HomeMy WebLinkAboutStormwater Report for GRD2000-00006 - PLN General - 4/25/2000r
1
i
MASON COUNTY
PUBLIC WORKS DIRECTOR/COUNTY ROAD ENGINEER
Shelton,Washington 99584
DATE:~'April 25, 2000
INTER-DEPARTMENTAL COMMUNICATIONS
TO: Tammy Griffey, PAC—Bldg Inspector
FROM: Alan A. Tahja, P/W- Co. Hydr. Engr. PAC WO#00-030
SUBJ: Stormwater Report Review NAME: John Byerly/R.W.J.J., Inc.
GRD2000-00006
A drainage report prepared for John Byerly's proposed BELFAIR DEVELOPMENT has been
received and reviewed by Public Works, raising the following issues;
1) The plan provides for the treatment of impervious area runoff with the employment of a
bioswale. I consider this an acceptable treatment approach,but Ecology's manual also
requires Spill Control (SC) oil-water separators preceding other treatment BMPs when
runoff is destined for a wetland disposal. Discharges to wetlands are allowed if the treated
runoff meets State Water Quality Standards, and the hydroperiod and flows of existing site
conditions are maintained. The engineer should be requested to provide information
verifying that the proposed discharges to the wetland meets these requirements.
2) The proposed drainage plan provides for no flow attenuation. Attenuation may not be
necessary if the receiving wetland can receive the subject property's runoff without
impacting the wetland hydroperiod and quality. Runoff attenuation is required unless the
engineer can show that the property's development and runoff discharge will not damage,
erode, or deplete the downstream conveyances.
3) Mason County requires the creation of an Operation and Maintenance (O&M) Covenant to
cover the ongoing operation and maintenance of privately owned stormwater facilities.
Public Works has developed a covenant form that has been accepted by Ecology to fulfill
their O&M requirements. Copies of the blank O&M Covenant form are available from
Public Works on request. Attached please find a copy of the covenant form. A copy of the
covenant form will also be forwarded to the engineer. The two page form is required to be
filled out, notarized by the proponent, recorded by the applicant with the County Auditor's
office, and a copy of the recorded covenant delivered to Public Works for monitoring and
administration.
4) Approval of the access off of SR3 should be requested from the Washington State
Department of Transportation, either as a new access, or as a change of use from what
appears to have been a residential driveway.
File: H:\WP\STRMWTR\REVIEWS\Byerly-IDC.doc
MASON COUNTY
PUBLIC WORKS DIRECTOR/COUNTY ROAD ENGINEER
Shelton,Washington 98584
DATE: May 18. 2000
INTER-DEPARTMENTAL COMMUNICATIONS
TO: Tammy Griffey, PAC —Bldg Inspector
FROM: Alan A. Tahja, P/W - Co. Hydr. Engr. PAC WO#00-030
SUBJ: Stormwater Report Review NAME: John B erl /R.W.J.J. Inc.
GRD2000-00006
Skillings-Connolly Inc. has submitted a drainage report addendum to their report dated Marc
24, 2000 which addresses concerns in an IDC dated April 25`h, 2000 from this department.
In addition to the addendum prepared by Skillings-Connolly, Mr. John Byerly has delivered a
copy of the recorded Operation and Maintenance Covenant prepared for the completed
stormwater control facilities.
Please find copies of both of these documents for your records.
With these submittals, Public Works concerns are all satisfactorily addressed.
Please feel free to contact me at County extension 461 if you have any questions pertaining
these comments or requirements.
Si cerely,
MA
A
XIhn A. Tahj a
Attached: O&M Coveneant
Drainage Report Addendum prepared by Skillings-Connolly
WSDOT General Access Permit
File: H:\WP\STRMWTR\REVIEWS\Byerly-IDC-2.doc
SUBJ: Stormwater Report Review NAME: John Byerly/R.W.J.J., Inc.
