Loading...
HomeMy WebLinkAboutFIR2002-00039 Final Sprinkler - FIR Permit / Conditions - 4/1/2003 MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Inspection Line(360)427-7262 Mason County Bldg. 3 426 W. Cedar P.O. Box 186 Phone: (360)427-9670,ext.352 Shelton,WA 98584 pro FIRE PROTECTION PERMIT FIR2002-00039 APPLICANT: BRIAN PETERSEN 360-275-8727 RECEIVED: 10/29/2002 CONTRACTOR: LICENSE: EXP: ISSUED: 11/7/2002 SITE ADDRESS: 151 NE STATE ROUTE 300 BELFAIR EXPIRES: 5/7/2003 PARCEL NUMBER: 12329429962& gb002 LEGAL DESCRIPTION: TR 10 OF NW SE, TR B EX OF SP#591, NOW TR 2 OF SP#2938 PROJECT DESCRIPTION: SPRINKLER GENERAL INFORMATION System Information Type of Use: Fire District: Sprinkler Heads: Audible Switches: Pull Stations: Hood&Duct?: Flow Switches: Visual Devices: Door Releases: Dry Chemical?: Pressure Switches:: Smoke Detectors: Duct Detectors: Wet Chemical?: Zones: Heat Detectors: Sprinkler?: Standpipe?: SQUARE FOOTAGE FEES Monitoring Station No.: First Floor: Type Amount Due Amount Paid Auto Fire Alarm?: Second Floor: Third Floor;: Sprinkler System Fee $100.00 $100.00 Total: $100.00 $100.00 FIR2002-00039 Please refer to the following pages for conditions of this permit. 1 of 2 CASE NOTES FIR2002-00039 CONDITIONS FOR FIR2002-00039 This project becomes null and voiid if work or construction authorized is not commenced within 180 days;or-if construction or work is suspended fora period of 180 days at anytime after work is commenced. Evidence of tinuation ork is a progress inspection within the 180 day period: Owner or Ag Date: l/ /z co �--- Please sign, date, initial all conditions and mail back to me. THANK YOU RECE" V`' - ►ROV 1 LUU2 M.C.Commtinit, �wdlopment r FIR2002-00039 Please refer to the following pages for conditions of this permit. 2 of 2 fiO 6 A P-cl b y Phi -5 v2 FJMASON COUNTY FIRE MARSHAL ids �e®3� get, County Bldg.III 426 W.Cedar P.O.Box 186 Shelton.Washington 98584 03 1�Q (360)427-9670 COD'ORCEMENT FIRE INSPECTIONS FIRE INVESTIGATION PuKld,EDUCATION PERMIT NO. F R. Drl�75b�� MASON COUNTY FIRE PROTECTION SYSTEM PERMIT APPLICATION PLEASE NOTE:This application must be completed and accompanled by a minimum of three'(3)copies of plans,specifications, and applicable calculations per Mason County Fire Protection Standards,and submitted to the office of the Mason County Fire Marshal. This.Is not a permit and failure to submit all necessary information will cause a delay and/or rejection of your submittal. When a permit has been Issued,you will be notified. PLEASE PRINT OWNER:-D1R- .h� ` C���2Svr.3 PHONE: FIRE DISTRICT SITE ADDRESS 0 �CITY �➢� � STATE 1P� MAILING ADDRESS:F0 GoK S=�v Crry_r;- �A STATE\,�A ZIP SZ6 LIEN/TITLE HOLDER: ADDRESS: CITY STATE ZIP CONTRACTOP. s1JC- ADDRESS:?e> CITY?dam 0RfA1JiR4:) STAT IP 993G, CONTRACTOR PHONE#'Zco (c;ZS i -CONTRACTOR REG#, F�XI � ,JZ�-Y11g PARCEL "�aa:e[= 1 cr'' ��tGAL DESCRIPTION: 2 -ram �c�o y°►3\2� BLDG.SQ. FT. (EXISTING/PROPOSED}1ST USE OF BUILDING R*g—� Oa-c_AL- iz'-yAX+— DESCRIPTION OF WORK: SPRINKLER: WET_DRY STANDPIPE: WET DRY AUTOMATIC FIRE ALARM HOOD &DUCT DRY CHEMICAL WET CHEMICAL HALON NEW SYSTEM MODIFICATION R9F?Uwf MONITORING STN PHONE ZOOS almfflo ISOSyi4 SmLZ609C Xd3 CC:6T 11111 00/OT/80 .r 1 f - YOUR SUBMITTAL MUST INCLUDE: t. DIMENSIONS,SCALE,NORTH ARROW 2. FLOOR PLAN AND CROSS SECTIONAL ELEVATION 3. ALL CONCEALED SPACES(LABELED COMBUSTIBLE AND NON-COMBUSTIBLE) 4. CUT SHEETS OR REFERENCES FOR ALL NEW DEVICES 5. LOCATIONIDESCRIPTION OF ANY EXISTING DEVICES G. BATTERY CALCULATIONS FOR FIRE ALARM SYSTEMS 7. RISER/WIRING DIAGRAM FOR FIRE ALARM SYSTEMS S. HYDRAULIC CALCULATIONS FOR SPRINKLER SYSTEMS PLEASE NOTE: WORK MAY PROCEED ONLY IN ACCORDANCE WITH A VALID FIRE PROTECTION SYSTEM PERMIT ISSUED BY THE MASON COUNTY FIRE MARSHAL. A VALID PERMIT AND AN APPROVED SET OF PLANS MUST BE ON THE JOB SITE DURING CONSTRUCTION AND MUST REMAIN THERE UNTIL A FINAL INSPECTION IS DONE BY THE MASON COUNTY FIRE MARSHAL. FAILURE TO OBTAIN A VAUD PERMIT PRIOR TO WORKING ON A FIRE PROTECTION SYSTEM AND/OR FAILURE TO PROVIDE THESE PLANS AND PERMIT FOR THE MASON COUNTY FIRE MARSHAL MAY RESULT IN A CITATION AND FINE. OWNER'S AFFIDAVIT I certify that I am exempt from the requirements of the Contractor's Registration Law RCW 18.27, and am aware of the Mason County ordinance requirements forwhich this perrnitis issued and that all work will be done in conformance therewith. No changes will be made without first obtaining approval from the Mason County Fire Marshal. OWNER' DATE: CONTRACTOR'S AFFIDAVIT I certify that I am a currently registered contractor in the State of Washington and I am aware of the ordinance requirements regulating the work for which the permit is issued and all work done will be in conformance therewith. No changes Wit be made without first obtaining approval from the Mason County Fire Marshal. BY. DATE: £002 A,LN1100 NOSVN 5ZV9LZT09£ XVd ££:bT 1111,E 00/OT/80 Page 1 Fox Fire Prevention P.O. BOX 594 PORT ORCHARD, WA., 98366 Date 10/22/02 Job: PETERS PROJECT INFORMATION Job DR PETERSON CLINIC OLD BELFAIR HWY BELFAIR ------------------------------------------------------------------------- Hose 250.0 gpm Outside Hose System type Wet Water Supply 100.00 psi Static, 82.00 psi Residual @ 1068.0 gpm ------------------------------------------------------------------------ CALCULATION SUMMARY Demand 74.36 psi @ 310.1 gpm @ B.O.R. 74.59 psi @ 560.1 gpm @ Supply 94.55 psi available @ 560.1 gpm Demand is below curve by 19.96 psi for Remote Area 1 ------------------------------------------------------------------------ Notes: RA#1 TENANT SPACE PGS 6-9 RA#2 ANIT-FREEZE LINE 10-13 te`,,%inn.Inc. EXTRA HEAD FLOW ADDED AT NODE 4 & 8 Qcs a`e ce elifi,.g. PROGRAM: 'HydroCalc' by Micro Space Systems I red Zlemke +y 91- 5-G481 P.O. Box 5069, Glacier, WA 98244-5069 (800) 334-6263 n. F 6 ti rill �h�O�Rh Decrmb t Water Availability Curve 100 Page 2 90 70 60 Pressure(PS 40 30 20 -------------------------------- 10 ------------------------------- 150 300 450 600 750 900 1050 1200 1350 1500 ■Static=100 psi. Flow(GPM) ❑Demand at BOR=74.36 psi with 310.1 gpm flowing. ■Residual=82 psi at aflow of 1068 gpm. ❑System demand=74.59 psi with 560.1 gpm flawing. Pressure available=94.55 psi when 560.1 gpm is flowing. Demand is below curve by 19.96 psi (21.10i). Page 3 Fox Fire Prevention Description of Fitting abbreviations Code Description ----------------------------------------------------------------- T Tee E Ninety degree elbow VT Victaulic tee VE Victaulic ninety degree elbow BKF Backflow preventor GV Gate valve UE Underground ASCA ninety degree elbow UT1 Underground ASCA tee: flow in run, flow out bullhead only Description of Other abbreviations Code Description ----------------------------------------------------------------- AO Arm-over DR Drop BL Branch Line CM Cross Main PT Total pressure PE Pressure loss due to elevation changes PF Pressure loss due to friction ^.5 Raised to the power of .5 (Square Root) A Actual pipe length F Fitting equivalent pipe length T Total pipe length PETERS , 10/22/02 12:27pm Page 4 Fox Fire Prevention DR PETERSON CLINIC OLD BELFAIR HWY BELFAIR Remote areas are selected by allowing specified nodes to flow for the designated remote area. Nodes not specified will have no flow exiting those nodes within the designated remote area. Remote area number 1 includes nodes: 1 4-11 19-21 23-26 Remote area number 2 includes nodes: 2 3 12-18 22 24-26 Remote Area Summary Minimum Sprinkler Demand @ Supply Avail Below RA Node Flow Press Flow Press Press Curve 1 5 26.0 20.22 560.1 74.59 94.55 19.96 2 16 14.8 6.25 391.9 76.51 97.18 20.67 Most demanding Remote Area is area number 1 PETERS 10/22/02 12:27pm Page 5 Fox Fire Prevention