Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
BLD2024-01096 Roof Solar - BLD Inspections - 10/28/2024
A: INSPECTION CARD Mason County 615 W. Alder St. Building 8, Shelton, WA 98584 360-427-9670 ext 352 www.masoncountywa.gov PERMIT# BLD2024-01096 PROJECT ADDRESS 1980 NE TAHUYA BLACKSMITH RD TAHUYA, WA 98588 PARCEL# 223305000215 PROJECT DESCRIPTION ROOF MOUNT SOLAR FOR SFR (PHASE 2) OWNER WIDELL KEVIN J &GERALDINE A ADDRESS 1980 NE TAHUYA BLACKSMITH RD PHONE 360-301-2220 CONTRACTOR POWER TRIP ENERGY CO ADDRESS 83 DENNY AVE PHONE 360-643-3080 CONTRACTOR LICENSE POWERTE964JN LENDER INSPECTION INSP D TE Comments INSPECTION INSP DATE Comments BLD-Final Inspection \ W � • MASON COUNTY INSPECTION RESULTS Page Department of Community Development COMMUNITY DEVELOPMENT 615 W Alder St,Shelton,WA 98584 ft—t&-taxe C<M�,8.,WiM PI-9 (360)427-9670 ext 352 Application# BLD2024-01096 Application Type ROOF MOUNT SOLAR Owner DELL KEVIN J& PANEL-RESIDENTIAL GERALDINE A Parcel# 223305000215 Site Address 1980 NE TAHUYA BLACKSMITH RD TAHUYA,WA 98588 Inspector Inspection Type Date Status Comments y 1C/28/24 NN Nicole Norris BLD-FINAL INSPECTION 10/28/2024 FAIL 1.L&I SIGN OFF NEEDED FOR FINAL. SEND PHOTO/VERIFICATION OF SIGN OFF TO NNORRIS@MASONCOUNTYWA.GOV r Mason County Mason County - Division of Community Development 615 W. Alder St. Building 8 Shelton, WA 98584 360-427-9670 ext 352 www.masoncountywa.gov B DD2024-01096 ROOF MOUNT SOLAR PANEL- RESIDENTIAL PROJECT DESCRIPTION: ROOF MOUNT SOLAR FOR SFR (PHASE 2) ISSUED: 09/11/2024 SITE ADDRESS: 1980 NE TAHUYA BLACKSMITH RD TAHUYA EXPIRES: 03/10/2025 PARCEL: 223305000215 APPLICANT: WIDELL KEVIN J &GERALDINE A OWNER: WIDELL KEVIN J &GERALDINE A 1980 NE TAHUYA BLACKSMITH RD 1980 NE TAHUYA BLACKSMITH RD TAHUYA,WA 98588 TAHUYA,WA 98588 360-301-2220 CONTRACTOR: POWER TRIP ENERGY CO 83 DENNY AVEPORT TOWNSEND,WA 98588 360-643-3080 GENERAL CONTRACTOR'S LICENSE: POWER TRIP ENERGY CO License: POWERTE964JN 83 DENNY AVEPORT TOWNSEND,WA 98588 Expires: 04/15/2026 360-643-3080 FEES: Paid Due Technology Surcharge $1.60 $0.00 State Fee-Residential $6.50 $0.00 Solar/PV Fee $285.00 $0.00 Final Inspection $80.00 $0.00 Solar/PV Base Fee $30.00 $0.00 Totals : $403.10 $0.00 REQUIRED INSPECTIONS BLD-Final Inspection CONDITIONS Printed by:Annie Wilson on:09/11/2024 01:08 PM Page 1 of 4 Mason County Mason County - Division of Community Development 615 W. Alder St. Building 8 Shelton, WA 98584 360-427-9670 ext 352 www.masoncountywa.gov ROOF MOUNT SOLAR PANEL-RESIDENTIAL BLD2024-01096 * The demolition and disposal of debris must meet the regulations of Mason County and Olympic Region Clean Air Agency (ORCAA). It is unlawful for any person to cause or allow the demolition (or major renovation)of any structure unless all asbestos containing materials have been identified and removed from the area to be demolished. Work shall not commence on an asbestos project or demolition project unless the owner or operator has obtained written approval from ORCCA.2490 B Limited Lane NW, Olympia WA 98502, 360.586.1044/800.422.5623 www.orcaa.org * All construction must meet or exceed all local and state ordinances in addition to the International Codes requirements as adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in permit revocation. * ^ --------- Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1-800-647-0982. The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. -----------.._._...____-----------_________ . . ,,,, * OWNER/ BUILDER acknowledges submission of inaccurate information may result in a stop work order or permit revocation. Acknowledgement of such is by signature below. I declare that I am the owner, owners legal representative, or contractor. I further declare that I am entitled to receive this permit and to do the work as proposed. I have obtained permission from all the necessary parties, including any easement holder or parties of interest regarding this project. The owner or authorized agent represents that the information provided is accurate and grants employees of Mason County access to the above described property and structure(s)for review and inspection. This permit/application becomes null & void if work or authorized construction is not commenced within 180 days or if construction work is suspended for a period of 180 days. PROOF OF CONTINUATION OF WORK IS BY MEANS OF INSPECTION. INACTIVITY OF THIS PERMIT APPLICATION