RD2000-00006
Mason County Comments Skillin s-Connoll , Inc. Response :
A drainage report prepared for John Byerly's proposed BELFAIR The response to the issues brought up for further
DEVELOPMENT has been received and reviewed by Public Works, raising the investigation by Mason County Department of
following issues; Public Works as follows:
1) The plan provides for the treatment of impervious area runoff with the 1) Due to sensitive nature of runoff destined to
employment of a bioswale. I consider this an acceptable treatment multiple wetland designations, a conservative
approach, but Ecology's manual also requires Spill Control (SC) oil- approach is to include a spill control oil-
water separators preceding other treatment BMPs when runoff is destined water separator in design. See Revised
for a wetland disposal. Discharges to wetlands are allowed if the treated Grading, Drainage, and Erosion Control plan
runoff meets State Water Quality Standards, and the hydroperiod and for inclusion of spill control device.
flows of existing site conditions are maintained. The engineer should be
requested to provide information verifying that the proposed discharges
to the wetland meets these requirements.
2) The proposed drainage plan provides for no flow attenuation. Attenuation 2) See Drainage Report Addendum,
may not be necessary if the receiving wetland can receive the subject downstream analysis (p 1) and hydroperiod
property's runoff without impacting the wetland hydroperiod and quality. calculations (p 3 & 4).
Runoff attenuation is required unless the engineer can show that the
property's development and runoff discharge will not damage, erode, or
deplete the downstream conveyances.
3) Mason County requires the creation of an Operation and Maintenance 3) "Declaration of Covenants Associated with
(O&M) Covenant to cover the ongoing operation and maintenance of Privately Maintained Storm Drainage
privately owned stormwater facilities. Public Works has developed a Facilities" forwarded to R.W. J. J. Inc to
covenant form that has been accepted by Ecology,to fulfill their O&M review and sign. Client to return form to
requirements. Copies of the blank O&M Covenant form are available Mason County, Department of Public Works.
from Public Works on request. Attached please find a copy of the
covenant form. A copy of the covenant form will also be forwarded to
the engineer. The two page form is required to be filled out, notarized by
the proponent, recorded by the applicant with the County Auditor's
• office, and a copy of the recorded covenant delivered to Public Works for
monitoring and administration.
4) Approval of the access off of SR3 should be requested from the 4) Client has obtained general permit for a Type
Washington State Department of Transportation, either as a new access, "D" commercial road approach,WSDOT
or as a change of use from what appears to have been a residential Permit No. M85-38 dated January 3, 1986.
driveway.
5) Plan sheet 1 of 4 indicates either the existence of storage bins, or the 5) NPDES not required per phone discussion
location of proposed storage bins. Certain industrial and commercial with Linda Matlock, Environmental
activities are required to procure National Pollutant Discharge Specialist, Department of Ecology on April
Elimination System (NPDES) permits. Storage of building and/or 28, 2000 at 1:26 PM. Further, conversation
nursery materials requires the facility to be covered with an NPDES with client confirms that storage bins are
permit. NPDES permitting requirements include development of a leased to general contractor who will use it to
• Stormwater Site Plan (SSP). store gravel and CSTC.
6) The plan sheets indicate that the proposed parking stalls are to be 9' by 6) See attached Revised Utilities, Paving and
18'. Mason County's Parking Ordinance requires parking stalls to be Striping plan indicating stalls to be 9' x 20'
constructed 9'x 20'. The aisle width between the ends of parking stalls is with aisles 25' wide.
required to be a minimum of 22'. The present plan indicates the aisle
width are to be 29' which is acceptable and could be reduced if needed to
meet the required parking stall length requirement.
These issues should be answered by the applicant or his engineer before any site We hope the responses resolve the issues.
grading commences.
Please feel free to contact me at County extension 461 if you have any questions
pertaining to these comments or requirements. Sincerely,
Sincerely,
Vince Corazza
Design Engineer
Alan A. Tahja Skillings-Connolly, Inc.