DR PETERSON CLINIC OLD BELFAIR HWY BELFAIR Raw data previous to any calculations No. Code Diam Length Kfacl Kfac2 Press Elev Hose HW Vel Fittings 1 DR1 1.104 5.0 5.6 21.56 -5.00 0.0 120 32 2 DR2 1.104 2.0 5.6 7.00 -2.00 0.0 120 32 3 AO1 1.104 2.0 5.6 7.00 -2.00 0.0 120 32 2E 4 BL1 1.104 10.0 DR1 DR1 0.00 0.00 0.0 120 32 lE 5 BL1 1.452 10.0 DR1 0.00 0.00 0.0 120 32 1T 6 BL1 1.687 12.0 DR1 0.00 0.00 0.0 120 32 1T 7 BL1 1.687 12.2 DR1 0.00 0.00 0.0 120 32 1T 8 BL2 1.104 12.0 DR1 DR1 0.00 0.00 0.0 120 32 1E 9 BL2 1.452 12.0 DR1 0.00 0.00 0.0 120 32 1T 10 BL2 1.687 12.0 DR1 0.00 0.00 0.0 120 32 1T 11 BL2 1.687 8.2 DR1 0.00 0.00 0.0 120 32 1T 12 BL20 1.104 13.2 5.6 7.00 0.00 0.0 120 32 13 BL20 1.104 9.8 5.6 7.00 0.00 0.0 120 32 14 BL20 1.452 13.2 5.6 7.00 0.00 0.0 120 32 15 BL20 1.687 14.3 5.6 7.00 -3.50 0.0 120 32 2E 16 BL20 1.687 9.0 DR2 0.00 0.00 0.0 120 32 1T 17 BL20 1.687 14.6 DR2 0.00 0.00 0.0 120 32 2E 18 BL20 1.687 24.2 AO1 0.00 0.00 0.0 120 32 1T 19 CMA 3.352 10.0 BL1 .0.00 0.00 0.0 120 32 IT 20 CMA 3.352 44.3 BL2 0.00 4.50 0.0 120 32 1T,2VE 21 CMC 3.352 28.2 CMA 0.00 0.00 0.0 120 32 1VT 22 CMJ 2.154 73.1 BL20 -11 0.00 5.30 0.0 120 32 1BKF, 6VE 23 RI 4.352 0.9 CMC 0.00 0.90 0.0 120 32 1VT 24 RI 4.352 9.8 CMJ -3 0.00 9.80 0.0 120 32 1BKF 25 UG 6.160 50.0 RI 0.00 0.00 0.0 140 32 lUE, lUT1, 1GV 26 UG 6.160 0.0 0.00 0.00 250.0 140 32 PETERS 10/22/02 12:27pm Page 6 Fox Fire Prevention DR PETERSON CLINIC OLD BELFAIR HWY BELFAIR Remote Area #1 Pipe Flow Dia Fitting Length Fr Loss Press Hyd Vel No (gpm) (inch) and Dev (ft) (psi/ft) (psi) Ref (fps) Notes Drop 1 C = 120 A 5.0 PT 21.56 1 26.0=5.60(21.56) ^.5 F 0.0 PE -2.17 (EL= -5.00 ft) 1 26.0 1.10 T 5.0 0.16488 PF 0.82 8.71 PT 20.22 4 B1 Jct K-factor for drop 1 = 26.0/ (20.22) ^.5 = 5.78 at Hyd Ref Pts 4 5 6 7 8 9 10 11 PETERS 10/22/02 12:27pm Page 7 Fox Fire Prevention DR PETERSON CLINIC OLD BELFAIR HWY BELFAIR Remote Area #1 Pipe Flow Dia Fitting Length Fr Loss Press Hyd Vel No (gpm) (inch) and Dev (ft) (psi/ft) (psi) Ref (fps) Notes Branchline No. 1 C = 120 K=11.56=5.78+5.78 A 10.0 PT 20.22 4 DR1 + DR1 52.0=11.56(20.22) ^.5 F 2.6 PE 0.00 4 52.0 1.10 lE T 12.6 0.59427 PF 7.47 17.43 A 10.0 PT 27.69 5 DR1 30.4=5.78 (27.69) ^.5 F 7.7 PE 0.00 5 82.4 1.45 1T T 17.7 0.36693 PF 6.49 15.97 A 12.0 PT 34.18 6 -DR1 33.8=5.78 (34.18) ^.5 F 10.0 PE 0.00 6 116.2 1.69 1T T 22.0 0.33376 PF 7.36 16. 