Loading...
HomeMy WebLinkAboutBLD30866 SFR - BLD Application - 7/14/1992 BUILDING PERMIT APPLICATION MASON COUNTY DEPARTMENT of GENERAL SERVICES 426 W.CEDAR/P.O. BOX 186 SHELTON,WASHINGTON 98584 427-9670 DATE ISSUED PERMIT NO. NAME MAILADDRESS CITY&STATE ZIP PHONE OWNER moc -6 "w1w, DIRECTIONS TO JOB SITE L PARCEL LEGAL NUMBER Z33d-7,5 -ew2le> DESCR. , � S 2 6 NAME MAIL ADDRESS CITY&STATE ZIP PHONE LICE SE NO. CONTRACTOR ` 'ww&OC&Y USE OF BUILDING �s CLASS OF NEW ADDITION ALTERATION REPAIR MOVE REMOVE WORK ✓ DESCRIBE WORK c f v AREA: NUMBER OF: PLEASE INDICATE: NOTICE SEPARATE PERMITS ARE REQUIRED FOR PLUMBING, HEATING, VENTILATING OR AIR RESIDENCE 24%GSgFt STORIES L SHORELINE❑ CONDITIONING. BASEMENT SgFt BEDROOMS PRIMARY RES.k� THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION AUTHORIZED IS NOT DECKS /'/n S Ft BATHROOMS SEASONAL RES.❑ COMMENCED WITHIN 180 DAYS, OR IF CONSTRUCTION OR WORK IS SUSPENDED OR -�--X� g ABANDONED FOR A PERIOD OF 180 DAYS AT ANY TIME AFTER WORK IS COMMENCED. CARPORT SgFt FIREPLACE IS CARPORT/GARAGE GARAGE SgFt ATTACHED Cl DETACHED❑ OWNERS AFFIDAVIT CONTRACTORS AFFIDAVIT I CERTIFY THAT I AM EXEMPT FROM THE REQUIREMENTS OF THE CONTRACTORS I CERTIFY THAT I AM A CURRENTLY REGISTERED CONTRACTOR IN THE STATE OF REGISTRATION LAW RCW 18.27, AND AM AWARE OF THE MASON COUNTY ORDINANCE WASHINGTON AND I AM AWARE OF THE ORDINANCE REQUIREMENTS REGULATING THE REQUIREMENTS FOR WHICH THIS PERMIT IS ISSUED AND THAT ALL WORK DONE WILL BE WORK FOR WHICH THE PERMIT IS ISSUED AND ALL WORK DONE WILL BE IN IN CONFORMANCE THEREWITH. NO CHANGES SHALL BE MADE WITHOUT FIRST CONFORMANCE THEREWITH.NO CHANGES SHALL BE MADE WITHOUT FIRST OBTAINING OBTAINING APPROVAL FROM THE BUILDING DEPARTMENT. APPROVAL FROM THE BUILDING DEPARTMENT. X OWNER DATE X BY- l Gl��J DATE FOR OFFICE USE ONLY DEPARTMENT YEAPPROVEDJO DEPARTMENT YES DEPARTMENTBUILDING VALUATION HEALTH I PUBLIC WORKS FEE PLANNING FIRE MARSHAL BUILDING PERMIT D.O.T. BUILDING 5115I41 PLAN CHECK C SPECIAL CONDITIONS BUILDING GROUP PRE-INSPECTION T4 F161 SHORELINE z >0 WOODSTOVE v As PLUMBING MECHANICAL 2 Z STATE BUILDING FEE APPLICATION ACCEPTED BY [P710HECIK BY APP VED FOR ISSUANCE PERMIT VALIDATION TOTALB CASH CK MO PLUMBING & MECHANICAL PERMIT APPLICATION MASON COUNTY DEPARTMENT of GENERAL SERVICES 426 W. CEDAR/P.O. BOX 186 SHELTON,WASHINGTON 98584 427-9670 DATE ISSUED PERMIT NO. NAME MAIL ADDRESS CITY&STATE ZIP PHONE OWNER htlllle z gle�ETr Re. /3ox-5-141:11 Ee5Z�� al6q gK-52 fe 7S lv DIRECTIONS _ TO JOB SITE AFT.9ii/ �� _ ©C>,L�.CO/� �t' lGT i✓ LEGAL DESCR. CONTRACTOR NAME MAILADDRESS CITY&STATE LICENSE NO. ZIP��y-•7g PHONE S" z s rs✓ y i3��LF�' d 7535�/ USE OF ��~ ,�,, / BUILDING f�L>��E/(/C S` rC PLUMBING FIXTURES MECHANICAL FIXTURES NO. 2.00 PER FIXTURE OR TRAP FEE NO. TYPE OF FIXTURE FEE 7j WATER CLOSETS (0 FORCED-AIR/GRAVITY TYPE FURNACE 6.00 BASINS (p FLOOR/SUSPENDED FURNACE 6.00 BATH TUBS z BOILER/COMPRESSOR 6.00 �[ SHOWERS REPAIR/ALTERATION 6.00 WATER HEATERS REFRIGERATION COMPRESSOR SYSTEM 6.00 AUTO.WASHER AIR HANDLING UNITS 7.50 SINKS HEAT-PUMPS 6.00 FLOOR DRAINS EACH GAS PIPING SYS.2.00 PER OUTLET DRINKING FOUNTAINS VENT.FAN SYS.3.00 PER UNIT LAU N DRY TRAYS FIRE SUPPRESSION 5.00 CONNECT TO CITY SEWER WOOD FURNACE 5.00 DISHWASHER Z DISPOSAL URINALS PERMIT BASIC FEE 3.00 PERMIT BASIC FEE 10.00 TOTAL TOTAL 2 SPECIAL CONDITIONS: _-. __..