HomeMy WebLinkAboutBLD2024-00199 SFR - BLD Inspections - 10/11/2024 MASON COUNTY 615 W.Alder St Bldg 8,SHELTON,WA 98584
COMMUNITY SERVICES SHELTON:360�27-9670,EXT 352
i BELFAIR:360-275-4467,EXT 352
Buildin%Planobig,Env'uonmenWl He Ith Community Nealdi ELMA:360-482-5269,EXT 352
www.co.mason.wa.us
INSPECTION CARD AND CERTIFICATE OF OCCUPANCY**
To schedule an inspection call or visit http:/twww.co.mason.wa.us/community-services/bid-inspection.php
Permit Number BLD2024-00199 Date Issued 05/09/2024 Issued By
Project NEW SFR-STOCKING THIS PLAN 2018-0060,1217 A GL
Site Address 290 NE BELFAIR STATION DR
Applicant LENNAR NORTHWEST INC
Contractor LENNAR NORTHWEST INC
Contractor Phone 1.253.350.6264
Primary Code UPC IBC,IRC,IFC,IEC,IMC,& Type
Permit Type NEW SINGLE FAMILY RESIDENCE Occupancy
-APPROVED PLANS MUST BE ONSITE FOR ALL INSPECTIONS.
-DO NOT PROCEED BEYOND EACH STAGE OR COVER WORK UNTIL APPROVAL IS GRANTED.
-THIS CARD MUST BE POSTED IN A CONSPICUOUS LOCATION,FRONT OF THE PREMISES IS BEST FOR MAKING ENTRY.
-ALL PERMITS EXPIRE 180 DAYS AFTER THE PERMIT IS ISSUED OR 180 DAYS AFTER DATE OF LAST INSPECTION.
-OWNER/AGENT IS RESPONSIBLE FOR REQUESTING ALL INSPECTIONS THROUGH FINAL INSPECTION.
**THIS STRUCTURE MAY NOT BE USED OR OCCUPIED UNTIL ALL APPROVALS ARE GRANTED.**
PRIOR TO CALLING FOR FINAL INSPECTION,ALL CONDITIONS OF THE PERMIT MUST BE MET
Public Works Access/Driveway Other
Health Septic Well
Deptartment
Planning Site Inspection
Department
Fire Marshall Fire Apparatus Access Fire Sprinkler
Auto Fire Alarm Hood and Duct
Other Final
Building Building Official: Community Services Designee
Department
Concrete Setbacks K Slab
Footing Perimeter Point load Footing
Footing Interior Footing Decks/Porches
Foundation Stem Walls Other
Rough-In Groundwork Plumbing Framing
Groundwork Mechanical Plumbing
Groundwork Gas Pipe Mechanical
Gas Piping Shear Wall Nailing EC.
Underfloor .a `1y"
