Loading...
HomeMy WebLinkAboutCOM2022-00041 Cancelled Cell Tower Upgrade - COM Inspections - 10/3/2024 INSPECTION CARD Mason County 615 W. Alder St. Building 8, Shelton, WA 98584 360-427-9670 ext 352 www.masoncountywa.gov PERMIT# COM2022-00041 PROJECT ADDRESS 1144 W California Rd Shelton, WA 98584 PARCEL# 421275000010 PROJECT DESCRIPTION UPGRADE TO EXISTING TOWER OWNER VAN STEERTEGEM/T-MOBILE ADDRESS 10 PRESIDENTIAL WAY PHONE 1.949.447.2303 CONTRACTOR ADDRESS PHONE CONTRACTOR LICENSE LENDER INSPECTION INSP DATE Comments INSPECTION INSP DATE Comments BLD-Final Inspection t Mason County Mason County - Division of Community Development 615 W.Alder St. Building 8 r n Shelton,WA 98584 360-427-9670 ext 352 �`�� Illrrr www.masoncountywa.gov GA FPROJECT 2-00041 NEW COMMERCIAL PERMIT ESCRIPTION: UPGRADE TO EXISTING TOWER ISSUED: 01/06/2023 ESS: 1144 W CALIFORNIA RD SHELTON EXPIRES: 07/05/2023 PARCEL: 421275000010 APPLICANT: VAN STEERTEGEM/T-MOBILE OWNER: VAN STEERTEGEM/T-MOBILE 10 PRESIDENTIAL WAY 10 PRESIDENTIAL WAY WOBURN,MA 01801 WOBURN, MA 01801 1.949.447.2303 CONTACT: Cameron Colgan 408 S Eagle Rd.Suite 200 Eagle, ID 83616 2088710773 VALUATIONS: FEES: Paid Due Project Valuation (BID, 20000.00 $20,000.00 Technology Surcharge $11.15 $0.00 ESTIMATION..) State Fee-Commercial $25.00 $0.00 Plan Check Fee $219.68 $0.00 Planning Commercial Review $380.00 $0.00 Fee Building Permit Fee $337.97 $0.00 Total: $20,000.00 Totals : $973.80 $0.00 REQUIRED INSPECTIONS BLD-Final Inspection CONDITIONS * Pressure treated wood manufactured after January 1, 2004 may contain high concentrations of copper which could quickly corrode metal fasteners, connectors, and flashing. Install metal connectors approved for contact with the new types of pressure treated material. * Owner/Agent is responsible to post the assigned address and/or purchase and post private road signs in accordance with Mason County Title 14.28 and 14.17. Printed by:Genie Mcfarland on:01/06/2023 11:46 AM Page 1 of 3 Mason County Mason County - Division of Community Development 615 W.Alder St. Building 8 Shelton, WA 98584 360-427-9670 ext 352 www.masoncountywa.gov NEW COMMERCIAL PERMIT COM2022-00041 * CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE ADOPTED BUILDING CODE. The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance with the international codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Building Inspector shall be made prior to requesting additional inspections. * All building permits shall have a final inspection performed and approved by Mason County Building Department prior to permit expiration.The failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with Mason County ordinances and building regulations. * Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1-800-647-0982. The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. * REQUIREMENTS FOR ROOF COVERINGS. Roof coverings shall be applied in accordance with the applicable provisions of the current code and the manufacturer's installation instructions. A drip edge shall be provided at eaves and gables of shingle roofs. * All surface water and potential runoff must be controlled on site and shall not adversely affect any adjacent properties nor increase the velocity flow entering or abutting to any state or county culverting/ditching system or road way. * All changes to"approved" building plans that effect compliance with the international codes as amended and adopted, or any other Mason County ordinance or regulation, must be reviewed and approved by Mason County prior to construction. * Concrete encased grounding electrodes must be installed and used at each new building or structure that is built upon a permanent concrete foundation. In Mason County the electrical code is regulated by Washington State Department of Labor & Industries (L&I). For more information contact L&I for additional information. In Olympia call (360)902-6350 and in Bremerton call (360)415- 4000. * All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may grant a one time extention of 180 days, upon the receipt of a written extension request prior to permit