Loading...
HomeMy WebLinkAboutDrainage Plan for BLD2002-01578 - PLN General - 5/6/2004 MASON COUNTY PUBLIC WORKS DIRECTOR/COUNTY ROAD ENGINEER Shelton,Washington 985" DATE: May 6t', 2004 INTER-DEPARTMENTAL COMMUNICATIONS TO: Rick Mraz, DCD -Planner FROM: Alan A. Tahja, P/W- Co. Hydr. Engr. SUBJ: Drainage Plan NAME: Howick SFR 2 Beard's Cove - Belfair BLD2002-01578 Rick, I've been in contact with Mr. Glen Coad, P.E., who's been developing a plan to alleviate a stormwater runoff problem on the Rick Howick property at Beard's Cove. Re-routing drainage around the Howick property was investigated, but the County's maintenance department could not support the proposed route, so Mr. Coad developed the attached plan. The applicant will need an access permit issued by Public Works for the access shown on the attached plan, and he will also need a utility permit issued by Public Works for the proposed connection to the County's road cross culvert. A copy of the attached plan has been forwarded to my maintenance crews for their review, but I do not expect any changes or objections to this proposed drainage work. If there are any major changes resulting from the road departments review of the plans, I'll let you know. Please feel free to contact me at County extension 461 if you have any questions regarding these comments, or if you feel any features need further discussion or attention. S' c rely, t. Al n A. Tahja File: H: \WP\Strmwtr\Reviews\Howick.doc W. Glen Coad, P.E. 6512 192°d Ave East Bonney Lake, WA 98390 April 16,2004 Mr. Allen Tajah Mason County Department of Community Development 426 West Cedar Shelton, WA 98584 - RE: Howick Drainage System, Parcel 912-33-05-20-00-14, BLD2002-01578 Dear Allen, Enclosed please find our presented solution for the existing culvert that drains into the Howick property. PROJECT DESCRIPTION The project is located at 10 NE Schooner Loop in Mason County, WA. The legal description is lot 14 of Plat of Beards Cove No. 5 and is assigned the tax parcel number of 12-33-05-20-00-14. Currently the site is a vacant undeveloped lot,which is surrounded by developed properties. The site drains from west to east and has slopes approximately 2:1 along the road on the west side, which tapers to approximately 5%across the remainder of the lot. CURRENT DRAINAGE CONDITIONS Figure 1 represents the three basins of which basin"B1"drains to the culvert,which crosses NE Schooner Loop and discharges into lot 14. The culvert is located about mid-way along the west property line and discharges about 3' below the road surface and approx. 3' above the existing ground of the project site. Field observations indicated that water had flown through the culvert in the past with minor erosion occurring as a result of the flow. Given the three foot drop from the invert of the culvert to the ground below and the relative lack of erosion it would seem that while water has flown in the culvert it was unlikely that it has been a large amount of water. From the culvert discharge point the water continues to travel to the east in an intermittent shallow channelized flow condition. Under these conditions the flow travels approximately 60' at which point it leaves the property as a shallow flow onto the neighboring property(lot 18). Based on the basin map, areas calculated and the number of lots peak flows were calculated using the Department of Ecology's Western Washington Hydrologic Model, (WWHM)version 2.5c. Basin"B1"represents an area of approximately 9.62 acres with 35 lots. Inputting this data into the model generates peak flows ranging from 3.58cfs for the 2yr to 8.24cfs for the 100yr storm. This basin contributes to the existing culvert which discharges onto the property. Although the peak flows are relatively high compared to what the field visit would suggest they have been used in sizing the