Loading...
HomeMy WebLinkAboutSlope Stability Investigation for BLD2001-00365 - BLD Engineering / Geo-tech Reports - 5/20/2001 � ^ Q. 61,12-ool CrD365- I . Ill Slope Stability Investigation � 311 NE Cutlass Court Belfair, WA Prepared for • Stephen Johnson,Inc. by Geotechnical Testing Lab Olympia, WA ' _ May 20, 2001 GEOTECB NICAL TESTI NG LABORATORY STEPHEN JOHNSON,INC. P.O. BOX 488 BELFAIR, WA 98528 Re: Slope stability&setback analysis 311 NE Cutlass Court Belfair,WA Gentlemen: As per your request, we have conducted a slope stability investigation for a home located on the above referenced property. The result of this investigation, together with our recommendations, are to be found in the following report. The site is located in Mason County, Washington. SUBSURFACE EXPLORATION PROGRAM The subsurface exploration program consisted of a site reconnaissance and a review of information from our files of similar work performed in this area. The slope was observed by our geologist, who studied the soils exposed at the site. The soil criteria shown on the slope profile were confirmed on the geological maps. SITE CONDITIONS The proposed home is to be located at the highest point of the lot on a leveled area to the west of the main access street. No excessive erosion or deep seated instability was observed. Under the surface, the soil was found to be a dense sandy gravel. The vegetation consists of grasses and trees indigenous to the northwest. The slope is bare of vegetation except for a few Fir trees. GEOLOGIC CONDITIONS Thd geology of the area as mapped by the Coastal Zone Atlas of Mason County Vol. 9 is Vashon Till (Qvt) characterized by Pleistocene silt deposits of sands,silty sands, and pebbly sands commonly bedded. It may contain large erratics with gravel lenses. The lower slopes are composed of a Vashon recessional outwash(Qvr). These are the youngest member of the Vashon Drift, consisting mainly of sandy and gravely meltwater or ablation deposits which have not been compacted by the continental ice sheet. NThe native soils can be considered to be at or near their natural angle of repose, and the factor of safety for most of the slope is near unity in the unsaturated condition. HYDROLOGIC CONDITIONS The lot slopes to the west and all surface runoff discharges to well established drainage ways that ultimately run south and to the Hood Canal. Runoff from the roof and/or parking areas will not pose significant problems due to the high porosity of the native soils. SLOPE STABILILTY MODELING& ANALYSIS The site was modeled using a slope program and we have included a profile of the model later in this report. The native soils were modeled using 124 Ibs/ft3 unit weight with an assumed phi angle of 33' in their cemented state. 10011 Blomberg Street SW,Olympia, WA 98512 Phone#:(206)754-4612 Fax#:(206)754-4848 GEOTECHNICAL TESTING LABORATORY We have calculated the slope and have found no indication of deep seated instability there. Slope 1 is a profile of the natural slope to the west. Sectional failure may occur under saturated conditions. The slope stabYlity is mapped by the Coastal Zone Atlas of Mason County Vol. 9 as "stable". Sloughing in this area will not impact the home because of the distance from the home to the western slope. Our study also indicates that the slope is