OF 180 DAYS WILL INVALIDATE THE APPLICATION UNLESS OTHERWISE APPROVED. Printed by:Annie Wilson on:09/11/2024 01:08 PM Page 2 of 4 Mason County Mason County - Division of Community Development 615 W. Alder St. Building 8 Shelton, WA 98584 360-427-9670 ext 352 www.masoncountywa.gov ROOF MOUNT SOLAR PANEL-RESIDENTIAL BLD2024-01096 The installation of solar(thermal or photovoltaic) energy systems to provide space heating or cooling, hot water and swimming pool heating shall conform to Chapter 23 of the International Residential Code, Chapter 14 of the International Mechanical Code, Uniform Plumbing Code, the International Fire Code, and be shall be listed and labeled in accordance with UL1703. Roof mounted panels shall weigh no more than 4 Ibs per square foot. Supports for solar panels are to be installed to spread the dead load across as many roof-framing members as needed to ensure that no point loads in excess of 50-Ibs are created. Panels may be installed on roof assemblies with a single layer of roofing material. Roof assemblies with more than one roofing material layer shall require an engineered analysis demonstrating that the roof will support the additional load of the solar panel system. Attachment to the roof shall be in accordance with manufacturer specifications provided during the inspection by the Mason County Building Inspector. Roof mounted equipment shall comply with the International Fire Code Section 605.11, including signage and access pathways. Roof access points shall not be located in areas where access ladders would block window or doors openings. Not less than two- 3-foot wide access pathways shall be provided from the eave to ridge. Ground-mounted panels and modules, installation must be in accordance with the manufacturer's instructions and be available at time of inspection. Inverters shall be listed and labeled in accordance with UL 1741. Systems connected to the utility grid shall use invertors listed for the utility interaction Collectors and thermal storage units shall be listed and labeled to show manufacturer's name, model number, serial number, collector weight, collector maximum allowable temperatures and pressures, and the type of heat transfer fluids that are compatible with the collector. Connections to potable water supplies shall be provided with backflow protection in accordance with the Uniform Plumbing Code. Solar energy systems containing pressurized fluids shall be protected with a temperature and pressure relief valve and be protected from freeze damage. Systems shall be equipped with means to limit the maximum water temperature of the system fluid entering or exchanging heat with any pressurized vessel inside the dwelling to 180 degrees Fahrenheit. Solar energy collectors, controls, dampers, fans, blowers and pumps shall be accessible for inspection, maintenance, repair and replacement. The roof shall be constructed to support the loads imposed by roof-mounted solar collectors and shall be constructed of noncombustible materials, flashed and sealed to prevent entry of water, rodents, and insects. The building inspector may require additional information, including an engineered design, to verify that existing roof or floor construction are adequate to support the additional load of the solar energy equipment. When required provide an engineered design for inspection. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of Laws and Ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any other state/local law regulating construction or the performance of construction. Issued By: Contractor or Authorized Agent: a ✓�y Date: L � l Printed by:Annie Wilson on:09/11/2024 01:08 PM Page 3 of 4 Mason County Mason County - Division of Community Development 615 W. Alder St. Building 8 Shelton, WA 98584 360-427-9670 ext 352 www.masoncountywa.gov ROOF MOUNT SOLAR PANEL-RESIDENTIAL BLD2024-01096 Printed by:Annie Wilson on:09/11/2024 01:08 PM Page 4 of 4 �a / ,�► � MASON COUNTY PERMIT NO. DEPARTMENT OF COMMUNITY DEVELOPMENT R `' n BUILDINGW�CO.MASON.WA USRSHAL (360)427-9670 Shelton ext.BECE) Y EL Mason County Bldg. III, 426 West Cedar Street (360)275-4467 Belfair ext.352 � Shelton,WA 98584 (360)482-5269 Elma ext. 352 SEP 10 2024 PLUMBING & MECHANICAL PERMIT APPLICATION 615 W. Alder StVat OWNER INFORMATION: CONTRACTOR INFORMATION: NAME:Kevin Widell NAME:Power Trip Energy MAILING ADDRESS:1980 NE Tahuya Blacksmith