HomeMy WebLinkAboutMIS96-0452 Foundation - BLD Permit / Conditions - 7/30/1996 MASON COUNTY
Mason County Bldg. III 426 W. Cedar `
P.O. Box 186 Shelton, Washington.98584
Wo I `:C r, I<.— 1— A N V= Q F—)�S; I I- Ike rvi I r bR INSPECTIONS CALL 427—•i)610.,'�
M1396-0452 PARCEL 1320^48090163 PLAT - ' ICI V i? I3I..h: : L.OT ,?
JOB .AI>t?1'tF,SS s r: 500 L I6BY HD S1^lEl_TON .
,,APPL I C'ANT : R I CIIAVD PAPRET+
B
fltvNE R s 111 CIW1T9 PARRIrTT - � �, � &�:p�� Cam,"
LEGAL c SOUTH PUGIT SOUND FARMS PTH OF 111 2 TL k 119 INT TAX 261
PROJECT DESCRIPTIONt ID
FOUNDATION ONLY
PROJECT LOCATION c
AGATE RD TO AGATE STORE LEFT TO L IT BY 1-11) A1nPROX 146 &11 LE 014 R 113TIT S I n- N POST SAYS h 4cm TAKE
LI FT FORK IN OR-1 VEWAY .
s,
PROJECT NOTESt
T v P r; AMOUNT BY DATE B CT I PT
[TOTAL c 44 .50 avVyAlIff" p �"`A�roC?I�i..I. 6ATI
O S_PRMT, Feu c 041Ij3 t 92 COt PI.I ANG.E TO ATTACIiEC1 CONDITIONS IS
Tt1�.f�I.11 RI:=1�
.'r
CONCRETE MECHANICAL MOBILE HOME
Footings-Setback date by Ribbons
date by Gas Piping date b
Foundation Walls date by Set Up
date by INSULATION date by
BG/SLAB Insulation Floors Final
date FRAMING by date by date by
Walls FIRE DEPT.
date
PLUMBING by date by date by
Attic OTHER
Groundwork
date by date by
D.W.V. WALLBOARD NAILING
date by date by
Water Line FINAL INSPECTION
date by date by date by
MASON COUNTY
Mason County Bldg. III 426 W; Cedar
P.O. Box 186 Shelton, Washington 98584
case No (A 1396-0452
Page , l 5f
I ? Proposed ;a•truc't<urco or arty ganr't i ovi uiereoT oreatea• t,i'ran moo" irk -tic-ociii -prom grade line,
III us't ttaa i i-a l n ,lr i n l romp of S " setback from all property l i nee, easements and right of
2} A t i up i and ; nrcr~���d l stui,,t)eof o r° ew i v creat:e '66:struot Ron act i v l t i es shelf be, Seeded,
vegetatpd 'ry%r? ghee some other e tv l va l cent type of protection against Oros i on .
The proposed pro J ect Inus.t be rjon i rten't w i tip a l l app i i aac i:p i e po i i r i ces an(j other
prov i 4, I oos f}F' the siiore i i no Management Aot , its rules, and the Mason County Shovr e i 1 lie
M&Ster ' jam► T ra69/
4 � All approvod plans a.r6� requ i r'ed 'to :Da can-s i tiq for i rdspea► i pan purposes . 'AT l agpeot i on
is called for and plans are, not on site, Approval Wit.i_ NOT !Ie grunted a $ n addition a
CONCRETE MECHANICAL MOBILE HOME
Footings-Setback date by Ribbons
date by Gas Piping date b
Foundation Walls date by Set Up
date by INSULATION date by
BG/SLAB Insulation Floors Final
date FRAMING by date by date by
Walls FIRE DEPT.
date by date by date by
PLUMBING Attic OTHER
Groundwork
date by date by
D.W.V. WALLBOARD NAILING
date by date by
Water Line FINAL INSPECTION
date by date by date by
MASON. COUNTY
Mason County Bldg. 111 ,426 W.. Cedar
P.O. Box 186 Shelton, Washington 98584
tia- irisipcic-c tort -reez- in -trio amount of s3fokjo per nour (tea inimum -i nous- ) wili F-7, o"argeo ario
must be oollected/by this department prior to any further Inspect Ions being performed or
approval c r a n t(*jl
—zz/-/—
PUNSUAm,r TO 1991 UNIFORM BUI Lid INQ GOD , SLUT lON "3305K) AND SECTION 513, - ALL sl-rEfs MUST
HAVE APPROVED NUMBERS OR ADDRESSES', PROVIDr--6 IN SUCH A POSITION AS TO BE: -PLAINLY VISIBLE
Titr PIROPERTY . MASON COUNTY BIJ I LD I NG
AND LEGIBLE FROM TI-IE STREET On ROAD F11ONTING
DEPARTMENT REQUMES THAT T1418 BE COMPLETED PRIOR TO CALLING FOR ANY SITE INSPECTIONS . A
REINSPECTION FEE , IFAS'E.D ON RATES IN TABLE SA OF THE -1091 UNtram BUILDING CODE WILL SE
AS 3r-.SSED IF OWNFR/CONTRACTOR FAILS TO POST ADDRESS ON SITE PR.IOn TO REQUESTING
INSPECTIONS .