proposed conveyance system for the sake of conservancy. PROPOSED DRAINAGE CONDITIONS As discussed with the county in previous correspondence it has been determined that abandonment of the existing culvert and re-routing the flow and containing it within public right of way is not a viable option. As such we have shown a connection to the existing culvert via a storm drain manhole and extending the culvert a further 40' to get under the proposed driveway where it discharges into a rip-rap pad. The discharge point will be constructed in such a way as to provide a pool and overflow across a 10 foot wide berm. This discharge condition is intended to restore the flow back into it's original pre-developed condition. The existing culvert is approximately 18" in diameter, the new pipe will also be 18"to maintain consistency in the conveyance system. The capacity of an 18"culvert at the proposed slope (1% min) is 10.5cfs based on full flowing and n=0.013. This is more than enough to flow the 100yr storm. CONCLUSION In terms of the change in flow conditions there will be no significant change of peak flows as a result of the proposal or in discharge conditions from the site from pre to post developed conditions. The pre-developed flows as previously stated were reasonably well defined as a shallow discharge condition. The proposed conditions will not alter the peak flows (other than the increase from roof drainage) and the discharge conditions will be similar in form as a result of being spread across the width of the rip-rap pad thereby restoring the pre-developed discharge conditions from the site. I trust that this and the provided drawings will be sufficient to meet the County needs and will allow for the release of the building permit for the project site. If you have any questions regarding the project please feel free to call me at (253)228-0513 to discuss or e-mail me back. Sincerely CE GI_F� Glen Coad, P.E. f 1 eg oadAcomcast.net 33718�� WGC Encl EXPIRES 10/31 17 CC Rick Howick file F .v - i pr �� -- •.+n.+•. —urY- v r SBI H Jn oSnL�O,i.p(Poo. a a! x ac owls os q 06 Is Y 1 ti � + � `*' r' � of "� a°�3 SF�' c a,•so k? S5 d5 � `.= '< •_ ~--r--',._.� w-�� •„ . ?�,','�' ` • �06 00 N (� MG�,tt s�, 'A y{� # � LY .{ , -�., :.. ,trrr+ s . 9e , tr` C • E �S ' ' ss a w:v.wiy.v*si•osyrrr ,� y v 6 r JVM NJP/2•/f�Mlrlt!!' � J . t - Q6 O � '{� �` -_ • ��+ ,.r Irrir�rJr t�',r ,s f 1�� / P a 58 .r r _�y�� ��$`r ,�(� �i `� �t -�• -_ �N ® rQ�� 6t°." � 65 f41 Is 07 I. T, Jo- c o9 - LL f �•; 'f'r '� JW . �° 4 sz '9z"� zs A oSol kX 9 1 �ey� 'S•s Q6`` �gb' v l�_ /� � �. � E5 N z � ,.I �• �. i� b 'I;r,,��' u voroov o�vo�I� . 4c r it isr� �� ® oil tb `�� �g SL GD ,,� o• � o� Lr �/ %A'� RA► 6 °"� tee..® ,t r &s/� ® .",Cx^ f ? a °Sep �� $ 12 $ <r y ®� ® •b�ZS r� EL �� •, 60 ' Z Q_ l ,y 05 ' z 4 ��rbF ; st, e r t' r'C � 41 Id !ig,it 9}it a9a Z i el Tr r t �► x'� OZ x6Z ' sr{� f �M O � ..` .f � �• Lw 'trr� f�t sd nr ` 7•_ y^ y A,/dl-•ni7•IC' 7a'1` y�lri7�' �y � did l ,/ 'OL 6/ 'Y 3801,0 �• -� �' f�^ ON a7�fP� SC7b�N.�9 CAS 1C�? .�O 10'7d�"b� G C� Ns0'IN ri(1/Yno7 NOSI'JJY i�r,�'Yvr�'L IO .71s, &D 3;s 20yl do Nvi.4eoo' D w AS i�7eY3�g�7 ze I � ° ti A „l vi 0 WESTERN WASHINGTON HYDROLOGY MODEL V2 PROJECT REPORT Project Name: default Site Address: City Belfair Report Date 4/16/04 Gage Quilcene Data Start 1955 Data End 1999 Precip Scale: 1.22 PREDEVELOPED LAND USE Basin Basin 1 Flows To Point of Compliance GroundWater: No Land Use Acres TILL GRASS: 6.245335 IMPERVIOUS: 3.374665 Standard residential land areas: Soil Type Lot Acres Number of Lots Outwash 0.000 0 Till 9. 620 35 Saturated 0.000 0 DEVELOPED LAND USE RCHRES (POND) INFORMATION ANALYSIS RESULTS Flow Frequency Return Periods for Predeveloped Return Period Flow(cfs) 2 year 3.575683 5 year 4.677784 10 year 5.463017 25 year 6.52069 50 year 7.357641 100 year 8.237853