Loading...
HomeMy WebLinkAboutBLD15232 Final Telephone Exchange - BLD Permit / Conditions - 6/25/1984 BUILDING PERMIT APPLICATION MASON COUNTY P.O. Box 186 Shelton, Washington 98584 426-5593 DATE ISSUED PERMIT NO. � OWNER AME MAIL 74�1 ITY 8 STATE ZIP PHONE i DIRECTIONS TO JOB SITE v 6ja& LEGAL (❑SEE ATTACHED SHEET) DESCR. c� C�_ a.3 CONTRACTOR NAME MAIL ADDRESS CITY&STATE // LICENSE NO. PHONE �' G�� USE OF -Dl-DIe-UV G:Z.33G,U BUILDING Class of work: EIA EW �,ADDITIOINI ❑ ALTERATION ❑ REPAIR ❑ MOVE ❑ REMOVE Describe work: 3 �8• A ./•Sid Valuation of work: $ O o PLAN CHECK FEE PERMIT FEE O, Si3 8, SPECIAL CONDITIONS: BEDROOMS I DECKS CARPORT ❑ NOTICE BATHROOMS f TOTAL SO. FT. GARAGE ! ; ATTACHED i SEPARATE PERMITS ARE REQUIRED FOR PLUMBING, HEATING, VENTILATING NO. OF STORIES -f BASEMENT I' OR AIR CONDITIONING. TOTAL SO. FT.1/J/D FIREPLACE i DETACHED L_: THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION AUTHOR- CONTRACTOR AFFIDAVIT IZED IS NOT COMMENCED WITHIN 180 DAYS,OR IF CONSTRUCTION OR WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF 180 DAYS AT ANY TIME AFTER I certify that I am a currently registered contractor in WORK IS COMMENCED. the State of Washington and I the aware of the FOR OFFICE USE ONLY ordinance requirements regulating the work for which the permit is issued and all work done will be in nformance ther with. PERMANENT i_i SHORELINES I Z) SEASONAL ; FLOODPLAIN iJ Fir E.D. NO. S.E.P.A. L" By Special Approvals IN OUT YES APPROVED NO Lic. oit�3�(j �llt-� Date 3— — ZONING PLANNING DEPT. 7 OWNERS AFFIDAVIT HEALTH DEPT. PUBLIC WORKS I certify that I am exempt from the requirements of the FIRE MARSHAL contract or registration law RCW 18.27, and am aware of the Mason County ordinance requirements for BUILDING DEPT. which this permit is issued and that all work done will ROAD ACCESS be in conformance therewith. MOTOR VEHICLE PERMIT APPLICATION ACCEPTED BY PLANS CHECK BY APPROVED FOR ISSUANCE L ner Date, V'Y" � fll� <--fi/ BY .HECK VALIDATION CK. M.O. CASH PERMIT VALIDATION CK. M.O. CASH February 8. 1984 ADDENDUM NO. 1 BID OPENING - FEBRUARY 152 1984 4:00 P.M. PACIFIC NORTHWEST BELL TELEPHONE CO. FOURTH ADDITION TO C.D.O. BUILDING BELFAIR„ WASHINGTON ROBERT A. BEZZO AIA ARCHITECT 115 FOURTH AVENUE SOUTHQ SUITE E EDMONDS, WASHINGTON 98020 The following :revisions and corrections shall be made to the Drawings and Specifications for the above projects and shall becrame a part of the Contract Documents: CHANGES TO PLANS 1. SHEET A-1 A. At Floor Plan at new concrete platform and steps at east end of new addition, change width of platform and steps from ?°-011 to 5°-0{'. Platform and steps to remain centered on the door opening. B. At Plot Plann change elevations on new catch basin at nor-`heart corner of the property as follows: (1) Change top of grate elevation from i01.25 to 101.00. (2) Change outflowing pipe invert from 99.18 to 99.23. - (3) Change inflowing pipe invert. from 99.21 to 99.25. Change elevations of grade and drain pipe at ru.dpoint betMeen the two new catch basins along the east side oll the new par3cing area as follows: (1) Change new spot elevation from 101.38 to 101.25. (2) Change drain pipe invert from 99.42 to 99.5(T C. At Typical French Drain Detail a., eliminate 4" depth of crushed O ck surfacing at top. Change note "1?- 11 minus coarse rock" to read "11171 minus washed rrayel full depth from bottom to top of trench." 2. SHEET A-2 A. At East Elevations note new metal louvered .rent frames and relocated louver frames as follows: "Provide 3/4" x 5=2-11 V.G. fir louver frames top and tvx) sides with 1%" thick fir sloping sills. Provide 1-1/3" x 1'1" V.G. fir exterior trim top and two sides typical." 