Loading...
HomeMy WebLinkAboutMIS99-0658 Reroof - BLD Permit / Conditions - 10/7/1999 MASON COUNTY Mason County Bldg. III 426 W. Cedar P.O. Box 186 Shelton, Washington 98584 M i lr E L. L_. A N E Ca CJ 'S P E R M I T' FOR I NSPf t; 1' I ON:, -ALL. 42,1 9670 MIS99--06.58 PARCEL - 123315100120 PLAT :BEPLrO DIV : BLK : LOT : 120 JOB ADDRESS : 1280 NE L.ARSON BL.VD BELFA I R APPLICANT : JEFF BISHOP 275-5725 OWNER : JEFF BISHOP 275-5725 LEGAL : BEARDS CAVE DIY 8 BLI(t LOT: 121 PROJECT DESCRIPTION : RFMOVF EXISTING ROOFING AND REPLACE PROJECT LOCATION : �A !�EXP`��Tfj� 1280 NE LARSON BL.VD . SANDH 1 LL TO L.ARSON BLVD . CORNER OF L_ARSON BLVD. AND CUTLAS r 1O8 PROJECT NOTES : �V`u 0 O NO- TYPE: AMOUNT BY DATE RECEIPT STFE $ 4 .50 KS 10/07/99 1669 RERF $ 42 .00 KS 10/07/99 1669 TOTAL : 46 .50. OWNER OR AGENT DATE MIS PAY1, r;3v: 04 41/92 COMPLIANCE TO ATTACHED CONDITIONS IS REQUIRED r• CONCRETE MECHANICAL MOBILE HOME Footings-Setback date by Ribbons date by Gas Piping date by Foundation Walls date by Set Up date by INSULATION date by BG/SLAB Insulation Floors Final date FRAMING by date by date by Walls FIRE DEPT. date by date by date by PLUMBING OTHER Groundwork Attic date by date by D.W.V. WALLBOARD NAILING date by date by Water Line FINAL INSPECTION date by date by date by • MASON COUNTY Mason County Bldg. III 426 W. Cedar P.O. Box 186 Shelton, Washington 98584 PFE RM I 'T Cc.) NCJ I `V 1 0N !;. Case No . : MIS99-0658 Fort JEF F BISHOP Page : 1 1 ) PURSUANT TO 1997 UNIFORM BUILDING CODE , ALL. SITE MUST BE MARKED WITH APPROVED NUMBERS OR ADDRESSES PROVIDED IN SUCH A POSITION AS TO BF PLAINLY VISIBLE AND LEGIBLE FROM THE STREET OR ROAD FRONTING THE PROPFRTY . MASON COUNTY BUILDING DEPARTMENT REQUIRES THAT THIS BE COMPLETED PRIOR TO CALLING FOR ANY SITE INSPECTIONS . A AEINSPECTION FEE , BASED ON RATES ADOPTED FEE SCHEDULES AND THE 1997 UNIFORM BUILDING CODE WILL. BE ASSESSED IF OWNER/CONTRACTOR FAILS TO POST ADDRESS ON SITE PRIOR TO REQUESTING INSPECTIONS . X 2 ) SINGLE RAFTER JOIST ROOF REPLACEMENT SHALL BE INSULATED TO, A MINIMUM OF R- 30 ALLOWING FOR A MINIMUM OF ONE INCH CONTINUOUS VENTED AIRSPACE ABOVE THE LEVEL OF INSULATION . X 3 ) ENCLOSED ROOF SYSTEMS THAT ARE EXPOSED TO THE SHEATHING SHALL BE IN UI ATE0 TO A MINIMUM R- 30 AND INSPECTED PRIOR TO COVER . X a ) CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING CONCRETE MECHANICAL MOBILE HOME Footings-Setback date by Ribbons date by Gas Piping date b Foundation Walls date by Set Up date by INSULATION date by BG/SLAB Insulation Floors Final date by date by date by FRAMING Walls FIRE DEPT. date by date by PLUMBING An,c by OTHER Groundwork date by date by D.W.V. WALLBOARD NAILING date by date by Water Line FINAL INSPECTION date by date by date by MASON COUNTY Mason County Bldg. III 426 W. Cedar P.O. Box 186 Shelton, Washington 98584 Jl:it-J, ; A'4i ,04 LD IN u t.Uh _ . i CONCRETE MECHANICAL MOBILE HOME Footjngs-Setback date by Ribbons data by Gas Piping date b Foundation Walls date by Set Up date by INSULATION date by BG/SLAB!nsulation Floors Final date by date by date by FRAMING Walls FIRE DEPT. date by date by date by PLUMBING Attic OTHER Groundwork date by date by D.W.V. WALLBOARD NAILING date by date by Water Line FINAL INSPECTION date by date by date by