Loading...
HomeMy WebLinkAboutCOM2023-00043 Cancelled Radio Antenna - COM Inspections - 10/3/2024 INSPECTION CARD Mason County 615 W. Alder St. Building 8, Shelton, WA 98584 360-427-9670 ext 352 www.masoncountywa.gov PERMIT# COM2023-00043 PROJECT ADDRESS 100 E UNION HEIGHTS PL SOUTH UNION, WA 98592 PARCEL # 322323390061 PROJECT DESCRIPTION INSTALL ANTENNA, INSTALL RRH, INSTALL AWG DC TRUNKS ROTATE MOUNT TO MATCH LTE AZIMUTHS & REMOVE SKEV1 OWNER ANSTEY SHAWN/AT&T ADDRESS 590 1ST AVE SOUTH#705 PHONE 1.206.484.4371 CONTRACTOR ADDRESS PHONE CONTRACTOR LICENSE LENDER INSPECTION INSP DATE Comments INSPECTION INSP I DATE Comments KNOX BOX VERIFICATION BLD-Final Inspection Is Mason County Mason County - Division of Community Development 615 W. Alder St. iio Building 8 CShelton, WA 98584 ANCELLED www.masoncountywa.gov FAWGDC 3-00043 NEW COMMERCIAL PERMIT ESCRIPTION: INSTALL ANTENNA, INSTALL RRH, INSTALL ISSUED: 05/22/2023 UNKS, ROTATE MOUNT TO MATCH LTE AZIMUTHS & KEW EXPIRES: 11/18/2023 ESS: 100 E UNION HEIGHTS PL SOUTH UNION PARCEL: 322323390061 APPLICANT: ANSTEY SHAWN/AT&T OWNER: ANSTEY SHAWN/AT&T 590 1 ST AVE SOUTH#705 590 1 ST AVE SOUTH#705 SEATTLE,WA 98104 SEATTLE,WA98104 1.206.484.4371 VALUATIONS: FEES: Paid Due Project Valuation (BID, 25000.00 $25,000.00 Plan Check Fee $269.73 $0.00 ESTIMATION-) Building Permit Fee $414.97 $0.00 Planning Commercial Review $380.00 $0.00 Fee State Fee-Commercial $25.00 $0.00 Technology Surcharge $13.69 $0.00 Total: $25,000.00 Totals : $1,103.39 $0.00 REQUIRED INSPECTIONS KNOX BOX VERIFICATION BLD-Final Inspection CONDITIONS * All RED stamped approved plans are required to be on-site for inspection purposes. If an inspection is called for and plans are not available on site, then approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and must be collected by the Building Department prior to any further inspections being performed or approvals granted. * All changes to"approved" building plans that effect compliance with the international codes as amended and adopted, or any other Mason County ordinance or regulation, must be reviewed and approved by Mason County prior to construction. Printed by:Annie Wilson on:05/22/2023 10:03 AM Page 1 of 3 F w. Mason County Mason County - Division of Community Development 615 W. Alder St. Building 8 Shelton, WA 98584 360-427-9670 ext 352 www.masoncountywa.gov NEW COMMERCIAL PERMIT COM2023-00043 * CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE ADOPTED BUILDING CODE. The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance with the international codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Building Inspector shall be made prior to requesting additional inspections. * All building permits shall have a final inspection performed and approved by Mason County Building Department prior to permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with Mason County ordinances and building regulations. * Approved per dimensions and setbacks on submitted site plan. Setbacks are measured from the furthest projection of the structure. * The international code requires a fire apparatus access road for every facility, building, or portion of a building that is more than 150'from an approved access road. Roads are required to meet the minimum Mason County Fire Marshal standards for Fire Apparatus Access Roads up to the point where such roads connect with a county maintained public road or to another fire apparatus access road which connects to a county maintained public road. * The stamped approved site plan is required to be on-site for inspection purposes. If an inspection is requested and the approved site plan is not on site, approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and shall be collected by the Building Department prior to any further inspections being performed or approvals granted. * All construction must meet or exceed all local and state ordinances in addition to the International Codes requirements as adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in permit revocation. * All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may grant a one time extention of 180 days, upon the receipt of a written extension request prior to permit expiration. Letter must indicating that circumstances beyond the control of the permit holder preventing action from being taken. No more than one extension may be granted. * Owner/Agent is responsible to post the assigned address and/or purchase and post private road signs in accordance with Mason County Title 14.28 and 14.17. * Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1-800-647-0982. The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. * Comply with MCC ORD 5-98 New equipment on/with the existing tower I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of Laws and Ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any other state/local law regulating construction or the performance of construction. Issued By: Contractor or Authorized Agent: Date: Printed by:Annie Wilson on:05/22/2023 10:03 AM Page 2 of 3