__--- ____.._.-_ NOTICE. THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION AUTHORIZED IS NOT COMMENCED WITHIN 180 DAYS,OR IF CONSTRUCTION OR WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF 180 DAYS AT ANY TIME AFTER WORK IS _. COMMENCED. OWNERS AFFIDAVIT: I CERTIFY THAT I AM EXEMPT FROM THE REQUIREMENTS OF CONTRACTORS AFFIDAVIT: I CERTIFY THAT I AM A CURRENTLY REGISTERED THE CONTRACT OR REGISTRATION LAW RCW 18.27, AND AM AWARE OF THE MASON CONTRACTOR IN THE STATE OF WASHINGTON AND I AM AWARE OF THE ORDINANCE COUNTY ORDINANCE REQUIREMENTS FOR WHICH THIS PERMIT IS ISSUED AND THAT ALL REQUIREMENTS REGULATING THE WORK FOR WHICH THIS PERMIT IS ISSUED AND ALL WORK DONE WILL BE IN CONFORMANCE THEREWITH. NO CHANGES SHALL BE MADE WORK DONE WILL BE IN CONFORMANCE THEREWITH. NO CHANGES SHALL BE MADE WITHOUT FIRST OBTAINING APPROVAL FROM THE BUILDING DEPARTMENT. WITHOUT FIRST OB ININ OVVAAL FROM THE BUILDING DEPARTMENT. X OWNER DATE _ X BY.v%'c/ C G DATE —2 7' 77 Z FOR OFFICE USE ONLY APPLICATION ACCEPTED BY PLANS CHECI(BY BUILDING GROUP APPROVED FOR ISSUANCE PERMIT VALIDATION BY CASH CK MO L BUILDING PERMIT PLOT PLAN MASON COUNTY DEPARTMENT of GENERAL SERVICES P.O. Box 186 SHELTON, WASHINGTON 98584 427-9670 DATE ISSUED PERMIT NO. OWNER NAME MAIE A D ESS CITY 8 STATE ZIP PHONE DIRECTIONS TO JOB SITE L � _ PARCEL '2 3s O- 75 LEGAL G> Z G _ NUMBER DESCR Indicate below. O Property lines and dimensions. O Easements and roads. O Septic, drainfield and reserve area, or sewer. O Septic tank and drainfield setback distances from foundations. �. O Location of proposed construction on property. - O Building & septic system setback distances from all property lines& easements. Indicate North O Well and water line. In Circle O Saltwater, lakes, rivers, streams, wetlands, drainage. O Attach copy of septic system"as built' or septic permit approval O Indicate topography profile of property and structure on reverse side. l' 5r , I/We certify that the proposed construction will conform to the dimensions and uses shown above and that no changes will be made without first obtaining approval. SIGNATU E OF OWNER(S)bPrAUTHORIZED REPRESENTATIVE DO NOT WRITE BELOW THIS LINE APPRnvpn Z 38ruo 8iS d0 NOIldOOI (INV AiH3dO8d d0 3IId08d kHddaJOdOl WATTSUN 5 . 2 SUPER GOOD CENTS ( 1991-MCS) COMPLIANCE REPORT 06/03/92 E: B: LT0056. WS HOUSE ID: LT0056 I Site: NE 591 BELFAIR MANOR DR Analyst : BELFAIR, WA Jurisdiction: ( ) - Utility: Homeowner: WILLY/JUANITA PICKETT House Type : Single Family/Duplex P. O. BOX 516 Floor Area: 2496 ft2 Builder : EASY BUILT SYSTEM Weather Data: Portland, OR P. O. BOX 359 Climate Zone: 1 ( 206) 275-5761 ' I The PROPOSED design *COMPLIES* with Super Good Cents ( 1991 MCS) . ' REFERENCE PROPOSED ` COMPONENT PERFORMANCE 465 454 Btu/hr-F ENERGY BUDGET 2 , 79 2 . 