Rd MAILING ADDRESS:83 Denny Ave CITY:Tahuya STATE:WA ZIP:98588 CITY:Port Townsend STATE:WA ZIP:98368 PHONE:(360)301-2220 CELL: PHONE:(360)643-3080 CELL: EMAIL:kevinwidell@gmail.com EMAIL :buddy@powertdpenergy.com L&I REG#POWFRTE964JN EXP. 4 /15 /2025 PARCEL INFORMATION: PARCEL NUMBER(12 DIGIT NUMBER):223305000215 LEGAL DESCRIPTION(ABBREVIATED):HAVEN LAKE TRS 215-216#20-23 AF#2143409,S 50/59 SITE ADDRESS:1980 NE Tahuya Blacksmith Rd Tahuya,WA 98588 CITY: DIRECTIONS TO SITE ADDRESS:Head NE on WA-3 N toward E Beil Rd from Shelton(22.7 mi),Continue on WA-300 W.Take NE Belfair Tahuya Rd and NE Haven Way to NE Tahuta Blacksmith Rd(10.5 mi),destination will be on Right toward lake. TYPE OF JOB NEW ADD X ALT REPAIR OTHER USE OF BUILDING LOCATION OF FIXTURES/UNITS—1sT FLOOR 2ND FLOOR BASEMENT GARAGE OTHER House Roof PLUMBING FIXTURES(SHOW NUMBER OF EACH) MECHANICAL UNITS Tvne of Fixture No.of Fixtures Fees Fuel Type:Electric LPG Natural Gas Ductless_ Toilets Type of Unit No.of Units Fees Bathroom Sink Furnace Bath Tubs Heat Pump Showers Spot Vent Fan Water Heater Propane Tank Clothes Washer Gas Outlets Kitchen Sinks Wood/Gas/Pellet Stove Dishwasher Kitchen Exhaust Hood Hose bibs Dryer Vent Other Solar Panel SPR-X22-360-WHT-AC Other Base Fee Base Fee TOTAL PLUMBING TOTAL MECHANICAL OWNER/BUILDER acknowledges submission of inaccurate information may result in a stop work order or permit revocation. Acknowledgement of such is by signature below. I declare that I am the owner,owners legal representative, or contractor.I further declare that I am entitled to receive this permit and to do the work as proposed. I have obtained permission from all the necessary parties, including any easement holder or parties of interest regarding this project.The owner or authorized agent represents that the information provided is accurate and grants employees of Mason County access to the above described property and structure(s)for review and inspection.This permittapplication becomes null&void if work or authorized construction is not commenced within 180 days or if construction work is suspended for a period of 180 days. PROOF OF CONTINUATION OF WORK IS BY MEANS OF INSPECTION.INACTIVITY OF THIS PERMIT APPLICATION OF 180 DAYS WILL INVALIDATE THE APPLICATION. X-AC tw 9/9/2024 nature of Applicant Date X Andy Cochrane Owner/Owners Representativglcontractor Print Name (indicate which one) DEPARTMENTAL REVIEW APPROVED DATE DENIED DATE TAGS/NOTES/CONDITIONS BUILDING DEPARTMENT PLANNING DEPARTMENT FIRE MARSHAL OVER-THE-COUNTER BUILDING PERMIT CHECKLIST FOR RESIDENTIAL SOLAR PHOTOVOLTAIC SYSTEMS: ROOFTOP MOUNTED Contractors can apply for an Over-The-Counter(OTC)permit where the PV system meets the requirements listed in this Checklist. All project plans and supporting documentation must be provided on site for the inspector. --------TO BE COMPLETED BY APPLICANT------- © Project Information Property Owner Name: Kevin Widell Project Address: 1980 NE Tahuya Blacksmith Rd Parcel# 22330-50-00215 City: State. ZIP: Tahuya WA 98588 Day Phone: (360) 301-2220 Contractor Name Power Trip Energy Contractor License#: POWERTE934QE Contractor day phone: (360) 643-3080 Describe project: Conventional framed built dwelling or garage, Pole structure,steel building,etc. 5.4 kW residential grid-tied roof-mounted PV Note: Manufactured/mobile homes require L&I Approvol PV system description (include manufacturer 15 SPR-X22-360-WHT-AC modules will be grid-tied and installed on and model#of PV the house roof at the residentail address of 1980 NE Tahuya modules and Blacksmith Rd in Tahuya, WA 98588. There is a micro-inverter on the inverters): back of each module EnPhase IQ7XS-96-ACM-US(12 at 320 Watts per MI) ©Determine if your project qualifies for expedited permitting: Yes No 1. PV system is designed and proposed for a detached one-or two-family dwelling or townhouse not more than three stories above grade or detached accessory structure that ❑ is code compliant to setbacks and height, or code allows expansion of nonconformity for solar modules. [IRC 101.2] 2. Modules on pitched roofs do not exceed the highest point of the roof unless approved by ❑ the local jurisdiction. 3. Rooftop is made from lightweight material such as a single layer of composition shingles, E>< ❑ metal roofing, lightweight masonry,or cedar shingles. 