Loading...
HomeMy WebLinkAboutSEP96-0296 - SEP Determinations - 1/2/1997 RECEIVED STATe JA N - 6 1997 ws �� MASON CO. DCD Y �y�lase�o STATE OF WASHINGTON DEPARTMENT OF ECOLOGY P.O. Box 47775 • Olympia, Washington 98504-7775 • (360) 407-6300 January 2, 1997 _ Mr. Allan Borden Mason County Department of Community Development PO BOX 578 Shelton,WA 98584 Dear Mr. Borden: Thank you for the opportunity to comment on the mitigated determination of nonsignificance to realign and reconstruct Sand Hill Road from mile post 0.23 to mile post 2.00 and mile post 2.05 to mile post 2.40 including the placement of approximately 87,000 cubic yards of fill and resurfacing adjacent to the existing roadway and grading and surfacing of new alignments in the right-of-way(File No. SEP96-0296). We reviewed the environmental checklist and have the following comments: Water Ouality: Stormwater, including highway runoff, should be collected and treated accordingly to an acceptable standard before stormwater is discharged to ground and/or surface waters. For those jurisdictions that have not adopted Ecology's technical manual(Stormwater Management Manual for the Puget Sound Basin)or a manual approved by Ecology,the Ecology manual is considered an acceptable standard for the design and maintenance of water quality Best Management Practices (BMP's). Wetlands: Mitigation measures to avoid,minimize and replace(in preferential order)impacts to wetlands are not addressed. It is unclear if efforts to avoid and minimize wetland impacts through the use of steeper sideslopes,guardrails and other design alternatives have been considered. If direct wetland impacts will occur,we recommend that their functions,values and acreage be adequately replaced. Ecology would be happy to assist the County in the review of mitigation alternatives. If you have any questions regarding the Water Quality comments,please call Ms. Jeannette Barreca at (360)407-6556. With questions regarding the Wetlands comments,please call Mr. Mark Bentley at(360) 407-7269. Sincerely, Ch--aeLs(G a I Assistant to the Regional Director (360)407-6309 CG:alw(96-8460) cc: Abbe White, SWRO Jeannette Barreca, SWRO Mark Bentley, SWRO .�. i 1► v WASHINGTON STATE DEPARTMENTOF JENNIHER Natural Resources Comm ER M.Bof Public Commissioner of Public Lands KALEEN C01TINGHAM Supervisor DATE: January 2 , 1997 TO: Gary Yando Director of Community Dev. P. O. Box 578 Shelton, WA 98584 FROM: David John Weiss Resource Protection Specialist South Puget Sound Region SUBJECT REVIEW OF: Sand Hill Road Reconstruction SEP96-0296 ACTION SPONSOR: Mason County Public Works PROJECT: Realign/Reconstruct Sand Hill Road [] We do not have an interest in the above project and have no comments on the proposal . [X] We do have an interest in the above project and wish to make the following comments: A *forest practices permit will be required for the harvest of timber associated with this project. cc: Dave Dietzman - SEPA Center - DNR SEPA$#: 011247 SOUTH PUGET SOUND REGION _ 28329 SE 448TH ST 1 PO BOX 68 1 ENUMCLAW,WA 98022-0068 1 FAX.(360)825-1672 1 TTY.•(360)82S-6381 1 TEL:(360)825-1631 Equal Opportunity/Affirmative Action Employer RECYCLED PAPERL, 1 SEP96-0296 MASON COUNTY +C-6 DEPARTMENT OF COMMUNITY DEVELOPMENT Planning-Landfill-Utilities MITIGATED DETERMINATION OF NONSIGNIFICANCE (WAC 197-11-350) Description of Proposal : SAND HILL RD. PROJECT #3 : REALIGN AND RECONSTRUCT SAND HILL ROAD FROM MILE POST 0.23 TO MILE POST 2 . 00 AND MILE POST 2 . 05 TO MILE POST 2 .40; PROPOSED WORK INCLUDES PLACEMENT OF FILL AND RESURFACING ADJACENT TO THE EXISTING ROADWAY AND GRADING AND SUFACING OF NEW ALIGNMENTS IN RIGHT-OF-WAY; FILL ESTIMATE OF 87, 000 CU. YDS. ; AND SEDIMENT-EROSION CONTROL X&MURES TO BE IMPLEMENTED. Proponent : MASON COUNTY PUBLIC WORKS Locationof Proposal : . . . . . . . . . . . . . . . PARCEL#:123300060000 COUNTY R/W SAND HILL ROAD, BETWEEN MILEPOST 0 .23 AND 2 . 00 AND MILEPOST 2 . 05 AND 2 .40, WEST OF BELFAIR, WA. Lead Agency: MASON COUNTY The Lead Agency for this proposal has determined that it does not have a probable significant adverse impact on the environment . An Environmental Impact Statement (EIS) is not required under RCW 43 .21C. 030 (2) (c) . This decision was made after review of a completed Environmental Checklist and other information on file with the Lead Agency. This information is available to the public upon request . MITIGATION MEASURES ARE ATTACHED. ( �- Plea contact � ( �� �� �, `��� ��-��Q� GL� Please ^ * v� 1 at ext . � with any questions . v � Qgency � ?S This DNS is issued under 197- 11-350 (2) , the Lead will not act on this proposal for 15 days from the date below. Comments must be submitted by 01/02/97 . DATE: 12/18/96 Signature of r9ponsible official Date Responsible Official : Gary Yando Director of Community Development 426 W. Cedar, PO BOX 578 �tbce Shelton, WA 98584 w.�r,�P� C'T Conditions of this Case are listed below: Case No.:SEP96-0296 1) 1 ) The applicant shall be responsible for the implementation of the approved erosion and sediment control plan for all phases of this road project, including the compliance by contractors involved in site preparation and road construction. X 2) The applicant shall be responsible for minimizing vegetation clearing of small wetland areas during site preparation and replanting buffer areas following construction, per mitigation plan developed by a wetland consultant. X Q y 1l• � / 11 N j •I• ��� � I /� )�; / p l � ul n �• j Pl I 1� u59 D � � /I 1,I � � I�� ..' 5258 --I' ' -, a` r ORTH ravel I , " GagingSta /i/, q 4 V N . 11 r / < I N -57 11..-__ Ali 1q - — 2T30" � " '-��a�' NFNO L �- 1 .�, . .�/ \` /y 1 n,r a �l ,�o/ �(� /��(i/�/ r 5� III , •G--.. ) „a'� ��.,11\ 'I/, "_� (/'_/;�/ )� j/i �;✓�/�� - P !I�,9 �tl::_- 8M 3 ' 14 Belfair52 r 'Illy6 2 I Pn� / / ABM 7 \ .� ( :• //l / r /.r , ' °mil y ''' �i /I / =' I ! 348 - �&kAG 5254 zu O Vi \ � ? 1 I 1 7� _ �% Lynch Cove o Y �•'i.1��1- \vi !� 1�. Jt.� °Piles.o -b'JjJ J �. _\ ,I i •9. / J( u (�J i px �' p0 O x o r CJp 2 O + r O O / O CDc 00 0 9 O co '4 ppp O �6 } pp r�O� a' O O s SCALE 560 1000 1500 2000 Sandhill Road Wetlands CRP 1470 Mason County Public Works ate: November S. 1996 , .!. Drawn by: Rich Geiger Iv,/Q�: S�eefs -2 .Q q. µ„ Pro'ect Plan Vew. See Sheets 1-5 Set/0 -. 4�pSF�A cC« (Js�sl 4'94-°�-1 02-95 • l • • • Possible Encroachment Area: _• . . . . . . . . . . . 2,750 sf or 0.06 acres . . . . . . . . eoo ols 362 641 N W'10'16'E N O1'34.29'E _ - Possible Encroachment Area: Berm. .• . . .• • .• . -. •. _ _. - 176 sf or 0.004 acres Area 1970 s.f., or . . . . . . . . . 0.05 acres Possible Encroachment Area: . 3049 sf or 0.07 acres . . . , . . - scgrnn� Wetland NO-1 p 30 60 90 120 VB -. oad Wetland s 1470 n Public Works 8 1996 Gei er Wetland Area: 3,372 sf or 0.08 acres 0 o ^ m g.999 a, 226.73, H So.,3.09'V N 30 •03,22 V �. J p, P O p GUlVE L12 m R 07.3763.9� Wetland Area: L S2 04 6173 sf or 0.14 acres E I Possible Encroachment: 437 sf or 0.01 acres aatvE zu T 13.30.07' D 07•J0.", L 2a'1. E 7.= SCALE 0 30 60 90 120 Sandhill Road Wetlands CRP 1470 Mason County Public Works ate: October 31 1996 yawn By: Rich Geiger a e 2 of 5 R wvc 300 n H!s�58'� 41-10'r a , IT, 07'0iie si Possible Wetland Encroachment �56'1 I 300:,7 703 sf or 0.02 acres E x.n SCALE 0 30 60 90 120 Sandhill Road Wetlands CRP 1470 Mason County Public Works ate: October 31 1996 Drawn BY: Rich Gei er a e 3 of 5 i Wetland Area not measured CURVE 301 A 21• •OE' D 07• •00•y T 1s.s� L 3 .06 q E 1 21 ✓ N W � � O N 04.801 7'363 14�35'4)•y N 369048'� 1 Sandhill Road Wetlands SCALE CRP 1470 0 30 60 90 120 Mason County Public Works ate: October 31 1996 Drawn BY: Rich Geiger ae 4of 5 r � y � Wetland Area: 44,800 feet or 1.03 acres W y N CURVE 302 A 34.59156' D 06'00'00' R 954.93 T 301.08 L 583.31 E 46.34 fU `0 0 m + 0 0 1200, o 93 969 N 71.50, 5'V SCALE Sandhill Road Wetlands 0 50 100 150 200 CRP 1470 Mason County Public Works Date: October 31 1996 Drawn by: Rich Geiger Sheet 5 of 5