3. SHEET M-2 A. At Storage Tank Detailq change concrete yardage figure in note pertaining to tank anchor pad to read as follows: "Provide minimum 1.05 cubic yards of concrete by mechanical contractor - - - - - --11 AGE 2 4. SHEET E-2 A. At Electrical Floor Plan, reduce the number of type: F1 lighting fixtures in the new building addition from 32 to 15. Contractor shall base bid on the quantity of conduit, wires switches,, E�6_-h circuit breakers and outlet boxes shown on the plans. A revised lighting plan will h,,- provided at a later date to the sucr-ess:Lvl low bid electrical subcontractor. CRANGE,S TO SPECIFICATIONS 1. SHEET SP-1,, paragraph ?49 CARPENTRY A. Add paragraph 12 as follows: '" All wood roof and wall framing members, truss gussets, blocking„ and similar wood framing shall be pressure-impregnated with fire- protective chemicals to provide a flame spread, fuel contributed and developed classification of 25 or 'less when tested by Underwriter's Laboratories in accordance with their Fire Hazard Classification Test Procedure and there shall be no evidence of significant progressive combustion when the test; is continued for 30 ir=nutes, and smoke developed rating not Exceeding 50. Von-:ar, by Koppers Company, Inc. , Pyresote as distributed by Wyckoff Company, Seattle, Washingtono or approved. After treatment, all lumber shall be dried to a maximum moisture content of 18%. B. Add paragraph 13 as follows: "New cedar siting at east g3 ible end of addition shall be clear grade cedar„ smooth bevel - KL, 3,14" x 8" size, " 2. SHEET .SP-1, paragraph P. ROOFING A. Add to paragrph 1 a new sentence as follows: "The Minimum to be provided to match existing shall be shingles of minimum 2.354;' weight per square, three- tab self-sealing type glass fiber or organic constrs!c'cion. UL Class "C", limited warrantee m_i.nimum 15 %rears." B. Add to paragraph 4 a new sentence; as follows: "Use brushes to loosen completely, brush of scrape off all mass, use hose spray for finish clearing. Block downspouts to prelrent Noss from entering. Completely clean existing gutters and ground areas of loosened moss, remove from site.' END OF ADDENDUM NO. 1 Pacific Northwest Bell Real Estate and Leasing Room 1502 Sixteen Hundred Bell Plaza Seattle,Washington 98191 i-' January 19, 1984 JAN 2 b Mr. Tim Fitzthum Mason County Planning P.O. Box 186 �;a_ !�RAL S� Shelton, WA 98584 Dear Mr. Fitzthum: In a telephone conversation on December 12, 1983 we discussed the parking requirement for our central office in Belfair. This was in connection with our proposed fourth building addition. You advised me that the parking ordinance did not specify a requirement for our type of facility and that the Industrial requirement of one space/two employees or one space per each 800 square feet gross floor area was probably the closest to our type of use. Since our conversation, I have checked with our architect and our building operations and central office people concerning the building size and population. With the fourth addition, we will have a total gross floor area of 3727.25 square feet. Under the Industrial classification we would be required to provide five parking spaces. As a result of this building addition and instal- lation of an electronic switching system, we will have just one person assigned to this office. There will be an occasional vehicle or two there from time to time as in the case of a super- visor stopping by. As shown on the enclosed site plan, we propose to provide three parking spaces at the rear of the building, which we feel will adequately meet our needs. Please advise me whether or not this will satisfy the requirements of Mason County and the community of Belfair. Thank you for your assistance in this matter. Sincerely, Larry D. Wittmeyer Staff Specialist Enclosure PACIFIC N. W. BELL TELEPHONE #15232 3-7-84 Tract 20 SW SE 29-23-1 1600 7th Ave. Seattle, Wash. Contractor Drury Const. Co. Telephone Exchange $30,438.00 Shorelines: A/A Setback: C / Special Conditions: Footing: r Setback: Foundation Walls: Framing: Fireplace: Wood Stove: Plumbing: Mechanical: Roof: Exterior : Interior : /p(� , �+ �S /7/ LS Final:may Stop Work: Mobile Home: Smoke Detector : Remarks: