Loading...
HomeMy WebLinkAboutCOM2024-00019 Mechanical - COM Inspections - 9/30/2024 c � 615 W.Alder St.Bldg 8,SHELTON,WA 98584 MASON COUNTY COMMUNITY SERVICES SHELTON:360-427-9670,EXT 352 4 BELFAIR:360-275.4467,EXT 352 Building Planning,Environmental Health.Community Health ELMA:360-482-5269,EXT 352 www.co.mason.wa.us INSPECTION CARD AND CERTIFICATE OF OCCUPANCY** To schedule an inspection call or visit http://www.co.mason.wa.us/community-services/bid-inspection.php Permit Number COM2024-00019 Date Issued 04/10/2024 Issued By Project REPLACEMENT OF HVAC SYSTEM IN BUILDING"A"AND BUILDING"B" Site Address 633 W DAYTON AIRPORT RD Applicant STATE OF WASHINGTON Contractor Contractor Phone Primary Code UPI8 IBC,IRC,IFC,IEC,IMC,& Type Permit Type MECH/PLUMB-COMMERCIAL Occupancy -APPROVED PLANS MUST BE ONSITE FOR ALL INSPECTIONS. -DO NOT PROCEED BEYOND EACH STAGE OR COVER WORK UNTIL APPROVAL IS GRANTED. -THIS CARD MUST BE POSTED IN A CONSPICUOUS LOCATION,FRONT OF THE PREMISES IS BEST FOR MAKING ENTRY. -ALL PERMITS EXPIRE 180 DAYS AFTER THE PERMIT IS ISSUED OR 180 DAYS AFTER DATE OF LAST INSPECTION. -OWNER/AGENT IS RESPONSIBLE FOR REQUESTING ALL INSPECTIONS THROUGH FINAL INSPECTION. **THIS STRUCTURE MAY NOT BE USED OR OCCUPIED UNTIL ALL APPROVALS ARE GRANTED.— PRIOR TO CALLING FOR FINAL INSPECTION,ALL CONDITIONS OF THE PERMIT MUST BE MET Public Works Access/Driveway Other Health Septic Well Deptartment Planning Site Inspection Department Fire Marshall Fire Apparatus Access Fire Sprinkler Auto Fire Alarm Hood and Duct Other Final Building Building Official: Community Services Designee Department Concrete Setbacks Slab Footing Perimeter Point load Footing Footing Interior Footing Decks/Porches Foundation Stem Walls Other Rough-in Groundwork Plumbing Framing Groundwork Mechanical Plumbing Groundwork Gas Pipe Mechanical 7'-J0.Zq DEC, jZeceJt1CeJ %GS Gas Piping Shear Wall Nailing Underfloor Other ? .41Z r& Ce1 7 •1d,z4 E6L 2�5 Insulation Slab Ceiling Floor Vaulted Ceiling Walls Vapor Barrier Other Wallboard Interior Wall Brace Panels Fire Walls Nailing Other Final Building Manufactured Setbacks Setup Home Concrete Foot/Runners Final / Other �fp /� 174cT/ kIGC(/� P,+' K�1!s5`7 G�i*m 'g�E� ,S r INSPECTION RESULTS Page Department of Community Development COMM NMYSECOUNT 615 W Alder St,Shelton,WA 98584 COMMUNYI'YSE­RVICES Application# COM2024-00019 Appplication MECH/PLUMB-COMMERCIAL Application# COM2024-00019 Ty Parcel# 420023260010 Site Address 633 W DAYTON AIRPORT RD SHE,WA 98584 Inspector —Inspection Type ate lfitui-- ..,�-Oomments. � "Total Action Points 8-13-24 DEC INSTALL CLAM SHELL BRACKETS ON ALL SUPPORTS Drew Carlson ROUGH-HVAC INSPECTION FAIL FOR LINE SETS MAKE CORRECTION AND CALL FOR REINSPECTION PRIOR TO COVERING GENERAL OBSERVATIONS AWAITING INSPECTION Description I Status StatusDate f 1 Mason County ce Mason County - Division of Community Development 615 W.Alder St. Building 8 Shelton, WA 98584 360-427-9670 ext 352 www.masoncountywa.gov FBUILDING 4-00019 MECH/PLUMB - COMMERCIAL ESCRIPTION: REPLACEMENT OF HVAC SYSTEM IN ISSUED: 04/10/2024 A"AND BUILDING "B" ESS: 633 W DAYTON AIRPORT RD SHE EXPIRES: 10/07/2024 PARCEL: 420023260010 APPLICANT: STATE OF WASHINGTON OWNER: STATE OF WASHINGTON WASH ST PATROL ACADEMY WASH ST PATROL ACADEMY SHELTON,WA 98584 SHELTON, WA 98584 1.360.704.5429 ARCHITECT: KMB ARCHITECTS 906 COLUMBIA STREET SW SUITE 400 OLYMPIA,WA 98501 1.360.292.1201 FEES: Paid Due Mechanical Base Fee $30.00 $0.00 Mechanical Fees $164.00 $0.00 Final Inspection $80.00 $0.00 Plumbing Base Fee $25.00 $0.00 Technology Flat Convenience $5.00 $0.00 Fee State Fee-Commercial $25.00 $0.00 Technology Surcharge $7.58 $0.00 Final Inspection $80.00 $0.00 Totals : $416.58 $0.00 FIXTURES City Mechanical Fixtures 2.0000 For each appliance or piece of equipment regulated by the Mechanical Code but not classed in other Appliance categories, or for which no other fee is listed in the table 2.0000 Heat Pump(s) Printed by:Genie Mcfarland on:04/10/2024 11:15 AM Page 1 of 3 Mason County Mason County - Division of Community Development 615 W.Alder St. Building 8 Shelton, WA 98584 360-427-9670 ext 352 www.masoncountywa.gov MECH/PLUMB - COMMERCIAL COM2024-00019 Qty Mechanical Fixtures 7.0000 Other REQUIRED INSPECTIONS Rough -HVAC Inspection Mechanical/Plumbing Final Inspection CONDITIONS * All construction must meet or exceed all local and state ordinances in addition to the International Codes requirements as adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in permit revocation. * All building permits shall have a final inspection performed and approved by Mason County Building Department prior to permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with Mason County ordinances and building regulations. * All furnace installations shall meet the minimum efficiencies set forth in the current edition of the Washington state energy code(WSEC). any portion of the mechanical system that is altered or replaced shall meet the minimum standards set forth in the WSEC and international mechanical code. * The demolition and disposal of debris must meet the regulations of Mason County and Olympic Region Clean Air Agency (ORCAA). It is unlawful for any person to cause or allow the demolition (or major renovation)of any structure unless all asbestos containing materials have been identified and removed from the area to be demolished. Work shall not commence on an asbestos project or demolition project unless the owner or operator has obtained written approval from ORCCA.2490 B Limited Lane NW, Olympia WA 98502, 360.586.1044/800.422.5623 www.orcaa.org * OWNER/BUILDER acknowledges submission of inaccurate information may result in a stop work order or permit revocation. Acknowledgement of such is by signature below. I declare that I am the owner, owners legal representative, or contractor. I further declare that I am entitled to receive this permit and to do the work as proposed. I have obtained permission from all the necessary parties, including any easement holder or parties of interest regarding this project. The owner or authorized agent represents that the information provided is accurate and grants employees of Mason County access to the above described property and structure(s)for review and inspection. This permit/application becomes null & void if work or authorized construction is not commenced within 180 days or if construction work is suspended for a period of 180 days. PROOF OF CONTINUATION OF WORK IS BY MEANS OF INSPECTION. INACTIVITY OF THIS PERMIT APPLICATION OF 180 DAYS WILL INVALIDATE THE APPLICATION UNLESS OTHERWISE APPROVED. * Owner/Agent is responsible to post the assigned address and/or purchase and post private road signs in accordance with Mason County Code 14.28 and 14.17. * Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1-800-647-0982. The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. Printed by:Genie Mcfarland on:04/10/2024 11:15 AM Page 2 of 3 Mason County Mason County - Division of Community Development 615 W.Alder St. Building 8 Shelton, WA 98584 360-427-9670 ext 352 www.masoncountywa.gov MECH/PLUMB - COMMERCIAL COM2024-00019 CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE ADOPTED BUILDING CODE. The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance with the international codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Building Inspector shall be made prior to requesting additional inspections. " All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may grant one or more extension of 180 days, upon the receipt of a written extension request prior to permit expiration. Letter must indicate that circumstances beyond the control of the permit holder prevented action from being taken. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of Laws and Ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any other state/local law regulating construction or the performance of construction. Issued By: Contractor or Authorized Agent: Date: Printed by:Genie Mcfarland on:04/10/2024 11:15 AM Page 3 of 3 MASON COUNTY Permit No: COMMUNITY DEVELOPMENT Permit Assistance Center,Building,Planning BUILDING PERMIT APPLICATION PROPERTY OWNER INFORMATION: CONTRACTOR INFORMATION: NAME:w..rsrorm sure Paw NAME:Not yet d,o..n. MAILING ADDRESS:105 t,mA-.sw MAILING ADDRESS: CITY:C- STATE:wA ZIP:Mso, CITY: STATE: ZIP: PHONE#1:L--ft- by.3567045429 PHONE: CELL: PHONE#2: EMAIL: EMAIL:r".P.nrrsr.b®wsP.wA.am L&I REG# EXP. PRIMARY CONTACT: OWNER❑ CONTRACTOR❑ OTHER +❑ NAME s.n.nw..we«eu.m ro wp,nr EMAIL,v.nd ew,e,mb rwi.cr,m. MAILING ADDRESS 9041c�.srsw.so4.400 CITY amp. STATE wA ZIP"Sol PHONE XO]N" CELL PARCEL INFORMATION: PARCEL NUMBER(12 Digit Number) 4=1326e010 ZONING tnwv,,,h—s LEGAL DESCRIPTION(Abbreviated) TR r or Nia sw FIRE DISTRICT 5 SITE ADDRESS 631 w-D.y,.b Mpw road CITY sn.'ka DIRECTIONS TO SITE ADDRESS wA-toroom,i.n-wA-102—,uwe.iDeyw.ahonRd. IS THE PROJECT WITHIN 300 FT OF SLOPE(S)GREATER THAN 14%: YES[] NO❑/ SNOW LOAD:_psf IS PROPERTY WITHIN 200 FT OF THE FOLLOWING: (C1,eckatm.1.pp1)): SALTWATER❑ LAKE❑ RIVER/CREEK❑ POND❑ WETLAND❑ SEASONAL RUNOFF❑ STREAM❑ TYPE OF WORK: NEW❑ ADDITION❑ ALTERATION +❑ REPAIR❑ OTHER ❑� NVAc-Wmrw USE OF STRUCTURE(Residence,Gamge,Commercial Bldg,Etc.)°Aki IS USE: PRIMARY❑ SEASONAL❑ NUMBER OF BEDROOMS NUMBER OF BATHROOMS HEATED STRUCTURE? YES orlwle Bldg)❑ YES(Pan/.y)ajBidg)❑ NO❑ DESCRIBE WORK RIP""—'w NVAC system In bLi ft•A•.rW bai ft•6' SQUARE FOOTAGE:(propased) I ST FLOOR sq.ft. 2ND FLOOR sq.ft. 3RD FLOOR sq.ft. BASEMENT sq.fl. DECK sq.ft. COVERED DECK sq.ft. STORAGE sq.ft. OTHER sq.ft. GARAGE sq.ft. Attached❑ Detached❑ CARPORT sq.ft. Attached❑ Detached❑ MANUFACTURED HOME INFORMATION: *4 COPIES OF THE FLOOR PLAN REQUIRED* MAKE WA MODEL YEAR LENGTH WIDTH BEDROOMS BATHS SERIAL NUMBER ENVIRONMENTAL HEALTH: SEWAGE/SEWER SOURCE: SEPTIC❑ SEWER / NEW❑ EXISTING r❑ PLUMBING IN STRUCTURE? YES❑ NO❑ /Jyes,allach completed Water Adequacy Forin PERIMETERIFOUNDATION DRAINS PROPOSED? YES❑ NO[] EXISTING SQ.FT. EXISTING BEDROOMS wA PROPOSED BEDROOMS NA TOTAL BEDROOMS OWNER acknowledges that submission of Ineccurale information may result In a stop work order or permit revocation.Acknowledgement of such Is by signature below.)declare that I am the owner and I further declare[hat I am enllUed to receive this permit and to do the work as proposed.I have obtained permission from all the necessary parties,including any easement holler or parties of Interest regarding this project. The owner or legal representative,represents that the Information provided Is accurate and grants employees of Mason County access to the above described property and structure(s)for review and inspection. This perml0application becomes null&void U work or authorized construction is not commenced within 180 days or U construction work is suspended for a period of 180 days. PROOF OF CONTINUATION OF WORK ON THIS PERMIT IS BY MEANS OF INSPECTION. INACTIVITY OF THIS PERMIT APPLI AT10N 70,P10 DAYS OF MORE WILL CAUSE THE APPLICATION TO BE EXPIRED.(MASON COUNTY CODE 14.08.42) SPtfiture of OWN R(Must lie lamed by the OWNER) D9t DEPA TMENTALREVIEW APPROVED DATE DENIED DATE TAGS/NOTES/CONDITIONS BUILDING DEPARTMENT PLANNING DEPARTMENT FIRE MARSHAL R PUBLIC HEALTH MASON COUNTY COMMUNITY SERVICES PerrnitNo&YYIZOZ -ow C� PERMIT ASSISTANCE CENTER: •BUILDING •PLANNING •FIRE MARSHAL 615 W.Alder St-Shelton, WA 98584 www.co.mason.wa.us Phone Shelton:(360)427-9670 ext.352• Fax:(360)427-7798 Phone Belfair.'(360)275-4467• Phone Elma:(360)482-5269 PLUMBING & MECHANICAL PERMIT APPLICATION OWNER INFORMATION: CONTRACTOR INFORMATION: NAME:Wechhgt.n smis Peva NAME:Not yet chosen. MAILING ADDRESS:iosi+mA—sw MAILING ADDRESS: CITY:aYmPi- STATE:WA ZIP:98501 CITY: STATE: ZIP: l"PHONE:Lee Pennington 360.704.5429 PHONE: CELL: 2°d PHONE: EMAIL : EMAIL:Las.P.mmnown(MwsP.w.cov L&I REG# EXP. PARCEL INFORMATION: PARCEL NUMBER(12 Digit Number):4200232-10 Zoning:uranvowths— LEGAL DESCRIPTION (Abbreviated):TR 1 OF N1125W SITE ADDRESS:631 W.Dayton AJmort Road CITY:sh.noo DIRECTIONS TO SITE ADDRESS: WA-101 north, left on WA-102 west/West Dayton Airport Rd. TYPE OF JOB: NEW=ADD=ALT=REPAIR=OTHER=USE OF BUILDING LOCATION OF FIXTURES/UNITS— 1sT FLOOR=2NDFLOOR=BASEMENT=GARAGE=OTHER= PLUMBING FIXTURES(SHOW NUMBER OF EACH) MECHANICAL UNITS Type of Fixture No.of Fixtures Fees Fuel Type:Electric=LPG=Natural Gas=Ductless=✓ Toilets Type of Unit No,of Units Fees Bathroom Sink Furnace Bath Tubs Heat Pump 2 Showers Spot Vent Fan Water Heater Propane Tank Clothes Washer Gas Outlets Kitchen Sinks Wood/Gas/Pellet Stove Dishwasher. Kitchen Exhaust Hood Hose bibs Dryer Vent Other Solar Panel Other 9 Base Fee Base Fee TOTAL PLUMBING TOTAL MECHANICAL OWNER acknowledge submission of inaccurate information may result in a stop work order or permit revocation.Acknowledgement of such is by signature below. I declare that I am the owner,owners legal representative,or contractor.I further declare that I am entitled to receive this permit and to do the work as proposed.I have obtained permission from all the necessary parties,including any easement holder or parties of interest regarding this project.The owner or authorized agent represents that the information provided is accurate and grants employees of Mason County access to the above described property and structure(s)for review and inspection.This permit/application becomes null&void if work or authorized construction is not comma cad within 180 days or if construction work is suspended for a period of 180 days. PROOF OF CONTINUATION,©FTHIS PEOMIT IS BY EANS OF INSPECTION.INACTIVITY OF THIS PERMIT APPLICATION OF 180 DAYS WILL INVALIDAT CIE,AAPL1CATION. 'Algnature of Owner Date DEPARTMENTAL REVIEW APPROVED DATE DENIED DATE TAGS/NOTES/CONDITIONS BUILDING DEPARTMENT PLANNING DEPARTMENT FIRE MARSHAL Rev:1/27/2016 JBN f ft HEAVY DUTY MAIN RUNNER PERIMETER 4'-0" X CLOSURE ANGLE Q >- MAX. CROSS RUNNER � 0 I � I 0 VAX 10 I � I I � I N O X 12'-0" M X. I I 8„ i MAX. LEGEND: TYP. X 12 GAUGE VERTICAL HANGER WIRE ® LATERAL BRACING (COMPRESSION STRUT AND BRACING WIRES) ATTACHMENT OF RUNNERS TO NOTES: CLOSURE ANGLE 1. EXCEPT WHERE RIGID BRACES ARE USED TO LIMIT LATERAL DEFLECTION, SPRINKLER HEADS AND OTHER PENETRATIONS SHALL HAVE A 2" OVERSIZE RING, SLEEVE, OR ADAPTER THROUGH THE CEILING TILE TO ALLOW FOR FREE MOVEMENT OF AT LEAST 1" IN ALL HORIZONTAL DIRECTIONS. ALTERNATIVELY, A SWING JOINT THAT CAN ACCOMMODATE 1" OF CEILING MOVEMENT IN ALL HORIZONTAL DIRECTIONS IS PERMITTED TO BE PROVIDED AT THE TOP OF THE SPRINKLER HEAD EXTENSION. 2. SEE DET. C/3 FOR DETAILS AT CEILING PERIMETER. 3. CEILING WITH AN AREA GREATER THAN 2500 SO. FT. SHALL BE PROVIDED WITH SEISMIC SEPARATION JOINTS. 4. SEE DET. D/3 FOR ATTACHMENT DETAIL OF LIGHT FIXTURE 20 LBS OR LESS. 5. THE INFORMATION PROVIDED IN THIS DESIGN GUIDE CARRIES NO IMPLIED OR INFERRED GUARANTEE AGAINST FAILURE OR DEFECTS. BY USING THIS DESIGN GUIDE, THE CONTRACTOR/OWNER ACCEPTS THE FULL RESPONSIBILITY OF RISK. ALTERNATE DESIGN MAY BE USED WHEN PROVIDED WITH WET STAMPED AND SIGNED STRUCTURAL CALCULATIONS & DETAILS BY A CALIFORNIA LICENSED ENGINEER OR ARCHITECT. VER DATE BY 11 FEB 2023 HLK City of Milpitas SHEET 2 Building Safety Department 1 3 SUSPENDED CEILING OF 3 SHEETS 4 SAMPLE REFLECTED CEILING PLAN COMPRESSION STRUT @ 12'-0"o.c. MAX. EA. WAY. SEE COMPRESSION STRUT SCHEDULE. 12 GA VERTICAL HANGER WIRES @ 4'—O"o.c. MAX. EA. WAY WITH MIN. 3 TIGHT FULL TURNS IN 3" AT BOTH ENDS OF WIRE (MAX. 1: 6 PLUMB). SEE DET. A/3 VERTICAL AND BRACING WIRES ATTACHED TO STRUCTURE ABOVE. SEE DET. A/3 & B/3. �f- 12 GA BRACING WIRES SPLAYED 90' APART AT 45° ANGLES @ EA. COMPRESSION STRUT WITH 4 TIGHT FULL TURNS IN 3" AT BOTH SPLAY WIRES AND ENDS OF WIRE. SEE DET. B/3. COMPRESSION 12 S.M.S. @ 12"o.c. STRUT SHALL BE # WITHIN 2" FROM HEAVY DUTY INTERSECTION OF MAIN RUNNER RUNNERS CROSS RUNNER DETAIL A COMPRESSION STRUT SCHEDULE ALLOWABLE MAX. USG DONN EMT STRUT LENGTH COMPRESSION STRUT COMPRESSION STRUT METAL STUDS 2'-6" VSA 18/30 Y2"0 250SI25-33 4'-0" VSA 30/48 Y2"0 250S125-33 5'-0" VSA 48/84 3/4"� 250S125-33 6'-6" VSA 48/84 1"o 250S125-33 7'-0" VSA 4B/84 1Y4"0 250S125-33 8'-6" VSA 84/102 1Y4"0 3625162-33 10'-0" VSA 102/120 1Y2"O 3625162-33 12'-0" VSA 120/144 2"0 3625200-33 16'-0" — — (2)-3625162-33 (DET. A) 20'-0" — — (2)-400S200-33 (DET. A) VER DATE BY 11 FEB 023 HLK City of Milpitas SHEET 2 Building Safety Department 2 3 SUSPENDED CEILING OF 3 SHEETS 4 SAMPLE CEILING GRID PERSPECTIVE VIEW • 6" MAX. 8" MAX. L 8" MAX. SUPPLEMENTAL 12 GA HANGER WIRE AT EA. CORNER OF FIXTURE LIGHT FIXTURE 20 LBS OR 3/4" LESS THAN GAP rMIN. RUNNER FREE TO MOVE ATTACH LIGHT FIXTURE ATTACH RUNNER 2TO CEILING GRID TO CLOSURE ANGLEAT ONE ENDACOUSTICAL 2" MIN. PERIMETER CLOSURE ANGLE CEILING PANEL #12 SCREWS ® EA. STUD D WOOD OR METAL STUD WALL C CEILING PERIMETER DETAIL �� LIGHT FIXTURE ATTACHMENT DETAIL SCALEI-1/2'-I'-O' v SCALE:1-1/2'-1'-0' NOTE: ROOF MEMBERS SHALL BE MIN. 2x6 FOR ATTACHMENT OF ANY WIRE OR COMPRESSION STRUT z Y4"O EYE SCREW �0 : Y4"0 EYE SCREW 12 GA. BRACING WIRE HANGER WIRE MIN. 3 TIGHT FULL TURNS IN 3" AT EA. WIRE END s, RUNNER ACOUSTICAL MIN. 4 TIGHT FULL CEILING PANEL TURNS IN 3" AT EA. WIRE END HANGER WIRE TIE DETAIL �B BRACING WIRE TIE DETAIL SCALE:1-1/2•-1'-0' SCALE:1-1/4'-1'-0' TE BY V1R FEBA 023 HLK City of Milpitas SHEET 2 Building Safety Department 3 3 SUSPENDED CEILING OF 3 SHEETS 4 SAMPLE DETAILS NEUDORFER ENGINEERS AN Integra COMPANY CERTIFIED TEST ADJUST AND BALANCE REPORT Project Completion Date: 09-20-24 Report Revision Date: Revision #: WSP - Shelton Academy HVAC System Improvement 631 W DaytonAirport Rd p plq- �06 EZy . .: : 0 1 www.integratesting.com NEUDORFER gra ENGINEERS inte . .'.. AN Integra COMPANY TITLE PAGE Project Name: WSP - Shelton Academy HVAC System Improvement Project Address: 631 W DaytonAirport Rd Shelton, WA 98584 Project Number: 2024-0647 Customer Project Number: N/A Engineer of Record: VEACH Consulting Engineers, LLC HVAC Contractor: N/A Architect: KMB Certified Professional: Certification #: 3856 Project 2024-0647 Page 2 of 29 NNEUDORFE)" ENGINEERS tegra -41'i A I N-1 ri�I t*gM C--NY TABLE OF CONTENTS PROJECT: WSP-Shelton Academy HVAC System Improvement Cover 1 Integra Title Page 2 Table of Contents 3 Executive Summary-1 4-5 ERV-1(SF)Test Data 6 ERV-1(SF)GRID 7 ERV-1(EF)Test Data 8 ERV-1(EF)GRID 9 ERV-2(SF)Test Data 10 ERV-2(SF)GRID 11 EVR-2(EF)Test Data 12 ERV-2(EF)GRID 13 TAB wsp shelton academy hvac pl 14-24 Certification Page-6 25 NEI Warranty-2 26 Integra Perf Guaranty-3 27 Alnor ADM 28 Terms and Abbrevs-4 ?9 Page 3 of 29 NEUDORFER r`W ENGINEERS AN Cin:tegr COMPANY Project: WSP - Shelton Academy HVAC System Improvements Location: Shelton, WA Test and Balance Executive Summary This project has been balanced per plans and specifications using the National Environmental Balancing Bureau (NEBB) standards and procedures and in accordance with the approved Test and Balance Strategy. The executive summary recap all systems that did not achieve specified balancing tolerances or were found to have performance or installation deficiencies. All air systems have been inspected and measured for fan operating data, operating amperage, voltage, rotation, RPM, belt tension, alignment, and operating static pressure. Unless specified otherwise, all grilles, Registers, and Diffusers (GRDs) have been proportioned to +/-10 % of the system's design airflow. Scope of Work The scope of work for this project includes the Air Balance of (2) DOAS and their associated GRDs Air Systems Summary DOAS Units ERV-1. This unit has two fans, one supply fan and one exhaust fan, which move air across a heat exchanger for energy savings. Based on the drawing schedule, the supply fan was designed to operate at 1225 CFM. The summation of the supply air outlets was 1,285 CFM. The actual measure airflow was 1,735 CFM 134%, approved by the design team because of leaking existing volume dampers. Page 4 of 29 `;, NEUDORFER ENGINEERS tegra [,:ntegra co..ravr Based on the drawing schedule, the exhaust fan was designed to operate at 1170 CFM. The summation of the exhaust air inlets was 1,290 CFM. The actual measure airflow was 1330 CFM 103%. ERV-2. This unit has two fans, one supply fan and one exhaust fan, which move air across a heat exchanger for energy savings. Based on the drawing schedule, the supply fan was designed to operate at 1225 CFM. The summation of the supply air outlets was 1830 CFM. The actual measure airflow was 1,672 CFM, 91%. The motor is currently operating at nameplate full load amps. Based on the drawing schedule, the exhaust fan was designed to operate at 1,600 CFM. The summation of the exhaust air inlets was 1,600 CFM. The actual measure airflow was 1,400 CFM, 88%. The motor is currently operating at nameplate full load amps. Page 5 of 29 NEUDORFER g , N ENC3/NEERS • Supply Fan Test Data Project No. 2024-0647 Project I.D. WSP-Shelton Academy HVAC System Improvement Test Date 9/20/2024 Tested By MRR Area Served Bldg."A" Equipment I.D. ERV-1 Unit Information Manufacturer RenewAire Model Number HE-2XJTRV-DVF3-WL Serial Number G24103500C Unit Location Roof Fan Quantity/Rotation 1 / Clockwise Drive Type Belt Drive Unit Filter Information Filter I.D. Type Rating Filter Size/Qty Filter Size/Qty Filter Size/Qty HX Supply Pleated MERV 10 20 x 20 x 2 / 2 N/A / - N/A / Fan Test Data Total Design Airflow 1,285 CFM Total Actual Airflow 1,735 CFM Design TSP -- in.wc Actual TSP 1.56 in.wc Design ESP 0.50 in.wc Actual ESP 0.67 in.wc Actual Volts(From VFD) 249.0 Actual Amps(From VFD) 3.7 Design Fan RPM 1328 Actual Fan RPM 1338 Design Motor RPM 1770 Actual Motor RPM 1762 Design VFD Speed -- Hz Actual VFD Speed 60.0 Hz Unit Pressure Data LExternal Static In/Out -0.220 in.wc / 0.450 in.wc I External Static A P 0.670 in.wc Motor Information Manufacturer Baldor Motor Frame/Serv. Factor 145T 1 1.15 HP/RPM 1.5 / 1770 Motor Phase/Hz 3 / 60 Motor Rated Volts/FLA 230/460 / 4.6/2.3 Motor Eff./PF 86.5% / 72.0% Sheave Information Motor Sheave Manuf./Model# Browning / 1 VL40 Fan Sheave Manuf./Model# Browning / AK46 Motor Sheave OD/Bore Dia. / 7/8 Fan Sheave OD/Bore Dia. / 1 Motor Sheave Type/Pos. Adjustable / Mid Number of Belts/Model# 1 / A35 Bushing Model#Motor/Fan / Centerline/Extend/Retract 12.5" / 3/4" / 3/4" Fan Test Notes Note (1) All actual amperage,motor RPM,and voltage readings derived from the VFD. Note 2 The Fan airflow was increased with the approve)of the design engineer.This was due to 16 of 29 existing. Cont.Note 3 Note 3 volume dampers were full closed and Room A-15 was not meeting design airflow Page 6 of 29 }' NEIIDORIFER 0 ENGINEERS Supply Grille, Register, & Diffuser Test Data Project No. 2024-0647 Project I.D. WSP-Shelton Academy HVAC System Improvement Test Date 09-20-24 Tested By MRR Area Served Bldg. "A" Equipment I.D. ERV-1 Grille, Register, Duct, Test Data Flow Spec + 10% - 10% GIRD Instrument GRID Size Design Initial Final Airflow No. Area Served Used Type Inches AK CFM CFM FPM CFM % Notes 1 RM.A-07 Flowhood CD 22x22 1.00 25 60 69 276% (3) 2 RM.A-06 Flowhood CD 22x22 1.00 25 44 93 372% (3) 3 RM.A-05 Flowhood CD 22x22 1.00 25 48 79 316% (3) 4 RM.A-04 Flowhood CD 22x22 1.00 25 48 88 352% (3) 5 RM.A-03 Flowhood CD 22x22 1.00 25 55 - 77 308% (3) 6 RM.A-02 Flowhood CD 22x22 1.00 25 0 - 69 276% (3) 7 RM.A-01 Flowhood CD 34x34 1.00 95 0 - 121 127% (3) 8 Corridor Flowhood CD 6x6 1.00 45 22 - 48 107% 9 RM.a-17 Flowhood CD 26x26 1.00 40 30 - 44 110% (1) 10 RM.A-18 Flowhood CD 22x22 1.00 20 24 - 22 110% (3) 11 Display Flowhood CD 26x26 1.00 50 30 - 47 94% (3) 12 Waiting Flowhood CD 22x22 1.00 45 24 - 39 87% (3) 13 Lobby Flowhood SWG 20x10 1.00 100 30 - 95 95% 14 Reception Airfoil Duct 6.00 0.19 25 20 26 104% 15 Deleted Flowhood CD 6.00 1.00 25 0 - 0 0% 16 Copy Flowhood CD 6x6 1.00 20 20 - 24 120% (1) 17 Shower Flowhood CD 8x8 1.00 20 20 - 26 130% (3) 18 RM.A08 Flowhood CD 20x20 1.00 70 22 - 70 100% 19 RM.A09 Flowhood CD 34x34 1.00 35 25 - 51 146% (3) 20 Number Not Used -- -- - 1.00 0 0 0 21 Deleted Flowhood CD 6x6 1.00 0 0 - 0 22 Corridor Flowhood CD 6x6 1.00 45 0 - 43 96% (1) 23 Corridor Airfoil Duct 6.00 0.19 45 23 28 62% 24 RM.A-14 Flowhood CD 26x26 1.00 25 0 - 26 104% (3) 25 RM.A-11 Flowhood CD 22x22 1.00 25 29 - 66 264% (3) 26 RM.A-12 Flowhood CD 22x22 1.00 25 0 - 59 236% (3) 27 RM.A-13 Flowhood CD 22x22 1.00 25 22 - 67 268% (3) 28 RM. A-15 Velgrid SWG 16x10 0.78 160 30 176 110% 29 Corridor Flowhood CD 6x6 1.00 45 0 - 47 104% 30 RM.A-15 Velgrid SWG 16x10 0.78 160 25 135 84% (1) Total Supply Airflowl 1295 651 1735 134% Test Notes Note (1) The balancing damper is full open. Note (2) The balancing damper is full closed. Page 7 of 29 NEUDORFER ENC3/NEERS tegra IV Exhaust Fan Test Data Project No. 2024-0647 Project I.D. WSP-Shelton Academy HVAC System Improvement Test Date 9/20/2024 Tested By MRR Area Served Bldg."A" Equipment I.D. ERV--1 Unit Information Manufacturer RenewAire Model Number HE-2XJRTV-DV3-WL Serial Number G24103500C Unit Location Roof Fan Quantity/Rotation 1 / Clockwise Drive Type Belt Drive Unit Filter Information Filter I.D. Type Rating Filter Size/Qty Filter Size/Qty Filter Size/Qty HX Exhaust Pleated MERV 10 20 x 20 x 2 / 2 N/A / N/A / Fan Test Data Total Design Airflow 1,290 CFM Total Actual Airflow 1,330 CFM Design TSP -- in.wc Actual TSP 1.47 in.wc Design ESP 0.50 in.wc Actual ESP 0.78 in.wc Actual Volts(From VFD) 245.0 Actual Amps(From VFD) 3.2 Design Fan RPM 1297 Actual Fan RPM 1335 Design Motor RPM 1770 Actual Motor RPM 1760 Design VFD Speed -- Hz Actual VFD Speed 60.0 Hz Unit Pressure Data P­Exiemal Static In/Out -0.400 in.wc / 0.380 in.wc I External Static A P 0.780 in.wc Motor Information Manufacturer Baldor Motor Frame/Serv.Factor 145T / 1.15 HP/RPM 1.5 / 1770 Motor Phase/Hz 3 / 60 Motor Rated Volts/FLA 230/460 / 4.612.3 Motor Eff./PF 86.5% / 72.0% Sheave Information Motor Sheave Manuf./Model# Browning / 1VP40 Fan Sheave Manuf./Model# Browning / AK46 Motor Sheave OD/Bore Dia. / 7/8 Fan Sheave OD/Bore Dia. / 1" Motor Sheave Type/Pos. Adjustable / Mid Number of Belts/Model# 1 / A35 Bushing Model#Motor/Fan / Centerline/Extend/Retract 12.5" / 3/4" / 3/4" Fan Test Notes Note (1) 1 All actual amperage,motor RPM,and voltage readings derived from the VFD. Page 8 of 29 NELIDORFER g N ENGINEERS �«�Inte�ra wrr�rr Exhaust Grille, Register, & Diffuser Test Data Project No. 2024-0647 Project I.D. WSP-Shelton Academy HVAC System Improvement Test Date 90-20-24 Tested By MRR Area Served Bildg. "A" Equipment I.D. ERV-1 Grille, Register, Duct,Test Data Flow Spec + 10% - 10% GIRD A Served Instrument GIRD Size Design Initial Final Airflow No. Area erve Used Type Inches AK CFM CFM FPM CFM % Notes 1 Shower Flowhood CEG 8x6 1.00 60 35 57 95% (1)(5) 2 RM.A09 Rot.Vane CEG 14x10 0.44 100 134 166 166% (4)(5) 3 Mens Rot.Vane CEG 12x8 0.28 150 95 111 74% (1)(5) 4 HC TLT Flowhood CEG 8x8 1.00 100 121 - 103 103% 5 Copy Flowhood CEG 8x8 1.00 100 55 - 93 93% (1) 6 Womens Flowhood CEG 8x8 1.00 150 184 - 152 101% 7 Mens Flowhood CEG 8x8 1.00 150 108 - 148 99% 8 RM.A15 Rot.Vane WRG 12x6 0.40 200 170 214 107% 9 RM.A16 Rot.Vane CEG 14X14 0.83 180 236 186 103% 10 Corridor Flowhood CEG 24x24 1.00 100 80 - 100 1000 Total Exhaust Airflowl 1290 1218 1330 103% Test Notes :Note,, 1 The balancing damper is full open. Existing inlet no volume damper. Page 9 of 29 N EERNO NERS tegra C•� ""o.. Supply Fan Test Data Project No. 2024-0647 Project I.D. WSP-Shelton Academy HVAC System Improvement Test Date 9/20/2024 Tested By MRR Area Served Bldg."B" Equipment I.D. ERV--2 Unit Information Manufacturer RenewAire Model Number HE-2XJRTV-DV3-WL Serial Number G24103499C Unit Location Roof Fan Quantity/Rotation 1 / Clockwise Drive Type Belt Drive Unit Filter Information Filter I.D. Type Rating Filter Size/Qty Filter Size/Qty Filter Size/Qty HX Supply Pleated MERV 10 20 x 20 x 2 / 2 N/A / - N/A / - Fan Test Data Total Design Airflow 1,830 CFM Total Actual Airflow 1,672 CFM Design TSP -- in.wc Actual TSP 1.55 in.wc Design ESP 0.50 in.wc Actual ESP 0.74 in.wc Actual Volts(From VFD) 249.0 Actual Amps(From VFD) 4.3 Design Fan RPM 1601 Actual Fan RPM 1520 Design Motor RPM 1770 Actual Motor RPM 1768 Design VFD Speed -- Hz Actual VFD Speed 60.0 Hz Unit Pressure Data Extemal Static In/Out -0.230 in.wc / 0.510 in.wc I External Static A P 0.740 in.wc Motor Information Manufacturer Baldor Motor Frame/Serv. Factor 145T / 1.15 HP/RPM 1.5 / 1770 Motor Phase/Hz 3 / 60 Motor Rated Volts/FLA 230/460 / 4.6/2.3 Motor Eff./PF 86.5% / 72.0% Sheave Information Motor Sheave Manuf./Model# Browning / 1VP40 Fan Sheave Manuf./Model# Browning / AK47 Motor Sheave OD/Bore Dia. -- / 7/8" Fan Sheave OD/Bore Dia 1" Motor Sheave Type/Pos. Adjustable / Max Number of Belts/Model# 1 / A35 Bushing Model#Motor/Fan -- / Centerline/Extend/Retract 11.75 / 1/2" / 1" Fan Test Notes Note (1) 1 All actual amperage,motor RPM,and voltage readings derived from the VFD. Page 10 of 29 NEUDORFER tegra , IV ENGINEERS Supply Grille, Register, & Diffuser Test Data Project No. 2024-0647 Project I.D. WSP-Shelton Academy HVAC System Improvement Test Date 09-20-24 Tested By MRR Area Served Bldg. "B" Equipment I.D. EVR-2 Grille, Register, Duct, Test Data Flow Spec + 10% - 10% GRID A Served Instrument GRD Size Design Initial Final Airflow No. Area erve Used Type Inches AK CFM CFM FPM CFM % Notes 1 Lobby Airfoil Duct 4.00 0.09 20 44 20 100% 2 Lobby Airfoil Duct 4.00 0.09 20 47 22 110% 3 RM.B05I1306 Flowhood CD 34x34 1.00 100 60 90 90% (3) 4 Corridor Flowhood CD 6x6 1.00 20 26 27 135% 5 RM.605IB06 Flowhood CD 24x24 1.00 100 33 - 92 92% 6 RM. B12 Flowhood CD 22x22 1.00 20 47 30 150% (3) 7 Corridor Flowhood CD 6x6 1.00 20 0 - 23 115% (3) 8 RM. 1311 Flowhood CD 13x13 1.00 20 30 - 38 190% (3) 9 RM. B10 Flowhood CD 13x13 1.00 20 30 - 40 200% (3) 10 RM. B09 Flowhood CD 13x13 1.00 15 35 - 40 267% (3) 11 RM. B08 Flowhood CD 13x13 1.00 15 31 - 43 287% (3) 12 RM. B07 Flowhood CD 26x26 1.00 70 85 - 70 100% 13 RM. B01 Rot.Vane SWG 18x8 0.44 225 91 182 81% (1) 14 RM. B01 Rot.Vane SWG 18x8 0.44 225 99 178 79% (1) 15 RM. B02 Rot.Vane SWG 18x8 0.44 225 187 184 82% 16 RM. B02 Rot.Vane SWG 18x8 0.44 225 165 183 81% 17 RM. B03 Rot.Vane SWG 18x8 0.44 225 190 190 84% 18 RM. B03 Rot.Vane SWG 18x8 0.44 225 181 184 82% 19 RM. B04 Airfoil Duct 4.00 0.09 40 31 36 90% Total Supply Airflow 1830 1412 1672 91% Test Notes Note (1) IThe balancing damper is full open. Note (3) IThe balancing damper is full closed. Page 11 of 29 T NEUDORFER ENGINEERS _ . Exhaust Fan Test Data Project No. 2024-0647 Project I.D. WSP-Shelton Academy HVAC System Improvement Test Date 9/20/2024 Tested By MRR Area Served Bldg."B" Equipment I.D. ERV-2 Unit Information Manufacturer RenewAire Model Number HX-2XJRTV-DV3-WL Serial Number G24102499 Unit Location Roof Fan Quantity/Rotation 1 / Clockwise Drive Type Belt Drive Unit Filter Information Filter I.D. Type Rating Filter Size/Qty Filter Size/Qty Filter Size/Qty HX Exhaust Pleated MERV 10 20x2Ox2 / 2 N/A / N/A / - Fan Test Data Total Design Airflow 1,600 CFM Total Actual Airflow 1,400 CFM Design TSP -- in.wc Actual TSP 1.62 in.wc Design ESP 0.50 in.wc Actual ESP 0.85 in.wc Actual Volts(From VFD) 248.0 Actual Amps(From VFD) 4.2 Design Fan RPM 1297 Actual Fan RPM 1516 Design Motor RPM 1700 Actual Motor RPM 1762 Design VFD Speed -- Hz Actual VFD Speed 60.0 Hz Unit Pressure Data External Static In/Out -0.520 in.wc / 0.330 in.wc I External Static A P 0.850 in.wc Motor Information Manufacturer Baldor Motor Frame/Serv.Factor 145T / 1.15 HP/RPM 1.5 / 1770 Motor Phase/Hz 3 / 60 Motor Rated Volts/FLA 230/460 / 4.6/2.3 Motor Eff./PF 86.5% / 72.0% Sheave Information Motor Sheave Manuf./Model# Browning / 1VL40 Fan Sheave Manuf./Model# Browning / AK46 Motor Sheave OD/Bore Dia. / 7/8" Fan Sheave OD/Bore Dia. -- / 1" Motor Sheave Type/Pos. Adjustable / Max Number of Belts/Model# 1 / A35 Bushing Model#Motor/Fan / Centerline/Extend/Retract 11.5" / 1/2" / 1" Fan Test Notes Note (1) 1 All actual amperage,motor RPM,and voltage readings derived from the VFD. Page 12 of 29 ANEUDORFER ENGINEERS • Cteg�I—PAN. Exhaust Grille, Register, & Diffuser Test Data Project No. 2024-0647 Project I.D. WSP-Shelton Academy HVAC System Improvement Test Date 09-20-24 Tested By MRR Area Served Bldg. "B" Equipment I.D. ERV-2(Exhaust) Exhaust Inlet Summary Flow Spec + 10% - 10% GIRD Area GIRD Size Design Initial Final Airflow No. Area Served Used Type Inches AK CFM CFM FPM CFM % Notes 1 RM.1308 Flowhood CEG 8x8 1.00 150 30 130 87% (1) 2 Corridor Flowhood CEG 12x12 1.00 250 100 - 211 84% 3 RM.B01 Velgrid WEG 36x12 2.15 400 105 360 90% 4 RM. B02 Velgrid WEG 36x12 2.15 400 424 355 89% 5 RM.B03 Velgrid WEG 36x12 2.15 400 444 344 86% Total Exhaust Airflow 1600 1103 1400 88% Test Notes Note (1) The balancing damper is full open. Page 13 of 29 HVAC GENERAL NOTES ENERGY CODE REQUIREMENTS HVAC LEGEND K*8 1. UNSIZED DUCTS SHALL MATCH THE SIZE OF A. HVAC EOIPMENT SHALL MEET THE MINIMUM SYMBOL DESCRIPTION ABBREV. DESCRIPTION ABBREV. DESCRIPTION THE LARGEST ADJACENT DUCT THAT IS SIZED. EFFICIENCIES(EER)LISTED IN THE WASHINGTON STATE WHERE THE ADJACENT DUCT SIZE IS NOT ENERGY CODE TABLES C403.3.2. —C— CONDENSATE LINE AAV AUTOMATIC AIR VENT MAX MAXIMUM architects SHOWN,PROVIDE THE FOEOWING$RED DUCTS AFT ABOVE FINISHED FLOOR MBH THOUSAND BTUH (OR EQUIVALENT RECTANGULAR). B. THERMOSTAT/TIME CLOCK CONTROL SHALL BE —RC— REFRIGERANT GAS APPROX APPROXIMATELY MCA MINIMUM CIRCUIT AMPS •"A4""snolu.m .ea. nw PROVIDED BY DIGITAL CONTROL SYSTEM.SYSTEM ARCH ARCHITECTURAL MECH MECHANICAL 2. WHERE DUCT SIZES ARE NOT SHOWN,SIZE SHALL PROVIDE 365 DAY CONTROL OF ENERGY AUTO AUTOMATIC MFR MANUFACTURER DUCTS FOR A MAXIMUM VELOCITY OF 500 RECOVERY VENTILATORS AND HEATING UNITS. —RL— REFRIGERANT UOUID KNOBN jn ]3063 FT/MIN BLDG BUILDING MIN MINIMUM C. VRF HEAT PUMP CONTROLS TO INCLUDE 7 DAY Ong DUCT(FIRST FIGURE.SIDE SHOWN) B.O.D BOTTOM OF DUCT NO NORMALLY OPEN 3, VERIFY LOCATIONS OF ITEMS WITH PROGRAMMING CAPABILITY,5'DEADBAND,OPTIMUM BTU BRITISH THERMAL UNIT NO. NUMBERARCHITEC WORK.NOTiv ARCAL LHTINTECT/OYNER OFS PRIOR TO PART PARTTLOD COOLIN STOP G RAND ST OUTDOOR AIR SETBACK.TROL.UNOCCUPIED ra LINE FOLD E D OF LINING R NET FREE AREA CAP BRIP��THERMAL UNIT/HOUR O^ NO TO SCALE DISCREPANCIES. LOCKOUT.CONTROLS SHALL NOT ALLOW SIMULTANEOUS HEATING AND COOLING. R 0 RISE: R OR DROP: D CFLI CUBIC FEET PER MINUTE DOD OPPOSED BLADE DAMPER p 4. MATERIALS,METHODS,AND INSTALLATION ARROW IN DIRECTION OF FLOW CLG CEILING RD PRESSURE DROP �,,,�,' SHALL COMPLY WITH THE PROVISIONS OF THE D. DAMPER LOCATIONS,LEAKAGE RATE,CONTROL TYPE. COMP COMPRESSOR PH PHASE •'�' 2018 EDITION OF THE INTERNATIONAL AND MAX CLEARANCE TO COMPLY WITH SECTION ® DUCT SECTION(SUPPLY) CON N CONNECTION P.O.C. POINT OF CONNECTION MECHANICAL CODE. C403.7.8 OF THE W.S.E.C. CONT CONTINUE.CONTINUATION RA RETURN AIR DUCT SECTION(EXHAUST OR RETURN) COP COEFFICIENT OF PERFORMANCE REF REFERENCE S. MECHANICAL EQUIPMENT 1/2 HP AND LESS E. ECONOMIZERS NOT REQUIRED PER WSEC C403.5 SHALL HAVE STARTER/CONTROL RELAY EXCEPTION 1,COMPLIANT DOAS O ROUND DUCT DB DRY BULB REO'D REWIRED PROVIDED 8Y DIVISION 23,STARTERS FOR DEC F' DECREE FAHRENHEIT RLA RATED LOAD AMPS MECHANICAL EQUIPMENT LARGER THAN 1/2 HP F. INSULATE ALL DUCTS IN CONDITIONED SPACE TO OA.0 DIAMETER RM ROOM PROVIDED BY DIVISION 26. R-3.3.INSULATE DUCTS IN UNCONDITIONED SPACE TO VOLUME DAMPER(MANUAL) DL DOOR LOUVER RPM REVOLUTIONS PER MINUTE R-B.INSULATE OUTSIDE AIR DUCTS WITH R-21. ..�4^ DN DOWN SA SUPPLY AIR 6. CONTRACTOR SHALL CARENLLY COORDINATE 1� MOTORIZED DAMPER DWG DRAWING SMACNA SHEET METAL AND AIR WORK W/ALL OTHER TRADES,ESPECIALLY IN C. INSULATE REFRIGERANT GAS PIPING WITH I'U-0.27 (E) EXISTING CONDITIONING CONTRACTORS CEILING SPACES WHERE SPACE 15 TIGHT. INSULATION. U� FLEXIBLE CONNECTION EA EACH NATIONAL ASSOCIATION SHEET METAL CONTRACTOR SHALL HAVE L EAT ENTERING AIR TEMPERATURE S.O. SCREENED OPENING PRIORITY'OVER OTHER MECHANICAL TRADES IN H. ALL DUCTWORK SHOWN SHALL BE CONSTRUCTED TO FIRE DAMPER S. TRANSFER DUCT CEILING SPACE WHERE CONFLICTS OCCUR. i'PRESSURE CLASSIFICATION PER SMACNA. COMBINATION FIRE/SMOKE DAMPER EER ENERGY DRY BULB TEMP TEMPERATURE Z EER ENERGY EFFICIENCY RATING 7. ALL DUCTWORK SHOWN IS SCHEMATIC, TG TRANSFER GRILLE CONTRACTOR SHALL PROVIDE ALL I. ALL DUCT WORK SHALL E SEALED.SEAL ALL f FLEXIBLE O1CT EFT EFFICIENCY np TYPICAL w OFFSETS LBOWS ST REO'D TO ALLOW TRANSVERSE 603.9 AND LONGITUDINAL SEAMS AS EIEC ELECTRICAL ELECTRIC C /E U.C. UNDERCUT DOOR C REWIRED BY 603.90 OF THE INTERNATIONAL EOL END OF LINING ROUTING AROUND STRUCTURE,ELECTRICAL,h TURNING VANES OTHER INTERFERENCES. MECHANICAL CODE. ESP EXTERNAL STATIC PRESSURE LINO UNLESS NOTED OTHERWISE j 0. ALL DUCT WALL PENETRATIONS THROUGHJ. PROVIDE ENERGY EFFICIENT MOTORS ON THE HVAC ®�a F-� CEILING OUTLET: EWB ENIERINC WET BULB V VOLTS. VOLTAGE O WALLS AND FLOORS SHALL BE PROVIDED WITH EQUIPMENT AS REQUIRED IN WASHINGTON STATE EXH EXHAUST VTR VENT THROUGH ROOF CLOSURE COLLARS AND BE TIGHTLY SEALED ENERGY CODE PARAGRAPH C405.8.MOTORS LESS �• CEILING INLET: WHERE 2 CFM'S SHOWN, EXIST EXISTING W WATT TO PREVENT THE TRANSMISSION OF NOSE. THAN INP SHALL HAVE A MINIMUM EFFICIENCY OF LARGER-HIGH SEED,SMALLER-LOW SPEED GEM FL FLOOR W/ WITH 7OC LINEAR SLOT DIFFUSER,FIRST NO.IS SLOT WIDTH. M FULL LOAD AMPS NB WET BULB 9, DUCT AND PIPING PENETRATIONS OF FIRE IFS"r SECOND N0.IS NO.OF SLOTS,THIRD NO.IS LENGTH FLEX FLEXIBLE WCO WALL CLEAN OUT RATED WALLS OR FLOORS SHALL BE SLEEVED P. TEST AND BALANCE EACH HVAC SYSTEM.ADJUST FPM FEET PER MINUTE AND FIRE STOPPED WITH USTED MATERIALS SO REGISTERS AND DAMPERS FOR AIR FLOW INDICATED f WALL OUTLET(OR INLET) FV FACE VELOCITY AS TO MAINTAIN THE INTEGRITY AND RATING ON DRAWINGS ADJUST FAN SPEED FOR TOTAL AIR GAL GALLON OF THE FLOOR OR WALL. FLOW. T T• THERMOSTAT LI-� Q� G-WITH WARD,A-AVERAGED WITH OTHER GALV. GALVANIZED )-- 10.SHIFT AIR INLETS/OUTLETS FROM LOCATIONS 0. PROVIDE COMMISSIONING OF ALL MECHANICAL HP NORSE POWER (n SHOWN AS REO'D TO AVOID CONFLICTS SYSTEMS AS REQUIRED BY WASHINGTON STATE QS SWITCH I.E. INVERT ELEVATION W/STRUCTURE h OTHER ITEMS.SUCH SHIFTS ENERGY CODE PARAGRAPH C40B.PROVIDE THE IN INCH SHALL MAINTAIN SYMMETRY OF AIR TERMINALS COMMISSIONING COMPLIANCE CHECKLIST TO THE ® TRUE CLOCK BYPASS INTEGR. INTEGRAL N @ SHALL HAVE PRIOR APPROVAL OF BUILDING OFFICIAL ON SUBSTANTIAL COMPLETION OF KW KILOWATT V ARCHITECTANGINEER. THE BUILDING. S ® INTERVAL TIMER LAT LEAVING AIR TEMPERATURE 11.PROVIDE MANUAL VOLUME DAMPERS IN ALL R. PROVIDE RECORD DRAWING,OWNERS MANUALS. LOB LEAVING DRY BULB O BRANCH DUCTS AND SPLITS IN MAIN DUCTS BALANCING REPORT AND COMMISSIONING REPORT TO LWB LEAVING NET BULB y3 AND WHERE REO'D BY BALANCERS. OWNER AT COMPLETION OF PROJECT.SEE C103.6 OF 1 DETAIL IDENTIFICATION NUMBER LWT LEAVING WATER TEMPERATURE 12.PRO DE PRIMARY CONDENSATE DRAWS FOR _ 3 THE W.S.E.C. SHEET ON WHICH DETAIL IS SHOWN VI j CC AIR CONDTONING COLS IN ACCORDANCE WITH S. PROVIDE SYSTEMS OPERATIONS TRAINING TO THE C INC REQUIEMEN75 k AS SHOWN ON PLANS. BUILDING GINNER PER NSEC PARAGRAPH C703.8.4. W "' A SECTION IDENTIFICATION LETTER W R.9 13.REFRIGERANT PIPING SIZES SHOWN ON y3 SHEET ON WHICH SECTION IS SHOWN Q Q IN O - 00 SHOP DRAWING NTH DRAWINGS ARE FORREFERENCE. PIPING U EVIDE LENGTHS Q (n a CALCULATED AND SIZED PER FACTORY C� RECOMMENDATIONS. SHEET INDEX Q p g Z F— ¢z M-CIO -HVAC LEGEND h NOTES ! O 0 C) M-002 -BLDG A HVAC SCHEDULES Z_ w M-003 -BLDG A HVAC SCHEDULES CONT. j —� = a¢ M-004 -BLDG B HVAC SCHEDULES w u) 3 w M-005 -BLDG B HVAC SCHEDULES CONT. N j M M-051 -BLDG A HVAC DEMO PLANS ' O N M-052 -BLDG B HVAC DEMO PLANS M-101 -BLDG A HVAC PUNS M-102 -BLDG B HVAC PLANS tea. M-501 -HVAC DETAILS 4iUTm4 M06ET M-001 VEACH MECHANICAL nvA,er.r.e ArtA n--wuWM NOTES AND LEGEND VENTILATION VRF HEAT PUMP SCHEDULE-OUTDOOR UNIT _REO'D VOLUME OUTSIDE SPECIFIED MFR. AREA COOLING CAP.- h AtING AP. ELECTRICAL REFRIGERANT WEIGHT AREA NAME AREA(SF) IMC CODE -- AIR KM EXHAUST SYMBOL s7 F^• REMARKS REQUIREMENT WARDE EXHAUST pRONDED PROVIDED k MODEL N0. SERVED M 1 M M A �S' TRANE/MITSUBISX IMSTRAT p7; architects A01 CONFERENCE 2S7 5 CFM ERSON OA k 92 - 95 - HP-IA NRYH210 BLDG A TI8 11.7 18.9 258 3.56 174 2.05 47 208/3 1-3/8 7/8 1324 1 { fa"xrnv Flr Wlw A01 0.08 CFM/SF OA a•�'�r•W4°" "m S CFM/PERSON OA k NOTES' 01 WITH LOW AMWLNI KII Jeo]9 Ytl COMMANDER A02 202 22 - 25 - 0.08 CM/SV'OA -COOLING CAPACITY IS AHRI RATING: AT BOF DB:67F WB INDOOR COIL Q MI7M ANTI CORROSION COALING KL6 BoHtl4 T300.1 ASSISTANT 202 5 CFM/M/SF OA k 22 - 25 - EAT AND 957 OUTDOOR COIL EAT. ®UNIT CAPABLE OF OPERATING IN HEATING MODE DOWN TO-13F COMMANDER A03 0.06 CFM/SF OA 4 TWINNED UNITS REQUIRE MULTIPLE ELECTRICAL CONNECTIONS OF SIZE A T 5 CFM/M/SF OA k COIL HEATING CAPACITY IS AHRI DOORHI-TEMP RATING. AT 70F DB INDOOR O STAFF OFFICE A01 TOT 22 - 25 - COIL EAT AND t7F DB;{3'AB OUTDOOR COIL EAT. INDICATED 0.06 CFM/SF OA STAFF OFFICE A05 202 5 CFM/PERSON OA k 22 - 25 - ...17F HEALING CAPACITY IS AHRI LO-TEMP RATING. AT 70F DB O.OS CFM/SF OA INDOOR COIL EAT AND 17T DB; 15VO OUTDOOR COIL EAT. S CFlI/PERSON OA k STAFF OFFICE A08 202 0.05 CFM/SF OA 22 - 25 - STAFF OFFICE A07 202 0.06 CFM/SF S ON OA A k 22 - 25 - DUCT INSULATION SCHEDULE STORAGE ADS 132 0.12 CFM/SF OA 16 - 20 - DUCT TYPE DUCT LOCATION INSULATION OTHER R-VAI.LIE REOUIREMENTS LOCKER ROOM ADOE283 0.25 CFM/SF EXH - 77 - 100 SUPPLY,RETURN NOT WITHIN CONDITIONED SPACE: ON EXTERIOR OF BUILDING,ON ROOF, R_B