68 A 12.2 PT 41.54 7 DR1 37.3=5.78 (41.54) ^ .5 F 10.0 PE 0.00 7 153.5 1.69 1T T 22.2 0.55830 PF 12.42 22.03 PT 53.95 19 Cross ❑in Jct K-factor for branchline no. 1 = 153.5/ (53.95) ^.5 = 20.90 Branchline No. 2 C = 120 ______= K=11.56=5.78+5.78 A 12.0 PT 20.22 8 DR1 + DR1 52.0=11.56(20.22) A.5 F 2.6 PE 0.00 8 52.0 1.10 lE T 14.6 0.59427 PF 8.66 17.43 A 12.0 PT 28.88 9 DR1 31.1=5.78 (28.88) ^.5 F 7.7 PE 0.00 9 83.1 1.45 1T T 19.7 0.37227 PF 7.33 16.10 A 12.0 PT 36.21 10 DR1 34.8=5.78 (36.21) ^.5 F 10.0 PE 0.00 10 117.9 1.69 1T T 22.0 0.34249 PF 7.55 16.92 A 8.2 PT 43.76 11 DR1 38.3=5.78 (43.76) A.5 F 10.0 PE 0.00 11 156.1 1.69 1T T 18.2 0.57604 PF 10.51 22.41 PT 54.26 20 Cross main Jct K-factor for branchline no. 2 = 156.1/ (54.26) A.5 = 21.19 PETERS 10/22/02 12:27pm Page 8 Fox Fire Prevention DR PETERSON CLINIC OLD BELFAIR HWY BELFAIR Remote Area #1 Pipe Flow Dia Fitting Length Fr Loss Press Hyd Vel No (gpm) (inch) and Dev (ft) (psi/ft) (psi) Ref (fps) Notes Cross main A C = 120 A 10.0 PT 53.95 19 BL1 153.5=20.90 (53.95)^.5 F 23.1 PE 0.00 19 153.5 3.35 1T T 33.1 0.01971 PF 0.65 5.58 A 44.3 PT 54.61 20 BL2 156.6=21.19 (54.61) ^.5 F 38.5 PE 1.95 (EL= 4.50 ft) 20 310.1 3.35 1T 2VE T 82.8 0.07239 PF 5.99 11.27 PT 62.55 21 Cross main Jct K-factor for Cross main A = 310.1/ (62.55) ^.5 = 39.21 Cross main C C = 120 A 28.2 PT 62.55 21 CM A 310.1=39.21 (62.55) A.5 F 20.0 PE 0.00 21 310.1 3.35 1VT T 48.2 0.07239 PF 3.49 11.27 PT 66.04 23 Top of Riser K-factor for Cross main C = 310.1/ (66.04) ^.5 = 38.16 PETERS 10/22/02 12:27pm Page 9 Fox Fire Prevention DR PETERSON CLINIC OLD BELFAIR HWY BELFAIR Remote Area #1 Pipe Flow Dia Fitting Length Fr Loss Press Hyd Vel No (gpm) (inch) and Dev (ft) (psi/ft) (psi) Ref (fps) Notes Riser C = 120 A 0.9 PT 66.04 23 CM C F 23.4 PE 0.39 (EL= 0.90 ft) 23 310.1 4.35 1VT T 24.3 0.02030 PF 0.49 6. 69 A 9.8 PT 66.92 24 CM J F 0.0 PE 4.24 (EL= 9.80 ft) 24 310.1 4.35 1BKF T 9.8 0.02030 PF 3.20 6.69 lBKF = 3.00# PT 74.36 25 B.O.R. Under ground C = 140 A 50.0 PT 74.36 25 B.O.R. F 31.3 PE 0.00 25 310.1 6.16 1UE 1UT1 T 81.3 0.00281 PF 0.23 3.34 1GV A 0.0 PT 74.59 26 250.0 gpm = Hose F 0.0 PE 0.00 26 560.1 6.16 T 0.0 0.00000 PF 0.00 6.03 PT 74.59 27 Supply Jct Available flow at 74.59 psi is 1286.8 gpm which is 726.7 gpm from curve. Supply pressure available with 560.1 gpm flowing is 94.55 psi, thus system requirement is 19.96 psi below supply curve. (21.1%) PETERS 10/22/02 12:34pm Page 10 Fox Fire Prevention DR PETERSON CLINIC OLD BELFAIR HWY BELFAIR Remote Area #2 Pipe Flow Dia Fitting Length Fr Loss Press Hyd Vel No (gpm) (inch) and Dev (ft) (psi/ft) (psi) Ref (fps) Notes Drop 2 C = 120 A 2.0 PT 7.00 2 14.8=5.60 (7.00)^.5 F 0.0 PE -0.87 (EL= -2.00 ft) 2 14.8 1.10 T 2.0 0.05824 PF 0.12 4.97 PT 6.25 16 Bl Jct K-factor for