HomeMy WebLinkAboutBLD96-0115 Final Storage and Garage - BLD Permit / Conditions - 8/20/1996 At i MASON COUNTY
Mason County Bldg. 111 426 W. Cedar
P.O, Box 186 Shelton, Washington 98584
I f1_11 C4 P IFF R M I _f_ FOR INSPFCTIONS CALL 427-9670
BETWEEN 5pm AND Sam 427-7262
BLD96--0115 PARCEL. :319053300000 PLAT DIVt BLI( i LOT :
JOB ADDRESS - SE 113 RYAN RD S"FLTON
OWNERt WASH INGTON HOME CENTER 748-6604
CONTRACTOR :
LEGAL : $1 So $111 EX IIII
CLASS OF WORK . . :NEW BE DR : 0 BATH ; 0 TYPE ANOINT BY DATE RfC1I?T TIFF ANAVIII) By DATE pfcfi PT
TYPE OF USE . . . . :ACC STORIFS . . . . . . . PO
OCCUP . GROUP . . . t 7 BLDG . HEIGHT . . : O .Oft ?Rol 1; 0.58 BkC 113/08''46 11 4142
TYPE OF CONST . . ;? FIREPLACES . . . . : 0 Pict 11 36.50 BI C 0308;96 41420
OCCUP . LOAD . . . . - 0 WOODSTOVES . . . . : 0 Siff 1 4.50 8;c 03/08146 414211
DWELL .UNITS . . . . . 0 PARKING SPACES ! 0
INSPECTION AREA : 2 SHOREL I NE 7 . . . . :N ITOTAL: 136.50 V411IL1,1100t 1 016
SETBACKS- TOILETS . . . . 0 FUEL TYPES-- BOILERS/COMP---- MOBILE HOME----
FnON'T _ O .Oft BATH BASINS . . . . . . 0 03 HP — 0
REAR _ . O .Oft BATH TUBS . . . . . . . . 0 3-15 HP . : 0 MODEL :
SIDE: ( l ) . O .Oft SHOWERS . — I . . . . . 0 FURN < 100K BTU ; 0 15--30 HP . i 0 44AV+_ __.._
SIDE (2 ) . O .Oft WATER HEATERS . . . . 0 FURN >-100K BTUs 0 30-50 Hp . : 0
SHP L I NE O .Oft CLOTHES WASHERS . . t 0 FURN -- FLOOR — i 0 Solt- HP . : 0 - YEAR--,,-,---.-
AREA KITCHFN SINKS . . . . : 0 HEAT PUMP . . . . . . : 0
LOT SIZF . . t FLOOR DRAINS . . . . . : 0 VENT SYSTEMS — : 0 EVAP COOLERSt 0 LENGTHt 0
BUILDING _ - Osf DRINKING FOUNT . . . 1 0 VENT FANS — _ .- 0 HOODS . . . . . - 1 0 WIDTH . t 0
BASEMENT . . . t ost LAUNDRY TRAYS . . . . : 0 DOMES . INCIN :O --,--'E R I A I IN---
DECKS . . . . . . i Oat DISHWASHERS . . . . . . , 0 AIR HANDLING UNITS- - COMM[ , INCIN -0
GAR/CARP :? Ost GARB DISPOSALS . . . : 0 < 10000 cfm : 0 RELOC/fIFIPAIR : 0
AT/DT . i? URINALS . . . . . . . . . . . 0 > 10000 clom . l 0 OTHER UNITS . : 0
MISC PIM FIXTURES : 0 GAS OUTLETS . : 0
'PROJICY IOCATION:Hwy TO RYAN RD
THIS PFAVIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION tWINORlifu is 001 CONIficto 111HIN I$# DAYS, ON If CONSTRUCTION OR WORK Is Suspf41f)(11 FOR A PERIOD
OF I11# DAYS AT ANY FIVE AFTER WORK IS COINZ11CF8. LVIDEICF Of C0111HAVATION OF WORK IS A PROGRESS IN33PECTION WITHIN THE 189 DAY PERIOD, FINAL INSPECTION MOST BE
APPROVED BEFORE BUIt0t#6 CAN BE OCCUPIED.