4. The installation shall comply with the manufacturer's instructions. [IRC M2302.2] CJX ❑ 5. The installation shall meet the requirements of NFPA 70 National Electric Code, and all required electrical permit(s) must be obtained from the Authority Having Jurisdiction to ❑ administer the electrical code. [IRC M2302.21 6. The installation shall meet the requirements of the International Fire Code as amended E>< ❑ by WA State. [IRC M2302.21 7. The PV system is designed for the wind speed of the local area, and will be installed per E>< ❑ the manufacturer's specifications. [IRC M2302.2.1(1)] 8. The ground snow load does not exceed 70 pounds per square foot. [IRC M2302.2.1(2)] E>< ❑ 9. Total dead load of modules, supports, mountings, raceways and all other appurtenances ❑ weigh no more than four pounds per square foot. [IRC M2302.2.1(3)] 1 Enter total dead load of system (lbs/ft): Click here to enter text. 257pounds persquare fo 10. To address uplift, modules are mounted no higher than 18" above the surface of the X ❑ roofing to which they are affixed. [IRC M2302.2.1(4)] 11. Supports for solar modules are installed to spread the dead load across as many roof- framing members as needed to ensure that no point load exceeds fifty(50) pounds. X ❑ [IRC M2302.2.1(5)] 12. The photovoltaic modules and supporting structure shall be constructed of noncombustible materials or fire-retardant treated wood equivalent to that required for X ❑ the roof construction. [IRC M2302.2.1] 13. Roof and wall penetrations shall be flashed and sealed to prevent entry of water, X ❑ rodents, and insects. [IRC M2302.2.21 14. PV modules are listed and labeled with a fire classification in accordance with UL 1703. X ❑ [IRC M2302.2.3] Comments: Click here to enter text. iy If you answered yes to all of the above questions, the project qualifies for the over-the- counter permitting process. © Submit this Checklist, Site Plan, and other required permit application forms to: [insert contact info for jurisdiction having authority] 110* As the property owner or authorized representative of the above listed property, I attest that all information in this checklist is accurate to the best of my knowledge. Applicant Signature: Date: 9/9/2024 Applicant Name (Please Prin _Eluc dy Taylor --------TO BE COMPLETED BY MASON COUNTY STAFF------ Qualifiesfor OTC Building Permit? ❑Yes ❑No Permit Application#: Staff Initials Date: 2 -- t w • w y Solar Agent: Becky Smith Client Name:Widell Residence Phase II Power Trip Energy Corp 83 Denny Ave, Port Townsend, WA 98368 (360)643-3080 www.powertripenergy.com LIC: POWERTE964JN Project:Widell Residence Tahuya Phase II Client: Kevin Widell Phone:(360) 301-2220 Address: 1980 NE Tahuya Blacksmith Rd,Tahuya,WA 98588 System Description: 5.41 kW Residential Grid-tied PV Solar Modules: Branch Circuit A-12 SPR-X22-360-WHT-AC EXISTING Phase 1 AC Circuit Combiner Panel: Branch Circuit B-12 SPR-X22-360-WHT-AC NEW Branch Circuit C-3 SPR-X22-360-WHT-AC NEW South Ext Wall Adj to meter Model:SPR-X22-360-WHT-AC Micro inverter max power output 320 watts Enphase IQ7XS South Roof AC System Disconnect: (For Rapid Shutdown of AC Modules) South Ext wall adj to meter Utility Grid: Mason PUD#3 Net Meter: South Ext Wall Meter#: 144 058 350 Customer Owned Production Meter: South Ext wall adj to meter Main Service Panel (LOAD): Interior, mechanical room,on South ext wall adjacent to meter September 9, 2024 -3 - Solar Agent: Becky Smith Client Name:Widell Residence Phase II Power Trip Energy Corp Project: Widell Residence Tahuya— Phase II Client: Kevin Widell Phone: (360) 301-2220 Address: 1980 NE Tahuya Blacksmith Rd,Tahuya,WA 98588 System Description: 5.41 Residential Grid-tied PV Project Photos and Notes: 15 Additional modules to be placed Li rM � � s 12 SPR-X22-360-WHT-AC modules (existing) September 9, 2024 -4- Solar Agent: Becky Smith Client Name:Widell Residence Phase II AC PV Install Checklist Client Name Kevin Widell Utility Mason PUD#3 Widell Residence Phase II -Tahuya Job 5.4 kW Residential Grid-tied PV Utility Account# 263059001 Description Revenue Meter# 144 058 350 Client Phone# (360) 301-2220 Client Email kevinwidell@gmail.com Site Address 1980 NE Tahuya Blacksmith Rd Billing Address 9493 HWY 20 Tahuya,WA 98588 Port Townsend,WA 98368 Tax Code 2300 Access to site? Key? Customer x Line Drawing ■Site Diagram Directions to Site: From Hwy 3 in Belfair,go west on NE Clifton towards Tahuya,about 3 miles,then right on Belfair Tahuya Rd, about 4 