drop 2 = 14.8/ (6.25) ^.5 = 5.92 at Hyd Ref Pts 16 17 Arm-over 1 C = 120 A 2.0 PT 7.00 3 14.8=5.60 (7.00) ^.5 F 5.1 PE -0.87 (EL= -2.00 ft) 3 14.8 1.10 2E T 7.1 0.05824 PF 0.42 4.97 PT 6.55 18 B1 Jct K-factor for arm-over 1 = 14.8/ (6.55) A.5 = 5.78 PETERS 10/22/.02 12:34pm Page 11 Fox Fire Prevention DR PETERSON CLINIC OLD BELFAIR HWY BELFAIR Remote Area 42 Pipe Flow Dia Fitting Length Fr Loss Press Hyd Vel No (gpm) (inch) and Dev (ft) (psi/ft) (psi) Ref (fps) Notes Branchline No. 20 C = 120 A 13.2 PT 7.00 12 End head 14.8=5.60 (7.00) ^.5 F 0.0 PE 0.00 12 14.8 1.10 T 13.2 0.05824 PF 0.77 4.97 A 9.8 PT 7.77 13 15.6=5.60(7.77) ^.5 F 0.0 PE 0.00 13 30.4 1.10 T 9.8 0.22048 PF 2.16 10.20 A 13.2 PT 9.93 14 17.7=5.60 (9.93) ^.5 F 0.0 PE 0.00 14 48.1 1.45 T 13.2 0.13532 PF 1.79 9.31 A 14.3 PT 11.72 15 19.2=5.60 (11.72) ^.5 F 10.0 PE -1.52 (EL= -3.50 ft) 15 67.2 1.69 2E T 24.3 0.12126 PF 2.95 9.65 A 9.0 PT 13.15 16 DR2 21.5=5.92 (13.15) ^.5 F 10.0 PE 0.00 16 88.7 1.69 1T T 19.0 0.20245 PF 3.85 12.73 A 14. 6 PT 17.01 17 DR2 24.4=5.92 (17.01) ^.5 F 10.0 PE 0.00 17 113.1 1.69 2E T 24.6 0.31743 PF 7.82 16.24 A 24.2 PT 24.83 18 AO1 28.8=5.78 (24.83) A.5 F 10.0 PE 0.00 18 141.9 1.69 1T T 34.2 0.48303 PF 16.54 20.37 PT 41.37 22 Cross main Jct K-factor for branchline no. 20 = 141.9/ (41.37) ^.5 = 22.06 PETERS 10/22/02 12:34pm Page 12 Fox Fire Prevention DR PETERSON CLINIC OLD BELFAIR HWY BELFAIR Remote Area #2 Pipe Flow Dia Fitting Length Fr Loss Press Hyd Vel No (gpm) (inch) and Dev (ft) (psi/ft) (psi) Ref (fps) Notes Cross main J C = 120 A 73.1 PT 41.37 22 BL20 141.9=22.06(41.37) ^.5 F 25.7 PE 2.29 (EL= 5.30 ft) 22 141.9 2.15 1BKF 6VE T 98.8 0.14686 PF 25.51 12.49 1BKF = 11.00# PT 69.17 24 Top of Riser K-factor for Cross main J = 141.9/ (69.17) ^.5 = 17.06 f PETERS 10/22/02 12:34pm Page 13 ^ Fox Fire Prevention DR PETERSON CLINIC OLD BELFAIR HWY BELFAIR Remote Area #2 Pipe Flow Dia Fitting Length Fr Loss Press Hyd Vel No (gpm) (inch) and Dev (ft) (psi/ft) (psi) Ref (fps) Notes Riser C = 120 A 9.8 PT 69.17 24 CM C F 0.0 PE 4.24 (EL= 9.80 ft) 24 141.9 4.35 1BKF T 9.8 0.00478 PF 3.05 3.06 1BKF = 3.00# PT 76.46 25 B.O.R. Under ground C = 140 A 50.0 PT 76.46 25 B.O.R. F 31.3 PE 0.00 25 141.9 6.16 lUE 1UTI T 81.3 0.00066 PF 0.05 1.53 1GV A 0.0 PT 76.51 26 250.0 gpm = Hose F 0.0 PE 0.00 26 391.9 6.16 T 0.0 0.00000 PF 0.00 4.22 PT 76.51 27 Supply Jct Available flow at 76.51 psi is 1233.3 gpm which is 841.4 gpm from curve. Supply pressure available with 391.9 gpm flowing is 97.18 psi, thus system requirement is 20.67 psi below supply curve. (21.30) yr