Loading...
HomeMy WebLinkAboutCOM2009-00074 Final Pump Station - COM Permit / Conditions - 10/17/2011 'i MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Inspection Line(360)427-7262 � Mason County Bldg. 3 426 W. Cedar P.O. Box 186 Phone: (360)427-9670,ext. 352 1pr to Shelton,WA 98584 COMMERCIAL BUILDING PERMIT COM2009-00074 OWNER: MASON COUNTY UTILITIES &WASTE RECEIVED: 7/22/2009 CONTRACTOR: LICENSE: EXP: ISSUED: 11/4/2009 SITE ADDRESS: 23600 NE STATE ROUTE 3 BELFAIR EXPIRES: 5/4/2010 PARCEL NUMBER: 123294300190 LEGAL DESCRIPTION: TR 19 OF SW SE PROJECT DESCRIPTION: DIRECTIONS TO SITE: PUMP STATION (#1)AND CONVEYANCE FOR NEW PUMP STATION IS LOCATED IN BELFAIR AND IS ACCESSED FROM WASTEWATER TREATMENT FACILITY STATE ROUTE 3 General Information Construction&Occupancy Information No. of Units: Type of Constr.: VB Type of Use: Insp.Area:Type of Work: NEW Fire Dist.: 2 No. of Bathrooms: Occ. Group: F1 Valuation: $ 10,500,000.0( No. of Stories: 1 Occ. Load: 1 Building Height: 20 Pre-Manufactured Unit Information Square Footage Information Make: Length: Lot Size: Model: Width: Building: 0 : Year: Serial No.: Basement: Parking Spaces: Setback Information Shoreline&Planning Information Front: W 20.00 Ft. Shoreline: Ft. Rear: E 15.00 Ft. Slope: Ft. Water Body: Shoreline Desig.: Not Applicable Side 1: N 20.00 Ft. SEPA?:Yes Comp. Plan Desig.: Urban Growth Area Side 2: S 5.00 Ft. Fire Protection System Information Auto Fire Alarm System?: Y Emergency Key Box?: Y Standpipe?: Auto Fire Sprinkler System?: N ? Access Road?: Y Fire Extinguishers?: Y Fixed Fire Suppression System?: Fire Hydrants?: Y Fire Lanes?: Y COM2009-00074 Please refer to the following pages for conditions of this permit. 1 of 6 Plumbing Fixtures Mechanical Fixtures FEES �! Type City. Type Qty. Type By Date Amount Receipt Kitchen Sink 2 Ventilation Fan 5 EH Plan Review r.Fw 7/'A1/9nng 0.1nA nn g19nngnn Lavatories 1 Ventilation System 1 Plan Check Fee nl r. Ail 1/9nng ngq ga C19nnQnn Showers 1 Heat Pump 3 Non-Res. Energy Code nl r Ail 1/9nng ,t1dR nn C19nngnn Water Closets (Toilets) 1 IFC Plan Check Fee nl r Ail 1/9nng M1 XUA A7 S17nngnn Building State Fee nl r Ail 1/9nng to rn G19nnQnn Building Permit Fee N r Ail l/9nng .tan 9AA 75 S19nngnn Planning Review Fee AHR R/19/9nng ckAin nn S19nngnn Planning Review Fee AHR R/19/9nng RiAn nn C19nngnn EH Plan Review nl r R/19/9nng ct1nA nn C19nngnn EH Plan Review ni r R/19/9nng R1nA nn R19nngnn Plumbing Permit Fee nl r R/97/9nng TWA an R19nngnn Plumbing Base Fee nl r A/97/9nng 19d 7n ,i9nnQnn Mechanical Permit Fee nl r R/97/9nng 0119 An C19nngnn Mechanical Base Fee nl r. R/97/9nng R9R sn C19nngnn Total $76,258.16 CASE NOTES FOR COM2009-00074 CONDITIONS FOR COM2009-00074 1) Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1-800 6-47- The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. 2) All approved plan. are required to be on-site for inspection purposes. If inspection is called f ns are not on site, Approval WILL NOT be granted. In addition, a reinspection fee, based on the current fee schedule, minimum o charged and collected by the Mason County Building Department prior to any further inspections being performed or approvals granted. 551 3) O i responsible to post the assigned address and/or purchase and post priv4 road signs in accordance with Mason County Title 14.28 COM2009-00074 2 of 6 4) A structural observation report, as defined in Chapter 17 of the International Code, shall be provided to the Mason County Building Department. •f Reports shall be prepared by the engineer or architect of record responsible for the structural design or another engineer or architect designated by the engineer or architect or record. Reports shall be submitted to the Mason County Building Department within 2 weeks following each structural observation. A final observation report shall be submitted prior to the final inspection of the structure. Written statements shall indicate the permit number, type of inspection, and identify any reported deficiencies. Structural observation is defined as the visual observation of the structural system by a registered design professional for general conformance to the a o formance to the approved construction documents at significant construction stages and at the completion of the structural S. ste 5) fi-�addition to the inspections required in IBC, Section 109, the owner, the engineer or architect of record acting as the owner's agent shall employ one or more special inspectors who shall provide inspections during construction on the types of work listed under Chapter 17 and as specified by the design professional. The special inspectors duties & responsibilities shall be as specified in Chapter 17. Special inspection reports shall be submitted to the Mason County Building Department, PO Box 186, Shelton WA 98584 and available for ffs . pection reports shall be completed and submitted to the dept. in a timely manner and shall be submitted prior to the framing and inspections. 6) construction shall be reviewed by engineer of record and submitted in writing to the Mason County Building Department prior to ll engineering documents are a part of the approved set of plans and must remain attached thereto. If engineering documents are re proval will not be granted. In addition, a reinspection fee, based on the current fee schedule, minimum one-hour will be charged and Coll ct6 b he Mason County Building Department prior to any further inspections being performed or approvals granted. 