HomeMy WebLinkAboutMIS98-0701 Propane - BLD Permit / Conditions - 12/21/1998 MASON COUNTY Lilly
Mason County Bldg. 111 426 W. Cedar
P.O. Box 186 Shelton, Washington 98584
F- t— 11--A N F C1 tJ �} p FE R m I -T FOR INSPECTIONS
MIS98-0701 PARCEL : 123294300060 PLAT ,, DIV -, BLI<. .- LOTs
JOR AMRFS-St Hi NU HFIFAIR ST BELFAIR
APPLICANT : DAM. ROESSEL 360-275-2559
OWNER : DAHI. V ROFS8UL 360-275-2559
LEGAI. , T1 6 Of SO Sr
PROJECT DESCRIPIAON -
PROPANE TANK, GAS STOVE
PRO-MT I-OCATION :
TURN AT KEY BANK, ONLY SINGI.F WIDE TRAIMI (IN LEFT, 4HAY AND WHITF
PROJECT NOTES :
TYPE AMOUNT BY DATE RECEIPT
MCFF * 2 0 .IS 0 K.: 12/21 /96 49101
m c B f-11 * 22 �00 K8 12/21 /98 49101
TO*I*AL. 42 ,50 OWNER OR AGENT D ATip
118 ?$if, rev: 041#1192, COMPLIANCE TO ATTACMED CONDITIONS IS
REQU I HU D
CONCRETE MECHANICAL MOBILE HOME
Footings-Setback date by Ribbons
date by Gas Piping date b
Foundation Watts date /2- b % Set Up
date by INSULATION date by
BG/SLAB Insulation Floors Final
date by date by date "7 by
FRAMING Walls FIRE DEPT.
date by date by date by
PLUMBING OTHER
Groundwork Attic
date by date by
D.W.V. WALLBOARD NAILING
date by date by
Water Line FINAL INSPECTION
date by I date by date by
MASON COUNTY
Mason County Bldg. 111 426 W. Cedar
P.O. Box 186 Shelton, Washington 98584
P F F3 1\11 I f 4:7, C.) 114 U-1 I 'T_ I (I N
Case No . i MIS980701
For DAHL, F nOF8SFL
Page I
1 ) PURSUANT 'TO 1994 UNIFORM BUILDING CODE , ALL, (3,1TE MUST BE MARKED WITH APPROVED NUMBURS
OR ADDRESSES PROVIDED IN SUCH A POSITION AS TO BE PI..AINI_Y VISIBLE AND LEGIBLE F'ROM THE
STREET OR ROAD rnONTING THE PROPFRTY , MASON COUNTY BUILDING D17PARTMENT HFOUIRLES TIJAT
THIS BE COMPLETED PRIOR TO CALI- ING FOR ANY SITE INSPECTIONS , A REINSPECTION FEE , BASED
ON RATES IN 4ABIr- 3A OF THE 1994 UNIFORM BUILDING CODF W11. 1 BF ASSF'SSED IF
OWNER/CP*TRACTOR FAII-S TO POST ADOPESS ON SITE PRIOR 1-0 REQUESTING INSPECTIONS .
X
2 ) The owner h,tt t have available on site for lwpeetion by Mason County . a r-eq:wrt
Indicating the name and Ito-ense number of the Installer , the amount of pressure at the
time, of testing and the lorogth of tost tifne . Th1 % report sh,'kil be signed by -the person
conducting the test OR the lines shall be under pressure for a minimum of 15 minutes at
10 lbs and have aocurate pret ,,uro jau4qe on t; fte under test ref lectiytg 1 &st roqljiremerits
at-- .t: lme, 6f I nspect f of) .
X
CONCRETE MECHANICAL MOBILE HOME
Footings-Setback date by Ribbons
date by Gas Piping date b
Foundation Walls date by Set Up
date by INSULATION date by
BG/SLAB Insulation Floors Final
date byAMING date by date by
Walls FIRE DEPT.
date by date by date by
PLUMBING OTHER
Groundwork Attic
date by date by
D.W.V. WALLBOARD NAILING
date by date by
Water Line FINAL INSPECTION
date by date by date by
MASON COUNTY
Mason County Bldg. III 426 W. Cedar
P.O. Box 186 Shelton, Washington 98584
i . Tank is to be io feet from any tau id l 1 ng, purl i c way or property i i ne .
2 . if the tank is exposed to probable vehicular damage, Provide
ide
protective bollards .
3 . R11 weed, , <irrt , brush , trash and other• oomhu€yt1ble> material
shal i he kept a minimum of io feet away fram t_P o+antainers .
X ' �
CONCRETE MECHANICAL MOBILE HOME
Footings-Setback date by Ribbons
date by Gas piping date b
Foundation Walls date by Set Up
date by INSULATION date by
BG/SLAB Insulation Floors Final
FRAMING by date by date by
Walls FIRE DEPT.
date by date by date by
PLUMBING OTHER
Groundwork Attic
date b date by
D.W.V. WALLBOARD NAILING
date by date by
Water Line FlNAL INSPECTION
date by date by date by