APPROVED WEATHER SHOWER 20 CFM/FIXTURE _ 40 _ 60 IN ATTIC,IN GARAGE,IN CRAWL SPACE,IN CONCRETE,IN GROUND. PROOF BARRIER EXHAUST WITHIN CONDITIONED SPACE,FROM AUTOMATIC SHUTOFF DAMPER TO PER ME W.S.E.0 OUTSIDE AIR INTAKE,EXHAUST INTERIOR INLET/OU1LET R-6 SECTION C40S.10.1 50 CFM/FIXTURE MENS - 140 - 150 EXHAUST WITHIN GON EXTERIOR SPACE.FROM AUTOMATIC SHUTOFF DAMPER TO PER THE 403.1C 5 CFM RSON OA k OUTSIDE AIR INTAKE.EXHAUST BUILDING EXTERIOR R-16 SECTION L{OJ.10.1 N OFFICE A10 32 - 35 - 0.06 CFM/SF OA SUPPLY,RETURN, 5 CFM RSON OA k NOT WITHIN CONDITIONED SPACE: IN ENCLOSED CEILING SPACE,IN WALLS. R-6 STAFF OFFICE All 0.06 CFM/SF OA 22 - 25 - OUTSIDE AIR INTAKE W S CFM RSON OA k SUPPLY,RETURN. SEPARATE FROM BUILDING STAFF OFFICE Al2 202 22 - 25 - NOT WITHIN CONDITIONED SPACE:IN BURRING ENVELOPE ASSEMBLY. R-16 ENVELOPE WITH MINIMUM 0.08 CFM/SF OA O UTSIDE AIR INTAKE ENVELOPE INSUUTION VALUE 5 CFM ERSON OA k 0 STAFF OFFICE A13 202 22 - TS - 0.06 CFM/SF N G INSU ATION APPLY TO THE DUCT TYPE LISTED.WHETHER HEATED OR MECHANICALLY COOLEDMECHANICALLY COOLED DUCT$ 5 CFM ERSON OA k URING INSULATION SHALL HAVE A VAPOR RETARDER,WITH A PERM RATING NOT GREATER MAN 0.5 AND ALL JOINTS SEALED. ' STAFF OFFICE A14 202 0.06 CFM/SF OA 22 - 25 - CLASSROOM A15 10 CFM/PERSDN OA 846 0.12 CFM/SF OA 308 - 320 200 C JANITOR A16 1" 1 CFM/SF EXH - 168 - 1B0 ENERGY RECOVERY UNIT SCHEDULE SPECIFIED MFR. AREA SUPPLY FAN RETURN FAN EN'HALPY FILTERS APPROX. UNITS CONNECTION MENS 73 50 CFM/FIXTURE - 100 - 150 SYMBOL qND MODEL NO. $FREED TYPE CFM ESP CFM ESP W/CFM RECOVERY UNIT HEIGHT REMARKS EXHAUSTEFFICIENCY TYPE EfF. MCA V/PN �JJ WOMENS 124 50 CFM/nXTURE _ 100 - 150 ERV-1 RENEWAIRE HE2XRT ADMIN ROOFTOP 1225 0.5 1170 0.3 0.54 SOIL SP MERV 13 700 10.8 208/3 Q1 EXHAUST BLDC A CROSSFLOW HC TOILET 53 50 CFM/FIXTURE _ 50 - BO 01 W/INTEGRAL BACKDRAFT DAMPERS (n EXHAUST IT ROOM A17 151 0.12 CFM/SF OA 18 - 20 - Q J FILE STORAGE AIS 303 0.12 CFM/SF OA 36 - 40 - ELECTRIC DUCT HEATER SCHEDULE > p m 5 CFM/PERSON OA, SYMBOL SPECIFIED MFR. TYPE AREA/UNIT ELECTRICAL NOMINAL STAGES CM REMARKS COPY ROOM 166 0.06 CFM/SF OA,k 20 B3 25 100 k MODEL NO. SERVED MW VOLT$/PH SIZE }• Q Z 0.3 M/PER EXH. W/MODULATING HEAT C d O 5 CM/PERSON OA k DX-I RENEWAIRE EK SERIES ELECTRIC ERV-1 9 206/3 18XI4 1 1225 CONTROL RECEPTION 170 0.08 CFM/SF OA 20 - 25 - W W LOBBY,WAITING 6" 0.06 CFM/OA A k 141 - 145 - a p k AIR TERMINAL SCHEDULE 5 FU SF OA DISPLAY 244 0.08 CFM/SF OA SPECIFIED MFft. U Z O SYMBOL TYPE k MODEL N0. DESCRIPTION a Oa tv CORRIDORS 680 0.06 CFM/SF OA 41 1 - 1 180 1 - I G Co DKNR TINS TDC LOUVER FACE,SQUARE NEON W/EQUALIZING GRID Z =z SE WSC WALL SUPPLY TITUS 300RS VERTICAL BLADES 3/4.O.C.,DOUBLE DEFLECTION Z O w ELECTRIC RADIANT HEATER SCHEDULE GRILLE O SPECIFIED MFR. SIZE WEIGHT ELECTRICAL WALL RETURN ALUMINUM CONSTRUCTION J = G a SYMBOL TYPE REMARKS WRG GRILLE TINS ail HORIZONTAL BLADES 3/4.O.C. w N 3 w AND MODEL N0. (L.H) (LBS.)WATTS V/PH WALL EXHAUST ALUMINUM CONSTRUCTION RCP-1 TPI CORP. T-BAR RADIANT CEILING 24X24 20 375 120/1 0WEG GRILLE TINS 3FL HORIZONTAL BLADES 3/4"O.C. CP SERIES PANEL CDUNG EXHAUST 1PI CORP. SURFACE-MOUNT RADIANT CEG GRILLE TITUS SOF 1/2-0/2-0/2-CUBE CORE RCP-2 CP SERIES CEILING PANEL 24X24 211 375 120/1 1 2 J TRANSFER " TG GRILLE nTUS SOF 1/z-vt/z-x1/2-CUBE CORE r.. NOTES:(D SEE FLOOR PUN FOR NUMBER OF UNITS. 0 W/SURFACE MOUNTING AIR INLET k OUTLET SCHEDULE NOTES- (2)SILICONE SEALED FOR HIGH-HUMIDITY FRAME 1, CEILING DIFFUSERS(CD)SHALL HAVE NO.k DIRECTION OF THROWS AS INDICATED ON OPERATION I PUNS.(E.G.CO-3 3 WAY THROW) 2. ALL AIR TERMINALS SHALL HAVE FACTORY FINISH,COLOR AS SELECTED BY ARCHITECT. rosEf 3. SEE LEGEND FOR TERMINOLOGY USED IN AIR TERMINAL CALL-OUTS ON DRAWINGS vm L _002 4. SEE ARCH.FINISH SCHEDULE FOR COUNG TYPES,PROVIDE AIR TERMINALS TO MATCH VEACH CEILING CONSTRUCTION INSTALLED IN. SCHEDULES KOUENCE OF OPERAnON: VRF HEAT PUMP SCHEDULE-INDOOR UNIT VRF NEAT PUMP UNITS-(HP-1): SYMBOL SPECIFIED N0. SEREVED MB COOLING SEER MINTING COOP CFM ESP AMP IN.0 MCAT YOLTS/PN LBS.T TYPE OUUNIT TD REMARKS A. GENERAL CONTROL SCHEME: architects HP-1B TRANE/MITSUBISHI STAFF CONFERENCE 12 01 13.5 01 297 - 0.19 - 0.30 208/1 25 WALL MOUNT HP-IA 1. MEAT PUMPS SHALL BE CONTROLLED BY A FACTORY DIGITAL CONTROL SYSTEM. PKFYITSU A01 al.s..w.o,�sswlJ CONTROL SYSTEM SHALL PROVIDE A 7-DAY OCCUPANCY SCHEDULE AND /MIT5E ITSUNISHI MODULATING TEMPERATURE CONTROL HP-1C THANP 2 COMMANDER A02 12 Q 13.5 (D 297 - 0.19 - 0.30 208/1 25 WALL MOUNT HP-IA 9. PROVIDE A CENTRALIZED DIGITAL CONTROLLER WITH A TOUCH SCREEN XMIIINN..23063 INTERFACE THE VRF HEAT PUMP FUNCTIONS AND SETPOINTS SHALL BE HP-10 TRANE/MITSUBISHI ASSISTANT 12 01 135 DI 297 - 0.19 - 0.30 200/1 25 WALL MOUNT HP-IA ACCESSIBLE FROM THE TOUCH SCREEN. PKFY-P12 COMMANDER A03 A� HP-tE TRANE/M TSUB'SII STAFF OFFICE A04 12 013.5 01 297 - 0.19 - 0.30 206/1 25 WALL MOUNT HP-IA D. A INTERFACE SHALL BE PROVIDED NTH THE CENTRAL VRF PKFY-P12 CONTROLLER HP-lF TRANE/MITSUBISHI STAFF OFFICE ADS 12 01 13.5 01 297 - 0.19 - 0.30 208/1 25 WALL MOUNT HP-IA ® J 1 v C e. INTERFACE THE CENTRAL VRF CONTROLLER WITH ME OWNERS ODC SYSTEM. PKFY-P12 COORDINATE THE DISPLAY OF ALL MONITORING POINTS. TRANE/MITSUBISII � HP-1G STAFF OFFICE A08 12 (D 13.5 (D 297 - 0.79 - 0.30 208/i 25 WALL MOUNT HP-IA 8. OCCUPIED MODE: UNITS SHALL CYCLE ON AND OFF AS REOgRED TO MAINTAIN SPACE PKFY-P12 TEMPERATURE.INITIAL ROOM TEMPERATURE SE71POINTS: 707 HEATING.757 COOLING. HP-lH TRANE/MITSUBISHI STAFF OFFICE A07 12 01 13.5 Q 297 - 0.12 - 0.30 208/1 25 WALL MOUNT HP-IA C. UNOCCUPIED MODE: UNITS SHALL CYCLE ON AND OFF AS REQUIRED TO MAINTAINPKFY-P12 SETBACK TCMPERA7URES(GOT HEATINO/BGT COOLING)WITH HEATING/COOUNO HP-11 TRANE/MITSUBISHI SIOHAGE AUG 8 01 9 01 ZJI - 0.19 - 0.40 208/1 25 WALL MOUNT HP-lA PROVIDED AS SPECIFIED ABOVE. pNFV-POI D. WARM-UP MODE: UNITS SHALL RUN AS IN THE UNOCCUPIED MODE UNTIL THE SPACE HP-1J TRANE/MITSUBISHI LOCKER ROOM A09 15 01 17 01 353 - 0.19 - 0.40 20B/1 29 WALL MOUNT HP-IA TEMPERATURE HAS WARMED UP TO THE OCCUPIED MODE HEATING SETPOINT,THEN PKFY-P15 UNITS SHALL OPERATE AS SPECIFIED FOR THE OCCUPIED MODE HP-1K TRANE/MITSUBISHI OFFICE AID 12 Q1 13.5 01 335 - 0,23 - 0.30 208/1 32 CASSETG HP-IA E. MODE CONTROL UNITS MODE OF OPERATION SHALL BE DETERMINED BY CENTRAL PLFY-P12 TIMECLOCN AND TIMECLOCK BYPASS SWITCH;WARM-UP MODE SHALL BE INITIATED BY Hp_1L TRA E/M IZ I9HI STAFF OFFICE A11 12 01 13.5 (2 297 - 0.19 - 0.30 208/1 25 WALL MOUNT HP-IA N CENTRAL OPTIMUM START CONTROLS. GGGC ENERGY RECOVERY VENTILATOR-(ERV-1): HP-IM TRA PKFY-SIBISMI STAFF OFFICE Al2 12 (2 13.5 Ot 297 - 0.19 - 0,30 208/1 25 WALL MOUNT HP-IA PKFY-P12 WS A. OCCUPIED MODE: SUPPLY AND EXHAUST FANS SHALL RUN CONTINUOUSLY.OUTDOOR HP-IN TRANE/MITSUOISHI STAFF OFFICE A13 12 0 13.5 01 297 - 0.19 - 0.30 208/1 25 WALL MOUNT HP-1A AIR DAMPERS SHALL BE 100% OPEN. PKFY-P12 B. UNOCCUPIED MODE: UNITS SHALL BE OFF.OUTDOOR AIR DAMPERS FULLY CLOSED. HP_10 TRANE/MIT%81SHI STAFF OFFICE A14 12 01 13.5 Q 297 - 0.19 - 0.30 208/1 25 WALL MOUNT HP-IA PKFY-P72 C. MODE CONTROL: UNITS SHALL BE CONTROLLED BY DIGITAL CONTROL SYSTEM(ODC) HP-IP TRANE/MITSUBISHI CLASSROOM AT5 15 01 17 Q 353 - 0.19 - 0.40 206/1 29 WALL MOUNT HP-IA Q PKFY-PI5 C DUCT HEATER-(DH-1): HP-10 TRANE/MITSUBISHI CLASSROOM A15 15 01 17 01 353 - D.19 - 0.10 208/1 29 WALL MOUNT HP-IA ( C PKFY-P15 cc A. GENERAL CONTROL SCHEME: TRANE/MIn3UBTSHI CEILING C MP-1R PKFY-POI JANITOR Alb 8 01 9 Q 390 - 0.28 - 0.30 208/1 29 CASSETTE HP-IA W 1. DUCT HEATERS SHALL BE PROVIDED WITH FACTORY SCR CONTROLS.ODC CONTROLS SHALL N PROVIDE MODULATING TEMPERATURE CONTROL FROM A DUCT HP-15 TRANE/MITSUSISHI FILE STORAGE A18 12 01 13.5 01 335 - 0.23 - 0.30 208/1 32 CASSETTE HP-IA © N PLFIP12 2. DUCT HEATERS SHALL BE ENABLED WHEN ERV IS ENABLED AND OUTSIDE AIR HP-IT TRANE/MITSUBISHI COPY ROOM 8 01 9 Ol 390 - 0.28 - 0.J0 208/1 2g CEILING HP-IA (J� TEMPERATURE 15 LESS THAN 50F. PLFY-PD8 CASSETTE B. OCCUPIED MODE: SCR CONTROLLERS SHALL MODULATE ELECTRIC HEATING ELEMENTS TO HP-IU TRANE/MITSUBISHI RECEPTION 8 (1) 9 n 390 - 0.28 - 0.30 208/1 29 CEIUNG HP-IA PROVIDE A LEAVING AIR TEMPERATURE OF GOT. Pury-p08 CASSETTE Q J N C. UNOCCUPIED MODE: UNITS SHALL BE OFF. MP-1V TRANPFY-LFY-S/BP78 CASSETTE ISHI W I NG,DISPLAY 18 (D20 (D280 - 0.19 - 0.50 200/1 32 ASKING HP-IA _ � 3 D. MODTIMEE CONTROL: UNITS SHALL BE CONTROLLED BY CENTRAL CONTROL SYSTEM HF_1W TRANE/MITSUBISHI LOBBY 24 Dj 27 DI r91 - 0.50 - 0.83 208/1 48 WALL MOUNT HP- ® zo ELECTRIC RADIANT CEILING PANELS-(RCP-1 THRU RCP-2): HP-lX TRANE/MITSUBISHIP CORRIDORS 8 01 9 01 - 0.28 - 0.30 208/1 29 CCAE�� HP-lA �JJ A. ELECTRIC RADIANT HEATERS SHALL BE CONTROLLED BY DOC SYSTEM.PROVIDE A y 7-DAY OCCUPANCY SCHEDULE.INITIAL ROOM TEMPERATURE SETPOINT. 