miles,then right on NE Haven Way,then right on Tahuya Blacksmith Rd,clients home is on right Date Sold & Proposed Installation Date:8/18/24&9/18/24 PV Module Info: PV Module#: SPR-X22-360-WHT-AC#of Modules: 15 Solar Array Location: South Roof Output @ 240V (min/nom/max): 211/240/264 Volts Output @ 208V (min/nom/max): 183/208/229 Volts AC Max continuous output at 240V: 1.33Amps AC Max continuous output at 208V: 1.54Amps Max Units per 20A Branch Circuit @ 240V: 12(Single Phase) Max Units per 20A Branch Circuit @ 208V: 3 (2 pole) Dimensions: 61.4" H x 41.2"W x 1.8" D Temp Coeff: (Vmp or Pmax): -0.3/C EV Charger:_N/A Project Roof Info: Structure: Rafter cross sections _ M: Spaced on center: Spanning':Sheathing: Roofing Type: metal Seams Distance: 12" Pitch: 22 Azimuth: 178 Roof Height: 15 Access to underside of roof?Vaulted ceilings? Flashing and Standoff Types: S-5N September 9, 2024 -1- Solar Agent: Becky Smith Client Name:Widell Residence Phase II Service Panel Info: Panel Manufacture:Square D Panel Model Numbers: HOM Service Panel Main Bus Bar rating:225 Amps Subpanel Feeder Wire Size: Breaker Size at Main Panel: Amps Breaker Size at Sub Panel: Amps Does panel need to be upgraded?No Clallam County AC Disconnect?No Service Amperage Size: 150 Amps Panel Manufacture:Square D Panel Model Numbers: HOM Service Panel Main Bus Bar rating:225 Amps Subpanel Feeder Wire Size: Breaker Size at Main Panel: Amps Breaker Size at Sub Panel: Amps Does panel need to be upgraded?No Clallam County AC Disconnect?No Service Amperage Size: 150 Amps Branch Circuit Configuration: 1 circuit Inverter output amps: (inverter continuous output rating) Amps output all inverters: !.11A xmodules= 15.96` (add amps for all inverters in branch) Inverter(s)amps x 1.25: x 1.25= PV System circuit breaker amps: 20 (15,20,25,30, 35,40,45,50,60,70,80,90, 100, 110, 125,150,200,225...) 120%of Busbar amp rating: Service Panel x 1.2 Main circuit breaker amps: A Busbar amp capacity for Inverter: 120 AW(120%of Busbar amps minus main circuit breaker amps) Allowable inverter output amps: JIM M(Busbar amp capacity for inverter divided by 1.25) Branch Circuit Configuration:A:12 circuits B:3 circuits Inverter output amps: Jinverte:rn cotinuous output rating) Amps output all inverters: (add amps for all inverters in branch) Inverter(s)amps x 1.25: PV System circuit breaker amps: 0, 25,30, 35,40,45,50,60,70,80,90, 100, 110, 125, 150, 200,225...120%of Busbar amp rating: ice Panel x 1.2Main circuit breaker amps: Busbar amp capacity for Inverter (120%of Busbar amps minus main circuit breaker amps) Allowable inverter output amps: Busbar amp capacity for inverter divided by 1.25) Specific Permits to be purchased: Labor and Industry Electrical Permit Permit Information :New Service(Grid Tied PV Only) Is there currently internet/WIFI access?yes WIN password:Maggie2005! September 9, 2024 -2- Solar Agent: Becky Smith Client Name:Widell Residence Phase II Power Trip Energy Corp 83 Denny Ave, Port Townsend, WA 98368 (360)643-3080 www.powertripenergy.com LIC: POWERTE964JN Project:Widell Residence Tahuya Phase II Client: Kevin Widell Phone:(360) 301-2220 Address: 1980 NE Tahuya Blacksmith Rd,Tahuya,WA 98588 System Description: 5.41 kW Residential Grid-tied PV Solar Modules: Branch Circuit A-12 SPR-X22-360-WHT-AC EXISTING Phase 1 AC Circuit Combiner Panel: Branch Circuit B-12 SPR-X22-360-WHT-AC NEW Branch Circuit C-3 SPR-X22-360-WHT-AC NEW South Ext Wall Adj to meter Model:SPR-X22-360-WHT-AC Micro inverter max power output 320 watts Enphase IQ7XS South Roof AC System Disconnect: (For Rapid Shutdown of AC Modules) South Ext wall adj to meter Utility Grid: Mason PUD#3 Net Meter: South Ext Wall Meter#: 144 058 350 Customer Owned Production Meter: South Ext wall adj to meter Main Service Panel (LOAD): Interior, mechanical room,on South ext wall adjacent to meter September 9, 2024 -3 - Solar Agent: Becky Smith Client Name:Widell Residence Phase II Power Trip Energy Corp Project: Widell Residence Tahuya—Phase II Client: Kevin Widell Phone: (360) 301-2220 Address: 1980 NE Tahuya Blacksmith Rd,Tahuya,WA 98588 System Description: 5.41 Residential Grid-tied PV Project Photos and Notes: 15 Additional modules to be placed S a! Ji 12 SPR-X22-360-WHT-AC modules (existing) September 9, 2024 -4- aw a.:n Simple and Fast Installation � � Integrated module-to-rail grounding ` } �fi eta Pre-assembled mid and end clamps • Levitating