HomeMy WebLinkAboutBLD2006-01028 Final Replace Mobile Home - BLD Permit / Conditions - 3/22/2007 Inspection Line(360)427-7262
MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Phone: (360)427-9670,ext.352
Mason County Bldg. III 426 W. Cedar P.O. Box 186
Shelton,WA 98584
RESIDENTIAL BUILDING PERMIT BLD2006-01028
OWNER: SANDRA ROGERS RECEIVED: 6/13/2006
CONTRACTOR: MIKE'S SETUP INC 260-710-4560 LICENSE: CCBEMHMIKES EXP: 8/2/2008 ISSUED: 6/26/2006
SITE ADDRESS: 321 NE SAND HILL RD BELFAIR EXPIRES: 6/12/2007
PARCEL NUMBER: 123305000051
LEGAL DESCRIPTION: BEARDS COVE DIV 3 TR 51
PROJECT DESCRIPTION: DIRECTIONS TO SITE:
MOBILE HOME REPLACEMENT TO STRAIGHT TOWARDS BELFAIR STATE PARK, RIGHT ON SANDHILL,
SITE ON LEFT JUST BEFORE HILL.
General Information Construction &Occupancy Information Square Footage Information
No.of Bedrooms: Type of Constr.:
Type of Use: MH Insp.Area: No. of Bathrooms: Occ. Group: Lot Size: Deck:
Type of Work: NEW Fire Dist.: 2 No.of Stories: Occ. Load: Building:
Valuation: Building Height: Occ. Status: Primary Basement:
Manufactured Home Information Setback Information Shoreline&Planning Information
Make:FLEETWOC Length: 66 Ft. Front: E 22.0 Ft. Shoreline: Ft. Water Body:
SEPA?: No
Model:BRAODMO( Width: 14 Ft. Rear: Ft. Slope: Ft. Shoreline Desi
Side 1: N 27.0 Ft. 9.: Not Applicable
Year:1977 Serial No.: 0322327418 Side 2: S 33.0 Ft. Comp. Plan Desig.: Rural
Plumbing Fixtures Mechanical Fixtures FEES
Type Qty. Type Qty. Type By Date Amount Receipt
Mobile Home Submittal Fee KS 6/13/2006 $214.50 S12006000
Planning Review Fee KS 6/13/2006 $155.00 S12006000
EH Plan Review TW 6/22/2006 $75.00 S22006000
Mobile Home Issuance Fee RTB 6/22/2006 $214.50 S22006000
Total $659.00
Z-- 1-- 6-1 `J BLD2006-01028 Please referto the following pages for conditions of this permit. 1 of 5
CASE NOTES FOR
BLD2006-01028
CONDITIONS FOR
BLD2006-01028
1) The international code requires a fire apparatus access road for every facility, building, or portion of a building that is more than 150'from an approved
access road. Roads are required to meet the minimum Mason County Fire Marshal standards for Fire Apparatus Access Roads up to the point where
such roads connect with a county maintained public road or to another fire apparatus access road which connects to a county maintained public road.
X
2) Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division.
There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at
1-800-647-0982. The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law.
X
3) Water quality is not to be degraded to the detriment of the aquatic environment as a result of this project.
X E°
4) Prior to final approval, all upland areas disturbed or newly created by construction activities shall be seeded, vegetated or given an equivalent type of
erosion protection (silt fencing or straw matting). X
5) Approved per dimensions and setbacks on submitted site plan. Setbacks are measured from the furthest projection of the structure.
X _/:
6) By definition, propane tanks and heatpumps are structures,which must meet setback conditions. Please check your"Approved Site Plan"to ensure
these structures meet the setback conditions listed.
7) Landings and stairs must meet the same setback conditions as any permitted structure; and, must be shown on your site plan. Please check your
"Approved Site Plan"to ensure these structures are shown and meet the setback conditions listed.
X F
8) Owner/builder assumes all responsibility if drainfield/reserve area is encumbered. X �.
9) All approved plans are required to be on-site for inspection purposes. If an inspection is called for and plans are not available on site, then approval will
not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and must be collected by the Building
Department prior to any further inspections being performed or approvals granted.
X
BLD2006-01028 Please referto the following pages for conditions of this permit. 2 of 5
I
10)', In accordance 4,th international codes and Title 14, Mason County Building Code, "Standards for Fire Apparatus Access Roads,"all new structures that
require an address shall have approved numbers or addresses located at the beginning of long driveways when the address is not clearly visible from the
access road. The numbers shall also be plainly visible and legible from the street or road fronting the property and shall contrast with their background.
Mason County Building Department requires that this be completed prior to calling for any site inspections. A re-inspection fee based on rates as adopted
by the jurisdiction and the international codes will be assessed if the owner and/or contractor fail to post the address on site prior to requesting
inspections.
X
11) The plan review check list and corrections are part of the approved plans and must remain thereto. It is the responsibility of the applicant to make the
corrections indicated on the plans. Once the plans are marked "APPROVED", they shall not be changed or altered without authorization from the Building
Official. The permit holder is responsible to retain the complete approved set of plans on site for the duration of the project. Failure to comply and/or
removal of approved documents will result in failure of required building inspections.
