Loading...
HomeMy WebLinkAboutBLD2010-00088 Final Repair Front Bldg Damage - BLD Inspections - 9/17/2010 r7 � o r N CONCRETE MECHANICAL MANUFACTURED HOME � 0 o Footings !Setbacks Gas Piping Date By Ribbons n 00 Interior Date By interior-Date By Date By 2 coExterror Date By Exterior-Date By Set-up D Point Load J isolated Footings INSULATION Date By Date By BG(SLAB INSULATION —I Data By FIRE DEPARTMENT Foundation Walla Floors Date By m Date By Data By DECKS FRAMING Wails Date By Date By Data By PROPANE TANKS PLUMBING vault Date By Date By OTHER Groundwork Attic Date By Date By Type:Dale By D.w.v DRYWALL Type n Date B Int Brace Wall Date By 0 y Date By N FINAL INSPECTION Water Line Fire Soperation CD Date By Date By oath —117-ro By C Pass or Request Inspect. co Type of Insp. Fail Date Date Done By Comments co C1J 0 0 O A o A