mid clamp for easy placement Mid clamp width facilitates consistent,even module spacing UL 2703 Listed integrated grounding Flexible Design Addresses nearly all sloped residential roofs Design in landscape and portrait with up to 8' rail span Pre-drilled rails and rail splice Rails enable easy obstacle management Customer-Preferred Aesthetics #1 module and#1 mounting aesthetics Elegant Simplicity Best-in-class system aesthetics Premium,low-profile design SunPowerO' InvisiMountTm is a SunPower-designed Black anodized components rail-based mounting system. The InvisiMount system Hidden mid clamps and capped,flush addresses residential sloped roofs and combines faster end clamps installation time, design flexibility, and superior aesthetics. Part of Superior System The InvisiMount product was specifically envisioned and Built for use with SunPower DC and AC modules Best-in-class system reliability and aesthetics engineered to pair with SunPower modules. The resulting • Optional rooftop transition flashing,rail- system-level approach amplifies the aesthetic and mounted)-box,and wire management rail clips installation benefits—for homeowners and for installers. Combine with SunPower modules and SunPower EnergyLink"monitoring app sunpower.com Now Module'/Mid Clamp and Rail Module'/End Clamp and Rai( Ground Lug Assembly Row-to-Row Spacer End Clamp Mid Clamp slow Row-to-Row Grounding Clip Rail and Rail Splice Mid clamp Black oxide stainless steel 300 series 63 g(2.2 oz) Temperature -40°C to 901 C(-40°F to 194'F) End clamp Black anodized aluminum 6000 series 110 g(3.88 oz) 3000 Pa uplift Max.Load(LRFD) 6000 Pa downforce Rail Black anodized aluminum 6000 series 830 g/m(9 oz/ft) Rail splice Aluminum alloy 6000 series 830 g/m(9 oz/ft) Rail bolt M10-1.5 x 25 mm;custom T-head SS304 18 g(0.63 oz) DesignRoof Attachment Hardware SUpported by Rail nut M10-1.5;DIN 6923 SS304 nominal Ground lug Composition Shingle Rafter Attachment assembly SS304;A2-70 bolt;tin-plated copper lug 106.5 g(3.75 oz) Composition Shingle Roof Decking Attachment Y Application Curved and Flat Tile Roof Attachment Row-to-row SS 301 with SS 304 M6 bolts 75 g(2.6 oz) Universal interface for other roof attachments grounding clip Row-to-row Black POM-grade plastic 5 g(0.18 oz) s acer Uplift 564 Ibf 25-year product warranty Mid clamp Shear 5401bf Warranties • 5-yearfnishwarranty Uplift 899 Ibf End clamp UL 2703 Listed Shear 2201bf Certifications Moment upward 548 Ibf-ft Class A Fire Rated Rail Moment:downward 580 Ibf-ft Moment:upward 548 Ibf-ft Rail splice Moment:downward 580 Ibf-ft Uplift 1000 Ibf L-foot Refer to roof attachment hardware manufacturers documentation. Shear 390 Ibf Module frame that is compatible with the InvisiMount system required for hardware interoperability. z SunPower recommends that all Equinox',InvisiMount ,and AC module systems always be designed using the InvisiMount Span Tables#524734.If a designer decides to instead use the component capacities listed in this document to design a system,note that the capacities shown are Load and Resistance Factor Design(LRFD)design loads,and are NOT to be used for Allowable Stress Design(ASD)calculations;and that a licensed Professional Engineer(PE)must then stamp all calculations.If you have any questions please contact SunPower Technical Support at 1-855-977.7867. sunpoweccom 2018 SunPower Corporation.All Rights Reserved.SUNPOWER,the SUNPOWER logo,EQUINOX,and INASIMOUNT are trademarks or registered trademarks of SunPower Corporation. 509506 RevF All other trademarks are the property of their respective owners.Specifications included in this datasheet are subject to change without notice. X SUNPOWER Sun Power"X-Series: X22-370 ( X22-360 SunPowero Residential AC Module Built specifically for use with the SunPower Equinox"'system,the only fully integrated solution designed,engineered,and warranted byone manufacturer. Maximum Power. Minimalist Design. �iArm iii Industry-leading efficiency means more power and savings iim—C per available space.With fewer modules required and hidden microinverters,less is truly more. Highest Lifetime Energy and Savings. Designed to deliver 60%more energy over 25 years in real-world conditions like partial shade and high temperatures.' 150% '-- ---------------------------------- Fundamentally Different. 