stable. IMPACT ANALYSIS We do not anticipate that the proposed project will have any off-site impact. HISTORY OF LANDSLIDE ACTIVITY Landslide activity has not occurred historically on the subject property. However occasional sloughing does occur during periods of heavy precipitation along the North Shore Road over a mile from this site and under different hydrologic and geologic conditions. OPINION OF POTENTIAL STABILITY Potential for instability is minimal. Potential for minor erosion is probable since all vegetation has been removed from the site. To correct this annoyance, the bare ground should be seeded with grass or straw. HILLSIDE FOUNDATIONS (DAYLIGHT DIMENSION) Structures built on sloping sites offer a number of potential problems. Fig. 1 illustrates a basic consideration for what is called the"daylight"dimension, which is the horizontal distance from the bottom of the footing to the adjacent ground surface. Many building codes require a minimum distance for this dimension in order to assure some safety against the pushing out of the footing in the downslope direction. Logically, the limit for this distance depends on the type of soil and the angle of the slope of the ground surface. For love slope angles, a reasonable daylight dimension is assured simply because of the usual requirements for the minimum depth of the bottom of the footing below the surface in a vertical direction. As the slope increases, the daylight dimension is less assured and should be limited to some minimum distance. A setback of 8 feet from the horizontal intersect of the slope will provide the critical exposure necessary. (see Fig. 1) A common problem with hillside construction is that shown in Fig. 2, where recontouring of the construction site results in a portion of the building being placed on some significant depth of fill. If possible, all of the footings should be carried down to a depth below the fill. If structural fill is used and placed with reasonable compaction, it may be possible to rest the footings in the fill, provided that this is done only with inspection and supervision by a qualified soils consultant. RECOMMENDATIONS All material excavated from the site cannot be dumped on site without adequate subgrade preparation at the spoils location and proper fencing and runoff controls. All spoils soil must be compacted to 90% MDD (maximum dry -i density)as per ASTM D-1557 and protected from erosion. 10011 Blomberg Street SW,Olympia, WA 98512 Phone#:(206)7544612 Fax#:(206)7544848 1 -- GEOTECBMCAL TESTING LABORATORY The conclusions and recommendations in this report are based on our interpretation of the site conditions as they - presently exist, anticipated future construction activities, and the expectation that our exploratory efforts adequately define the subsurface conditions throughout the site. In the event that the scope or location of the project should change, or subsurface conditions different from those encountered during our study be observed or suspected, we should be advised. At that time, a review of the changed conditions will be made and alternative or remedial - recommendations given as requested. Thank your for this opportunity to be of service to you. If you have any questions concerning this report, please contact us at(360)7544612. Respecfully submitted, - GEOTECIINICA.L TESTING LAB Harold Parks, .. Engineering Geologist 1 J _ 1 _ I . I . I _ 10011 Blomberg Street SW,Olympia, WA 98512 L Phone#:(206)7544612 Fax#:(206)754-4848 A rfA T7.1 G EOTECHNICAL TESTING LABORATORY TOPOGRAPHIC MAP i ' N • s� ' A WOW, 411 IL f `r7 • �t�H r• •�• -�. Spa ■ ■ `,.