Loading...
HomeMy WebLinkAboutCOM2022-00015 Cancelled Cell Tower Upgrade - COM Inspections - 10/3/2024 ",..•,., 615 W.Alder St.Bldg 8,SHELTON,WA 98584 MASON COUNTY COMMUNITY SERVICES SHELTON: 360-427-9670, EXT 352 BELFAIR:360-275-4467,EXT 352 Building.Plan q.E,wir n.e tal llcaldt Community Health ELMA:360-482-5269,EXT 352 i —_ www.co.mason.wa.us INSPECTION CARD AND CERTIFICATE OF OCCUPANCY** To schedule an inspection call or visit http://www.co.mason.wa.us/community-services/bid-inspection.php Permit Number COM2022-00015 Date Issued 05/18/2022 Issued By Project CELL TOWER UPGRADE Site Address 24765 NE State Route 3 !(�✓ Applicant T-MOBILE-KUKI Contractor Contractor Phone '2015 IBC,IRC,IFC,IEC,IMC,& NiUELLEO Primary Code UPC Type Permit Type NEW COMMERCIAL PERMIT Occupancy -APPROVED PLANS MUST BE ONSITE FOR ALL INSPECTIONS. -DO NOT PROCEED BEYOND EACH STAGE OR COVER WORK UNTIL APPROVAL IS GRANTED. -THIS CARD MUST BE POSTED IN A CONSPICUOUS LOCATION,FRONT OF THE PREMISES IS BEST FOR MAKING ENTRY. -ALL PERMITS EXPIRE 180 DAYS AFTER THE PERMIT IS ISSUED OR 180 DAYS AFTER DATE OF LAST INSPECTION. -OWNER/AGENT IS RESPONSIBLE FOR REQUESTING ALL INSPECTIONS THROUGH FINAL INSPECTION. **THIS STRUCTURE MAY NOT BE USED OR OCCUPIED UNTIL ALL APPROVALS ARE GRANTED.`* PRIOR TO CALLING FOR FINAL INSPECTION,ALL CONDITIONS OF THE PERMIT MUST BE MET Public Works Access/Driveway Other Health Septic Well Deptartment Planning Site Inspection Department Fire Marshall Fire Apparatus Access Fire Sprinkler Auto Fire Alarm Hood and Duct Other Final Building Building Official: Community Services Designee Department Concrete Setbacks Slab Footing Perimeter Point load Footing Footing Interior Footing Decks/Porches Foundation Stem Walls Other Rough-In Groundwork Plumbing Framing Groundwork Mechanical Plumbing Groundwork Gas Pipe Mechanical Gas Piping Shear Wall Nailing Underfloor Other Insulation Slab Ceiling Floor Vaulted Ceiling Walls Vapor Barrier Other Wallboard Interior Wall Brace Panels Fire Walls Nailing Other Final Building Manufactured Setbacks Setup Home Concrete Foot/Runners Final Other Mason County Mason County - Division of Community Development 615 W. Alder St. Bldg.8 Shelton, WA 98584 360-427-9670 ext 352 www.co.mason.wa.us CANCELLED FPROJECT 2-00015 NEW COMMERCIAL PERMIT ESCRIPTION: CELL TOWER UPGRADE ISSUED: 05/18/2022 ESS: 24765 NE STATE ROUTE 3 BELFAIR EXPIRES: 11/14/2022 PARCEL: 123282190030 APPLICANT: T-MOBILE-KUKI OWNER: BELFAIR MINI STORAGE LLC 21806 POPLAR WAY P.O. BOX 2057 BRIER, WA 98036 GIG HARBOR,WA 98335 206.295.5926 VALUATIONS: FEES: Paid Due Project Valuation (BID, 40000.00 $40,000.00 Plan Check Fee $380.84 $0.00 ESTIMATION..) Planning Commercial Review $380.00 $0.00 Fee State Fee-Commercial $25.00 $0.00 Building Permit Fee $585.91 $0.00 Technology Surcharge $19.34 $0.00 Total: $40,000.00 Totals : $1,391.09 $0.00 REQUIRED INSPECTIONS Footing Inspection BLD-Final Inspection CONDITIONS Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1-800-647-0982. The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. All RED stamped approved plans are required to be on-site for inspection purposes. If an inspection is called for and plans are not available on site, then approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and must be collected by the Building Department prior to any further inspections being performed or approvals granted. Printed by:Genie Mcfarland on:05/18/2022 02:34 PM Page 1 of 3 Mason County Mason County - Division of Community Development 615 W. Alder St. Bldg.8 Shelton, WA 98584 360-427-9670 ext 352 www.co.mason.wa.us NEW COMMERCIAL PERMIT COM2022-00015 * All building permits shall have a final inspection performed and approved by Mason County Building Department prior to permit expiration.The failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with Mason County ordinances and building regulations. * All construction must meet or exceed all local and state ordinances in addition to the International Codes requirements as adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in permit revocation. * All changes to"approved" building