expiration. Letter must indicating that circumstances beyond the control of the permit holder preventing action from being taken. No more than one extension may be granted. * Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and MUST NOT adversely impact adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either private ditches and drains will meet requirements of the stormwater ordinance or prior approval will be granted to use an existing utility and drainage easement dedicated for that specific purpose. For further information regarding this ordinance and the REQUIREMENT to obtain an ACCESS PERMIT for the installation/construction of a driveway or access connecting from a Mason County Road, Contact the Mason County Public Works Department prior to construction at Ext 450. For any construction which is proposed to be located within 25'of a Mason County road right of way, it is suggested to contact that office to review future planned work which may affect your project. * All construction must meet or exceed all local and state ordinances in addition to the International Codes requirements as adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in permit revocation. * Approved per dimensions and setbacks on submitted site plan. Setbacks are measured from the furthest projection of the structure. * The foundation/footing must be placed on undisturbed, firm-native soil. Proper frost depth shall be observed below grade in undisturbed soils. Printed by:Genie Mcfarland on:01/06/2023 11:46 AM Page 2 of 3 Mason County - Mason County - Division of Community Development 615 W. Alder St. Building 8 Shelton, WA 98584 360-427-9670 ext 352 www.masoncountywa.gov NEW COMMERCIAL PERMIT COM2022-00041 When parcel development requires direct access to county road(s), a Road Access Permit or Approval must be granted by the Mason County Department of Public Works. For more information contact Public Works, at (360)427-9670, ext. 450 or 100 W Public Works Dr. Shelton. The building permit will not be finaled until the permit holder can show proof that the access permit from Public Works has been finaled and approved. The stamped approved site plan is required to be on-site for inspection purposes. If an inspection is requested and the approved site plan is not on site, approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and shall be collected by the Building Department prior to any further inspections being performed or approvals granted. The international code requires a fire apparatus access road for every facility, building, or portion of a building that is more than 150'from an approved access road. Roads are required to meet the minimum Mason County Fire Marshal standards for Fire Apparatus Access Roads up to the point where such roads connect with a county maintained public road or to another fire apparatus access road which connects to a county maintained public road. All property lines shall be clearly identified at the time of foundation inspection. By definition, propane tanks and heatpumps are structures, which must meet setback conditions. Please check your "Approved Site Plan"to ensure these structures meet the setback conditions listed. " When parcel development requires direct access to state road(s), a Road Access Permit or Approval must be granted and approved by the Washington State Department of Transportation. For more information contact Washington State Department of Transportation, at (206)357-2620, ext. 630. ` WIND LOADS - Roof coverings shall be designed and tested to withstand the maximum basic wind speed. The basic wind speed for Mason County is 85 MPH. All RED stamped approved plans are required to be on-site for inspection purposes. If an inspection is called for and plans are not available on site, then approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and must be collected by the Building Department prior to any further inspections being performed or approvals granted. " Towers shall not be artificially lighted, unless required by the FAA or other applicable authority • Towers shall be enclosed by security fencing not less than six feet in height and shall also be equipped with an appropriate anti-climbing device. No new tower approved. All work must occur within the existing tower compound. hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of Laws and Ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any other state/local law regulating construction or the performance of construction. Issued By: Contractor or Authorized Agent: Date: Printed by:Genie Mcfarland on:01/06/2023 11:46 AM Page 3 of 3 [specIns ec i ialInspection ton Requirements MASON COUNTY - �__.:----------------- ----------_.