01019 OR AGfNl,, DATE
BLI-PAIT, rev; 03131191 COMPLIANCE TO ATTACHED CONDITIONS IS REQUIRED
CONCRETE MECHANICAL MOBILE HOME
Footings-Setback date by Ribbons
date by Gas Piping date b
Foundation.Walls date by Set Up
date by INSULATION date by
BG/SLAB Insulation Floors Final
date by date by date by
FRAMING Walls FIRE DEPT.
date by date by date by
PLUMBING Attic OTHER
Groundwork
date b date by
D.W.V. WALLBOARD NAILING
date by date by
Water Line FINAL INSPECTION
date by date zo ! L by date by
—— — — — — ————— —
MASON COUNTY
Mason County Bldg, 111 426 W. Cedar
P.O. Box 186 Shelton, Washington 98584
pFnm 1 71- (_1C3ND I _r I C) N14:3
Case No , : BLD960115
For : WASHING70N HOME CENTER
Page ! I
1 ) Permit- sul:�ct to at I condit Ions I Jsted In permit #Bl.D96--0117
X
2 ) All approved plans are required to be on- site for iris eation purposes . If Inspection
ts oalled for and plans are not on site , Approval WIFL NOT Vie granted , In addition, a
Re- inspection fee in the -4mount of $30 .00 per hour (minimum I hour ) will be chArged and
must be collected by this department prior to any further ln,;p(.*tct tons being perrforive-d or
approval guanted .
X
3 ) PURSUANT TO 1991 !IN IFORM BUILDING CODE , SECTION 305(C ) AND SECTION 513 , ALL SITES MUST
HAVE APPROVED NUMBERS OR ADDRESSES PROVIDED IN SUCH A POSITION AS TO BE PLAINLY VISIBLE
AND LEGIBLE FPOM THE STREET OR POAD FRONTING THF PROPERTY . MASON COUNTY BUILDING
DEPARTMENT REQUIRES THAT THIS BE COMPLETED PRIOR TO CALLING FOR ANY SITE INSPECTIONS . A
REINSPECTION FFF BASED ON RATFS IN TABLE 3A OF *THE 1991 UNIFORM BUILDING CODE WILI BE
ASSESSED IF OWNER/CONTRACTOR FAILS TO POST ADDRESS ON SITE PRIOR TO REQUESTING
INSPECTIONS .
X
4 ) The correction lli=t , along with the Fner(ly Compliance Worksheet (when applicable) Is
part of the plans and must remain attached thereto . It Is the responsibility of the
applicant to make corrections indicated on theXans from the correction Onoe
the plant are marked APPROVED, they may not be anged or altered without authorization
from the Bitilding Offleial . The permit holder Is reponsible to retain the completer
approved set of plans on site for the duration of the project . Failure to comply will
result In failure of required buildinq inspections . Every shall expires
limitation and become null and void it the buildIn Or work e
ilt horized by s uo. permits
is not oommenced within 180 days from the (late of Issuances, or If the building or work
authorized by such permits is st,ispended or aban4onq at any time after the work is
commenced for a period of 180 days . —
5 ) THIS STRUCTURE IS CONSIDERED UNHEATED SPACE (NOT TO EXCEED I WATT/SQUARE FOOT OR 3 .4
BTU/HP/SQUARE. FOOT) . AT SUCH TIME THIS CONDITION CHANGES, A CHANGE OF USE PERMIT AND A
MECHANICAL PERMIT SHALL BE APPLIED FOR AND APPROVED PRIOR TO THE CHANGE , X
------------------- ------
MASON COUNTY
Mason County Bldg. 111 426 W. Cedar
P.O. Box 186 Shelton, Washington 98584
6 ) No OcoupancV . This i3truoture is I imitect to wi use only . Any other- use will be in
violation of the Uniform Building Code and Mason County4egulations
unless a "Change of (Ise" permit is approved . X
7 ) The use , handling and storage of hazardous materials or flammable and combustible
liquids In excess of 10 gallons is not allowed without the approval of the Mason Counts
Fire Marshal ,
8 ) ALL CONSTEUCT ON MUST MEET OR EXCEED ALL LOCAL CODES AND UBC REQUIREMENTS .