Other
Insulation Slab Ceiling
Floor Vaulted Ceiling
Walls Vapor Barrier
Other
Wallboard Interior Wall Brace Panels Fire Walls
Nailing
Other
Final Building Ib_6�•1
Manufactured Setbacks Setup
Home
Concrete Foot/Runners Final
Other
Mason County
Mason County - Division of Community Development
615 W. Alder St.
Building 8
Shelton, WA 98584
360-427-9670 ext 352
www.masoncountywa.gov
B DD2024-00199 NEW SINGLE FAMILY RESIDENCE
PROJECT DESCRIPTION: NEW SFR-STOCKING THIS PLAN 2018- ISSUED: 05/09/2024
0060, 1217 A GL
SITE ADDRESS: 290 NE BELFAIR STATION DR BELFAIR EXPIRES: 11/05/2024
PARCEL: 123285100026
APPLICANT: LENNAR NORTHWEST INC OWNER: LENNAR NORTHWEST INC
33455 6TH AVE S, UNIT 131 33455 6TH AVE S, UNIT 131
FEDERAL WAY,WA 98003 FEDERAL WAY,WA 98003
1.253.350.6264
GENERAL CONTRACTOR'S LICENSE: LENNAR NORTHWEST INC License: LENNANL783JO
33455 6TH AVE SOUTH UNIT 1-13 Expires: 08/18/2026
11807 NE 99TH ST,SUTIE 1170,VANCOUVER WA
98682
FEDERAL WAY,WA 98003
1.253.350.6264
VALUATIONS: FEES: Paid Due
U VB Utility, miscellaneous 400.00 $26,592.00 State Fee-Residential $6.50 $0.00
Covered Deck/Carport 60.00 $1,320.00 Mechanical Base Fee $30.00 $0.00
R-3 VB Residential, one- 1185.00 $196,804.80 Technology Surcharge $67.74 $0.00
and two-family Planning Review Fee $240.00 $0.00
Plumbing Base Fee $25.00 $0.00
Plumbing Fees $115.00 $0.00
Plan Check Fee $1,207.02 $0.00
Building Permit Fee $1,856.96 $0.00
Building Plan Review/Change of $135.00 $0.00
Use-Onsite Sewage
Mechanical Fees $153.00 $0.00
Total: $224,716.80 Totals : $3,836.22 $0.00
FIXTURES
(3ty Mechanical Fixtures (�jt C Plumbing Fixtures
1.0000 Dryer Vent(s) 1.0000 Number of Hose Bibs
Printed by:Annie Wilson on:05/09/2024 08:42 AM
Page 1 of 7
Mason County
Mason County - Division of Community Development
615 W. Alder St.
Building 8
Shelton, WA 98584
360-427-9670 ext 352
www.masoncountywa.gov
NEW SINGLE FAMILY RESIDENCE BLD2024-00199
(3ty Mechanical Fixtures -t� Plumbing Fixtures
1.0000 Kitchen Exhaust Hood(s) 1.0000 Number of Clothes Washers
1.0000 Ductless Heat Pump 1.0000 Number of Dishwashers
1.0000 Wood/Gas/Pellet Stove(s) 1.0000 Number of Kitchen Sinks
3.0000 Spot Vent Fan(s) 1.0000 Number of Water Heaters and or Vent
2.0000 Number of Bath Tubs
2.0000 Bathroom Sink
2.0000 Number of Showers
2.0000 Number of Toilets
REQUIRED INSPECTIONS
Setback Inspection Rough- Plumbing Inspection
Footing Inspection Mechanical Inspection
Foundation Wall-Pre-Pour Inspection Insulation Inspection
Underfloor Inspection Connection is to be verified by Health or Utilities
Shearwall Inspection BLD-Final Inspection
Framing Inspection
CONDITIONS
" A minimum of 90 percent of all permanently installed lamps in lighting fixtures shall be high efficacy lamps in accordance
with IECC/WSEC Section R404.1.
" Concrete used for basement walls, foundation walls, exterior walls, porches, carport slabs, steps exposed to the weather,
garage floor slabs and other vertical concrete work exposed to the weather shall have a minimum compressive strength of
3000 psi (IRC Table R402.2).
The international code requires a fire apparatus access road for every facility, building, or portion of a building that is more
than 150'from an approved access road. Roads are required to meet the minimum Mason County Fire Marshal standards
for Fire Apparatus Access Roads up to the point where such roads connect with a county maintained public road or to
another fire apparatus access road which connects to a county maintained public road.
" All changes to"approved" building plans that effect compliance with the international codes as amended and adopted, or
any other Mason County ordinance or regulation, must be reviewed and approved by Mason County prior to construction.
The use, handling and storage of hazardous materials or flammable and combustible liquids in excess of 10 gallons is not
allowed without the approval of the Mason County Fire Marshal.
