Loading...
HomeMy WebLinkAboutBLD92-1335 Cancelled SFR - BLD Permit / Conditions - 11/20/1997 CONCRETE MECHANICAL MOBILE HOME Footings-Setback date by Ribbons date by Gas Piping date b Foundation Walls date by Set Up date by INSULATION date by BG/SLAB Insulation Floors Final date by date by date by FRAMING Walls FIRE DEPT. date by date by date by PLUMBING OTHER Groundwork Attic date by date by D.W.V. WALLBOARD NAILING date by date by Water Line FINAL INSPECTION date by date by date by MASON COUNTY Mason County Bldg. III 426 W. Cedar j P.O. Box 186 Shelton, Washington 98584 j BUILDING PERMIT APPLICATION r ` PLEASE PRINT #1 Owner L• Phon 31 �� Site Address City 7n : '&)P, St Zi Directions to Job Si e N Owner Mailing Address City St_ V.)d_ Zip '�2� Lien/Title Holder Address City St Zip #2 Contractor Name Contractor Reg# Address Expiration date _ Cit St Zip Phone A4�lq-�1�`�P�, #3 If septic is located on project site, include records. Connect to Septic? Public Water Supply� Well (If residential, proof of potable water may be required) #4 Parcel No. Legal Description L 3p�(,Z„ oglW #5 Building Square Footage: (existing/proposed) ,�``Est FI 2nd. Fl 3 rd Fl / Loft / Y asement / Deck #bedrooms #bathrooms Garage / Carport (Circle- .Attached r Detached?) Other sq ft / .�+rl9zo 1 �0� #6 Use of building uoo Describe work) #7 Type of Job: Ne Add Alt Repair Demolition Woodstove Re-Roof Bulkhead Other #8 MOBILE HOME INFORMATION Model Year Make Model Length_ Width Serial No. #Bedrooms #Bathrooms Type of Heat #9 Any water on or adjacent to property: saltwater lake river pond wetland seasonal runoff other Lot Dimensions Flood Zones i Existing Structures Fences Structure Setbacks Driveways Water Lines Shorelines Drainage Plan Topography Septic Systems Wells Proposed Improvements Easements Name of Flanking Street Scale: Name of Fronting Street Date: APPLICANT TO DRAW SITE PLAN BELOW � - �o APPLICANT TO DRAW TOPOGRApgy PROFILE BELO i i i #7�'ltk ' Fee No. Toilets °� Vent Systems X 3 . 00 Bath Basins .Vent Fans X 3 . 00 Bath Tubs . No. Boilers/Compressors Showers � �=- 0-3 HP � 0 Hot Water Htr Z 3-15 HP 6 . 00 Laundry Washer z..Sinks 15-30 HP � ;� Floor Drains �... 30-50 HP 50 + HP Laundry Basins No. Air Handling Unit Dishwasher <- 10000 cfm. Disposal > 10000 cfm. 7 . ,50_ Urinals Other Other Evap Coolers Hoods Permit Basic Fee 3 . 00 Fire Suppression TOTAL PLUMBING $ ` Domes. Incin. Comml. Incin. Reloc/Repair 6 . 00 Mechanical Fixtures Gas Outlets X 2 . 00 No. Fuel Types Woodstove separate Furn < 100K BTU 6 . 00 Other "''®I_Furn >= 100K BTU _6. 00 Furn - Floor 6 . 00 Permit Basic Fee 1 0 Heat Pumps 6 . 00 TOTAL MECHANICAL $ NOTICE: THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION AUTHORIZED IS NOT COMMENCED WITHIN 180 DAYS, OR IF CONSTRUCTION OR WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF 180 DAYS AT ANYTIME AFTER WORK IS COMMENCED OWNERS AFFIDAVIT CONTRACTORS AFFIDAVIT I CERTIFY THAT I AM EXEMPT FROM THE REQUIREMENTS OF THE I CERTIFY THAT I AM A CURRENTLY REGISTERED CONTRACTOR CONTRACTORS REGISTRATION LAW RCW 18.27 AND AM AWARE IN THE STATE OF WASHINGTON AND I AM AWARE OF THE OF THE MASON COUNTY ORDINANCE REQUIREMENTS FOR WHICH ORDINANCE REQUIREMENTS REGULATING THE WORK FOR WHICH THIS PERMIT IS ISSUED AND THAT ALL WORK DONE WILL BE IN THE PERMIT IS ISSUED AND ALL WORK DONE WILL BE IN CONFORMANCE THEREWITH. NO CHANGES SHALL BE MADE CONFORMANCE THEREWITH. NO CHANGES SHALL BE MADE WITHOUT FIRST OBTAINING APPROVAL FROM THE BUILDING WITHOUT FIRST OBTAINING APPROVAL FROM THE DEPARTMENT. DEPARTMENT. BUILDING X OWNER X BY DATE DATE Return permit to: Department of General Services 426 W. Cedar/P.O. Box 186, Shelton, WA 98584 427-9670/1-800-562-5628 FOR OFFICIAL USE ONLY: Accepted by-16 Date: _ S ��2 r .�.-� -..�� roe"� V✓r. V�{�Ji Approved Cond Fold Approval Planning: bMS1 Environmental Health: l� Building Plan Review: -t�i1 MM;l- MZEJ 4t2 cKcj,- n All Occupancy Group: Fire Marshall: Other: FEES It IlSpecial Conditions: II Ilsite Inspection I II 11 II 1i �1 11 11 Il Building Permit 11 11 H '1 11 11 (lviolation Fee I 11 11 II C ;I 11 11 (lviolation Investigation Fee I II Il II H II 11 IlPlan Check 11 Ii 'I 1I 11 IlPlumbing Fee 1 II 11 I 11 limechanical Fee 11 H 'I 11 IlWoodstove Fee I II 11 11 11 IlBuilding State Fee 11Building Valuation: 5e7 II 11 TOTAL 1