6) ALL. CONI, TAUCIV`I ON MUST 4EET OR EXCEED ALL LOCAII. DES AND UN! FORM BLI I LD I NG
CODIE
I I NANCF
F51"113f.-FION MUST MEET REQUIRED �,-ETBACKS AS ESTABLISH ED PER MASON COUNTY OrM
I -
138-92 AND MASON COUNTY SNORELHNE MASTER PnOGRAM IF APPLICABLE .
IF THE FOUNDATION IS PLACED IN VIOLATION OF ANY MASON COUNTY REGULATION, IT WILL 11E TI-IE
OWNERS LIABILITY TO REMOVE SAIC.} CONSTRUCTION AT THE OWNEIRS EXPENSE Awl) TO DO 80 WITHIN
THE TIME SPECIF,1,01) BY THE CCU ILDIN(1 OFFICIAL . IT SHALL BE DEEMED A VIOLATION FOR A(N'Y
V-1100D FP1AME,-AONS1f BEGIN ON THIS FOUNDATIbN Irk I -114OUT THE ISSUED 13[JiLDING PERMIT .
AI,-A- 1-0(',AL G 0 1)E',13 AN' D USr�
7) ALL CONSTRypr/r I opl//KUST IVJEET Oil Excr-,
REGO I AEMENly's
8 ) Chang6,,,c, t(i approved bul IdIng pl a ris. that of eot comp I IfAnce to t 1-1 e 1991, Washington State
Energy Code, 1991 ventilation and Indoor Air Quality
Godo, the Unifor-m Building Cof���_pd/or Mason Cone my nocitt I at Ions twist be approv,ed hV
CONCRETE MECHANICAL MOBILE HOME
Footings-Setback date by Ribbons
date by Gas Piping date b
Foundation Walls date by Set Up
date by INSULATION date by
BG/SLAB Insulation Floors Final
date by date by date by
FRAMING Walls FIRE DEPT.
date by date by date by
PLUMBING Attic OTHER
Groundwork date by
date by WALLBOARD NAILING
D.W.V.
date by date by
Water Line FINAL INSPECTION
date by date by date by
R
31 ALL cows UCT t€ N mu 1,'rr ma w,'t
0,1UST I ONS, PLEA',F.
OC � C VV
CALL THIS OFFICE RE ST 4
�-
Mason County Bldg, III 426 W; Cedar
P,O, Box 186 Shelton, Washington 98584
10) CONSTRUCTION. PROC:E,S&' TO BF r t E L1) !�f RREC 17r;D "A 1/1 �t�1?; D Ear MASO ' C`n�l'hR•i"Y BUILDING
DEPARTMENT ANC UN t FORM BU t �: DI t�tG CQ�+r :�
S ,
CONCRETE MECHANICAL MOBILE HOME
'Footings-Setback date by Ribbons
date by Gas Piping date b
Foundation Walls date by Set Up
date by INSULATION date by
BG/SLAB Insulation Floors Final
date by date by date by
FRAMING Walls FIRE DEPT.
date by date by date by
PLUMBING OTHER
Groundwork Attic
date by date by
D.W.V. WALLBOARD NAILING
date by date by
Water Line FINAL INSPECTION
date by date by date by
J
1
1
Permit No.
MASON COUNTY
BUILDING PERMIT APPLICATION
426 W. Cedar/P.O. Box 186, Shelton, WA 98584 427-9670/1-800-562-5628
PLEASE PRINT
#eSiteAddress'
'Phone#
Fire District#-St Zip
Directions to Job Site � �^
c
Gi=
Owner Mailing Address a /1
City =�/sl y %�,�_/ StZ' C
Lien/Title Holder
Address
Clty St Zip
#2 Contractor Name ,/ f,��l=G= �y�1G,�� Contractor Reg#
- Address Expiration Date
City St Zip Phcy+rly
#3 If septic is located on ro'e ite include records. V
P P J
Connect to Septic? Public Water Supply.Well {� ✓G
Connect to Sewer System? Name of System
(If re identi I, proof of potable water is required)
# Parcel No -- - - -_ —_ - --- - Te3
Legal Description
UAIP
#5 Building Square Footage: (existing/proposed) n
1 st FI / 2nd FI / 3rd FI / Loft /
Basement Deck / #bedrooms / #bathrooms /
Gar (Circle:Attached or Detached?)
erK C1 sq.ft. 770 Y /
#6 Use of building _r���� � �`� Describe work
#7 Type of Job: New Add Alt Repair OtheyA/gC��'G/���j��
#8 MOBILE/MANUFACTURED HOME INFORMATION
Model Year Make Model
Length Width Serial No.