Printed by:Annie Wilson on:05/09/2024 08:42 AM
Page 2 of 7
Mason County
Mason County - Division of Community Development
615 W. Alder St.
Building 8
Shelton, WA 98584
360-427-9670 ext 352
www.masoncountywa.gov
NEW SINGLE FAMILY RESIDENCE BLD2024-00199
' A permanent certificate, completed by the builder or registered design professional, shall be posted on a wall in the space
where the furnace is located, a utility room, or an approved location inside the building.When located on the elctrical panel,
the certificate shall not cover or obstruct the visibility of the circuit directory label, service disconnect labek, or toher reqyired
Iabels.The certificate shall list the predominant R-values of insulation installed in or on ceiling/roof, walls, foundation (slab,
basement wall, crawlspace wall and/or floor), and ducts outside the conditioned spaces; U-factors for fenestration; and the
solar heat gain coefficient(SHGC)of fenestration. Where there is more than one value for each component, the certificate
shall list the value covering the largest area. The certificate shall list the type and efficiency of heating, cooling, and service
water heating equipment, duct leakage rates including test conditions as specified in WSEC Chapter 4, and air leakage
results if a blower door test was conducted.
Building envelope air leakage control shall be considered acceptable when tested to have an air leakage less than 5 air
changes per hour when tested with a blower door in accordanve with WSEC Section R402.4.1.2.
The blower door test results shall be recorded on the permanent certificate required located near the electrical distribution
panel. Air leakage testing is not required for additions less than 500 square feet. Reference WSEC R402.4.1.2.
Compliance certificates are available online at the WSU Energy program website titled, "WSEC 2015 Certificate"and are
available in '/4 or%sheets.
* Approved per dimensions and setbacks on submitted site plan. Setbacks are measured from the furthest projection of the
structure.
* All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building
Official may grant a one time extention of 180 days, upon the receipt of a written extension request prior to permit expiration.
Letter must indicating that circumstances beyond the control of the permit holder preventing action from being taken. No
more than one extension may be granted.
* REQUIREMENTS FOR ROOF COVERINGS. Roof coverings shall be applied in accordance with the applicable
provisions of the current code and the manufacturer's installation instructions.
A drip edge shall be provided at eaves and gables of shingle roofs.
* OWNER/BUILDER acknowledges submission of inaccurate information may result in a stop work order or permit
revocation. Acknowledgement of such is by signature below. I declare that I am the owner, owners legal representative, or
contractor. I further declare that I am entitled to receive this permit and to do the work as proposed. I have obtained
permission from all the necessary parties, including any easement holder or parties of interest regarding this project. The
owner or authorized agent represents that the information provided is accurate and grants employees of Mason County
access to the above described property and structure(s)for review and inspection. This permit/application becomes null &
void if work or authorized construction is not commenced within 180 days or if construction work is suspended for a period of
180 days. PROOF OF CONTINUATION OF WORK IS BY MEANS OF INSPECTION. INACTIVITY OF THIS PERMIT
APPLICATION OF 180 DAYS WILL INVALIDATE THE APPLICATION.
* Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and
MUST NOT adversely impact adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either
private ditches and drains will meet requirements of the stormwater ordinance or prior approval will be granted to use an
existing utility and drainage easement dedicated for that specific purpose. For further information regarding this ordinance
contact the Mason County Public Works Department prior to construction at Ext 450
Printed by:Annie Wilson on:05/09/2024 08:42 AM
Page 3 of 7
Mason County
Mason County - Division of Community Development
615 W. Alder St.
Building 8
Shelton, WA 98584
360-427-9670 ext 352
www.masoncountywa.gov
NEW SINGLE FAMILY RESIDENCE BLD2O24-00199
* Adopted Washington State Energy Code Compliance has been approved as follows:
Heat Type: Electric or other than electric, Compliance Method: Prescriptive option Marine-4C, Window (Max U-
Factor):0.30, Skylight(Max U-Factor):0.50, Doors (Type/Max U-Factor):0.30 or less, Wall insulation R-21, Floor insulation
R-30, Ceiling Insulation min. R-49, Vault Insulation R-38, and Slab Insulation R-10.