X
9 ) Proposed structure or portions thereof with an projection over 30" In height from grader
line , must maintain a 5 ' separation -4 ! stance between adjacent structures and that
f(Irthest projection ,
10) Chanqen to approved building plans that effect compliance to the 1991 Washington State
Energy Code , 1991 Ventilation and Indoor Air Quality
Code, the Uniform Building Code and/or Mason County Regulations must
be approved by Mason Courify prior to construct I o n X
11 ) ALL CONSTRUCTION MUST MEET' OR EXCEED LOCAL CODES . IF ANY QUESTIONS, PLEASE
CALI. THI ' OUICE BEFORE CONSTRUCTION .
X
12 ) CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIR D PER MASON COUNTY BUILDING
DEPARTMENT AND UNIFORM BUILDING CODE .x
13 ) Building will be placed 100 feet from the well and this buildinq will not be used .48
the pumphouse
14 ) This Iei considered an unheated structure . At such time this condition changes a
change of' use and a mechanical permit shall be applied for and approved prior to work
being performed .
X
--------------------------------------------------
Page No. 1 CASE HISTORY FOR CASE NO.: BLD96-0115
WASHINGTON HOME CENTER
SE113 RYAN RD SHELTON
08/21/96
Action Description Req/ Schd/ End/ Action Notes Disp By Update Upd
Code Sent Done Done Date By
BLDA010 Application received / / / / 02/08/96 02/08/96 KW
BLDA500 (F) Issue building permit / / / / 03/08/96 DONE CPH 03/08/96 CPH
BLDA920 Miscellaneous action / / / / 03/08/96 2/29/96 GARY YANDO LIFTED HOLD, CPH ATTN CPH 03/08/96 NJP
BLDB110 Structural Plan Review 02/29/96 / / 03/01/96 DONE GDR 03/01/96 GDR
BLDB120 WSEC Compliance Review 03/01/96 / / 03/08/96 see condition lighting will be discussed DONE TDH 03/08/96 TDH
in the near future per Reneker
BLDB130 Planning Review 02/09/96 / / 02/29/96 DONE PBC 02/29/96 PBC
BLDB134 RLC Checklist Review / / / / / / 02/08/96 KW
BLDB135 Addressing / / / / 02/15/96 DONE GM 02/16/96 GM
BLDB200 Environmental Health Review 02/08/96 / / 02/09/96 Must follow drinking water standards. DONE PSD 02/23/96 NJP
psd
BLDB210 Water Adequacy 03/07/96 / / 03/07/96 this building does not have any plumbing DONE CAJ 03/07/96 CAJ
this building must be 100 feet from the
well head
BLDC110 Footing inspection 05/08/96 / / 05/09/96 no approved plans on site. FAIL GDR 05/10/96 GDR
time 11:00 a.m.
will try to return in the afternoon. '
BLDC110 Footing inspection 05/08/96 / / 05/09/96 mono-footing and slab. passed time 2:00 PASS GDR 05/10/96 GDR
p.m.
BLDC155 Final inspection 08/20/96 / / 08/20/96 PASS GDR 08/21/96 GDR \
,l
2-1
SITE ADDRESS Permit No.
SCHEDULED FOR THE
FIELD ON "-l ,6 MASON COUNTY
WILL ATTACH TO BUILDING PERMIT APPLICATION
TIDEMARK WHEN
ASSIGNED. GMM Cedar/P.O. Box 186, Shelton, WA 98584 427-9670/1-800-562-5628
#1 Owner h 6- 9, T61 0+1 rm I. 1 ✓ Phone #
"ddress__�E.l�� �``'�'�-ram C,u J Fire District#
ity 0 St ag zip
G�
Directions to Job Site 4,v�t / Z�T yGvl K �g
Owner Mailin Address B 0 x
City a r St alA Zip
Lien/Title Holder
Address
Clty St Zip
#2 Contractor Name M as e o qn Contractor Reg #
Address Expiration Date
City St Zip Phone#
#3 If septic is located on project site, include records. /
Connect to Septic?_Public Water Supply Well L�
Connect to Sewer System? Name of System
(If residential, proof of potable water is required)
#4 paxcef'No.3 trt d 5 - 33 _ cxDpOD
Cgal Description 5u1 y o4 5�L� d� �► �✓ � r ►► Ss �l5 T�3
#5 Building Square Footage: (existing/proposed)
1st FI / 2nd FI / 3rd FI / Loft /
Basement / Deck / # bedrooms / #bathrooms /
Garage / Carport / (Circle: Attached or Detached?)