76 kWh/ft2-yr I ' REFERENCE DESIGN Reference component Description Value X Area = UA ------------------------------------------------------------------------------ On Grade Slab R15 2 ' horizontal w/TB F-0. 520 148ft 77 . 0 Glazing @15% 0. 35 U-value U-0. 350 374 . 4 131 . 0 Doors Metal R5 base case U-0 . 190 42 . 0 8. 0 AG Wall R21+R5 ADV U-0. 041 2183 89. 5 Ceiling, Attic R49 blown Attic ADV U-0. 020 1063 21 . 3 Ceiling, Vault R38 batt vault vented U-0. 027 192 5. 2 Infiltration Standard air sealing ACH-0 . 350 20832ft3 133. 4 ---------------------------- Reference UA 465 ------------------------------------------------------- PROPOSED DESIGN COMPONENTS Component Description Value X Area = UA ------------------------------------------------------------------------------ On Grade Slab R5 Fully insulated F-0. 460 148ft 68. 1 Glazing @13% **INSUL. INDUS. XO/PIC LOWE/AR U-0. 360 215 . 5 75. 4* **INSUL. INDUS. PATIO LOWE/AR U-0. 380 105 . 0 38. 9* Doors Metal R-5 base case U-0. 190 42 . 0 8. 0* AG Wall **R21 + R7 . 2 ADV U-0. 040 2137 85. 5 -------------------------------------------------------------------------------- Items-in parentheses not included-in COMPONENT PERFORMANCEtotals . - ** Denotes non-standard values - check calculation of thermal value. * Denotes adjusted UA to reflect 7-1/2 mph wind speed. Page 1 j I I WATTSUN 5. 2 SUPER GOOD CENTS ( 1991 MCS) COMPLIANCE REPORT 06/03/92 E: B: LT0056 . WS HOUSE ID: LT0056 **SKYLIGHT SHAFTS/BUFFER R21 U-0. 056 100 5. 6 Skylights @1%**CRYSTALITE 2650 W/LOWE OVERALL U-0. 150 23. 0 3. 5* Ceiling R30 batt Vault vented 2x12 24oc U-0. 033 192 6. 3 R38 blown Attic STD baffled U-0. 031 520 16. 1 R38 blown Attic ADV U-0. 026 520 13. 5 Infiltration Standard Air Sealing ACH-0. 350 20832ft3 133. 4 ---------------------------- Proposed UA 454 Struc Mass Light Frame, Sheetrock walls M- 3. 000 1248 3744 Slab w/carpet w/pad, Sheetrock wall M- 5 . 000 1248 6240 - ------------------------------------------------------------------------------- HEATING/COOLING/VENTILATING SYSTEMS PROPOSED Heating System Type: Electric: Zoned System Efficiency: 100 % Modified Efficiency: 100 % Design ACH: 0. 60 Heating Load(at 47F dt) : 25830 Btu/hr System Size : 7 . 6 kW Maximum Size @150%: 11 . 4 kW Average Annual Heat : 9989 kWh Annual Cost : $ 450 Ventilation System : Integrated Spot & Whole House Cooling Load(at 8F dt) : 29130 Btu/hr Recommended Size @125%: 3. 4 tons Solar Access : Partially Shaded -------------------------------------------------------------------------------- GLAZING ORIENTATION PROPOSED PROPOSED South: 80. 1 ft2 North: 80. 1 ft2 Southeast : Northwest : East : 80. 1 West : 80. 1 Northeast: Southwest : -------------------------------------------------------------------------------- Economic and energy consumption estimates are designed for comparative purposes only. Actual cost for heating will vary depending on weather conditions , occupant lifestyle and other factors . Page 2