HomeMy WebLinkAboutBLD2007-01990 Final Wind Turbine Foundation DDR2007-00347 - BLD Permit / Conditions - 5/12/2010 Inspection Line(360)427-7262
MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Phone: (360)427-9670,ext.352
Mason County Bldg. III 426 W. Cedar P.O. Box 186
Shelton, WA 98584
RESIDENTIAL BUILDING PERMIT BLD2007-01990
OWNER: MARK GASPER RECEIVED: 11/29/2007
CONTRACTOR: LICENSE: EXP: ISSUED: 2/26/2008
SITE ADDRESS: 42 NE LANYARD CT (WIND TURBINE ONLY) BELFAIR EXPIRES: 8/26/2008
PARCEL NUMBER: 123305100068
LEGAL DESCRIPTION: BEARDS COVE DIV 4 LOT: 68
PROJECT DESCRIPTION: DIRECTIONS TO SITE:
Per the Building Permit Application this building permit is for the 1/4 mile up Larson to left on Lanyard Ct.
construction of the wind turbine foundation only and does not apply to any
other type of construction on the site (ie, the placement of the actual wind
General Information Construction&Occupancy Information Square Footage Information
No. of Bedrooms: Type of Constr.: vb
Type of Use. SF Insp.Area: No. of Bathrooms: Occ. Group: U Lot Size: Deck:
Type of Work: ACC Fire Dist.: 2 No.of Stories: Occ. Load: Building:
Valuation: Building Height: Occ. Status: Unknown Basement: Wind turbi 36
Manufactured Home Information Setback Information Shoreline&Planning Information
Make: Length: Ft. Front: N 35.0 Ft. Shoreline: Ft. Water Body:
SEPA?: Yes
Rear: S 40.0 Ft. Slope: Ft.Model: Width: Ft. Side 1: W 5 1.0 Ft. Shoreline Desi g.: Not Applicable
Year: Serial No.: Side 2: E 5.0 Ft. Comp. Plan Desig.: Rural
Plumbing Fixtures Mechanical Fixtures FEES
Type Qty. Type Qty. Type By Date Amount Receipt
Plan Check Fee KKK 11/29/200 $108.91 S22007000
Planning Review Fee KKK 11/29/200 $170.00 S22007000
EH Plan Review ADR 12/18/200 $35.00 S22008000
Building State Fee MAL 2/13/2008 $4.50 S22008000
Building Permit Fee MAL 2/13/2008 $167.25 S22008000
Total $485.66
BLD2007-01990 Please refer to the following pages for conditions of this permit. 1 of 4
CASE NOTES FOR
` BLD2007-01990
CONDITIONS FOR
BLD2007-01990
1) The building permit,appli solely for the construction of the wind turbine foundation only and cannot be tied to the construction or placement of an actual
wind turbine on site.X
2) Own�r�/`Agent is responsible to post the assigned address and/or purchase and post private road signs in accordance with Mason County Title 14.28.
3) All construction must meet or exceed all local ordinances and the international codes requirements as adopted and amended by Mason County and the
State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in
permit revocation.
X
4) All changes to"approved" building plans that effect compliance with the international codes as amended and adopted, or any other Mason County
ordie or regulation, must be reviewed and approved by Mason County prior to construction.
X
5) Any changes in proposed construction shall be reviewed by the engineer or architect of record and submitted in writing to the Mason County Building
Department prior to construction. All engineering and/or architectural documents are a part of the approved set of plans and shall remain attached
thereto. If documents are removed, approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be
char and shall be collected by the Building Department prior to any further inspections being performed or approvals granted.
6) CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE ADOPTED
BUILDING CODE.
The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance
with the international codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Building
Inspect shall be made prior to requesting additional inspections.
X
7) THE FOUNDATION SYSTEM SHALL BE PLACED ON UNDISTURBED, NATIVE SOIL. X ;
8) All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure
to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with
Xasopipounty ordinances and building regulations.
BLD2007-01990 Please referto the following pages for conditions of this permit. 2 of 4
9) The international code requires a fire apparatus access road for every facility, building, or portion of a building that is more than 150'from an approved
access road. Roads are required to meet the minimum Mason County Fire Marshal standards for Fire Apparatus Access Roads up to the point where
such roads connect with a county maintained public road or to another fire apparatus access road which connects to a county maintained public road.
