March 13, 1972 W-814-30
Seifert, Forbes and Berry
925 Tacoma Avenue South
Tacoma, Washington 98402
Attention: Mr. Dean Haas
Re: Preliminary Soils and Foundation Investigation
Puget Sound National Bank Site
Belfair, Washington
Gentlemen:
In accordance with your request, we have completed a preliminary
soils investigation on the subject site. This report summarizes our work-_ .
and contains preliminary conclusions and recommendations pertinent tq- e`'
design of the project. �' �
SITE DESCRIPTION
The proposed site is located on the southwest corner of the inter-
section of State Highway No. 3 and Belfair Street in the city of Belfair,
Washington. The northeast part of the parcel is presently occupied by
an old building with paved parking from the building out to both Belfair
Street and the State Highway. The building and the paved parking occupy
nearly half of the parcel.
The site is fairly level in the north half, but slopes gently west
and south in the south portion. The site is covered with grass with the
exception of some gravel driveways at the west and south sides of the
existing building. The property drains toward the southwest corner.
EXPLORATION PROGRAM
A total of six (6) test pits were excavated on the site utilizinci a
tractor mounted backhoe. Their depths varied from four to eleven feet.,�,, ;._,
All materials encountered were logged by an engineering geologist from
'S: VAN Nuys,CALIF.• SANTA ANA,CALIF.• PALO ALTO.CALIF.0 LAS VEOAS.NEV.0 BELLEVUE.WASH. TACOMA•WASH. 0 HONOLULU.HAW. •MURRAY HILL.N.J.
a
• i
W-814-30
Seifert, Forbes and Berry Page Two
March 13, 1972
Approximate test
our office. Logs of the pits are presented in Tabdloef this report.
pit locations are shown on the site plan at the ez
x loration was not accomplished in the northeast part o the locations
site
E p paved parking. In addition.,
because of the existing building and
of utilities were not known in this area.
1
SUBSURFACE CONDITIONS
The materials encountered were loose to medium dense, brown,
fine to medium grained SAND with a few six to twelve inch thick beds of
brown, silty, fine SAND and brown, medium �Ihowever,hlthis lens
may be any
sandy GRAVEL was found in Test Pits
old drainfield.
In the south part of the site, one to two feet of fill composed of
n placed over the original topsoil. (See
fine SAND and silty SAND has bee
Site Plan.) $
n Test Pits 1 and 5, a normal sequence of soils was encountered.
I its appeared
(See logs in Table A.) Generally, the materials in these two p
to be somewhat denser than in the other pits e silt beds
. In addition, there is a thicker !
section of sand immediately beneath the topsoil and overlying th
than that observed in other pits.
elow the surface
Groundwater seepage was noted at six to nine
e feeeet bbelowthe surface i
in Test Pits 1 and 5, and from three and a half to fiv
4 and 6. The difference in these groundwater elevations is
in Test Pits 2, the north t
probably from the difference in surface elevation at the site; i. e. ,
portion is higher than the south portion.
DESIGN CONSIDERATIONS
1.
Traffic in and around the existing building probably has
densified the underlying soils to soiree extent. It is strongly recommended
that after removal of the existing building and paved parking, test pits
be dug in thi
s area to determine the underlying soil conditions. Final
siting of the new building should be delayed until this information is I
available.
2. All existing fill, topsoil, and buried facilities,
ilitie , such The void
septic and fuel tanks should be removed prior to construction.
should be filled with compacted sand and gravel.
G- IMO E3, IMZC•
W-814-30
Seifert, Forbes and Berry Page Three
March 13, 1972
3.
After completion of stripping, the original soil should be
thoroughly compacted using a vibratory steel roller.
After the proof-rolling procedure, the site should be raised
4°
to the desired grade with a compacted, granular fill. The placement of
to
the fill should be supervised and the material shoulde
ASTM b Dc mpa or Led at
modi-
least 90% of the laboratory maximum density
fi ed AASHO T-180). If it becomes necessary to place uch as sandill during y gravel
months, the fill materials a madteria; by we be limited ight,ypassing the No. 200 sieve.
with no more than 5% o .
5.