��J` n,"t amity. Rara•rrtiL. � �iC a>��{{S�... ■ f � t * 1'1�•r•'•a�' �;,+;�����.j��`y1:r/.��'�S,.�^F� �nY�ri♦vtv'�l'i� rS�a��r�. tl' r'�/Ia_t iti._^�r.� r • rr;_f .ii'• M+ �T • f 10011 Blomberg Street SW, Olympia, WA 98512 — L_ G EOTECHNICAL TESTING LABORATORY GEOLOGIC MAP BM_I-7 ,• /' w a r% of I ■ pr' ev f • I j -Q0s of l °S r:(r Q69.,. L nc h V e T r • '- Qbs i y� a2 i 14 - t•'/r Qdr 10011 Blomberg Street SW, Olympia, WA 98512 i G EOTECHNICAL TESTING LABORATORY SLOPE STABILITY 1' Qy / ! elf 33 la/ 47 ;r M / :r.54 7 S Lynch C'o7 , �:%.• Ries C� y' q Par a I •'3:%i s PA — j M � n i •rLJ�,�it; ' r Urs 10011 Blomberg Street SW, Olympia, WA 98512 �.° N .- N P1 v h b r m O• O^ � ^v�b m Q 0 N W a y w � a t .mom owy �p •t+ •.. aapp � ��pp Fryrye.. oe. •���pp qq qq• f° C A V] N � Vf V] N N V] V] q: v] N � V] N � fn V: N N C e ° ° � �e. �e. su •Y. eel;.: � � � a s � s � o a E OD - A AAAA AA AAA 'AAAA � AAAAA � Am � � � �3 � ��� � AA U � v w Z a e e �`• � � '�° o � N R O� .O : « .n. $ :' � V m F �,, .E — � t� r. v. .: .•i N r r r r ri r N N � S • E ° h � �h�� nh� rhr � � h�h � � hr m e�qb Z t.d .d .d •d •d •c •d •d .d •d .d .d .d .d .d •d .d .d •d .d •d N m m .� rt O. O O\ m of O^m O N r ti U FQ 0000 - - rvrvmrivcvi S � 8 IL � � XXXe O O i O O O O vt O v m m .- O r N Q M O r N t•t b m v a Yr0000 .- ._ ccrnoohOhohOovt v, � ••-1 A f,°yuw NNrf w. vvhhhv, a « O m « g S g g g g g g g g g g g g g g g N E g x E,° _ (Z O O O O O O po•^ '� �^ ^ .O vi rn lV 1Op b b ° N t•1 O h O�O h O\ N N l�Y Cl N AC'. 1'.1 1'.1 R Q � L a 1 i G � C Z � Z •1 lL „ q C O OD .C: - - .. '1 C � C — � � - � o � o 000 � aoo � oo m u y .t 0000 ..; ovov, '^ �A 00 11 _iry ^i Rio ono 4a �- h e ° 0 0 0 0 0 0 vt 0 0 y.• 00 ao M1 m m � r r -pp m r ° C • v ' �3 � = asagS88o8888 $ 88888888888 m o o R R R 8 a � Uw0000 �: oriovi .-: .r•vivi ,.iv; ,,S ,�,riovio 0 z �• g S S g g g g g S g g g S g S g 8 8 g S g �. Y A� p ° e e � wG O -. N m Y N b r m O.�— ^ ^ .b-. � .r m O^•N a v e G EOTECHNICAL TESTING LABORATORY SITE PLAN \N W e O seprc� rtG,.k �C) co 3 bedrooM �_�o� �p wYR 35' - - N o si 10011 Blomberg Street SW,Olympia, WA 98512 GEOTECHNICAL TESTING LABORATORY e N daylight � l FIGURE, 1 CritiQ111 exposure co lid!tiozi for a lilllsida fovti�ig. i i (- — � L__1 FIGURE 2 i'rvblems of foundations on graded 10side sites. �wu��.wrw.��..u�.w � ■.r r�n�� ur�rr���r ��� 10011 Blomberg.Street SW,.Olympia, WA 98512 i Stephen Johnson, Inc. P.O. Box 488 Beifair, WA 98528 OD Z cgvc -tom..k, Ros (O 3 3s si C r'r C(XT [�Ot) bt'4- v-AAJ 3 [ k N c:. C�,-� (ass -r LZ33 1 -2-2--boo c{ Z ALL ' USGNi2—. i.t��C�.C1�21�� DATE CLIENT c, Tjl. _ L ; ,�d1Y -J O . mph, ExpsP- C B / CO) WIND . Type 5�'SDI'L• . 