X
10) Owner/builder assumes all responsibility if drainfield/reserve area is encumbered. XA—
11) All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may extend the time for
action for a period not exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of the permit
hold_' have prevented action from being taken. No more than one extension may be granted.
XM
b
12) The plan review check list and corrections are part of the approved plans and must remain thereto. It is the responsibility of the applicant to make the
corrections indicated on the plans. Once the plans are marked "APPROVED", they shall not be changed or altered without authorization from the Building
Official. The permit holder is responsible to retain the complete approved set of plans on site for the duration of the project. Failure to comply and/or
rem ' I of approved documents will result in failure of required building inspections.
X .
13) All approved plans are required to be on-site for inspection purposes. If an inspection is called for and plans are not available on site, then approval will
not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and must be collected by the Building
De p " ent prior to any further inspections being performed or approvals granted.
X � r\
r
14) All property lines shall be clearly identified at the time of foundation inspection.
15) Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division.
There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at
1-8_ ,647-0982. The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law.
�
X ` `�,
JT
16) Retaining walls needed to support a sur . rge such as structures, roads, or to support slopes, shall require a separate building permit and approval prior
to construction of the retaining wall. X
17) Xpprj�r�d per dimensions and setbacks on submitted site plan. Setbacks are measured from the furthest projection of the structure.
18) The"approved" site plan is required to be on-site for inspection purposes. If an inspection is requested and the"approved" site plan is not on site, then
approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and shall be collected by the
Buildirg Department prior to any further inspections being performed or approvals granted.
X ,/
19) Plac �td�nt of structure must comply with standards set forth per the international codes regarding descending and/or ascending slopes.
X
BLD2007-01990 Please referto the following pages for conditions of this permit. 3 of 4
20) International Building Code. In addition to the inspections required by Chapter 1 of the International Building Code, the owner or the engineer or architect
of record acting as the owner's agent shall employ one or more special inspectors who shall provide inspections during construction on the types of work
lisWo under IBC, section 1704. The special inspectors' duties & responsibilities shall be as specified in Chapter 17.
21) Proposed structure or portions thereof, must maintain a 5' separation distance between adjacent structures and that furthest projection.
x, kL. -
22) This structure is limited to U-occupancy use only (private garages, carports, sheds, and agricultural buildings.) Any other use will be in violation of the
interpational codes and Mason County Regulations unless a"Change of Use" permit is applied for, reviewed and approved.
X
23) Prior to final approval, all upland areas disturbed or n wly created by construction activities shall be seeded,vegetated or given an equivalent type of
erosion protection (silt fencing or straw matting). Xlti
24) Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and MUST NOT adversely impact
adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either private ditches and drains will meet requirements of the
stormwater ordinance or prior approval will be granted to use an existing utility and drainage easement dedicated for that specific purpose. For further
information regarding this ordinance and the REQUIREMENT to obtain an ACCESS PERMIT for the installation/construction of a driveway or access
connecting from a Mason County Road, Contact the Mason County Public Works Department prior to construction at Ext 450. For any construction which
is proposed to be located within 25' of a Mason County road right of way, it is suggested to contact that office to review future planned work which may
affect your prof 'pt.—
X; .
25) Wate, lity is not to be degraded to the detriment of the aquatic environment as a result of this project.
X �
This permit becomes null and void if work or construction authorized is not commenced within 180 days,or if construction or work is suspended for a period of 180 days at any time after work is
commenced. Evidence of continuation of work is a progress inspection within the 180 day period. Final inspection must be approved before building can be occupied. Proof of continuation of
work is by means of a progress inspection.The owner or the agent on the owners behalf, represents that the information provided is accurate and grants employees of Mason County access to
the above described prope and structure for r view and inspection. JJ
OWNERORAGENT: DATE: O�(p
BLD2007-01990 Please refer to the following pages for conditions of this permit. 4 of 4
c ,
o CONCRETE MECHANICAL MANUFACTURED HOME y
o Date By N
C) Footings I Setbacks Gas Piping Ribbons
b Interior Date By Interior-Date By Date By X
oExterior Date By Exterior-pate_ By Set-up ic
Point Load!Isolated Footings INSULATION Date By >
Date By Data SLAB INSULATIONgy FIRE DEPARTMENT - A
Foundation Walls Floors Date By
Date By Data By DECKS
FRAMING wars Date By
Date By Data By PROPANE TANKS
PLUMBING vault Date By
Date By OTHER
Groundwork Attic
Date By Date By Type.
Date By
D.W.v DRYWALL Type.