(360) 491-3399
cc: Skillings-Connolly Inc.
encl: O&M Covenant Form
File: H: \WP\STRMWTR\REVIEWS\Byerly-IDC.doc File: G:\project\2000\00008 Byerly-
Belfar\response to MC.doc
CS 2305 SR 3
PP.!�07
� Washington State
Department of Transportation GENERAL PERMIT
PERMIT NO. M85-38 DISTRICT NO. 3
Name and Address of Applicant: William J. , Jerry D. , John and Robert Byerly
P.O. Box 133
Belfair, Washington 98528
The Applicant, hereinafter referred to as the "Grantee", having applied for a permit to
construct, operate and maintain a .Tv e "D"_commercial road approach to a mini-
storage at Mile Post 25.86, left side, sixty feet north of the southerly prop-
erty line,
on a portion of State Route No. 3 in Mason County, Washington, the Washington
State Department of Transportation or its designee, hereinafter referred to as the "Department", hereby orders
that this permit be granted, subject to the terms and provisions stated upon the reverse hereof and Exhibits
attached hereto and by this reference made a part hereof.
Exhibit "A". Special Provisions for Highway Encroachments, Pages 1 & 2.
This permit shall be void unless the work herein
contemplated shall have been completed before
.GepteffibeF--39, 1985-- Su I 31 t 9 8(a
This permit is accepted and approved by the
Grantee subject to the terms and provisions as
herein set forth.
GRANTEE DEPARTM NTH OF TRA SPdRTA�hON
By: By:
Title: Title: District Location Support Engineer
Date: / / Date: /! "/' ;1
DOTForm 224.004 Y
Ro—sed 5,83 OX A 129 ,C •-
Washington State
-„ Department of Transportation
Office of District Administrator
5720 Capitol Blvd.,KT•11
Tumwater,Washington -
P.O.Box 9327
Olympia,Washington 98504.9327
Duane Berentson,Secretary
November 14, 1986
I
Farmers Insurance Companies
4600 25th Avenue N.E.
Salem, Oregon 97313-100
Attention: Jim Reiser
Bond No. 98 72 3340 4
Byerly Road Approach-
--
General -Permit -38
I
Dear Mr. Reiser:
We received your request for cancellation of the above referencedbond.
j, The terms of the bond state that it may be released when all conditions
of the permit have been met and upon receipt of a written discharge
from the State. This is to advise you that the terms and conditions_
of the permit have been com leted and the bond may be released at this
time.
If you have any questions , please call this office at 753-9620 in
Tumwater between 7:30 a.m. and 4:00 p.m.
Sincerely,
R. L. ANDERSON
District Location
Support Engineer
RLA:sb
CLV
Attachment
cc: C. Vanderpool
William, Jerry, John I/
and Robert Byerly
William L. Berg
01 &
VVUKK UKUtR - PUBLIC WORKS DEPT.
Vy Date: -60 (E) Work Order
PERMIT# DOC1D5' Number:
P�
Requested by:
Authorized by: Date:
Type of Work:
CHARGE TO:
NAME f'
AGENCY/COMPANY
BILLING ADDRESS
PHONE
Pub Works Person In Charge:
:: ::. : ; :: �PWOR{5
(C) Project Time Line: (from-to datesl TO
Project Start date: ?j Estfuted Fk-Jsh Date:
Appradmate hours: ESTIMATED TOTAL VS:
COST ESTIMATE
(D) Date _ Employee S Rate Hours Subtotal Fringe
TOTAL i
/D 6Z, zee
a> H ( ! o
>� UNIT j3AIE TOTAL ss
EQUIPMENT USED:
MATERIAL USED:
(F) Actual Cost $ BARS: PROD#:
DATE Employee
WORKED Name s Rate Hours Subtotal Fringe% TOTAL$
EQUIPMENT USED: Date UnK Rate TOT
MATERIAL USED:
TOTAL ALL
(G) BILLED DATE INV tR PAID DATE