Loading...
HomeMy WebLinkAboutCOM2024-00050 Cell Tower Upgrade - COM Inspections - 10/23/2024 INSPECTION CARD Mason County 615 W. Alder St. Building 8, ,Shelton, WA 98584 360-427-9670 ext 352 f www.masoncountywa.gov PERMIT# COM2024-00050 PROJECT ADDRESS 19941 E State Route 3 Allyn,WA 98524 PARCEL# 122172200032 PROJECT DESCRIPTION ' Cell Tower Modification OWNER JUDGE ET AL BROOKE A ADDRESS BRENT W BRAKKE PHONE CONTRACTOR ADDRESS PHONE CONTRACTOR LICENSE LENDER INSPECTION INSP DATE Comments INSPECTION INSP DATE. Comments l KNOX BOX VERIFICATION ,c6C- I/O-z3 jzq BLD-Final Inspection Z t� ra Electric Tech Construction, Inc. 1910 Mark Court, Ste. 130 ATE H Concord, CA 94520 CONMUCTION.INC. Phone: 925-849-5324 Fax: 925-849-5356 www.etech-inc.net NOTICE OF COMPLETION ATTN: Mason County Permit# COM2024-00050 FROM: E-TECH CONSTRUCTION DATE: 10/23/2024 SITE NAME: ALLYN DEVEREAUX LAKE SITE NUMBER: AT&T TA3 3 77 This is to certify that I, Kevin Robison, am an authorized official of the-above Firm or Corporation working in the capacity of Project Manager and have been-properly authorized by said firm,or corporation to sign the following statements pertaining to the subject contract. I know of my own personal knowledge, and do hereby certify, that the work of the contract described above has been performed, and materials used and installed in every particular, in accordance with, and in'conformity to, the contract drawings and specifications. The contract work is now substantially complete in all parts and requirements, and ready for your final inspection. s I.understand that neither the determination by the Engineer -Architect that the work is complete nor the acceptance:thereof by the Owner, shall operate as a bar to claim against the-Contractor under the terms of the guarantee provisions of the contract documents. TITLE: Project Manager Signature: K��V�VI. R,D�OI,SOVI• Date: 10/23/2024 Mason County Mason County - Division of Community Development 615 W.Alder St. , . . Building 8 Shelton,WA 98584 360-427-9670 ext 352 www.masoncountywa.gov FPROJECT 4-00050 CELL TOWER UPGRADE ESCRIPTION: CELL TOWER MODIFICATION ISSUED: 08/06/2024 ESS: 19941 E STATE ROUTE 3 ALLYN EXPIRES: 02/02/2025 PARCEL: 122172200032 APPLICANT: AT&T-HALE, KEN OWNER: JUDGE ET AL BROOKE A 802 W. 19th Street BRENT W BRAKKE Tempe,AZ 85281 GIG HARBOR,WA 98335 4803954299 VALUATIONS: FEES: Paid Due Project Valuation (BID, 25000.00 $25,000.00 Building Permit Fee $414.97 $0.00 ESTIMATION..) Technology Surcharge $13.69 $0.00 Plan Check Fee $269.73 $0.00 State Fee-Commercial $25.00 $0.00 Planning Commercial Review $380.00 $0.00 Fee Total: $25,000.00 Totals : $1,103.39 $0.00 REQUIRED INSPECTIONS KNOX BOX VERIFICATION BLD-Final Inspection CONDITIONS * All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed.The Building Official may grant one or more extension of 180 days, upon the receipt of a written extension request prior to permit expiration. Letter must indicate that circumstances beyond the control of the permit holder prevented action from being taken. All changes to"approved"building plans that effect compliance with the international codes as amended and adopted, or, any other Mason County ordinance or regulation, must be reviewed and approved by Mason County prior to construction. Printed by:Annie Wilson on:08/06/2024 11:50 AM Page 1 of 3 Mason County Mason County - Division of Community Development 615 W.Alder St. Building 8 Shelton, WA 98584 360-427-9670 ext 352 www.masoncountywa.gov CELL TOWER UPGRADE COM2024-00050 * CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE ADOPTED BUILDING CODE. The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance with the international codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Building Inspector shall be made prior to requesting additional inspections. _ * All RED stamped approved plans are required to be on-site for inspection purposes. If an inspection is called for and plans are not available on site,then approval will not be granted. In addition, a re-inspection fee(refer to current fee schedule, minimum 1 hour)will be charged and must be collected by the Building Department prior to any further inspections being performed or approvals granted. _-------------------------------____--------------------------_-------- ____________. * OWNER/BUILDER acknowledges submission of inaccurate information may result in a stop work order or permit