#Bedrooms #Bathrooms Type of Heat
Purchase Price$
#9 Indicate by circling the applicable source if any water is on or adjacent to subject property:
River Pond Creek Stream Wetland Lake Marsh Saltwater Seasonal Runoff Other
Show following on the site plan
Lot Dimensions, Flood Zones �.
Existing Structures Fences ;
Structure Setbacks , Driveways
Water Lines Shorelines
Drainage Plan Topography
Septic Systems Wells
Proposed Improvements Easements Indicate Directional b N, S, E, W)
Name�of Flanking�Street .in relation t y of Ian
Name of Fronting Street p p
APPLICANT TO DRAW SITE PLAN BELOW
APPLICANT TO DRAW TOPOGRAPHY PROFILE BELOW
r
"
Plumbing Fixtures ($3.25 each) Fee Mechanical Fixtures ($6.50 eachl
No. Toilets CIRCLE FUEL TYPE: Gas, Electric,
Bath B ins Heatpump, Other
Bath Tubs No. Units Fees
Showers Furn B
_Hot Water Htr _ Heatpump
_Laundry Washer _ Ve ystems
Sinks Spot Vent Fans
Floor Drains o. Boilers/Compressors
_Laundry Basins _ HP
Dishwasher No. Air Handling Units
_Disposal _ cfm#
Urinals No. Fire Protection Systems
Other Auto. Fire Alarm Sys 50.00
Fixed Fire Supp. Sys 50.00
Permit Basic Fee 16.25 to Fire Sprink Sys 35.00
TOTAL PL BING $ No. Othe
Gas Out is
Wood, Gas, ellet Stove
NOTICE: THIS PERMIT BECOMES NULL AND'VOID IF -
WORK OR CONSTRUCTION AUTHORIZED IS NOT COM-
MENCED WITHIN 180 DAYS OR IF CONSTRUCTION OR Permit Basic Fee' 16.25
WORKIS SUSPENDED OR ABANDONED FORA PERIOD TOTAL MECHANICAL $
OF 180 DAYS AT ANY TIME AFTER WORK IS COM-
MENCED. PROOF OF CONTINUATION OF WORK IS BY
MEANS OF A PROGRESS INSPECTION.
OWNERS AFFIDAVIT CONTRACTORS AFFIDAVIT
I CERTIFY THAT I AM EXEMPT FROM THE REQUIRE- I CERTIFY THAT I AM A CURRENTLY REGISTERED
MENTS OF THE CONTRACTORS REGISTRATION LAW CONTRACTOR IN THE STATE OF WASHINGTON AND I
RCW 18.27, AND AM AWARE OF THE MASON COUNTY AM AWARE OFTHE ORDINANCE REQUIREMENTS REGU-
ORDINANCE REQUIREMENTS FOR WHICH THIS PER- LATING THEWORK FOR WHICH THE PERMITIS ISSUED
MIT IS ISSUED AND THAT ALL WORK DONE WILL BE IN AND ALL WORK DONE WILL BE IN CONFORMANCE
CONFORMANCE THEREWITH.NO CHANGES SHALL BE THEREWITH. NO CHANGES SHALL BE MADE WITHOUT
MADE WITHOUT FIRST O INING APPROVAL FROM FIRST OBTAINING APPROVAL FROM THE BUILDING
THE BUILDING T. DEPARTMENT.
X OWNER X BY
DATE DATE
01
.;
FOR OFFICIAL USE ONLY Accepted by Date'
DEPARTMENTAL REVIEW
FOR OFFICE USE ONLY
Approved Cond. Hold
Approval
Planning.
Environmental Health:
Building Plan Review Vj L,�.
Occupancy Group: Type of Const:
Fire Marshal:
Y
e
Other:
Special Conditions: FEES
Building PermitVW
Plan Check
) u
Plumbing Fee
Mechanical Fee.
Wood/G'as/Pellet Stove
Radon Monitor
Violation Fee
A= Site Inspection
Building State Fee
Other
Other
Building Valuation: TOTAL FEE