X c's'
12) THE FOUNDATION SYSTEM SHALL BE PLACED ON UNDISTURBED, NATIVE SOIL. X
13) Any retailer, manufacturer or contractor who installs a manufactured home warrants that the manufactured home is installed in accordance with the State
Installation code, chapter 296-150M WAC. All installers hired to do installation work shall be certified manufactured home installers and shall be present
to supervise the installation of all on-site work. An Installer Tag shall be posted on site giving the certification number and signature of the certified
installer responsible for each major part of the installation. RCW43-63B.090
An approved Installer cerification tag shall be placed on the end of the manufactured home directly above or below the HUD certification tag or temporarily
located in plain site within three of the home's front entry. There shall be one certification tag for each certified installer accounting for the work that each
installer performed or installed. certification number and signature of the certified installer responsible for each major part of the installation.
WAC365-210 X
14) If you are installing a manufacturing home and no longer have the installation manual for the home, you must use the instructions of the American
National Standards Institute(ANSI).To order the ANSI instructions you may either get an order form from the Mason County Building Department or you
can contact the Offfice of Manufacturing Housing (360) 725-2800.
15) Concrete used for basement walls, foundation walls, exterior walls, porches, carport slabs, steps exposed to the weather, garage floor slabs and other
vertical concrete work exposed to the weather shall have a minimum compressive strength of 3000 psi (IRC Table R402.2).
X i
16) All construction must meet or exceed all local ordinances and the international codes requirements as adopted and amended by Mason County and the
State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in
permit revocation.
X " t'
BLD2006-01028 Please referto the following pages for conditions of this permit. 3 of 5
17) REQUIRED INSPECTIONS (Footing Inspection-prior to pour, Set-up Inspection-prior to skirting, Final Inspection-prior to occupancy). I hereby assume all
responsibility for.the scheduling of my required inspections. If the required inspections are not requested, inspected and signed off(approved) by the
inspector in the prescribed order, I understand that reinspection fees and an hourly investigation fee pursuant to the current fees adopted by the Mason
County Building Dept., and will be assessed in addition to my original permit fees to resolve any questionable practices or problems that have been
discovered. I further understand that this investigation will be scheduled as time allows. Until resolution of any/all problems no occupancy(Final
Inspection)will be granted for the residence.
OWN ER/CONTRACTOR(indicate which) Signature Xl��
v
18) This permit is for the placement and installation of the manufactured home only and does not imply approval or review for any other items indidcated on
the plot plan. X
19) All changes to"approved" building plans that effect compliance with the international codes as amended and adopted, or any other Mason County
ordinance or regulation, must be reviewed and approved by Mason County prior to construction.
X
20) CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE ADOPTED
BUILDING CODE.
The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance
with the international codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Building
Inspector shall be made prior to requesting additional inspections.
X
21) The installation permit shall be displayed in clear view of the site access road. The approved site plan and other applicable instructions, including
installation instructions, shall be available in this location OR placed in the location specified by WAC 296-150M-655. Support configuration shall be
clearly marked in the installation instructions.
22) All property lines shall be clearly identified at the time of foundation inspection. X
23) All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure
to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with
Mason County ordinances and building regulations.
X
24) All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may extend the time for
action for a period not exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of the permit
holder have prevented action from being taken. No more than one extension may be granted.
X
25) Pressure treated wood manufactured after January 1, 2004 may contain high concentrations of copper which could quickly corrode metal fasteners,
connectors, and flashing. Install metal connectors approved for contact with the new types of pressure treated material.
X
BLD2006-01028 Please refer to the following pages for conditions of this permit. 4 of 5
26) By definition, propane tanks and heatpumps are structures, which must meet setback conditions. Please check your"Approved Site Plan"to ensure
these structures meet the setback conditions listed.
X
27) Landings and stairs must meet the same setback conditions as any permitted structure; and, must be shown on your site plan. Please check your
"Approved Site Plan" to ensure these structures are shown and meet the setback conditions listed.
X
28) This parcel is located in a smoke management zone. Please contact a fire warden at(360)427-9670 ext. 459 for further information.
X
29) Landings and stairs must meet the same setback conditions as any permitted structure; and, must be shown on your site plan. Please check your
"Approved Site Plan"to ensure these structures are shown and meet the setback conditions listed.
X
30) By definition, propane tanks and heatpumps are structures, which must meet setback conditions. Please check your"Approved Site Plan"to ensure
these structures meet the setback conditions listed.
X
This permit becomes null and void if work or construction authorized is not commenced within 180 days,or if construction or work is suspended for a period of 180 days at any time after work is
commenced. Evidence of continuation f 0 o work is a progress inspection within the 180 day Period. Final inspection must be approved
ed before building can be occupied.Pro
of of continuation of
work is by means of a progress inspection.The owneror the agent on the owners behalf,represents that the information provided is accurate and grants employees of Mason County access to
the above described property and structure for review and inspection.
OWN ER OR AGENT: DATE:
BLD2006-01028 Please refer to the following pages for conditions of this permit. 5 of 5
W
o �,-QNCRETE MECHANICAL. MANUFACTURED HOME
o �-----,
CD Foctkn p I$911backs Date By Ribbons
o Date By Gas PIPIng
Date By
i Foundation Walls Date By set-up
Date By INSULATION Dale By
BG 1 slab Insulation Floors FINAL.INSPECTION
Date By Date By Dahrg 07-v? By �
FRAMING Walla FIRE DEPARTMENT
Date By Date By pate By
PLUMBING Attie OTHER
Groundwork DOW By
Date By WALLBOARD NAILING
Date ale By
Date By
v
Water Line FINAL I NSPECTION
m Date By cr?By ram" Date By
m
s Type of Insp. PasslFaii Request Date Inspect. Date Done By Comments
CD
o
CD
8
0
y
O
(D
q
I
O
L
N60 NE/nf
Place, Be it
Site inspfirm c struction
- B A05920051EENDING
uD200( - 0l028
8L��)20 0 Co — 0t -7
Mkk) .
(0 (0
oo CY-\
4:71
49D ME
C,c4s
MASON COUNTY PERMIT N6.:-W
BUILDING PERMIT APPLICATION
426 W. Cedar- P.O. Box 186, Shelton, WA 98584
Shelton (360) 427-9670 - Belfair (360) 275-4467- Elma (360) 482-5269
On the web www.co.mason.wa.us
APPLICANT INFORMATIOA CONTRACTOR INFO MV TION
Owner 3'° Company Name ► KP S S k T LAP
Mailing Address `I C Herz Mailing Address
City O State Zip Code— City State Zip Code
Phone 3Ga5 221 1.6'63 Other Ph. d 3 Phone 364 7S 339,T Other Ph.
Lien/Title Holder Sae- P Contractor Reg. # =0L .SS Ok_E Exp.
E mail address E Mail Address
Drivers Lic.# DOB Drivers Lic.# DOB
SEPTIC/WATER SYSTEM INFORMATION - Connect to New Septi Existing eptic ✓
Connect to Water System _>�Name of Water System ;'s n', tic� Wa'T
Well Water System Name of Water System
PARCEL INFORM ION- 1 Digit Parcel No Q-T I Fire District
Legal Description -S
Site Address(Please includ street name,street number and city) C' ®N S e( a;
Directions to site 0 i � O t �iND• S),0 2 e 9d - v-t3 Nr HILL.
Will timber be cut and sold in parcel preparation?Yes
Is property within 200'of Saltwater Lake River/Creek Pond
Wetland Seasonal Runoff Stream Slopes or Bluffs > 15%
Is this permit submittal the result of a Stop Work Notice,Correction Notice or other enforcement aciion?Ye o
TYPE OF JOB - New Add Alt Repair Other PRIMARY RESIDENCE ❑ SEASONAL ❑
Use of Building YE2 Describe Work �---
No. of Bedrooms No. of Bathrooms - Square Footage-1 st Floor 2nd Floor
3rd Floor Basement Deck Covered Deck Other Sq.ft.
Garage Attached Detached Carport Attached Detached
MANUFACTURED HOME INFORMATION -Make Model Bk'oa ry)6ae_ Year 11
Length Width_I-q—Serial No. O Aa 3a /41 A No. of Bedrooms-%3— No. of Bathrooms
Type of Heat Lke S-- Purchase P ice$ 071 Replacement Unit? Pe /No
Installer Name e Certification No. 1d- ;:::'6Q09
CIWNER/BUILDFA Acknowledges submission of inaccurate information may result in a stop work order or permit revocation.Acknowledgement of
such is by signature below.I declare that I am the owner,owners legal representative,or the contractor.I further declare that I am entitled to receive this
permit and to do the work as proposed in the application.I declare that I have obtained the permission from all the necessary parties.If permission is
required from any easement holder or any other party in interest regarding this application or the work proposed in the application,I have obtained
permission from them to apply for this permit and conduct the work proposed. The owner or agent on owners behalf,represents that the information
provided is accurate and grants employees of Mason County access to the above described property and structure for review and inspection.
PROOF OF NUATIOVF WORK IS BY MEANS OF A PROGRESS INSPECTION.
X Date
Owner/Owners Re sentative/Contractor indicate which one
FOR OFFICIAL USE BEYOND THIS POINT Accepted by: Date
DEPARTMENTAL REVIEW APPROVED DENIED NOTES
Building Department pG
Planning Department
Environmental Health Department
Public Works Department
Fire Marshal
FEES
Buildino Permit Fee Site Inspection
Plan Review Fee EH Review Fee
Plumbing& Base Fee Planning Review Fee
Mechanical& Base fee Other
Wood/Gas/Pellet Stove Fee State Fee
Violation Fee Pre-Paid at Submittal Oq Is
Valuation$ TOTAL FEES
� r
I
Y (07
6 � �
I'
I
x
i
I
,
r
tJ6
r-'at oi
/`/ T�t'"K
36 f C
4`
roir �AN
7
soy
y
� f Dep spa` 'hJ
---- 7 ft Z
6
2f�
4z f