Loading...
HomeMy WebLinkAboutBLD2024-00335 - GRD Letters / Memos - 10/17/2024 R „ti Mason County Mason County - Division of Community Development 615 W.Alder St. Building 8 Shelton, WA 98584 360-427-9670 ext 352 www.masoncountywa.gov B DD2024-00335 BULKHEAD OR DOCK- RESIDENTIAL PROJECT DESCRIPTION: BULKHEAD REPAIR ISSUED: 06/04/2024 SITE ADDRESS: 23820 N US HIGHWAY 101 HOODSPORT EXPIRES: 12/01/2024 PARCEL: 422135000004 APPLICANT: OGG, DARIN P OWNER: OGG, DARIN P PO BOX 1336 PO BOX 1336 HOODSPORT,WA 98548 HOODSPORT,WA 98548 360-790-3021 CONTRACTOR: STEVE MERRILL PO BOX 1590 ALLYN,WA 98524 360-275-6684 GENERAL CONTRACTOR'S LICENSE: JESFIELD CONSTRUCTION License: JESFII*228D0 PO BOX 1590 Expires: 11/24/2025 ALLYN,WA 98524 360-275-6684 VALUATIONS: FEES: Paid Due Project Valuation (BID, 19850.00 $19,850.00 State Fee-Residential $6.50 $0.00 ESTIMATION..) Planning Review Fee $240.00 $0.00 Plan Check Fee $219.68 $0.00 Technology Surcharge $11.15 $0.00 Building Permit Fee $337.97 $0.00 Total: $19,850.00 Totals : $815.30 $0.00 REQUIRED INSPECTIONS Setback Inspection Footing Inspection Hole Inspection BLD-Final Inspection CONDITIONS Printed by:Annie Wilson on:06/04/2024 10:40 AM Page 1 of 4 Mason County Mason County - Division of Community Development 615 W. Alder St. Building 8 Shelton, WA 98584 360-427-9670 ext 352 www.masoncountywa.gov BULKHEAD OR DOCK- RESIDENTIAL BLD2024-00335 * Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and MUST NOT adversely impact adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either private ditches and drains will meet requirements of the stormwater ordinance or prior approval will be granted to use an existing utility and drainage easement dedicated for that specific purpose. For further information regarding this ordinance contact the Mason County Public Works Department prior to construction at Ext 450 * All construction must meet or exceed all local and state ordinances in addition to the International Codes requirements as adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in permit revocation. * The stamped approved site plan is required to be on-site for inspection purposes. If an inspection is requested and the approved site plan is not on site, approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and shall be collected by the Building Department prior to any further inspections being performed or approvals granted. * Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1-800-647-0982. The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. * OWNER/ BUILDER acknowledges submission of inaccurate information may result in a stop work order or permit revocation.Acknowledgement of such is by signature below. I declare that I am the owner, owners legal representative, or contractor. I further declare that I am entitled to receive this permit and to do the work as proposed. I have obtained permission from all the necessary parties, including any easement holder or parties of interest regarding this project. The owner or authorized agent represents that the information provided is accurate and grants employees of Mason County access to the above described property and structure(s)for review and inspection. This permit/application becomes null & void if work or authorized construction is not commenced within 180 days or if construction work is suspended for a period of 180 days. PROOF OF CONTINUATION OF WORK IS BY MEANS OF INSPECTION. INACTIVITY OF THIS PERMIT APPLICATION OF 180 DAYS WILL INVALIDATE THE APPLICATION UNLESS OTHERWISE APPROVED. * Owner/Agent is responsible to post the assigned address and/or purchase and post private road signs in accordance with Mason County Code 14.28 and 14.17. * The foundation/footing must be placed on undisturbed,firm-native soil. Proper frost depth, minimum 12 inches, shall be observed below grade in undisturbed soils. * All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed.The Building Official may grant one or more extension of 180 days, upon the receipt of a written extension request prior to permit expiration. Letter must indicate that circumstances beyond the control of the permit holder prevented action from being taken. * All other necessary permits from Mason County, Washington State and/or Federal Agencies that are required for this proposed development and construction must be obtained PRIOR TO SAME DEVELOPMENT AND CONSTRUCTION. * All building permits shall have a final inspection performed and approved by Mason County Building Department prior to permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with Mason County ordinances and building regulations. * All changes to"approved" building plans that effect compliance with the international codes as amended and adopted, or any other Mason County ordinance or regulation, must be reviewed and approved by Mason County prior to construction. * All surface water and potential runoff must be controlled on site and shall not adversely affect any adjacent properties nor increase the velocity flow entering or abutting to any state or county culverting/ditching system or road way. Printed by:Annie Wilson on:06/04/2024 10:40 AM Page 2 of 4 Mason County Mason County - Division of Community Development 615 W. Alder St. Building 8 Shelton, WA 98584 360-427-9670 ext 352 www.masoncountywa.gov BULKHEAD OR DOCK- RESIDENTIAL BLD2024-00335 Any changes in proposed construction shall be reviewed by the engineer or architect of record and submitted in writing to the Mason County Building Department prior to construction. All engineering and/or architectural documents are a part of the approved set of plans and shall remain attached thereto. If documents are removed, approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and shall be collected by the Building