-__-- --._._.-------..----- -J COMMUNMSCRVICFS COM2022-00041 43084 Purdy Canyon L600 1144 W. California Rd/42127-50-00010 Permit Number Project Title Project Address/Parcel Number Applicants of projects requiring Special Inspection or Testing per Chapter 1704&1705 of the International Building Code, as amended by Washington State. Please acknowledge and return this form to the Mason County Permit Center. THESE INSPECTIONS ARE NOT PERFORMED BY THE BUILDING DEPARTMENT AND MUST BE PERFORMED BY QUALIFIED SPECIAL INSPECTORS, HIRED BY THE OWNER AND APPROVED BY THE COUNTY PERMIT CENTER. Individuals certified in a special inspection category by Washington Association of Building officials(WABO)or individuals employed by a recognized testing laboratory and under the direct supervision of a Registered Professional Engineer are typically considered qualified at the discretion of the local jurisdiction having authority for enforcement. BEFORE A PERMIT CAN BE ISSUED: The Owner or his/her representative, on the advice of the responsible Project Engineer or Architect, shall fill out completely, sign and submit two (2) copies of the attached "Structural Tests and Inspection Schedule"to this Department for review and approval including any requirements related to the Mason County Municipal Code. The Owner, General Contractor, and Inspection/Testing Agency, where applicable, shall also acknowledge the following conditions applicable to Special Inspection and/or Testing. 1. InspectionfTesting Agency shall submit names and qualifications of on-site Special Inspectors to the Building Inspection Permit Center for approval PRIOR TO PERMIT/S BEING ISSUED. 2. All Special Inspections shall be noted on the approved plans or attached approved documents. 3. All special inspections shall be approved by the County or as recommended by the Engineer of Record (EOR). 4. It is the responsibility of the General Contractor to review County approved plans for additional inspection or testing requirements that may be noted or required per IBC as noted on approved plans. 5. The General Contractor is responsible for proper notification to the Inspection/Testing Agency for items listed on this form. 6. Special Inspectors shall provide detailed reports on company letterhead to the Building Inspector of all required inspection activities. These may also be provided when the inspector visits the jobsite for the scheduled inspection but must be completed before the subject of inspection is approved by the building inspector. 7. Copies of all ongoing laboratory and testing reports shall be sent directly to the Building Inspector by the Inspection/Testing Agency or other responsible party within a reasonable time to test results. 8. BEFORE A CERTIFICATE OF OCCUPANCY APPROVAL CAN BE ISSUED: The Inspection/Testing Agency shall submit a FINAL REPORT LETTER stating that all items requiring testing and inspection have been fulfilled and reported and a final inspection report shall be provided. A copy of the statement is to be maintained at the jobsite for the Building Inspectors review prior to final inspections. Page 1 of 4 s t y.. Special Inspection Requirements - '.t.xs'�* r�ti�.M'tie,r' t^,-" `:a `' '�'r�^..-«-r acsF'�f3.h ".,`fib°�t,,�,'s"s''Ti,�i 4-✓.xF ry rK.„gr" .'