7) ILL CONSTRUCTION MUST MEET OR EXCEED ALL LOCAL CODES AND THE INTERNATIONAL CODE REQUIREMENTS AND OCCUPANCY IS LIMITED TO THE PERMITTED AND APPROVED CLASSIFICATION. ANY CHANGE OF USE OR OCCUPANCY WOULD RESULT IN PERMIT REVOCATION. CHANGE OF USE MUST BE APPROVED PRIOR TO CHANGE. x 8) C oved building plans that affect compliance to the current Washington State Energy Code (WSEC), ventilation and Indoor Air u it IAQ), Building/Plumbing/Mechanical Codes and/or Mason County Regulations shall be approved prior to construction. X 9) C INSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE AbOPTED BUILDING CODE. The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in c with the international codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Ma n un Building Inspector shall be made prior to requesting additional inspections. 10) II property lines shall be clearly identified at the time of foundation inspection. 1��R 11) All building permits shall have a final inspection performed and approved by t e Mason County Building Department prior to permit expiration. The fai est a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being t with Mason County ordinances and building regulations. COM2009-00074 3 of 6 12) All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may extend the ctios for a period not exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of a older have prevented action from being taken. No more than one extension may be granted. 13� The approval of this project is subject to the recommendations and specifications outlined in th geotechnical report or assessment. J Structures and/or land modifications (grading, cuts, fills, etc.) required in the geotechnical re sment, may require a seperate permit. The geotechincal report/assessment shall remain attached to the approved building plans. 4) An inspection performed by a representative of the geologist, their authorized representative, engineer of record, shall be completed on-site prior to the footing pour to verify that earthwork and foundation installation activities comply with the'Geotechnical report or assessment recommendations. In addition a final inspection report, prepared by a representative of the geologist, their authorized representative, or engineer of record shall be required to verify that erosion control, drainage and final work is completed in accordance to the Geotechnical report or assessment recommendations. psure-�reated be submitted to the Mason County Building Dept., PO Box 186, Shelton, WA 98584, prior to the footing and final inspections and nspection. 15) wood manufactured after January 1, 2004 may contain high concentrations of copper which could quickly corrode metal nnectors, and flashing. Install metal connectors approved for contact with the new types of pressure treated material. 16) PER TITLE 14 MASON COUNTY BUILDING CODE - CHAPTER 14.17, STANDARDS FOR FIRE APPARATUS ACCESS ROADS - 14.17.110: A fire apparatus access road in excess of 14% grade and more than 150'to new residential or commercial structures will require an automatic fire spn r ste installed. Contact the Mason County Fire Marshal at(360)427-9670, extension 273, for further information. X 17) dimensions and setbacks on submitted site plan. Setbacks are measured from the furthest projection of the structure. 18) emporary erosion control measures must be implemented to prevent water uali de on of adjacent waters or properties. Silt fencing must e installed and maintained until upland vegetation has become established. COM2009-00074 4 of 6 • 19) A f NFPA 72 fire alarm system is required to be installed, the monitoring company is required to be UL certified. A separate permit • uired to submitted an approved prior to the installation of the system. ti x box � required to be installed per section 506 of the 2006 International Fire Code. Please contact the local fire district for more information in ions. it x fishers are required to be installed per chapter 9 of the 2006 International and NFPA10, 4A60BC required. J D _ are to provided on site for hazardous materials stored or used on site. This pe it becomes null and void if work or construction authorized is not commenced within 180 days,or if construction or work is suspended for a period of 180 days at any time after work is commenced. Evidence of continuation of work is a progress inspection within the 180 day period. Final inspection must be approved before building can be occupied. Proof of continuation of work is by means of a progress inspec n.The owner or the agent on the owners behalf, represents that the information provided is accurate and grants employees of Mason County access to the above describe an str ure for review and inspection. OWN ER OR AGE < DATE: f� I \_ COM2009-00074 5 of 6 0 3 N CONCRETE MECHANICAL MANUFACTURED HOME _ N p Footings /Setbacks Gas Piping Dale By Ribbons co Rlhbons Z o Interior Date By Interior-Date By Date By 0 AExterof Date By Exterior-Date _ g Sit-up -__.. 0 INSULATION � C Point goad/isolated Footings Date By Z--IBG I SLAB INSULATION � Date By Data By FIRE DEPARTMENT Foundation Walls Floors Date By � C _ Date By Data By DECKS r FRAMING walls Date ByFn Date By Data By PROPANE TANKS t'n PLUMBING vault Date By Date By — OTHER D Groundwork Attic N Date By Type Data By Date By o.w.v DRYWALL 0 Type: Int Brace Wail Date By Date By ic Date BY FINAL INSPECTION N Water Line Fire Separation O O Date By Date By Date �� By tP tP Pass or Request Inspect. c Type of Insp. Fail Date Date Done By Comments o� 0 a