1<14EEDIMCE ( Y 11 _ AGIZCLTIZL ( Y N SITE''-"SPECIFICS: �Uat)/ U1'HEfZ > psf SLAD ( eY / I-1 ) VERT LOADS 1/2" Mvm, ( Y,) SNOW SHEAR WALLS (Y 'N > DERD q5 )_ F— POST TOP C01414TN' S L wT w w S z a Hp --11 Bq x a �r I 3 • i i Ct, *cq q s 2 ( DES I G[4 > p L, M ETHoD �' - W�,-,� ,� ��- • .c�r = �1 �LL1 Ale I ...a r' B• Boof.WA y w�'rC�I� A / y � fie• �O� O 0008913 9FGIsTE�° G� O 0008913 �SS�ONAL E� IS _ TONAL� �_EXPIRES-tj-2 _ 2 EXPIR6S � M JOBS ] / �G N �O/��J ��'^ • / CONSOLIDATED ENGINEERING SHEET NO. OF P.O. Box 2321 ,,QQ BREMERTON, WASHINGTON 98310 CALCULATED BY '�, ,DATE �U L_ -« �� (360) 479-5598 CHECKED BY DATE SCALE CT Z 2 :2 `T SSA Co k �1 0+4 5 10159 Z tt A- �� - z - 14; 6pr) ORnnl ifl'MI! Km,b ChM<I 7(K I IPM"Mj e JOB CONSOLIDATED ENGINEERING . SHEET NO.- P.O. Box 2321 BREMERTON, WASHINGTON 98310 CALCULATED BY �[, DATE (360) 479-5598 CHECKED BY DATE SCALE 37,s , S# lk- 75 r 7 �o4t&' 7 300 S,+ f `7,Sao ` 7= S!�- � �'-i- S ' ? I �- l 3 40 2- 2 �r C ON"7M 1"4-*W-KI 71A I IP*W) c^� TABLE 23-1-K-1—ALLOWABLE SHEAR FOR WIND OR SEISMIC FORCES IN POUNDS PER FOOT FOR WOOD STRUCTURAL PANEL SHEAR WALLS WITH FRAMING OF DOUGLAS FIR-LARCH OR SOUTHERN PINE1� N PANELS APPLIED OVER V6�-.11NCH(13 mm) PANELS APPLIED DIRECTLY TO FRAMING OR s/a-INCH(16 mm)GYP SOM SHEATHING MINIMUM MINIMUM NAIL Nail Spacing at Panel Edges(in.) INall Spacing at Panel Edges(In.) NOMINAL PANEL PENETRATION x 25.4 for mm 7 Nall Slze x 23.4 for mm THICKNESS IN FRAMING Nall Size (Common (Inches) (Inches) (Common or 6 4 3 2z or 6 4 3 23 Galvanized Galvanized PANEL GRADE t x 25.4 for mm Box) x 0.0146 for N/mm Box) x 0.0146 for N/mm 5/16 11/4 6d 200 300 390 510 8d 200 300 390 510 Structural) 3/8 2304 3604 4604 6104 7/16 11/2 8d 2554 3954 5054 6704 10d5 280 430 550 730 15/32 280 430 550 730 15/32 15/8 I0d5 340 510 665 870 — — — — — _ 5/16 11/4 6d 180 270 350 450 8d 180 270 350 450 C-D,C-C 3/8 200 300 390 510 200 300 390 510 Sheathing,plywood 3 2204 3204 4104 5304 panel siding and other 7/16 1 t/ 8d 2404 3504 4504 5854 10dS 260 380 490 640 grades covered in U.B.C.Standard 23-2 /3, 260 380 490 640 or 23-3 15/32 15/8 10d5 310 460 600 770 — — — — — 19/32 340 510 665 870 Nail Size Nail Size (Galvanized (Galvanized Casing) Casing) Plywood panel siding 5/16 11/4 6d 140 210 275 360 8d 140 210 275 360 in grades covered in U.B.C. 3 1 8d 160 240 3l0 410 IOdS 160 240 3I0 410 Standard 23-2 /8 1 /'- I All panel edges backed with 2-inch(51 mm)nominal or wider framing.Panels installed either horizontally or vertically.Space nails at 6 inches(152 mm)on center along intermediate framing members for 3/8-inch(9.5 mm)and 7/16-inch(1 I mm)panels installed on studs spaced 24 inches(610 mm)on center and 12 inches(305 mm)on center for other conditions and panel thicknesses.These values are for short-time loads due to wind or earthquake and must be reduced 25 percent for normal loading. Allowable shear values for nails in framing members of other species set forth in Table 23-III-FF of Division III shall be calculated for all other grades by multiplying the shear capacities for nails in Structural I by the following factors:0.82 for species with specific gravity greater than or equal to 0.42 but less than 0.49.and 0.65 for CI with a specific gravity less than 0.42. Z 2 Where panels are applied on both faces of a wall and nail spacing is less than 6 inches(152 mm)on center on either side,panel joints shall be offset to fall on different framing t7 members or framing shall be 3-inch(76 mm)nominal or thicker and nails on each side shall be staggered. n 317raming at adjoining panel edges shall be 3-inch(76 mm)nominal or wider and nails shall be staggered where nails are spaced 2 inches(51 mm)on center. 0 m