revocation.Acknowledgement of such is by signature below. I declare that I am the owner, owners legal representative, or contractor. I further declare that I am entitled to receive this permit and to do the work as proposed. I have obtained permission from all the necessary parties, including any easement holder or parties of interest regarding this project.The owner or authorized agent represents that the information provided is accurate and grants employees of Mason County access to the above described property and structure(s)for review and inspection. This permit/application becomes null & void if work or authorized construction is not commenced within 180 days or if construction work is suspended for a period of 180 days. PROOF OF CONTINUATION OF WORK IS BY MEANS OF INSPECTION. INACTIVITY OF THIS PERMIT APPLICATION OF 180 DAYS WILL INVALIDATE THE APPLICATION UNLESS OTHERWISE APPROVED., ------------------------------------ * Approved per dimensions and setbacks on submitted site plan. Setbacks are measured from the furthest projection of the structure. ---------------------------------------------------------------------------------------------------------------- * Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division.There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1-800-647-0982.The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. * All construction must meet or exceed all local and state ordinances in addition to the International Codes requirements as adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in permit revocation. ____-------I________________________________________________________________.-------.------------------------- * The plan review check list and corrections are part of the approved plans and must remain attached. It is the responsibility of the applicant, owner or contractor to make the required corrections indicated on the plans. Once the plans are marked "APPROVED",they shall not be changed or altered without authorization from the Building-Official. The permit holder is responsible to retain the complete approved set of plans on site for the duration of the project. Failure to comply and/or removal of approved documents-will,result-in-failure-of required building inspections. * All building permits shall have a final inspection performed and approved by Mason County Building Department prior to permit expiration.The failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with Mason County ordinances and building regulations. ----------------____________________________________r.---._.__..______-------------------.------ * The stamped approved site plan is required to be on-site for inspection purposes. If an inspection is requested and the approved site plan is not on site, approval will not be granted. In addition, a re-inspection fee(refer to current fee schedule, minimum 1 hour)will be charged and shall be collected by the Building Department prior to any further inspections being performed or approvals granted. ---------------------------------------_----------------------------------.------_________________________. * All surface water and potential runoff must be controlled on site and shall not adversely affect any adjacent properties nor increase the velocity flow entering or abutting to any state or county culverting/ditching system or road way. _____-_______________._________________________________________________.______________________________________.__. * Owner/Agent is responsible to post the assigned address and/or purchase and post private road signs in accordance with Mason County Code 14.28 and 14.17. * Comply with requirements of Mason County ORD 5-98 ----------------------------------------------____---------_---------_-------------------_---------____________. Printed by:Annie Wilson on:08/06/2024 11:50 AM Page 2 of 3 Mason County Mason County - Division of Community Development 615 W.Alder St. iwrv- IBuilding 8 Shelton,WA 98584 360-427-9670 ext 352 www.masoncountywa.gov CELL TOWER UPGRADE COM2024-00050 hereby certify that I have read and examined this application and know the same to be true and.correct. All provisions of Laws and Ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any other stat`ee/local law, regulating construction or the performance of construction. Issued By: A10A,'e, UoLL Contractor or Authorized Agent: Date: i Printed by:Annie Wilson on:08/06/2024 11:50 AM Page 3 of 3