Int.Brace Wail Date By
Dare By Date By FINAL INSPECTION
CD
Water Line Fire Seperation } CD
Date By Date By Date 'S, -�� By O
Pass or Request Inspect.
Type of insp. Fail Date Date Done Bar Comments CID
CD
y _ tir�T,C 6,g C-Ac- o
� p/3 cv a,•�- �-0/7
CD
v
N
/S
ry?Al_ �r
�''�,-}"�>z Cl�e d �' vn�w r' /hAL
(N
O
-w
U
fD
O
Fd.3 pipe / 1
25`E0.08' ug for .mon,
f calc. posi ' could not fin '.
70 Fd.3/4"ppi e" PLANNING:
RED
A 43*E 0.,;3 SETBACKS ARE MEASU
/ y ALL
om calc. po FROM THE FURTHEST
Fd.3/4"pipe �p`i , E PROJECTION OF THE BUILDING
N24*01 E 0.08' I 58 ? ��`
Dug for man. // F; N�� om cal : sition
could not ,{,a \,��• `
'P �Dug for. m n
f _
4could not end 69 I .�...f.��_��� r.•�-�-o__.�L�-�`�� .=-�v
7 3
Fd. 3/4"pipe /
\� Pock Wall__ r'�. 4p s� 3 Trom point
66 + � no encroachment �'T � s surve
6 5 \`� � on lot 68
-0
cc 0
0
( 85.00
n'E ; ' 'Fd. 3 4?i�e N 89'09'24" E Fd. 3/4"pipe
d. 3/4 pipe S28x4� c 0. 4 from calc. position S36* 6' .72' S22=36'E 0.71' APPROVED
distant from point from talc. pose'
set this survriy. ;MASON COUNTY DCD PLANNI`�C
SITE PLAN REQUL: E7 TO BE ON SITE
SURVEYORS CERTIFICATE - CHANGE 'SU iEC TO APPROVAL` O(�
This ma correct! represents a survey mode C. Pp - �.1te
p y ) VE.R 3
by me or under my direction in conformance p��� s f for
o Q r
with requirements of the SURVEY RECORDING ACT z Mr.& Mrs. M. Gasper
.1rtC�,..M...G9; p��..................
Ar
at the request of
_ A PORTION OF
In JAt u.....,1 G91... �r?� t c t• THE_N.W.4 QF �lp,� � SECTION_;�QJTWP.Zj N.,P.
Ce ificate �1®..�z .?5............. E1r .t . ent�N A,SHJN ,TON
RECEIVED
—Krazan & ASSOCIATES , INC .
GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEE}l.(g�C11,: CEDAR ST:
CONSTRUCTION TESTING & INSPECTION i `�`�
June 16, 2008 KA Project No.: 106-08021
Marc Gasper
P.O. Box 412
Belfair, WA 98528
RE: Gasper Windmill Foundation
Dear Mr. Gasper:
In accordance with your request and authorization, the following test data are presented on the following reports,
which are enclosed:
June 5 Field Report No. 92681
Referenced concrete reports and compressive.strength data will be mailed following 28-day tests, if applicable.
If you have any questions,or if we can be of further assistance, please do not hesitate to contact our office.
Respectfully submitted,
Penn Seely, Laboratory Manager
Peninsula Division
PS: pm
Enclosures
Cc:
Client-email
With Offices Serving The Western United States
20714 State Hwy. 305 NE, Suite 3C •Poulsbo, Washington 98370• (360)598-2126 •Fax: (360)598-2127
FIELD REPORT NO:
t�.Y.V*XaZal & Associates , Inc .
GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING
CONSTRUCTION TESTING AND INSPECTION
DATE: ` - 6 9 CONTRACTOR: /77 q r (:5;4 5402.--
PROJECT#: %c7 - e) go Z/ JURISDICTION: /12q Sa
PROJECT:642,543c;;'r Gb//�, �„I1 ��s�.,,��2;", PERMIT#: ,SL n Z.06-7 -d% 9 D
LOCATION: 1�-(9 4 tt y INSPECTOR: A, k"�0 7za r Sc A
KRAZAN PROJECT MANAGER: WEATHER:ea;A TEMP: SAD
Y at z- 1 z G?h l /'6 S Svc 7"o r^
P-0/fi ct ,1- S(on Q Cz- ,ro A
(A,/;;'n pcj�,✓e,- --Z'h C., ) !AA is oi► 4ins 7a tl�r
ja L v WAA A o A,, ,7_��
s s s .'0-
rl/ )e4A ,
D S r
�. s l ,
Tb(� ']TIIP--,S Q. ��T>t'rGVC. Vey/
RED P4S /} i A;e_' ('1�� 'r i AT3�n;ZN So :Dr-tor 40
- ►.�c l ✓ Zr— .r- 1..alp
+ � J
IF
Equipment/Asset Number(s):
To the best of my knowledge,the abov A /WAS NOT performed in accordance with the approved plans,specifications,and regulatory requirements.