3 14 o. 130% And Better. a 120% SunPower X-Series up to >, 110% 60% 10096 more c 90% lifetime m so% energy T Conventional Module 70% of N 60% 0 5 10 1s 20 25 The SunPower"Maxeon®Solar Cell Years of operation • Enables highest-efficiency modules available 2 • Unmatched reliability 3 Best Reliability. Best Warranty. • Patented solid metal foundation prevents breakage and corrosion With more than 25 million modules deployed around the world,SunPower technology is proven to last.That's why we stand behind our module and microinverter with the industrys best 25-year Combined Power and Product Warranty,including the highest Power Warranty in solar. Factory-integrated Microinverter 1may • Simpler,faster installation a 98% a 96% • Integrated wire management, d 94% rapid shutdown v' 92% • Engineered and calibrated by more 0 SunPower for SunPower modules :; se% Conventional Module power q 84% 82% in year 3 a0% 25 0 5 11) 1s 20 25 Years of operation Datasheet X-Series: X22-370 I X22-360 SunPower°Residential AC Module AC Electrical Data Inverter Model:Type E(IQ 7)(5) @240 VAC Peak output Power 320 VA Max.Continuous Output Power 315 VA Nom.(L-L)Voltage/Range21 240/211-264 Max.Continuous Output Current(A' 1.31 Max.Units per 20 A(ILL)Branch Circuit' 12(single phase) CEC Weighted Efficiency 97.5% Nom.Frequency 60 Hz Extended Frequency Range 47-68 Hz AC Short Circuit Fault Current Over 3 Cycles 5.8 A rms Overvoltage Class AC Port III AC Port Backfeed Curren 18 mA Power Factor Setting 1.0 Power Factor(adjustable) 0.7 lead./ 0.7 lag. No active phase balancing for three-phase installatiors DC Power D. . and Compliance SPR-X22-370-E-AC SPR-X22-360-E-AC Warranties 25-year limited power warranty Nominal Power'(Pnom) 370 W 360 W 25-year limited product warranty _ Power Tolerance +5/-0% +5/-0% UL 1703 Certifications UL 1741/IEEE-1547 Module Efficiency 22.7% 22.1% and UL 1741 AC Module(Type 2 fire rated) Temp.Coef.(Power) -0.2996/°C -0.29%/'C Compliance UL 62109-1/IEC 62109-2 FCC Part 15 Class B •Three bypass diodes ICES-0003 Class B Shade Tolerance Integrated module-level maximum CAN/CSA-C22.2 NO.107.1-01 power point tracking CA Rule 21(UL 1741 SA)' (includes VolWar and Reactive Power Priority) Fested Operating Condmons UL Listed PV Rapid Shutdown Equipment" Operating Temp. -40'F to+185'F(-40°C to+85"C) Enables installation in accordance with: Max.Ambient Temp. 122°F(50°C) NEC 690.6(AC module) Max.Test Load? Wind:154 psf,7400 Pa,754 kg/m2 back NEC 690.12 Rapid Shutdown(inside and outside the array) Snow:208 psf,10000 Pa,1019 kg/m2 front NEC 690.15 AC Connectors,690.33(A)-(E)(1) Wind:62 psf,3000 Pa,305 kg/m2 back Design Load Snow:125 psf,6000 Pa,611 kg/m2 front When used with InvisiMount racking and InvisiMount accessories (UL 2703): Impact Resistance 1 inch(25 mm)diameter hail at 52 mph(23 m/s) Module grounding and bonding through InvisiMount Class A fire rated When used with AC module Q Cables and accessories(UL 6703 and Solar Cells 96 Monocrystalline Maxeon Gen III UL 2238)6: •Rated for load break disconnect High-transmission tempered glass with Front Glass anti-reflective coating PID Test Potential-induced degradation free Environmental Rating Module:Outdoor rated /ssam"+(613eQ .- Inverter:NEMAType 6 Class II Frame Class 1 black anodized(highest AAMA rating) + Weight 42.9 lb(19.5 kg) 46 mm Recommended Max. 1.3 in.(33 mm) Module Spacing i i 1 SunPower 360 w compared to a conventional module on same-sized arrays(260 W,16%efficient,approx. 1046 rr#v 1.6m2),4%more energyper wart(based on third-parry module characterization and PVSim),0.75%/yr slower 141.2 m.) +30mm—. degradation(Campeau,Z.at al."SunPower Module Degradation Rate,"SunPower white paper,2013). (1.2 t"') 2 Based on search of datasheet values from websites of top 10 manufacturers per l HS,as of January 2017, 3#1 rank in"FraunhoferPV Durability Initiative for Solar Modules:Part I"PVrech Power Magazine,2015. Campeau,z.etal.SunPowerModule DegradationRate,-SunPowerwhite paper,2013. 393 rmn 4 Factory set to 1547a-2014 defaultsettings.CA Rule 21 default settings profile set during commissioning. (15Sm.J 5 Standard Test conditions(1000 W/m'trradiance,AM 1.5,25°q NRELcalibration standard:SOMS current,. LACCS FF and voltage.All DC voltage is fullycontained within the module. 6 This product is UL Listed as PVRSE and conforms with NEC 2014 and NEC 2017 690.12;and C22.1-2015 -------"---- - "- -- Rule 64.218 Rapid Shutdown of Pv Systems,for AC and DC conductors;when installed according to 431— manufacturer'sinstructions. 