. MASON COUh^IY coMMUNCIY SOVICLS J ACKNOWLEDGEMENTS Prior to issuance of a building permit, the Owner, on the advice of the Project Engineer or Architect, shall complete, sign,and submit this form to the County Permit Center. Declaration of Owner I,as the owner of the project,declare that the testing agency firm/s or individual/s listed herein are hired by me to perform "Special Inspections" and/or"Structural Testing" in accordance with the provisions of the International Building code(IBC)Chapter 17. Cameron Colgan (A-- 6/22/22 Owner(print) Owner(Signature) (date) Declaration of Registered Professional Architect/Engineer I, as the design professional in responsible charge of the project listed herein, declare that the special inspection listed herein are required for this project in accordance with the provisions of the International Building Code(IBC)Chapter 17. 41 Christopher J.Warren of s►qti Architect/Engineer(print) r :� C�0 ti Architect/Engineer Stamp/Signature(date) 40190 ,t, FC►sTER� �SSf�NALE�G` /5/22 Krazan Testing Agency Name/Contact Chris Martin info: P: 253-939-2500 Christine Marti n krazan.corn The Special Inspection/Testing Agency listed above must have a current Portfolio of Qualifications on file with the County prior to performing work. Declaration of the General Contractor I, as the General Contractor of the project,agree to comply with the"Contractor Responsibility"items noted herein. TKK, LLC 111�YA rff4taw- 7/11/2022 General Contractor(print) G neral Contractor Signature (date) Page 2 of 4 Special Inspection Requirements MASON COUNTY _..' COMMUNITY SERVICES Required Special Inspections International Building Code; Chapter 17: A completed and signed copy of pages 1 through 4 of this form shall be submitted to the "Permit Center" prior to building permit approval. Engineer shall check the applicable items: ❑ Special inspection of fabricated items 1704.2.5 ❑ Submittals to the building official 1704.5 Pll Structures over 75' in height located in Seismic Design Category D, 1704.6.1 ❑Structures classified as Risk Category III or IV located in Seismic Design Category D, 1704.6.1 ❑ Steel construction&structural Steel 1705.2.1 ❑Cold form steel deck 1705.2.2 ❑Open-web steel joists&girders 1705.2.3 ❑Cold form steel trusses spanning 60 feet or greater 1705.2.4 ®Concrete construction 1705.3 &Table 1705.3 ❑ Shotcrete 1705.3 ❑Welding of reinforcing bars 1705.3.1 ❑Material Tests 1705.3.2 ❑Masonry Construction 1705.4 ❑Empirically designed masonry,glass unit&masonry in Risk Category IV 1705.4.1 ❑Vertical masonry foundation elements 1705.4.2 ❑Wood construction 1705.5 ❑High Load Diaphragms 1705.5.1 ❑Metal-plate connected wood trusses spanning 60 feet or greater 1705.5.2 ❑Soils 1705.6&Table 1705.6 ❑Driven deep foundations 1705.7&Table 1705.7 ❑ Cast in-place deep foundations 1705.8&Table 1705.8 ❑Helical pile foundations 1705.9 ❑Fabricated items 1705.10 Page 3 of 4 1 4 i, Special Inspection Requirements MASONCOUN Y - COMMUKMSERVICGS ❑ Special inspections for wind resistance 1705.11 ❑ Structural wood 1705.11.1 ❑ Wind resisting components 1705.11.3 ❑ Cold formed steel light frame 1705.11.2 ❑ Special inspection for seismic resistance 1705.12 ❑ Special inspection for structural steel per 1705.12.1 ❑ Seismic force-resisting systems 1705.12.1.1 ❑ Structural steel elements 1705.12.1.2 ❑ Special inspection for structural wood per 1705.12.2 ❑ Special inspection for cold-formed steel per 1705.12.3 ❑ Designated seismic systems 1705.12.4 ❑Architectural components 1705.12.5 ❑ Plumbing,mechanical&electrical components 1705.12.6 ❑ Storage racks 1705.12.7 ❑ Seismic isolation systems 1705.12.8 ❑ Cold-formed steel special bolted moment frames 1705.12.9 ❑ Testing for seismic resistance 1705.13 ❑ Structural steel 1705.13.1 ❑ Seismic fore-resisting systems 1705.13.1.1 ❑ Structural steel elements 1705.13.1.2 ❑Nonstructural components 1705.13.2 ❑ Designated seismic systems 1705.13.3 ❑ Seismic isolation systems 1705.13.4 ❑ Sprayed fire-resistance materials 1705.14 ❑Physical and visual tests 1705.14.1 ❑ Structural member surface conditions 1705.14.2(1705.14.3 through 1705.14.6.3) ❑ Mastic&intumescent fire-resistance costings 1705.15 ❑Exterior insulation&finish systems(EIFS) 1705.16 ❑Fire-resistance penetrations and joints 1705.17 ❑Penetration firestops 1705.17.1 ❑Fire-resistant joint systems 1705.17.2 ❑ Testing for smoke control 1705.18 ❑Testing Scope 1705.18.1 Page 4 of 4