HomeMy WebLinkAboutMIS95-0244 Cancelled Retaining Wall - MIS Permit / Conditions - 6/12/1995 MASON COUNTY PERMIT
Mason County Bldg. 111 426 W. Cedar NULL & VOID BY EXPIRATION
RO. Box 186 Shelton, Washington 98584 DATE 1PjZ-95BY
M I �S G 1E t- L- A N IEE 00 LJ:F,- PERM I I FOR INSPECTIONS CALI. 427-96/0
jn�W244 FARIU. PLAT :BEPL0 DIV ; BLK LOT :
JOB N -ri wy "fl,fAll"
APPLICANTi MACKINNON CONSTRUCTION 275-0611
OWNERt MACKINNON CONSTRUCTION 275-0611
LEGAL i BEARDS COVE DIY 3 TA iS
PRO T I ON
PROJECT LOCATION :
SANDHILL LEFT ON ANCHOR END OF CULDESAC ON LEFT.
PROJECT NOTES
TYPE AMOUNT BY PATE RFCL I PT
PRMT * 60 -50 KS 04/24/95 38870
PLCK * 25 ,00 KS 04124195 38870
STFE $ 4 .50 KS 04/24/95 38870
TOTALt 90 .00 OWNFR OR AGENT DATE
N I S PONT, resat 04101192 COMPLIANCE TO ATTACHED CONDITIONS IS
CONCRETE MECHANICAL MOBILE HOME
Footings-Setback date by Ribbons
date by Gas Piping date b
Foundation Walls date by Set Up
date by INSULATION date by
BG/SLAB Insulation Floors Final
date by date by date by
FRAMING Walls FIRE DEPT.
date by date by date by
PLUMBING OTHER
Groundwork d tle b
date b y
D.W.V. WALLBOARD NAILING
date by date by
Water Line FINAL INSPECTION
date by date by date by
MASON COUNTY
Mason County Bldg. 111 426 W. Cedar
P.O. Box 186 Shelton, Washington 98584
II
P E Ft M I -r C" C) N ID I -T I ct ri "S;
Case No . ; MIS95-0244
For : MACKINNON CONSTRUCTION
Page : I
1 ) Structure must he setback 5 ' from a I I ut I I I tv and drainage easements, a tota I (it 10 '
from all side property lines and 15 ' from rear property line, unless a variance Is
obtained from the Building Oept .
X
2 ) Pro p"o'sed structure or any port ion thereof greater than 30" i ro he I(ght from Grade line,
must mai..�tiLi_q a mi ninium of 5 ' setback from al I property lines . easements and r Ight of
ways
X
3 ) Owner responsible if primary and/or reserve drainfield areas are encumbered .
x---4 I tvl r-A
CONCRETE MECHANICAL MOBILE HOME
Footings-Setback date by Ribbons
date by Gas Piping date b
Foundation Walls date by Set Up
date by INSULATION date by
BG/SLAB Insulation Floors Final
date by date by date by
FRAMING Walls FIRE DEPT.
date by date by date by
PLUMBING Attic OTHER
Groundwork date b
date b y
D W WALLBOARD NAILING
date by date by
Water Line FINAL INSPECTION
date by date by date by
it
I
:t
A
MOM
■i
• IAM
7 �
1� y
r J• s-
a
ire_ st