Footings should be at least twelve inches wide and should be
founded at least eighteen inches below a acent l l should be provided under
If possible,. a two-foot thiround and slab surfaces.
ck mat of compatd f
all footings and the slab.
for spread i
g. Tentative maximum allowable bearing pressures for
per
footings on at least t<vo feet of camp Se tlefinent°es amate be s0 cannot be made
square foot (dead load + live lod )
until the building has been sited and structural configurations determined.
The recommendations herein are subject to n difie Ligation subse-
by the
final location of the building and additional subsurface
quent to site clearing.
se concerning this stage of the project,
If any further questions ari
please do not hesitate to call.
Respectfully submitted,
GEOLABS-WASHINGTON I INC.
L4eS:ton�, Engineering Geologist
Vas�riy
lvin R. Zeman, P. E. ,
LS/mh o `�
FSS�ONAL
b�.e.
C� � ULASF'J. INd.
f
TABLE A
TEST PIT LOGS
i
Depth - ft. Soil Classification
Test Pit No. 1 ;
0. 0 - 1. 0 Loose, brown, silty, organic SAND. (Topsoil)
1.0 - 7. 0 Loose -to medium dense, brown to grey, fine to medium,
clean SAND.
7.0 - 8. 0 Soft to medium stiff, brown, thin-bedded, moist, sandy
SILT.
8.0 - 11. 0 Medium dense, brown, clean, fine to medium SAND.
(Seeps from 7 to 9 feet.)
Test Pit No. 2 i
0. 0 - 2. 0 Loose
, brown, silty, fine to medium SAND with occasional
irregular masses of black to brown, organic topsoil. (Fill)
2. 0 - 3. 0 Loose, reddish brown, organic, silty SAND. (Topsoil)
3.0 - 7. 0 Loose to medium dense, brown, clean to slightly silty,
fine to medium SAND.
7.0 - 8.0 Soft to medium stiff, brown, wet, sandy SILT.
(Seeps from 4 to 8 feet.) (Hole caving from 4 to 8 feet.)
(Depth to water after 30 minutes = 3. 5 feet.)
Test Pit No. 3
0. 0 - 1. 5 Loose, brown, fine SAND. (Fill)
=f 1. 5 - 3.0 Loose, reddish brown, silty, fine SAND. (Topsoil)
3.0 - 4. 0 Medium dense, brown, clean, sandy GRAVEL. (Drainfield?)
Test Pit No. 4
0. 0 - 2.0 Loose, brown, fine to medium SAND. (Fill)
3f =
2.0 - 3. 5 Loose, reddish brown, silty, fine SAND. (Topsoil) 4
37 3. 5 - 4.5 Medium dense, reddish brown, wet, clean, sandy GRAVEL. i
4.5 - 6. 5 Medium dense, brown, silty, fine to medium SAND.
c1xn0'=...aW313. xsvC.
W-814-30,
. 4
i
TEST PIT LOGS (CONT.)
Depth - ft. Soil Classification
Test Pit No. 4 (cont.)
6.5 - 8. 5 Loose to medium dense, grey, clean to slightly silty,
fine to medium SAND.
(Seeps from 4 feet to bottom.) (titer 30 minutes caving j4 feet to
bottom.) (Water table 3. 5 feet of
Test Pit No. 5
{
0.0 - 1. 0 Loose, reddish brown, silty SAND. (Topsoil)
lean, fine to
1.0 - 6.0 Loose to medium dense, bro o grey,
medium SAND.
6.0 - 7. 0 Soft to medium stiff, brown, thin-bedded, sandy SILT.
7.0 - 10. 0 Loose to medium dense, brown, interbedded, clean, fin !
SAND and silty, fine SAND. (Numerous seeps from 6 feet
to bottom.) (Hole caving from 3 feet to bottom.) (Sand to i
6 feet stands fairly well except where undermined by caving.)
Test Pit No. 6 €
0.0 - 1. 5 Loose, brown, silty, fine to medium SAND. (Fill)
1.5 - 2. 5 Loose, reddish brown, moist, silty, fine SAND. (Topsoil)
2. 5 - 5.0 Medium dense, brown, moist, fine to medium SAND with
thin beds of silty, fine SAND.
0 Soft tan moist SILT.
6.0 - 10. 5 Loose to medium dense, tan and brown, interbedded, fine, i
t clean SAND and silty, fine SAND. (Seeps at 5 feet.)
(Caving from 5 feet to bottom. )
C;- n 0 L.,A. %3. I N C.