7 Please read the safety and installation instructions for more information regarding load ratings and mounting configurations. K nauu O GEq SUMOer UgeY See www.sunpower.com/facts for more reference information. oY For more details,see extended datasheet wwwsunfwwec.com/datasheets Specifications rvwD swrtlawra SUNPOWER M un33o included m this datazheet are subject to change without notice. LISTED H7WC @2020SunPower cutporation.All Rights Reserved.SUNPOW ER,the SUNPOW ERlogo and Mole f.re Pedormmn:Type 2 MAXEON are registered trademarks of SunPower Corporation in the U.S.and other countries as well.1-800-SUNPOWER. Please read the safety and Installation Instructions for details. 531 945 RevC sunpower.com .c_ G LO The Right Way! " W J Y � M S-5-S Clamp The S-S-S clamp was created specifically for popular snap-together profiles— including residential profiles by Taylor Metals and Easy Lock Standing Seam. For horizontal seams under.540 inches N (like the Firestone UC4) the S-S-S or aF.. S-S-S Mini can be used to avoid the Onecessity of crimping the seam. s- Its simple design and size make it '�V' perfect for use with S-5! , snow retention � products and other heavy-duty applications. Installation is as simple 0 as setting the patented round-point O setscrews into the clamp, placing the 4_J clamp on the seam,and tightening them to the specified tension.Then, affix ancillary items using the bolt provided with the product.Go to >% www.S-5.com/tools for information and = tools available for properly attaching and tensioning S-5! clamps. cn O O v S-5-S Mini Clamp ca Cn � The 5-5-5 Mini is a bit shorter than the V S-S-S and has one setscrew rather than COtwo.The mini is the choice for attaching 4-0 all kinds of rooftop accessories: signs, walkways, satellite dishes,antennas, _ 0.0 rooftop lighting, lightning protection The S-5-S clamp was systems, solar arrays,exhaust stack created specifically for M bracing,conduit,condensate lines, mechanical equipment—just about popular snap-together M anything! profiles. LO a..d; M L "5-5!mini clamps are not compatible with,and should not be used with S-S!SnoRail"/SnoFence'"or ColorGard snow M retention systems. WMM 00 pierceThe strength of the S-5-S clamp is in its simple design. The patented setscrews will slightly dimple the metal seam material but not it— leaving roof RightThe The 5-5-S and S-5-S Mini clamps are each furnished with the hardware shown to the right.Each box also includes a bit tip for tightening setscrews using an electric screw M8-1.25 X 16.00 n1m gun.A structural aluminum attachment clamp,the S-5-S Hex Flange Bolt is compatible with most common metal roofing materials excluding copper.All included hardware is stainless steel.Please visit www.S-5.com for more information including CAD details,metallurgical compatibilities and specifications. The S-5-S clamp has been tested for load-to-failure ' 1 results on most major brands and profiles of standing P E seam roofing.The independent lab test data found at Threaded s Thr Hole www.S-5.com can be used for load-critical designs and applications.S-5!"holding strength is unmatched in the o industry.Profiles that are shaped as illustrated below will work with the S-5-S and S-5-S Mini.In order for the S-5-S or S-5-S Mini to fit these types of seams,the finished seam must: Two 318-24 X 0.80" • Be at least 1.00"high. Round-Point Setscrews • Have a height distance less than or equal to 0.25" between the male portion of the panel and female portion of the panel. S-5-S Mini Clamp Example Profiles S o z v i o V Please note:All measurements are rounded to the second decimal place. S-5!'Warning!Please use this product responsibly! Distributed by Products are protected by multiple U.S.and foreign patents.Visit the website at www.S-5.com for complete information on patents and trademarks.For maximum holding strength,setscrews should be tensioned and re-tensioned as the seam material compresses.Clamp setscrew tension should be verified using a calibrated torque wrench between 160 and 180 inch pounds when used on 22ga steel, and between 130 and 15o inch pounds for all other metals and thinner gauges of steel.Consult the S-51 website at www.S-5.com for published data regarding holding strength. Copyright 2021 Metal Roof Innovations,Ltd.S-51 products are patent protected. S-51 aggressively protects its patents,trademarks and copyrights.Version 081721.