Loading...
HomeMy WebLinkAboutBLD2023-01373 DEMO - BLD Inspections - 10/7/2024 INSPECTION CARD 4k Mason County 615 W. Alder St. Building 8, Shelton, WA 98584 360-427-9670 ext 352 www.masoncountywa.gov PERMIT# BLD2023-01373 PROJECT ADDRESS 80 E BLEVINS RD NORTH SP 301 SHE, #A 8584 PARCEL# 420013300040 PROJECT DESCRIPTION DEMO PUMPHOUSE /GARAGE STRUC U E OWNER EVERGREEN MOBILE HOMEOWNERS ADDRESS KATHERINE CASTELLANO, PRESIDENT PHONE CONTRACTOR PINUP CLEANUP LLC ADDRESS 3805 SOUTHBAY LOOP NE PHONE 360-951-2435 CONTRACTOR LICENSE PINUPCL831MU LENDER INSPECTION INSP I DATE Comments INSPECTION INSP DATE Comments Connection has been verified by I Z)U- /0.72 Demolition Final Inspection .� cO°�'�,. MASON COUNTY PERMIT NO. '61 J 2- COMMUNITY SERVICES DEPARTMENT BUILDING•PLANNING•FIRE MARSHAL WWW.CO.MASON.WA.US (360)427-9670 Shelton ext.352 Mason County Bldg.#8,615 W.Alder St (360)275-4467 Belfair ext. 352 Shelton,WA 98584 (360)482-52%Elma ext.352 DEMOLITION PERMIT APPLICATION OWNER INFORMATION: CONTRACTOR INFORMATION: NAME:(�,;,�-2 otiy �`oc',er )g 1�\ti�naaem e NAME: ?i n t&� N er yL Lip LL !C MAILING ADDRESS: (� C7 W c v�a S a'a� MAILING ADDRESS: '3 z1 E 5o,,AA c CITY: STATE: b3 i} ZIP: �j g,58Q CITY:dyH p,'r� STATE: t�a, ZIP: q PHONE:36p y 2 1, 3�ELL: 360 q2(— -�)7A:4 PHONE:3&D 59 I ,2 y3_S`CELL: EMAIL:.�` �tia c���i�c�:� �fbpc �yl�nl t[� EMAIL : n&Qk LLf,4) C-on-1 L&I RE6# EXP. PARCEL INFORMATION: PARCEL NUMBER (12 DIGIT NUMBER) 00 3 bUy O Q FIRE DISTRICT LEGAL DESCRIPTION (ABBREVIATED) SITE ADDRESS e •Yx ?,C) 5T�qGC CITY S h,el DIRECTIONS TO SITE ADDRESS: IS PROPERTY WITHIN 200 FT: SALTWATER LAKE RIVER/CREEKQ POND WETLAND SEASONAL RUNOFF STREAM DOES PROPERTY HAVE SLOPE(S)WITHIN 300 FT OF THE PROJECT-GREATER THAN 14% YESQ NO ID IF YOUR PROJECT IS LOCATED ADJACENT TO OR WITHINANAREA THAT IS LISTED ABOVE,PLEASE CONTACT THE PLANNING DIVISION OF COMMUNITY DEVELOPMENT PRIOR TO DEMOLITION TO ENSURE REDEVELOPMENT. USE OF STRUCTURE BEING DEMOLISHED(RESIDENCE,GARAGE ETC.) HOW WILL THE DEBRIS BE DISPOSED OF?: Icivn2j !;i 1 PROVIDE A PLOT PLAN INDICATING LOCATION OF STRUCTURE TO BE DEMOLISHED OWNER/CONTRACTOR acknowledges submission of inaccurate information may result in a stop work order or permit revocation. Acknowledgement of such is by signature below. I declare that I am the owner,owners legal representative,or contractor. I further declare that I am entitled to receive this permit and to do the work as proposed. I have obtained permission from all the necessary parties,including any easement holder or parties of interest regarding this project.The owner or authorized agent represents that the information provided is accurate and grants employees of Mason County access to the above described property and structure(s)for review and inspection.This permit/application becomes null&void if work or authorized construction is not commenced within 180 days or if construction work is suspended for a period of 180 days. PROOF OF CONTINUATION OF WORK IS BY MEANS OF IN ECTION.IN TIVI OF THIS PERMIT APPLICATION OF 180 DAYS WILL INVALIDATE THE APPLICATION. Srdn&r 'of Applicant Date aOWNER/nREPRESENTATIVE/CONTRACTOR -Prinf Name DEPARTMENTAL REVIEW APPROVED DATE DENIED DATE TAGS/NOTES/CONDITIONS BUILDING DEPARTMENT PLANNING DEPARTMENT VIGION ELL Olympic Region Clean Air Agency 2940 Limited Lane NW Olympia,WA 98502 (360) 539-7610• FAX(360)491-6308 Demolition Permit South Bend Office (360) 942-2137 O RCA A Port Townsend Office (360)338-6419 #, • • ,� www.ORCAA.org '�► knnsa•ra°'' Demolition and renovation projects within Clallam,Grays Harbor,Jefferson,Mason,Pacific,and Thurston counties REQUIRE A PERMIT and require that the following conditions be met prior to the demolition. Olympic Region Clean Air Agency(ORCAA) regulations define a demolition project as the wrecking, razing, leveling,dismantling,or burning(by a fire department for training purposes) of a structure,making the structure permanently uninhabitable or unusable. Renovations include the removing of load bearing structural members, but not to the extent to make the structure uninhabitable. The following information is merely a reference guide and not a substitute for agency regulations. 