Other sq.ft. /
#6 Use of building a Describe work
#7 Type of Job: New Add Alt Repair Other
#8 MOBILE/MANUFACTURED HOME INFORMATION
Model Year Make Model
Length Width Serial No.
# Bedrooms # Bathrooms Type of Heat
Purchase Price $
#9 Indicate by circling the applicable source if any water is on or adjacent to subject property:
River Pond Creek Stream Wetland Lake Marsh Saltwater Seasonal Runoff Other
Show following on the site plan
Lot Dimensions Flood Zones
Existing Structures Fences
Structure Setbacks Driveways
Water Lines Shorelines
Drainage Plan Topography
Septic Systems Wells
Proposed Improvements Easements
Name of Flanking Street Indicate Directional by (N, S, E, W)
Name of Fronting Street in relation to plot plan
APPLICANT TO DRAW SITE PLAN BELOW
APPLICANT TO DRAW TOPOGRAPHY PROFILE BELOW
Plumbing Fixtures ($3 each) Fee Mechanical Fixtures ($6 each)
No._Toilets CIRCLE FUEL TYPE: Gas, Electric,
_Bath Basins Heatpump, Other
Bath Tubs No. Units Fees
Showers Furn BTU
_Hot Water Htr Heatpumps
_Laundry Washer Vent Systems
_Sinks Spot Vent Fans
_Floor Drains No. Boilers/Compressors
_Laundry Basins HP
_Dishwasher No. Air Handling Units
_Disposal cfm#
Urinals No. Fire Protection Systems
Other Auto. Fire Alarm Sys 50.00
Fixed Fire Supp. Sys 50.00
Permit Basic Fee 15.00 _ Auto Fire Sprink Sys 25.00
TOTAL PLUMBING $ No. Other
Gas Outlets
Wood, Gas, Pellet Stove
NOTICE: THIS PERMIT BECOMES NULL AND VOID IF
WORK OR CONSTRUCTION AUTHORIZED IS NOT COM-
MENCED WITHIN 180 DAYS OR IF CONSTRUCTION OR Permit Basic Fee 15.00
WORK IS SUSPENDED OR ABANDONED FOR A PERIOD TOTAL MECHANICAL $
OF 180 DAYS AT ANY TIME AFTER WORK IS COM-
MENCED. PROOF OF CONTINUATION OF WORK IS BY
MEANS OF A PROGRESS INSPECTION.
OWNERS AFFIDAVIT CONTRACTORS AFFIDAVIT
I CERTIFY THAT I AM EXEMPT FROM THE REQUIRE- I CERTIFY THAT I AM A CURRENTLY REGISTERED
MENTS OF THE CONTRACTORS REGISTRATION LAW CONTRACTOR IN THE STATE OF WASHINGTON AND I
RCW 18.27, AND AM AWARE OF THE MASON COUNTY AM AWARE OF THE ORDINANCE REQUIREMENTS REGU-
ORDINANCE REQUIREMENTS FOR WHICH THIS PER- LATING THE WORK FOR WHICH THE PERMIT IS ISSUED
MIT IS ISSUED AND THAT ALL WORK DONE WILL BE IN AND ALL WORK DONE WILL BE IN CONFORMANCE
CONFORMANCE THEREWITH. NO CHANGES SHALL BE THEREWITH. NO CHANGES SHALL BE MADE WITHOUT
MADE WITHOUT FIRST OBTAINING APPROVAL FROM FIRST OBTAINING APPROVAL FROM THE BUILDING
THE BUILDING DEPARTMENT. DEPART17
X OWNER X BY a
DATE DATE
FOR OFFICIAL USE ONLY: Accepted by Date:
DEPARTMENTAL REVIEW
FOR OFFICE USE ONLY
Approved Cond. Hold
Q Approval
Planning: C 1C•�-' ��Lh� + v�3 tti�- 13 L-bq(-D
Environmental Health: )r i�/l)<r /�(3�T' L ,/(?D Z�dm
3 r
70
Dkf(j)M /ICYBuilding Plan Review
Occupancy Group: �L Type of Const:
Fire Marshal:
Other:
Special Conditions: FEES
Building Permit 761 .
Plan Check 31 -
Plumbing Fee
Mechanical Fee
Wood/Gas/Pellet Stove
Radon Monitor
Violation Fee
Site Inspection
Building State Fee
Other
Other
Building Valuation: �� ' ,� - TOTAL FEE SO