Superintendent/Representative: Technicia
Serving the Western United States
1501 Field Report.doc Revision I
Effective Date:5/25/05
The information provided on this report is prepared for the exclusive use of the client.This report may not be reproduced in any format without the written permission of the client and Krazan&Associates.
MASON COUNTY PERMIT NO.
{ BUILDING PERMIT APPLICATION
426 W. Cedar• P.O. Box 186, Shelton, WA 98584 G
Shelton (360) 427-9670 - Belfair (360) 275-4467 • Elma (360) 482-5269
On the web www.co.mason.wa.us
APPLICAtiT INFORMATION CONTRACTOR INFORMATION
Owner q y -t Company Name
Mailing Address �Q dV� Mailing Address
City State Zip Code City State Zip Code
Phone 2-"2s"W9 Other Ph. G 2-/- '77 D 1Y Phone Other Ph.
Lien/Title Holder ge&4��'' moo, �cf" Contractor Reg. # Exp.
E mail address i2a_;"ee Ha�z�'f1 yam• Cc, -&j E Mail Address
Drivers Lic.# ; . <�jjjjed {fs OB 1 Z r Drivers Lic.# DOB
SEPTIC /WATER SYSTEM INFORMATION - Connect to New Septic Existing Septic �d
Connect to Water System Name of Water System Ayo Came
Well Sewer System Name of Sewer System
PARCEL INFORMATION - 12 Di it Parcel No. Fire District
Legal Description -
Site Address (Please include street name, street number and city) yy NZ ! -Y�'V f
.,,..4 oeO t a-
Directionstosite i41; EA- � y o4kPoVC
t 7 C v <
Will timber be cut and sold in parcel preparation?Yes o
Is property within 200' of Saltwater V/a Lake River/Creek N/�Pond A, ,4
Wetland_seasonal Runoff fl Stream a/.4 Slopes or Bluffs 15%
Is this permit submittal the result of a Stop Work Notice,Correction Notice or other enforcement action?Yes/No
TYPE OF JOB - New_)jLAdd Alt Repair Other PRIMARY RESIDENCE ❑ SEASONAL ❑
Use of Building Describe Work -0R7zo,Al'No. of Bedrooms— No. of Bathrooms /-s Square Footage- 1 st Floor //z t 2nd Floor
3rd Floor Basement Deck_ Covered Deck Other Sq. ft.
Garage Attached Detached Carport Attached Detached
MANUFACTURED HOME INFORMATION - Make Model
Length_Width Sept I No. r No. of Bedr o.. o_f B ooms
Type of Heat_. Phase Pr' cement Unit? Yes No
Installer Name Certification No.
OWNER/BUILDER Acknowledges submission of inaccurate information may result in a stop work order or permit revocation.
Acknowledgement of such is by signature below. I declare that I am the owner,owners legal representative,or the contractor. I further declare
that I am entitled to receive this permit and to do the work as proposed in the application. I declare that I have obtained the permission from all
the necessary parties. If permission is required from any easement holder or any other party in interest regarding this application or the work
proposed in the application, I have obtained permission from them to apply for this permit and conduct the work proposed. The owner or
agent on owners behalf, represents that the informaticn provided is accurate and grants employees of Mason County access to the above
described property and structure for review and inspection. This permit/application becomes null & void if work or authorized construction is
not commenced within 180 days or if construction work is suspended for a period of 180 days. PROOF OF CONTINUATION OF WORK IS BY
MEANSOFAPRgrp, SS INSPECTION.INACTIVITY OF THIS PERMIT APPLICATION OF 180 DAYS WILL INVALIDATE THE APPLICATION.