1. A good faith asbestos survey is required for any demolition.The survey must be conducted by a certified Asbestos Hazardous Emergency Response Act(AHERA)building inspector. Qualified contractors and inspectors may be found in your local Yellow Pages,through the Washington State Department of Labor and Industries,or on ORCAA's website. 2. Asbestos samples must be sent to a NVI.AP Laboratory(National Voluntary Laboratory Accreditation Program) per 40 CFR 763.87.A list of labs can be found on ORCAA's website. 3. The start date on other structure demolitions must be at least 10 working days from the submission date of the complete application and payment. 4. It is the responsibility of the property owner and/or demolition contractor to ensure there is no asbestos-containing material present in the structure to be demolished 5. Any and all structures on the same parcel of property that are not proposed to be demolished must be identified as such. 6. A copy of the asbestos survey and approved Demolition Permit must be kept on site and be available for review by Agency inspection personnel. 7. The original demolition permit will expire 1 year from start date. If the permit expires and the project is not complete, you must submit and pay for another demolition permit. Under no circumstances will a project be extended beyond 1 year from original submission date. ADDITIONAL REQUIREMENTS: In addition to Agency requirements,most building departments require a demolition permit(separate from ORCAA's Demolition Permit).The Washington State Department of Labor&Industries and the local fire authorities may also require notification for asbestos removal projects. "Owner Occupied Residential Dwelling"means any single family housing unit which is permanently or seasonally occupied by the owner of the unit both prior to and after the proposed project.This term includes houses,mobile homes, trailers,houseboats,and houses with`mother-in-law apartment'or a`guest room.'This term does not include structures that are demolished or renovated as part of a commercial or public project;nor does this term include any mixed-use building, structure,or installation that contains a residential unit,or any building that is leased or used as a rental,or for commercial purposes. Mason County lop Mason County - Division of Community Development 615 W.Alder St. Building 8 Shelton, WA 98584 360-427-9670 ext 352 www.masoncountywa.gov B DD2023-01373 DEMO PROJECT DESCRIPTION: DEMO PUMPHOUSE/GARAGE ISSUED: 11/13/2023 STRUCTURE SITE ADDRESS: 80 E BLEVINS RD NORTH SP,-eSHE EXPIRES: 05/11/2024 PARCEL: 420013300040 APPLICANT: GATEWAY PROPERTY MANAGEMENT OWNER: EVERGREEN MOBILE HOMEOWNERS PO BOX 1997 COOPERATIVE SHELTON,WA 98584 KATHERINE CASTELLANO, PRESIDENT 1.360.426.3988 SHELTON,WA 98584 GENERAL CONTRACTOR'S LICENSE: PINUP CLEANUP LLC License: PINUPCL831 MU 3805 SOUTHBAY LOOP NE Expires: 07/31/2025 OLYMPIA,WA 98506 360-951-2435 FEES: Paid Due Demolition Fee $120.00 $0.00 Technology Flat Convenience $5.00 $0.00 Fee State Fee-Residential $6.50 $0.00 Totals : $131.50 $0.00 REQUIRED INSPECTIONS Connection has been verified by Health or Utilities Demolition Final Inspection CONDITIONS The demolition and disposal of demolition debris must meet requirements as per Mason County regulations. it is unlawful for any person to cause or allow the demolition (or major renovation)of any structure unless all asbestos containing materials have been removed from the area to be demolished.work shall not commence on an asbestos project or demolition unless the owner or operator has obtained written approval from ORCAA @ 2490 B Limited Lane NW, Olympia WA 98502, 360-586-1044, 800-422-5623, www.orcaa.org For public safety, it is the responsibility of the applicant to confirm through written verification all utility services (electric, gas, water, sewer, ...) have been terminated prior to demolishing a structure. Printed by:Genie Mcfailand on:11/13/2023 12:00 PM Page 1 of 2 Mason County Mason County - Division of Community Development 615 W.Alder St. Building 8 Shelton, WA 98584 360-427-9670 ext 352 www.masoncountywa.gov DEMO BLD2023-01373 * All construction debris must be removed from the site after project completion to an approved location. Proper disposal of construction debris must be on land in such a manner that debris cannot enter or cause water quality degradation of aquatic environments. * The Washington State Clean Air Act prohibits the burning of any construction or demolition debris in an outdoor fire. * All building permits shall have a final inspection performed and approved by Mason County Building Department prior to permit expiration.The failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with Mason County ordinances and building regulations. * OWNER/BUILDER acknowledges submission of inaccurate information may result in a stop work order or permit revocation.Acknowledgement of such is by signature below. I declare that I am the owner, owners legal representative, or contractor. I further declare that I am entitled to receive this permit and to do the work as proposed. I have obtained permission from all the necessary parties, including any easement holder or parties of interest regarding this project. The owner or authorized agent represents that the information provided is accurate and grants employees of Mason County access to the above described property and structure(s)for review and inspection.This permit/application becomes null & void if work or authorized construction is not commenced within 180 days or if construction work is suspended for a period of 180 days. PROOF OF CONTINUATION OF WORK IS BY MEANS OF INSPECTION. INACTIVITY OF THIS PERMIT APPLICATION OF 180 DAYS WILL INVALIDATE THE APPLICATION. * Proper erosion and sediment control practices must be used on the construction site and adjacent areas to prevent upland sediments from entering the aquatic environment. Erosion control measures must be in place prior to any clearing, grading, or construction. These control measures must be effective to prevent soil from being carried into surface water by stormwater runoff.Any discharge of sediment-laden runoff or other pollutants to waters of the state is in violation of state regulations.Any work in or adjacent to waterways that will adversely affect water quality must receive specific prior authorization from the Department of Ecology. Silt fencing, straw matting, etc. must be installed and maintained until seeding or upland vegetation has become established around all areas disturbed or newly created by construction activities. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of Laws and Ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any other state/local law regulating construction or the performance of construction. Issued By: Contractor or Authoriz Agent: Date: Printed by:Genie Mcfadand on:11/13/2023 12:00 PM Page 2 of 2 2xb RAFTERS Rey,"s: - ARCH COMP ROOFING TYP SPA 1 6'O.G. ROOF(SEE PLAN) 12 4[_ 5/8'PLYWOOD ROOF 5HTH6. PLATE HT. 5ECURED W/SG COMMON NAILS b'ED6ES AND 1 2'O.G.INTERMED. PLATE HT.•' ' 2x6 BLOCKING f711E]E W/SGRE VENTS CONTINUOUS ALUH.CUTTERSFRONT ELEVATIONRF b 5 O LE 6 OEG.PANELS5/4x&RAGAFIN.5LAB. in1x4STUDS H2,SA CLIPS EA.RAFTER•16 o.c. PUMP r b - ECALG 1/4'-1'_0' 2x4 P.T.PLATE 1 WEDGEANCHOR SATR."`R Q BOOLL T.AT CORNERS EXI5TIN6 GONG.SLAB�p RM J ROOM AND]'O.G. _ F.6. • ry1`� 1 ry �\ Ay '� •— NON-LOAD O d Cp ° Q SLAB FOR WALL 0 in EXITIN& n 0 a, EXI5TIN65TEM WALL LL 5 g AND FOOTING L4L STOR. b ROOM w EFT SIDE ELEVATION RIGHT 51DE ELEVATION b BUILDING DATA: 2x4 P.T.PLATE A -TYP.WALL 5EGTION s 4 GONC BLAB SCALE:1'-1'-O' 3'A J_l� L -O' L FINAL ;p i.. a • —6'-O' .4 . A. ` FLOOR PLAN Z #4 CONT.REBAR &GALE:1/4•-Y-a Date: • .Fa, 4 ..: TYP ry 4 REAR ELEVATION 4 �1 MONO POUR DETAIL &GALE:VD-•1._O' 1'-C lGAL6,•.,-O' Al