Table 406.3—Energy Credits(Single Family)
1.2 Prescriptive compliance is based on Table R402.1.1 with the following modifications: Vertical fenestration U =0.20
2.1 Compliance based on R402.4.1.2: Reduce the tested air leakage to 3.0 air changes per hour. maximum at 50 Pascals or
For R-2 Occupancies, optional compliance based on Section R402.4.1.2: Reduce the tested air leakage to 0.3 cfm/sf
maximum at 50 Pascals and All whole house ventilation requirements as determined by Section M1507.3 of the International
Residential Code or Section 403.8 of the International Mechanical Code shall be met with a high efficiency fan(s)(maximum
0.35 watts/cfm), not interlocked with the furnace fan (if present). Ventilation systems using a furnace including an ECM motor
are allowed if they are controlled to operate at low speed in ventilation only mode.
3.4 Ductless mini-split heat pump system, zonal control: In homes where the primary space heating system is zonal electric
heating, a ductless mini-split heat pump system with a minimum HSPF of 10.0 shall be installed and provide heating to the
largest zone of the housing unit.
5.5 Water heating system shall include one of the following: Electric heat pump water heater meeting the standards for Tier
III of NEEA's advanced water heating specification or For R-2 Occupancy, electric heat pump water heater(s), meeting the
standards for Tier III of NEEA's advanced water heating specification, shall supply domestic hot water to all units. If one
water heater is serving more than one dwelling unit, all hot water supply and recirculation piping shall be insulated with R-8
minimum pipe insulation. 5
7.1 All of the following appliances shall be new and installed in the dwelling unit and shall meet the following standards:
Dishwasher—Energy Star rated Refrigerator(if provided)—Energy Star rated washing machine—Energy Star rated Dryer—
Energy Star rated, ventless dryer with minimum CEF rating of 5.2, all appliances shall be installed and connected to utilities.
Dryer ducts and exterior dryer vent caps are not permitted to be installed in the dwelling unit.
* All RED stamped approved plans are required to be on-site for inspection purposes. If an inspection is called for and
plans are not available on site,then approval will not be granted. In addition, a re-inspection fee(refer to current fee
schedule, minimum 1 hour)will be charged and must be collected by the Building Department prior to any further inspections
being performed or approvals granted.
* Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries,
Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an
unregistered contractor. Further information can be obtained at 1-800-647-0982. The person signing this condition is either
the homeowner, agent for the owner or a registered contractor according to WA state law.
* The foundation/footing must be placed on undisturbed,firm-native soil. Proper frost depth shall be observed below grade
in undisturbed soils.
* Landings and stairs must meet the same setback conditions as any permitted structure; and, must be shown on your site
plan. Please check your"Approved Site Plan"to ensure these structures are shown and meet the setback conditions listed.
* All property lines shall be clearly identified at the time of foundation inspection.
* All building permits shall have a final inspection performed and approved by Mason County Building Department prior to
permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property
records on file with Mason County as being non-compliant with Mason County ordinances and building regulations.
* Concrete encased grounding electrodes must be installed and used at each new building or structure that is built upon a
permanent concrete foundation. In Mason County the electrical code is regulated by Washington State Department of Labor
& Industries(L&I).
For more information contact L&I for additional information. In Olympia call (360)902-6350 and in Bremerton call (360)415-
4000.
Printed by:Annie Wilson on:05/09/2024 08:42 AM
Page 4 of 7
Mason County
Mason County - Division of Community Development
615 W.Alder St.
Building 8
Shelton, WA 98584
360-427-9670 ext 352
www.masoncountywa.gov
NEW SINGLE FAMILY RESIDENCE BLD2024-00199
* Installation of heating equipment in a single-family residence shall meet the requirements of the current WSEC R403,
applicable sections of the IRC, and IMC.
Heating equipment shall be sized in accordance to ICC/WSEC, Section R403.7. Heating and design load calculations for the
purpose of sizing HVAC systems are required and shall be calculated in accordance with accepted practice, including
infiltration and ventilation. Design calculations shall be available for inspection during inspection.
