Loading...
HomeMy WebLinkAboutGrade and Drainage Plans - COM Plot / Site Plans - 4/1/1996 140.00 = BUILDING ONE - ' 130.00 _ SECOND I LOOR ELEV. 127.5 STD. M qN. PORT-, 120.00 BUILDING TWO TW=126.0 SECOND FLOOR ELEV. 115.0 110.00 TW=113.15 ?�:f:= BF=115.0 �' � DRAINFIELD -- -�11ES• O�FY'i SEASONAL GROUND WATER TABLE 100.00 BF=101 .0 STATE HIGHWAY C C DATUM E'LE'V 90_DD .off-- --- 100 - 200.00 - 30.O.00 - 400.00 500.00 - _ GROUP LINCOLN SECTION A-A �- DRAINAGE SWALE DETENTION PIPES SECTION A-A TN �?U OFFICE SITE i 12' INFLOW TO GRASS SWALE NOTES 1. METAL PARTS A. CORROSION RESISTANT OR GALVANIZED OR m ALUMINUM TYPE 2. CAST IRON DJLET B. IF GALVANIZED STEEL PIP& HAVE ASPHALT PENINSULA NOTE: PROJECT GEOMETRY HAS BEEN DEFINED FRAME AND a4A7E oo TREATMENT I CREDIT UNION ELECTRONICALLY IN AUTOCAD. FOR SPECIFIC \� Z/ 2. FRAME & LADDER OR STEPS OFFSET SD,DIMENTIONS AND COORDINATES, CONTACT THE DESIGNER. _ ELEVATIONS ARE BASED ON AN ASSUMED ELEVATION OF N A. CLDHBDOWN SPACE IS CLEAR OF RISER & 100 FEET AT THE NORTHWEST PROPERTY CORNER. FRAME & LADDER OR ITEPS OFFSET, SEE B. FRAME IS CLEAR OF CURB. vVTE A FRAME & 5RA7E ELEVATION -99.00 3 STRUCTURE SHALL BE A TYPE 2 CATCH BASIN Max v 54' MINIMUM DIAMETER. vs DVERFLOY ELEV = 97.5 185 FOOT LONG GRASS LINED SWALE WITH / n) / I Tc PROVIDE STANDARD CAL VAN= STEEL A TOP ELEVATION OF 194.0 AND A BOTTOM \ ` % / / DETENTILN & DR ALLpIR" LADDER/STEPS: ELEVATION OF 192.5. OUTLET STRUCTURE OIL SfPARATMN 0 4'ORIFICE SET AT ELEV 96.5 - '� / / 1 ,/ PIPE AND SHALL BE 2, 2 INCH PIPES AT ELEVATION 92.5 / / % / AND A BROAD CRESTED OVERFLOW WEIR AT \ 1 Y2' 4_ 1 ELEVATION 93.75. THE SWALE IS 4 FEET � / / j /' IP' OUTLET PDv_w_ _p 7O AND FROM DE7DVMN I o � � WIDE ON THE BOTTOM WITH A 2:1 SIDE SLOPE. SLOPE SWALE AT 0.57o. INSTALL 3 8" TH fNVERICK NOTE: THE DRAINFIELD EASEMENT FOR THIS PROPERTY IS APPROX. SOY LINE s3.o o FLUV LINE EL.- 9aD BY 7' LONG BY 8" DEEP STAINLESS STEEL �_ / ; 108' BY 35'. THE USE OF BOTH BUILDINGS WILL BE GENERAL OFFICE. = CROSS WEIRS IN SWALE (LEVEL) TO HELP BUILDING ONE WILL HAVE 2 BATHROOMS UNISEX - ONE EA. FLOOR. o R£S7RICTIIR PLATE DISRIBUTE FLOW ACROSS SWALE AT THE �� ! BUILDING TWO WILL HAVE 2 BATHROOMS EA. FLOOR FOR A TOTAL OF FOUR. vrTV DICE _ D,F FriXTURES WILL BE 4 URINALS, 8 TOILETS, 6 SINKS AND 2 M P SINKS. SUE TO BE 4 WaIEs611111m FOUR LOCATIONS SHOWN. � � � ! "� - � 54• TYPE II CB Y/ INLET [,SATE Q- i f� a P OCT ro scaLE� r - Co 1 WITH AN INFILTRATION RA OF 0.8 L./S T S io ,�cL�.,� - r-I t, USED FOR DRAANFIELD SIZING BASED ON USING A GRA`lELESS DRAINFIELD. C�NSTROL STRUCTURE % o /7 N 87'08'25" W / EXPANSION OF THE DRAINFIELD IS POSSIBLE ON THE NORTHERLY 60 FEET / ® 208.77' OF THE EASEMENT - OIL/WATEK SEPA ATO;�? CD WL_ _ - L ti wL 100 102 \ / 104 106 cxDCWL 08 ! /---CB#D2 51 WL B 4 WL Dc 9 : D 8" CB#2 08.77' M _ wA �} L� ��� ,��g 20 ��--CB#D4 _ -TWO - TWO INCH OUTLET PIPES LOCATED p=� S 8 12 I - --- 'f 87'08'25" E 167.94' �'�� AT THE END OF THE SWALE. RELOCATE SEWER LINE / Z 1 D CB#3 �' o \ OVERFLOW WEIR - SET AT ELEV. 93.75 TO PARKING LOT CB#1 12 / 2 CB 1 I 12" N. 0 SEE STR \ 8 - ,�`l, 0 8 FT 7 FT 1.5 FT J I DRAINFIELD i I EXISTING DRAINFIELD / �,� fr LINE W/ _ ` 22 '\ THIS SHEET \ EASEMENT r ; EAS �� --1 GRASS T , EM_ JT � v � CB#5 �. S� I 35 FT 103 / �Qj Z g I I FOR PAN!^ SULA 4 FT CREDIT U,,ION 2 FT - �� • �� tv p�c / Q/ /o \ BELFAIR WATER DIST. WATER LINE cn Q/ / 1 �Qv e pI � , /�/ ^� per/ _ % \ CB#6 J ! ! W, j 0 BE CAREFUL YOU DON'T BREAK IT! ��� SECTION TNf� � FL��' Tw o70 6 2.00' 1 �( i',1`T U S W A L 7�.0 �. 45 FAT 1 ` - NO SCALE 41 9 FT. BY 37.5 FT GRAVELESS DRAINFIELD USING I I STD. INFILTRATOR UNITS WITH 1 INCH PRESSURE h #6 < DISTRIBUTION LATERALS. 62.00 i o / h --- �� �/ �� 3 16 INCH HOLES SPACED w \ / /� I / tv TP AT 3 FT - ROTATED TO THE 12 OCLOCK POSTITION. II 2 ;- 1 / , THE LAST HOLE OF EACH LATERAL SHALL BE 1.5 FEET IL f� f- FROM THE END. SET AND COVER AS SHOWN IN SECTION _ O� A-A- THIS-SHEET. INSTALL STD. 4 IN-CH OBSERVATION J���,� / I L� I� t `n I �- _ PORTS AT EACH END OF EACH LATERAL. INSTALL 1 INCH 6 FT ROCKERY S 8� ;cam �.- � � ( ;� 4+00 l I � I � - �' � _ BALL VALVES ON EACH LATERAL FOR ADJUSTMENT OF SQUIRT. X li �D LLJJ �' r N PROVIDE STD. CLEANOUT SWEEP AND CAP FOR EACH LATERAL GRAVITY TY S + / zm II I / p� CS 1 „� Cre fIIIx' ,, � / o •"' �6 -- // \#5I 1 _o o \ -1ft6rGALLON SEPTIC TANK �36" SEWER MANH LE ° ° - o o # JI / - T E fifi �1, SITE INFORMATION, .]�' GAL. SURGE TANK/PUMP STA. � N 86 41 55 � W �w n„ o M � / � ,� ,l � \� SET TANKS AT ELEVATION 96.40 ° 426.07 �`�' �� 4+19,40 I / LOT AREA = 0.98 ACRES BENCH MARK 11 � I � � N0. PARKIIN TOP OF PIPE = 100.00 SEE DETAILS IN ON .SHEET TWO. � , j G STALLS = 41 ��� 5•�(�E�r�t \-WASTE WATER FORCE MAIN i �,\ I � ;� / � I TOTALN ONE GROSS LEASABLE AREA GROSS E 7,760 OSF I L " / I EA = 2300 SF l� 1 1/2 CL 200 PVC I BUILD ! BUILDING TWO GROSS LEASABLE AREA = 5460 SF ��^17 730 % IMPERVIOUS AREA - PARKING LOTS = 19,200 SF IMPERVIOUS AREA - ROOFS = 4,600 SF SITE PLAN CP y IMPERVIOUS AREA - SIDEWALKS = 800 SF / i TOTAL WASTE WATER GENERATED = 380 GPD SOIL TYPE = CLASS 3 (0.8 GPD/SF) 45 FT -- - J - gyp � Approved ft: Dmum. By: Date: scaae: ,t_ L I N C O L N OFFICE BUILDING Designed By: En irteerin So ware A ications oriz. Sheet I = Tr Checked By: Vert. I"=5' Gf2ADING AND DQAINAGE PLANS � 2 Approved By: °171db NoX=> PNAS= ONE AND PHASE TWO Of No. Date By Ckd. APpr Revisionl o,