HomeMy WebLinkAboutBLD2010-00088 Final Repair Front Bldg Damage - BLD Inspections - 9/17/2010 r7 �
o r
N CONCRETE MECHANICAL MANUFACTURED HOME �
0
o Footings !Setbacks Gas Piping Date By Ribbons n
00 Interior Date By interior-Date By Date By 2
coExterror Date By Exterior-Date By Set-up D
Point Load J isolated Footings INSULATION Date By
Date By BG(SLAB INSULATION —I
Data By FIRE DEPARTMENT
Foundation Walla Floors Date By m
Date By Data By DECKS
FRAMING Wails Date By
Date By Data By PROPANE TANKS
PLUMBING vault Date By
Date By OTHER
Groundwork Attic
Date By Date By Type:Dale By
D.w.v DRYWALL Type n
Date B Int Brace Wall Date By 0
y Date By N
FINAL INSPECTION
Water Line Fire Soperation
CD
Date By Date By oath —117-ro By C
Pass or Request Inspect.
co
Type of Insp. Fail Date Date Done By Comments co
C1J
0
0
O
A
o
A