Referencing IRC M1601.4, all ducts, air handlers, filter boxes, and building cavities shall be sealed. All joints of duct
systems and seams shall be made substantially air tight by means of tapes, mastics, liquid sealants, gasketing or other
approved closure systems. Closure systems used with rigid fibrous glass ducts shall comply with UL181A and shall be
marked 181A-P for pressure-sensitive tape, 181A-M for mastic or 181 A-H for heat-sensitive tape. Closure systems used
with flexible air ducts and flexible air connectors shall comply with UL181 B and shall be marked 181 B-FX for pressure-
sensitive tape or 181 B-M for mastic. Duct connections to flanges of air distribution system equipment or sheet metal fittings
shall be mechanically fastened. Mechanical fasteners for use with flexible nonmetallic air ducts shall comply with UL 181 B
and shall be marked 181 B-C. Crimp joints for round metal ducts shall have a contact lap of at least 1-1/2 inches(38 mm)
and shall be mechanically fastened by means of at least three sheet-metal screws or rivets equally spaced around the joint.
Closure systems used to seal metal ductwork shall be installed in accordance with the manufacturer's installation
instructions.
Duct tape is NOT permitted as a sealant on any ducts. When ducts are located in unheated spaces the ducts hall be
insulated to R-8
DUCT TIGHTNESS TESTING shall be conducted by person(s)trained to perform such testing. A signed affidavit
documenting test results in accordance to IECC/WSEC Section R403.3.3 shall be provided to the Mason County Building
Department prior to the final occupancy inspection. Affidavit forms are available on at the WSU-Energy Program website
titles, "Duct Leakage Affidavit"or"Duct Leakage Testing Results (Existing Construction)." Duct tightness testing is not
required if the air handler and all ducts are located within the heated space.
* Retaining walls needed to support a surcharge such as structures, roads, or to support slopes, shall require a separate
building permit and approval prior to construction of the retaining wall.
* Carbon monoxide alarms, listed as complying with UL 2075 shall be installed in accordance with manufacturer
specifications and in accordance with IRC Section R315.
Alarms shall be installed outside of each separate sleeping area in the immediate vicinity of the bedrooms and on each level
of the dwelling.
EXISTING DWELLINGS shall be equipped with carbon monoxide alarms when alterations (including addition or alteration of
fuel burning appliances), repairs, or additions requiring a permit occur, or when one or more sleeping rooms are added or
created.
* CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING
DEPARTMENT AND THE ADOPTED BUILDING CODE.
The construction of the permitted project is subject to inspections by the Mason County Building Department. All
construction must be in conformance with the international codes as amended and adopted by Mason County. Any
corrections, changes or alterations required by a Mason County Building Inspector shall be made prior to requesting
additional inspections.
Printed by:Annie Wilson on:05/09/2024 08:42 AM
Page 5 of 7
Mason County
Mason County - Division of Community Development
615 W.Alder St.
Building 8
Shelton, WA 98584
360-427-9670 ext 352
www.masoncoun"a.gov
NEW SINGLE FAMILY RESIDENCE BLD2024-00199
* A Mason County Stormwater Management Worksheet was completed and signed as part of this building permit
application. Design, sizing, placement, inspection and maintenance of stormwater management systems shall be the
responsibility of the owner/agent of the developed parcel. It is the owner/agent/contractor's responsibility to ensure that
Mason County Department of Public Works has approved the stormwater site plan for this parcel prior to the commencement
of any development activities. *NOTE if Stormwater Management option "A"was selected on the Small Parcel Stormwater
Management Application/Worksheet the document entitled "Managing Storm Drainage on Small Lots, The Small Parcel
Stormwater Site Plan" constitutes an approved plan based on the criteria listed on the application/worksheet. If the
development has, or will have, a septic/drainfield system you are responsible for contacting Mason County Division of
Environmental Health to ensure that the stormwater system will not adversely affect the septic system of this, or any other,
parcel. You may also wish to consult with the septic design professional involved with the project. By calling for a final
inspection of the building permit the owner/agent/contractor is acknowledging that all components of the stormwater
management system have been installed as approved on the stormwater site plan. Under the requirements of Mason County
Stormwater Ordinance, either private ditches and drains will meet requirements of the stormwater ordinance or prior
approval will be granted to use an existing utility and drainage easement dedicated for that specific purpose.