plans that effect compliance with the international codes as amended and adopted, or any other Mason County ordinance or regulation, must be reviewed and approved by Mason County prior to construction. * Approved per dimensions and setbacks on submitted site plan. Setbacks are measured from the furthest projection of the structure. * Owner/Agent is responsible to post the assigned address and/or purchase and post private road signs in accordance with Mason County Title 14.28 and 14.17. * Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and MUST NOT adversely impact adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either private ditches and drains will meet requirements of the stormwater ordinance or prior approval will be granted to use an existing utility and drainage easement dedicated for that specific purpose. For further information regarding this ordinance and the REQUIREMENT to obtain an ACCESS PERMIT for the installation/construction of a driveway or access connecting from a Mason County Road, Contact the Mason County Public Works Department prior to construction at Ext 450. For any construction which is proposed to be located within 25' of a Mason County road right of way, it is suggested to contact that office to review future planned work which may affect your project. * All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may grant a one time extention of 180 days, upon the receipt of a written extension request prior to permit expiration. Letter must indicating that circumstances beyond the control of the permit holder preventing action from being taken. No more than one extension may be granted. * The international code requires a fire apparatus access road for every facility, building, or portion of a building that is more than 150'from an approved access road. Roads are required to meet the minimum Mason County Fire Marshal standards for Fire Apparatus Access Roads up to the point where such roads connect with a county maintained public road or to another fire apparatus access road which connects to a county maintained public road. * The foundation/footing must be placed on undisturbed,firm-native soil. * CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE ADOPTED BUILDING CODE. The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance with the international codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Building Inspector shall be made prior to requesting additional inspections. * The stamped approved site plan is required to be on-site for inspection purposes. If an inspection is requested and the approved site plan is not on site, approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and shall be collected by the Building Department prior to any further inspections being performed or approvals granted. * Concrete encased grounding electrodes must be installed and used at each new building or structure that is built upon a permanent concrete foundation. In Mason County the electrical code is regulated by Washington State Department of Labor & Industries (L&I). For more information contact L&I for additional information. In Olympia call (360)902-6350 and in Bremerton call (360)415- 4000. Printed by:Genie Mcfadand on:05/18/2022 02:34 PM Page 2 of 3 Mason County Mason County - Division of Community Development 615 W. Alder St. Bldg.8 .,� Shelton, WA 98584 360-427-9670 ext 352 www.co.mason.wa.us NEW COMMERCIAL PERMIT COM2022-00015 By definition, propane tanks and heatpumps are structures, which must meet setback conditions. Please check your "Approved Site Plan"to ensure these structures meet the setback conditions listed. All required signage shall be installed prior to final inspection including any hazardous materials placards required for fire code, state or federal compliance requirements. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of Laws and Ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any other state/local law regulating construction or the performance of construction. Issued By: Contractor or Authorize 4Ant: Date: Printed by:Genie Mcfarland on:05/18/2022 02:34 PM Page 3 of 3