X Date: lllZ,'?I�'7
Owner!Owne s Representative/Contractor (indicate which one)
FOR OFFICIAL USE BEYOND THIS POINT Accepted Date
DEPARTMENTAL REVIEW A ROV DENIED NOTES
Building Department
Planning Department
Environmental Health Department L VUCNO �!r
Fire Marshal
FEES
Building Permit Fee Site Inspection
Plan Review Fee O 4 EH Review Fee
Plumbing & Base Fee Planning Review Fee
Mechanical & Base fee Other
Wood /Gas/ Pellet Stove Fee State Fee 4 6
Violation Fee Pre-Paid at Submittal gel
Valuation $ TOTAL FEES
, w
MASON COUNTY
DEPARTMENT OF COMMUNITY DEVELOPMENT
411 N. Fifth Street/P.O. Box 186, Shelton WA 98584
360.427.9670 ext. 352
DDR
Rec'd by
Request for
Administrative Variance for Reduction in the Required Setbacks ($100.00)
For administrative review, the minimum variance on a setback request is 5 feet
from the side yard lot lines and 10 feet for front and rear lot lines or any access
easement. Request for further reduction requires a standard variance.
Setbacks are measured from the furthest r)roiection of the structure including
roof eaves.
Applicant/Owners: 'l evee-
Mailing Address: lil� i�
Telephone 9
City: State: t-J q—
Zip:
If this reduction is tied to a building permit, please give permit
case number. BLD
Parcel Number(s): Zoning_ 12,V(�
Site Address: 4146 Al Z� L�y� C 7
Requested variance: Front/ Rear gidYard (please circle all that apply)
T
Requested setback variance: ft.
An illustrated site plan is required
Your site plan must show the following: north arrow, abutting street or
easements, set backs to all property lines and existing buildings, slopes, surface
water, wetlands, critical areas, septic, well and driveway. Show all proposed new
development.
The following circumstances must apply: D 0
FRONT AND OR REAR YARD REQUIREMENTS: rn
1) Existing lots of record as of March 5, 2002;
You must meet one of the following: (Please circle all that apply) 0 X
2) One of the following exists on the lot: RI -p
a) steep slopes, wetlands, or streams present; r "t
soils that restrict building or septic development; Z
c) lot width at the front yard line of no more than 50 feet;
d) lot size of no more than one-fourth acre;
e) existing improvements of buildings, septic systems, and well areas. m
I:\PLANNING\PAC\VARIANCES\Adminstrative.var.doc Created on 04/27/07 12:51 PM
«� ti
,SIQ'E YARD REQUIREMENTS:
1) r Existing lots of record as of March 5, 2002;
ou must meet one of the following. (Please circle all that apply)
2) One of the following exists on the lot:
a) steep slopes, wetlands, or streams present;
b) soils that restrict building or septic development;
c lot width at the front yard line of no more than 50 feet;
t size of no more than one-half acre;
e) xisting improvements of buildings, septic systems, and well areas.
Explain how these circumstances preclude a reasonable development proposal
from meeting the setback standard for Rural Residential 2.5, 5, 10, or 20 zones.
Owner/Agent (please indicate)
Signature and date
Official Use Only
Approved Date
Denied Date
Reason for denial:
I:\PLANNING\PAC\VARIANCES\Adminstrative.var.doc Created on 04/27/07 12:51 PM
�N.STA MASON COUNTY
h1 c DEPARTMENT OF COMMUNITY DEVELOPMENT
S° �= Planning Division
~ NOT z P O Box 279, Shelton,WA 98584
Y �,o~ (360)427-9670
186A
REQUEST FOR ADDITIONAL INFORMATION
December 27, 2007
MARK A GASPER
NE 40 LANYARD CT
BELFAIR WA 98528
Parcel No.: 123305100068
Project Description: Wind Turbine Foundation.
Dear Applicant:
You have submitted a permit application (case no. BLD2007-01990) for proposed
construction or development in the county. Upon review of your application, I require
additional information to complete the permit review process.
Therefore, review of your application will not proceed until the necessary information
is provided (see the comment section of this letter for details.) Once the information
is submitted and the application is complete, I will continue to process your
application accordingly. If the additional information is not provided to the County
within 180 days of this request, the application shall expire and no further action on
the proposed development shall take place.
Please contact me at (360) 427-9670, ext. 363 if you have questions.
Sincerely,
Kell McAboy
Land Use Planner
Mason County Planning Department
Comments: The proposed project is not exempt from the State Environmental
Policy Act (SEPA). Please fill out the enclosed SEPA checklist and
return to the Mason County Permit Assistance Center with appropriate
fee.
12/27/2007 1 of 1 BLD2007-01990