* Owner/Agent is responsible to post the assigned address and/or purchase and post private road signs in accordance
with Mason County Title 14.28 and 14.17.
* The stamped approved site plan is required to be on-site for inspection purposes. If an inspection is requested and the
approved site plan is not on site, approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule,
minimum 1 hour)will be charged and shall be collected by the Building Department prior to any further inspections being
performed or approvals granted.
* All surface water and potential runoff must be controlled on site and shall not adversely affect any adjacent properties nor
increase the velocity flow entering or abutting to any state or county culverting/ditching system or road way.
* All construction must meet or exceed all local and state ordinances in addition to the International Codes requirements as
adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted
classification. Any non-approved change of use or occupancy would result in permit revocation.
* The plan review check list and corrections are part of the approved plans and must remain attached. It is the responsibility
of the applicant, owner or contractor to make the required corrections indicated on the plans. Once the plans are marked
"APPROVED", they shall not be changed or altered without authorization from the Building Official. The permit holder is
responsible to retain the complete approved set of plans on site for the duration of the project. Failure to comply and/or
removal of approved documents will result in failure of required building inspections.
* WIND LOADS- Roof coverings shall be designed and tested to withstand the maximum basic wind speed. The basic
wind speed for Mason County is 85 MPH.
* By definition, propane tanks and heatpumps are structures, which must meet setback conditions. Please check your
"Approved Site Plan"to ensure these structures meet the setback conditions listed.
* From Richard Dickinson, Deputy Director of Utilities and Waste: Must meet all Mason County design and construction
standards, must pay all fees including: connection fee with permit and inspection fee, and Latecombers charge (TBD).
* Any changes in proposed construction shall be reviewed by the engineer or architect of record and submitted in writing to
the Mason County Building Department prior to construction. All engineering and/or architectural documents are a part of
the approved set of plans and shall remain attached thereto. If documents are removed, approval will not be granted. In
addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and shall be collected by the
Building Department prior to any further inspections being performed or approvals granted.
* Stock Plan Identification number: 2018-0060
This project is approved subject to the provisions identified the Mason County Stock Plan Policy. The site plan approved by
the Planning Department, red stamped approved building plans, and all attachments approved by the Mason County
Building Department shall be available for the Mason County Building Inspector at each required inspection.
Printed by:Annie Wilson on:05/09/2024 08:42 AM
Page 6 of 7
Mason County
Mason County - Division of Community Development
615 W. Alder St.
Building 8
Shelton, WA 98584
360-427-9670 ext 352
www.masoncoun"a.gov
NEW SINGLE FAMILY RESIDENCE BLD2024-00199
* A separate inspection in addition to the inspections required in the IBC, Section 110 shall be required in accordance with
the 2018 IBC, Section 1705.12.2 and Section 1707.1. The additional inspection is required when shear wall fastener
spacing is required to be 4 inches or less. The shear wall schedule shown on sheet S3.01 designate TYPE 4, 6, AND MUD
SILL @ ALL WALLS TYPES with fastener spacing 4 inches or less.
The required inspection may be performed by the Mason County Building Department, a WABO certified inspector, certified
to inspect lateral connections, the Engineer of record (EOR), or an authorized representative of the (EOR). The special
inspectors duties and responsibilities shall be as specified in Chapter 17. When a third party inspector is used to perform the
inspection, special inspection reports shall be submitted to the Mason County Building Department, 615 W Alder St, Shelton,
WA 98584 and also available on site for review by the Building Official. Inspection reports shall be completed and submitted
to the Mason County Building Department in a timely manner and shall be submitted prior to the framing inspection of said
project.
I hereby certify that I have read and examined this application and know the same to be true and correct.
All provisions of Laws and Ordinances governing this type of work will be complied with whether
specified herein or not. The granting of a permit does not presume to give authority to violate or cancel
the provisions of any other state/local law regulating construction or the performance of construction.
Issued By: t�i n,n t JL) I L5J�n
Contractor or Authorized Agent: Date:
5
Printed by:Annie Wilson on:05/09/2024 08:42 AM
Page 7 of 7