND ON I FORM BUILDING CODE
9) Maintain 15 foot set-back between Mobile Home and any and all structures .
CONCRETE MECHANICAL MOBILE HOME
Footings-Setback date by Ribbons
date by Gas Piping date b
Foundation Walls date by Set Up
sate by INSULATION date by
BG/SLAB Insulation Floors Final
date FRAMING by date by date by
Walls FIRE DEPT.
date by date by date by
PLUMBING OTHER
Groundwork Attic
date by date by
D.W.V. WALLBOARD NAILING
date by date by
Water Line FINAL INSPECTION
date by date by date by