Department prior to any further inspections being performed or approvals granted. * Pressure treated wood manufactured after January 1, 2004 may contain high concentrations of copper which could quickly corrode metal fasteners, connectors, and flashing. Install metal connectors approved for contact with the new types of pressure treated material. * A Hydraulic Project Approval from the Washington State Department of Fish and Wildlife must be granted prior to commencing work. wdfw.wa.gov * This property has been identified in a FEMA(AE) Flood Hazard Area. SUBSTANTIAL IMPROVEMENT as defined in the 2021 International Building Code is any repair, reconstruction, rehabilitation, alteration, addition or other improvement of a building or structure, the cost of which equals or exceeds 50 percent of the market value of the structure BEFORE the improvement or repair is started. If the structure has sustained substantial damage, any repairs are considered substantial improvement regardless of the actual repair work performed. The term does not, however, include either: 1. Any project for improvement of a building to correct existing health, sanitary or safety code violations identified by the building and that are the minimum necessary to assure safe living conditions. 2, Any alteration of a historic structure provided that the alteration will not preclude the structure's continued designation as a historic structure. When Substantial Development has been determined future work including such items as change of use, additions, alterations, and repairs are subject to the requirements of the 2021 International Existing Building Code and 2021 International Building Code Section 1612. Mason County Flood Prevention Ordinance definition (MCC 14.22.040): "Substantial improvement" means any repair, reconstruction, or improvement of a structure, taking place DURING A TEN- YEAR PERIOD, in which the cumulative cost equals or exceeds fifty percent of the market value of the structure either: (1)Before the improvement or repair is started, or (2) If the structure has been damaged and is being restored before the damage occurred. For this definition "substantial improvement" is considered to occur when the first alteration of any wall, ceiling, floor, or other structural part of the building commences, whether that alteration affects the external dimensions of the structure. This term includes structures which have incurred "repetitive loss"or"substantial damage" regardless of the actual amount of repair work performed. The term does not, however, include either: (1)Any project for improvement of a structure to comply with existing state or local health, sanitary, or safety code specifications which have been identified by the local code enforcement official, and which was in existence prior to the damage event or improvement, and which are solely necessary to assure safe living conditions, or (2)Any alteration of a structure listed on the National Register of Historic Places or a State Inventory of Historic Places. All future work will be evaluated at the time and by scope and value. Printed by:Annie Wilson on:06/04/2024 10:40 AM Page 3 of 4 Mason County Mason County - Division of Community Development 615 W.Alder St. Building 8 Shelton, WA 98584 360-427-9670 ext 352 www.masoncountywa.gov BULKHEAD OR DOCK- RESIDENTIAL BLD2024-00335 I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of Laws and Ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any other state/local law regulating construction or the performance of construction. Issued By: 1 Contractor or Authorized Agent: Date: Printed by:Annie Wilson on:06/04/2024 10:40 AM Page 4 of 4 % \ MASON COUNTY 615 W.Alder St.Bldg 8,SHELTON,WA 98584 SHELTON:360-427-9670,EXT 352 COMMUNITY SERVICES BELFAIR:360-275-4467,EXT 352 r l Building,Planning,Enviratmental Healtl,community Healdi ELMA•360-482-5269,EXT 352 - www.co.mason.wa.us INSPECTION CARD AND CERTIFICATE OF OCCUPANCY** To schedule an inspection call or visit http:Itwww.co.mason.wa.us/community-services/bid-inspection.php Permit Number BLD2024-00335 Date Issued 06/04/2024 Issued By 1{� Project BULKHEAD REPAIR I IIII���, ���' l� Site Address 23820 N US Highway 101 Applicant OGG,DARIN P Contractor JESFIELD CONSTRUCTION Contractor Phone 360-275-6684 Primary Code UPC IBC,IRC,IFC,IEC,IMC,& Type Permit Type BULKHEAD OR DOCK- Occupancy RESIDENTIAL -APPROVED PLANS MUST BE ONSITE FOR ALL INSPECTIONS. -DO NOT PROCEED BEYOND EACH STAGE OR COVER WORK UNTIL APPROVAL IS GRANTED. -THIS CARD MUST BE POSTED IN A CONSPICUOUS LOCATION,FRONT OF THE PREMISES IS BEST FOR MAKING ENTRY. -ALL PERMITS EXPIRE 180 DAYS AFTER THE PERMIT IS ISSUED OR 180 DAYS AFTER DATE OF LAST INSPECTION. -OWNER/AGENT IS RESPONSIBLE FOR REQUESTING ALL INSPECTIONS THROUGH FINAL INSPECTION. **THIS STRUCTURE MAY NOT BE USED OR OCCUPIED UNTIL ALL APPROVALS ARE GRANTED.`* PRIOR TO CALLING FOR FINAL INSPECTION,ALL CONDITIONS OF THE PERMIT MUST BE MET Public Works Access/Driveway Other Health Septic Well Deptartment Planning Site Inspection Department Fire Marshall Fire Apparatus Access Fire Sprinkler Auto Fire Alarm Hood and Duct Other Final Building Building Official: Community Services Designee Department Concrete Setbacks 8 /5'lzq _T& ?Lzo/ Slab Footing Perimeter Point load Footing An tlq J LT/26 1zq_mz Footing Interior Footing Decks/Porches Foundation Stem Walls Other Rough-In Groundwork Plumbing Framing Groundwork Mechanical Plumbing Groundwork Gas Pipe Mechanical Gas Piping Shear Wall Nailing Underfloor Other (_p A%l (Hole) q sal Insulation Slab Ceiling Floor Vaulted Ceiling Walls Vapor Barrier Other Wallboard Interior Wall Brace Panels Fire Walls Nailing Other Final Building Zb1)7 Z Manufactured Setbacks Setup Home Concrete Foot/Runners Final Other