687 NOTES: Q CL DISPLAY POINTS: COOLING CAPACITY IS ARI RATING: AT 80F DO;67T WB INDOOR COIL EAT AND 95T OUTDOOR COIL EAT. DO SEE OUTDOOR UNIT FOR EFFICIENCY U - ROOM TEMPERATURE(EACH ZONE) ®MITH FACTORY CONDENSATE PUMP Q 0 a N HEATING CAPACITY IS ARI HI-TEMP RATING: AT 70F DB INDOOR COIL EAT AND 47T DB; 43'49 OUTDOOR COIL EAT. OUTSIDE AIR TEMPERATURE Z VENTILATION RETURN AIR TEMPERATURE 6 VENTILATION SUPPLY AIR TEMPERATURE PRELIMINARY ONLY-SIZING AND ACCUMULATOR SELECTION BY HEAT PUMP SUPPLIER.SEE SECTION 238100 VRF HEAT PUMP STATUS O Z O w ENERGY RECOVERY VENTILATOR STATUS O DUCT NEATER STATUS Lu RADIANT NEATER STATUS MISCELLANEOUS EQUIPMENT SCHEDULE = 3 W = 2Q ALARMVSRF. HEAT PUMP FAILURE SYMBOL ITEM DESCRIPTION SPECIFIED MFR. AREA EQUIPMENT ELECTRICAL REMARKS N J ENERGY RECOVERY VENTILATOR FAILURE k MODEL NO. SERVED CAPACITY AMPS VOLTS/PH DUCT HEATER FAILURE SUBISlo, UH BLDG A BC-IA MAIN BRANCH CONTROLLER OMB_p-P -JAt BLDG A OHIO BRANCH MAX 1.8 208/1 02, BC_IB SUB BRANCH CONTROLLER MITSUBISHI ADMINtSTRA CMB-PIOBNU-KB1 BLDG AT'oN 8 BRANCH MAX. 1 0.9 208/1 2 •s^ ACCESSORIES: Q1 W/BALL VALVES ON CONNECTION PORTS Q2 W/FACTORY CONDENSATE PUMP ii3:TON ITBSR HE VEACH SCHEDULES 003NT VENTILATION VRF HEAT PUMP SCHEDULE-OUTDOOR UNIT REO'O VOLUME_ OUTSIDE SPECIFIED MFR. AREA COOLING CAP.• H-ATING CAP. ELECTRICAL REFRIGERANT WEIGHT KM AREA NAME AREA(SF) REOUIREMOUENT OUTSIDE AIR FR�VIUDED SYMB01. A MODEL N0. SERVED N I M47F•• MBH C• M A G LBS. REMARKS AIR EXHAUST pRpV1p[p architects TRANE/MITSUBISH EDUCATION 47+ CLASSROOM 801 867 10 CFM/PERS0"OA 404 - 450 400 HP-2A TURYH240 BLDG B 228 11.7 18.9 258 3.56 174 2.05 47 208/3 1-3/8 7/8 I324 0.12 CFM/SF OA BIq'�R"m�°"•°fi°I em 10 CFM/PERSON OA �'� Ql NTH LOW AMBIENI KIT MDMm eeM CLASSROOM 802 967 0.i2 CFM/SF OA 404 - 450 400 10 CFM ERSON OA OCOOUNG CAPACITY IS AHRI RATING: AT BOF DB; 57F WB INDOOR COL ©WITH ANTI CORROSION COATING IU.B Boltl4 D�Dy CLASSROOM 903 667 404 - 450 400 EAT AND 957 OUTDOOR COL EAT. ©UNIT CAPABLE OF OPERATING IN HEATING MODE DOWN TO-137 0.12 CFM SF OA •OILS EAT CAPACITY 1S AHRI DOORHI-TEUPC RATING: AT 70F DB INDOOR OO INDICATED UNITS REWIRE MULTIPLE ELECTRICAL CONNECTIONS OF SIZE 4 p- STORAGE 804 308 0.12 CFM/SF OA 37 - 10 - COIL EAT AND 47F D8;431VB OUTDOOR COL EAT. INDICATED 'V COMMUNICATIONS 10 CFM ERSON OA •O.17T HEATING CAPACITY IS AHRI LO-TEMP RATING: AT 70T DB B051 8 06 536 0.12 CFM/SF OA 194 - 200 - a /J INDOOR COL EAT AND 177 09; 15VB OUTDOOR COL EAT. 'a COMMUNICATIONS 5 CFM/PERSON OA 11 t eke OFFICE 807 214 0..CFM/SF OA 68 - 70 - CUSTODIAN 808 126 1 CFM/SF EXH - 126 15 150 DUCT INSULATION SCHEDULE FIRST AID/STORAGE 118 0.12 CFM/SF OA 14 - 15 - INSULATION OTHER 609 DUCT TYPE DUCT LOCATION R-VALUE REWIREMENTS 5 CFM/PERSON OA Be _ _ FIREARMS B10 149 0.06 CFM V OA ,8 20 NOT WITHIN CONDITIONED SPACE: ON EXTERIOR OF BUILDING,ON ROOF, APPROVED WEATHER SUPPLY,RETURN IN ATTIC,IN GARAGE,IN CRAWL SPACE,IN CONCRETE,IN GROUND. R-5 PROOF BARRIER COPY CENTER 811 119 5 CFM/PERSON OA dI 18 - 20 - 0.06 CM/SF OA OUTSIDE AIR INTAKE,EXHAUST WITHIN CONDITIONED SPACE,FROM AUTOMATIC SHUTOFF DAMPER TO R-8 PER THE W.SE.0 STORAGE 812 149 0,12 CFM/SF OA 18 - 20 - INTERIOR INLET/OUTLET SECTION C403.10.1 LOBBY 505 5 CFM/PERSON OA Q _ - OUTSIDE AIR INTAKE,EXHAUST WITHIN CONDITIONED SPACE,FROM AUTOMATIC SHUTOFF DAMPER TO R-16 PER THE W.S.E.0 0.08 CFM/SF OA 40 BUILDING EXTERIOR SECTION C403.10.1 N SUPPLY,RETURN, NOT WITHIN CONDITIONED SPACE: IN ENCLOSED CEILING SPACE,IN WALLS. R-8 CORRIDORS 584 0.08 CFM/SF OA 35 - 40 250 OUTSIDE AIR INTAKE SJPPIY,RETURN, SEPARATE FROM BUILDING UJI OUTSIDE AIR INTAKE NOT WITHIN CONDITIONED SPACE: IN BUILDING ENVELOPE ASSEMBLY. R-16 ENVELOPE WITH MINIMUM ENVELOPE INSULATION VALUE I ELECTRIC RADIANT HEATER SCHEDULE NOTE: REOIAREMENTS APPLY TO THE DUCT TYPE LISTED,WHETHER HEATED OR MECHANICALLY COOLED. MECHANICALLY COOLED DUCTS Q SYMBOLSPECIFIED M FR. TYPE SIZE IGHT CLCCTRICAL MARKS REWIRING INSULATION SHALL HAVE A VAPOR RETARDER,NTH A PERM RATING NOT GREATER THAN 0.5 AND ALL JOINTS SEALED. AND MODEL NO. (L.H) (LBS)WATTS V/PH RCP-1 TPI CORP. T-BAR RADIANT CEILING 24%24 20 375 120/1 0 CP SERIES PANEL RCP_2 TPI CORP. SURFACE-MOUNT RADIANT 24%24 20 37s 120/, 1 z J ENERGY RECOVERY UNIT SCHEDULE CP SERIES CEILING PANEL SPECIFIED MFR. AREA PPLY FAN RE IVRN FAN EN-HALPY FILTERS APPROX. UNITS CONNECTION SYMBOL qND MODEL NO. SERVED TYPE CFM ESP CFM ESP W/CFM RECOVERY UNIT WEIGHT REMARKS NOTES:Qt SEE FLOOR PLAN FOR NUMBER OF UNITS. 03 W/SURFACE MOUNTINGEFFICIENCY TYPE EFF. MCA V/PH LLJ Q SILICONE SEALED FOR NIGH-HUMIDITY FRAME ERV-2 RENEWAIRE HE2XRT EDUCATION ROOFTOP OW 1750 0.5 16DO 0.5 0.65 5OF SP MERV 13 700 14.9 2W/3 Oi N OPERATION BLDG OW/INTEGRAL 13ACKDRAFT DAMPERS (J U e ELECTRIC DUCT HEATER SCHEDULE j p SPECIFIED MFR. ARE ELECTRICAL NOMINAL = ' Q SYMBOL a,MODEL NO. TYPE SERVED kW VOLTS/PH SIZE STAGES CFLI REMARKS F— 3 W/ } O- O•' OH-2 RENEWMRE IX SERIES ELECTRIC ERV-1 12 206/3 18%16 i 1225 MODULATING HEATCONTRA LLJ LV W co I y O AIR TERMINAL SCHEDULE ! U N N SPECIFIED MFR. Z p EW-RG TYPE h MODEL NO. DESCRIPTION Q S N � �O FUCEILISER TITUS TOO LOUVER FACE,SQUARE NECK W/EOUALIZING GRID z a= WALL SUPPLY O Z O w GRILLE TITUS DOORS VERTICAL BLADES S/4'O.C..DOUBLE DEFLECTION 0 WALL RETURN ALUMINUM CONSIRUC110N J EE G per, GRILLE TITUS HORIZONTAL BLADES 3/4.O.C. = Q 3WALL EXHAUST ALUMINUM CONSTRUCTION GRILLE TIIUs 3FL HORIZONTAL BLADES 3 4-O.C. IMD rn CEILING EXHAUST DIEDGRILLE TAUS 50F 1/2'.1/2-.1/2-CUBE CORE TC IGRI!E ER ITUS W 1/2-.1/2-.1/2-GIBE CORE .m.. NR IN fTk I FTCN WFNO S: 1. CEILING DIFFUSERS(CD)SHALL HAVE NO.8,DIRECTION OF 1HROWS AS INDICATED ON PLANS.(E.C.CD-3-7 WAY THROW 4 110N 2. ALL AIR TERMINALS SHALL HAVE FACTORY FINISH,COLOR AS SELECTED BY ARCHITECT. BID SIT }4. SEE ARCH.FINISH SCHEDULE FOR CEILING. SEE LEGEND FOR TERMINOLOGY USED IN AIR TERMINAL CALL-OUTS ON DRAWINGS. �M-OO4 TYPES,PROVIDE AIR TERMINALS TO MATCH VEACH CEILING CONSTRUCTION INSTALLED IN. BUILDING B HVAC 'T"" "I"•"•� SCHEDULES rasa o,•yiNsn SEQUENCE OF OPERATION: VRF HEAT PUMP SCHEDULE-INDOOR UNIT KW VRF HEAT PUMP UNITS-(HP-2): SYMBOL SP EL N0. SERVED CIFIED MFR. AREA CM SEER IJBH COP CFM ESP AMPUNITO ING TING N IN.0 MCA ELECTRICAL VOLTS/PH EIGHT TYPE OUTDO R REMARKS A. GENERAL CONTROL SCHEME- architects HP-28 TRANE/MITSUBISHI 1. HEAT PUMPS SHALL BE CONTROLLED BY A FACTORY DIGITAL CONTROL SYSTEM. PKFY-P24 CLASSROOM 801 24 01 27 Q 920 - 0.50 - 0.83 208/1 46 WALL MOUNT HP-2A 20 gwwreye�Sesat� CONTROL SYSTEM SHALL PROVIDE A 7-DAY OCCUPANCY SCHEDULE AND xoasnNu MODULATING TEMPERATURE CONTROL. HP-2C TRANL/MI P241S'NI CLASSROOM 801 24 027 0920 - 0.50 - 0.6.3 208/1 46 WALL MOUNT HP-2A a. PROVIDE A CENTRALIZED DIGITAL CONTROLLER WITH A TOUCH SCREEN KMB ftiq 123061 INTERFACE.THE VRF HEAT PUMP FUNCTIONS AND SETPOINTS SHALL BE HP-21) TRANE/MITSUBISHI CLASSROOM 802 24 07 27 QI 920 - 0.50 - 0.63 208/1 46 WALL MOUNT HP-2A ACCESSIBLE FROM THE TOUCH SCREEN. S MP-2E TRANE/MITSUBISHI CLASSROOM B02 24 (�1 27 Q 920 - 0.50 - 0.61 208/1 46 WALL MOUNT HP-2A E. A BACNETNTROLL INTERFACE$HALL BE FRONDED WITH THE CENTRAL VRF PKFY-P24 CONTROLLER 1RANE ITSUBISHIc. INTERFACE THE CENTRAL VRF CONTROLLER WI1H TIE O'WNER'S OOC SYSTEM. HP-� PKFY-P24 CLASSROOM B03 24 �1 27 01 920 - 0.50 - 0.6J 208/1 46 WALL MOUNT NP-2ACOORDINATE THE DISPLAY OF ALL MONITORING POINTS. HP-2G TRANE/MITSUBISHI CLASSROOM B03 24 (2 27 01 920 - 0.5D - 0.63 208/1 46 WALL MOUNT HP-2A � - S. OCCUPIED MODE: UNITS SHALL CYCLE ON AND OFF AS REWIRED TO MAINTAIN SPACE PKFY-P24 a- TEMPERATURE.INITIAL ROOM TEMPERATURE SETPOINTS: 70T HEATING.75T COOLING. HP-2H TRANE/MITSUBISHI STORAGE B04 12 01 13.5 ( 335 - 0.23 - 0.30 208/1 32 CA�NTGIE HP-2A PLFY-P12 C. UNOCCUPIED MODE: UNITS SHALL CYCLE ON AND OFF AS REQUIRED TO MAINTAIN SETBACK TEMPERATURES(GOT HEATING/BGT COOLING)WITH HEATINO/COOUNO HP_21 TRANE/MITSUGISHI COMMUNICATIONS 3I1 Ol 34 (1 92U - U.19 - O.BS 208/1 46 WALL MOUNT HP-2A PROVIDED AS SPECIFIED ABOVE. PKFY-P30 805/B06 D. WARM-UP MODE: UNITS SHALL RUN AS IN THE UNOCCUPIED MODE UNTIL THE SPACE HP-2J TRANE/MITSUBISHIPK COMMUNICATIONS B07OUS 12 Q1 13.5 Q1 297 - 0.19 - 0.30 208/1 25 WALL MOUNT HP-2A TEMPERATURE HAS WARMED UP TO THE OCCUPIED MODE HEATING SETPORT.THEN UNITS SHALL OPERATE AS SPECIFIED FOR THE OCCUPIED MODE HP-2K TRANE/MITSUBISHI CUSTODIAN B08 8 1]1 8.7 Q7 191 - 0.19 - 0.20 208/1 25 WALL MOUNT HP-2A PKFY-PO6 E. MODE CONTROL: UNITS'MODE OF OPERATION SHALL BE DETERMINED BY CENTRAL TIMECL.00K AND TIMECLOCK BYPASS SWITCH;WARM-UP MODE SHALL BE INITIATED BY HP_21. TRANPN/MITSU ISHI FIRST AIBD HTORAGE 6 Q 6.7 Q 191 - 0.19 - 0.20 208/1 25 WALL MOUNT HP-2A O Cn CENTRAL OPTIMUM START CONTROLS. ENERGY RECOVERY VENTILATOR-(ERV-2): HP_214 TRAPKFY- 615H1 01 FIREARMS 810 6 6.7 191 - 0.19 - 0.20 208/1 25 WALL MOUNT HP-2A © Z PE/MIT O6 01 SW A OC DAMPERS MODEHASUP LYt0AND 0R EXHAUST FANS SHALL RUN CONTINUOUSLY.OUTDOOR HP-2N TRANPEN. PK/MITSUUSISHI COPY CENTER 811 6 Q1 6.7 (1 191 - 0.19 - 0.20 208/1 25 WALL MOUNT HP-2A ® ` B. UNOCCUPIED MODE: UNITS SHALL BE OFF.OUTDOOR AIR DAMPERS FULLY CLOSED. HP-20 TRANE/MITSUBISHI STORAGE 812 6 01 6.7 (2) 191 - 0.10 - 0.20 208/1 25 WALL MOUNT HP-2A © 0 PKFY-POB C. MODE CONTROL: UNITS SHALL BE CONTROLLED BY DIGITAL CONTROL SYSTEM(DDC) TRANE/MITSUBISHI CDUNC TIMECLOCK. HP-2P PLFY-P12 LOBBY 72 O7 13.5 Qt 335 - 0.23 - 0.30 208/1 J2 CASSETTE MR-2A © a. DUCT HEATER-(DH-1): HP-20 TRANE/MITSUBISHI LOBBY 72 O1 13.5 01 335 - 0.23 - 0.30 206/1 32 CEILNG HP-2A PLFY-P12 CASSETTE A. GENERAL CONTROL SCHEME: NOTES. 1. DUCT HEATERS HALL BE PRODDED WITH FACTORY SCR CONTROLS.DDC Lu SHALL CONTROLS PROVIDE MODULATING TEMPERATURE CONTROL FROM A DUCT COOLING CAPACITY IS ART RATING: AT 80T DB; 677 N9 INDOOR COIL EAT AND 957 OUTDOORCOIL EAT. OO SEE OUTDOOR UNIT FOR EFFICIENCY TEMPERATURE SENSOR. Q WITH FACTORY CONDENSATE PUMP (n HEATING CAPACITY IS ART HI-TEMP RATING: AT 70T DE INDOOR COIL EAT AND 477 OB; 43'WB OUTDOOR COIL EAT. 2. DUCT HEATERS SHALL BE ENABLED WEN ERV IS ENABLED AND OUTSIDE AIR TEMPERATURE IS LESS THAN SOT. PRELIMINARY ONLY-SIZING AND ACCUMULATOR SELECTION BY HEAT PUMP SUPPLIER.SEE SECTION 238100 'N♦ B. OCCUPIED MODE: SCR CONTROLLERS SHALL MODULATE ELECTRIC HEATING ELEMENTS TO v eQepp PROVIDE A LEAVING AR TEMPERATURE OF SOT. Q J lO C. UNOCCUPIED MODE: UNITS SHALL BE OFF. MISCELLANEOUS EQUIPMENT SCHEDULE _ 0 c 0. MODE CONTROL: UNITS SHALL BE CONTROLLED BY CENTRAL CONTROL SYSTEM SPECIFIED MFR. AREA EOUiPMENT ELECTRICAL 3 TIMECLOCK. SYMBOL ITEM DESCRIPTION @ MODEL NO. SERVED CAPACITY AMPS VOL171 REMARKS } d o ti ELECTRIC RADIANT CEILING PANELS- RCP-1 TRRU RCP-2: BC-2 BRANCH CONTROLLER MITSUBISHI EDUCATION 8 BRANCH MAX 1.8 208/1 t 2 Gc W ( ) CM BLDG B W H Z CO A. ELECTRIC RADIANT HEATERS SHALL BE CONTROLLED BY DDC SYSTEM.PROVIDE A ACCESSORIES: QI W/SALL VALVES ON CONNECTION PORTS 02 W/FACTORY CONDENSATE PUMP N O 7-DAY OCCUPANCY SCHEDULE INITIAL ROOM TEMPERATURE SETPOINT: 68T DISPLAY POINTS: V ¢g ROOM TEMPERATURE(EACH ZONE) Q. Z O N VENT�ILDATION RE AIR TENPRNAAIRR TEMPERATURE ERTUE Z LZ O VRF HE TOIPVENTLA1INUMP STATUS SUPPLY MR TEMPERATURE O Z z0 ENERGY RECOVERY VENTILATOR STATUS J = C DUCT HEATER STATUS o. RADIANT HEATER STATUS W En 3 w ALARMS: 2 a - VRF MEAT PUMP FAILURE ENERGY RECOVERY VENTILATOR FAILURE DUCT HEATER FAILURE iii:Toz4 810SET VEACH BUMIN005C SCHEDULES CONT. xv.na-sw rzsn MECHANICAL DEMOLITION NOTES 1. IT IS THE CONTRACTORS RESPONSIBILITY TO RENEW SITE CONDITIONS AND architects TO IDENTIFY ALL DEMOLITION WORK AND INCLUDE IN HIS BID ALL COSTS FOR DEMOLITION. w[arrm,em al.:m 2. CONTRACTOR SHALL VERIFY THE LOCATIONS k CONNECTIONS OF ALL ITEMS NOTED TO BE REMOVED, 3, ALL EXIST.ITEMS NOT BEING REUSED SHALL BE REMOVED.THIS INCLUDES KMA POW#23063 SUCH ITEMS AS THERMOSTATS,CONTROL WIRING ABOVE CEILING.CONTROL ----- __--- RELATE.DUCTS,FANS,PIPING,GRILLES.SUPPORTS,VALVES,CURBS,AND \ RELATED ACCESSORIES. a. ABANDONED ITEMS.ANCHORS,INSERTS,PIPE STUBS,AND OTHER (�,�, PROJECTIONS NOT BEING CONCEALED BY NEW CONSTRUCTION SHALL BE (E)—(a) I REMOVED TO I'BELOW THE ADJACENT FINISHED SURFACE.AND THE s. �I ------- MULR20NE UNIT I DISTURBED AREA PATCHED. +•o-„'" �•' MZU-1 TO BE S REMOVED J S. PATCH ALL WALL/FLOOR/CEIUNG OPENINGS LEFT BY REMOVAL OF EXIST. 1 I I ITEMS.PATCH SO AS TO MATCH FINISH OF ADJACENT UNDISTURBED AREA, PN I (E)ROOFTOQ EXHAUST FA 6. REFERENCE ARCHITECTURAL DRAWINGS FOR WHERE CEIUNG/WALL AND OTHER 0(E)ROOFTOP i TO RF RFMOVFD GENERAL DEMOLITION WORK IS BEING DONE. EXHAUST FAN EE1 TO BE 7. EXIST.DUCTS,AIR INLETS/OUTLETS SHOWN DASHED REPRESENT MAJOR REMOVED �� 1 i �'F�t MECHANICAL ITEMS TO BE REMOVED. SEE NOTES AND BUBBLE NOTES WHICH { COVER ALL OTHER MISCELLANEOUS MECHANICAL ITEMS TO SE REMOVED. I I :-'(E)GAS PIPING 8. PROVIDE TEMPORARY CAP-OFF OF ALL EXIST.SYSTEMS TO ALLOW TO BE REMOVED J CONTINUED USE OF ALL SYSTEMS UNTIL THE SYSTEM COMPONENTS L--------------_______________________- ARE INSTALLED AND CONNECTED(INCLUDES ES HNS/HWR,FIRE SPRINKLERING. ... CW,HW,MEDICAL GAS,ETC.). z w KEYED NOTES: Qt REMOVE(E)PACKAGED UNIT AND ALL ASSOCIATED CURBS•SUPPORTS,DUCTS O INTO BUILDING,AND OTHER RELATED ITEMS. Q REMOVE(E)EXHAUST FAN AND EXHAUST DUCT.CURB TO REMAIN. - --- ----- ------ -- --- --- (a) REMOVE GAS PIPING DOWN TO SHUTOFF VALVE AT METER AND CAP REMAINING LINE. ROOF HVAC PLAN Q:% — SCALE: i 8'-V-0' 04 INFILL VENT OPENINGS BELOW E%1571NG FLOOR GRILLES NiTH RIGID FOAM / INSULATION PER ARCHITECTURAL DETAILS. W (E)66X14 8 REMOVE INTERIOR AND EXTERIOR GRILLES.PROVIDE INSULATED AND SEALED f— ©(E)FLOOR RETURN DUCT TO O SHEET METAL CAPS ON INTERIOR AND EXTERIOR OPENINGS. Cn RETURN GRILLES BE REMOVED TO BE REMOVED (E)SPUT-SYSTEM AIR - CAP AND ABANDONOS } (TYP.19) CONDITIONER TO REMAIN (E)RELIEF VENTS (E)GAS METER N [� o•a 'c-v JANITOR fT f (TYP.9) U7M ,FILE ST GE IT ROOM Ai5 E� k STAFFOFFICE STAFF OFFICE STAFF OFFICE j J I CLASSROOM A 3 - f Al2 All 0 m i OSPLAv TE)18%B All HZ _� A15-- TO)REIN 3 ­TING TO REMAM - rU^�' ri _ r ri T� i ' MiNS ,� L-u id W(E)18XIO © TO REMAIN -- - RFCEPTXJN QT f(E)18X12 i i z�' 1 (E)8X8 I OFF C O E a Cn n (E)THEAMOSTAT - TO REMAIN I �z 3r--- TO REMAIN I ---- V O N TO BE REMOVED II- MIENS QT AID ,. ¢ o • a (TYP) "' Y I F C i. D.O H ; aZ (E)12XID I. fH STAFF OFFICE Q z CD ~ R HC TGI FT II W LOBBY TO REMAIN ., 1. - Q I rti AMA TO 81N Z R12% EMA J o p v r III (E)MAIN_ _ _ � TO REMAIN ..____ __ _____ _- ---- Q 3 w I� 1 J_OCKER ROOM N �.y E 18X14 A.- TO REMAIN TO RENNN�ii', AWIF .,.M STAFF CONFERENCE F1+_.., COMMANDER COMMANDER STAFF OFF'.DIE (E)1BXt0 CE STAFF OFFICE STAFFOFFICETOE)REMAIN STORAGE" Ml A02 ADD! ADA TO R[;MAIN A. A07 _. .. SHOWER 4i3'A2i FIRST FLOOR HVAC DEMO PLAN inl�'N Aro sn SCALE: 1/8"-V-D• N0111K VEACH -M-051 BUILDING A HVAC DEMO PLANS _ MECHANICAL DEMOLITION NOTES I K*,3 1. IT IS THE CONTRACTORS RES ONSIBILITY TO REVIEW SITE CONDITONS AND TO IDENTIFY ALL DEMOLITION architects ._....... .... ._. ._------------ � � WORK AND INCLUDE IN HIS BID ALL COSTS FOR DEMOLITION. aoar.I..rHrHM.wem 2. CONTRACTOR SHALL VERIFY THE LOCATIONS&CONNECTIONS OF ALL ITEMS NOTED TO BE REMOVED. 3. ALL EXIST.ITEMS NOT BEING REUSED SHALL BE REMOVED.THIS INCLUDES SUCH ITEMS AS THERMOSTATS, KMB Rgd�2J060 CONTROL WIRING ABOVE CEILING,CONTROL DEVICES,DUCTS.FANS,PIPING GRILLES,SUPPORTS,VALVES, CURBS,AND RELATED ACCESSORIES. a. ABANDONED ITEMS.ANCHORS.INSERTS.PIPE STUBS.AND OTHER PROJECTIONS NOT BEING CONCEALED �N y BY NEW CONSTRUCTION SHALL BE REMOVED TO I'BELOW THE ADJACENT FINISHED SURFACE,AND THE '_--,( I--- DISTURBED AREA PATCHED, Q��J+ PATCH ALL WALL/FLOOR/CERING OPENINGS LEFT BY REMOVAL OF EXIST.ITEMS.PATCH SO AS TO MATCH FINISH OF ADJACENT UNDISTURBED AREA. HAi 8. REFERENCE ARCHITECTURAL DRAWINGS FOR WHERE CEIUNG/WALL AND OTHER GENERAL DEMOLITION WORT( -----""--" IS BEING DONE. ' { 7. EXIST.DUCTS.AIR INLET$/OUTLETS SHOWN DASHED REPRESENT MAJOR MECHANICAL ITEMS TO BE ! C1�(E)ROOFTOP- REMOVED. SEE NOTES AND BUBBLE NOTES WHICH COVER ALL OTHER MISCELLANEOUS MECHANICAL ITEMS ITZONE UNIT j TO BE REMOVED, MZU-2 TO BE B. PROVIDE TEMPORARY CAP-OFF OF ALL EXIST.SYSTEMS TO ALLOW CONTINUED USE OF ALL SYSTEMS REMOVED H I UNTIL THE FINAL SYSTEM COMPONENTS ARE INSTALLED AND CONNECTED(INCLUDES HWS/HWR,FIRE ). SPRINKLERING.CW,HW,MEDICAL GAS.ETC.). I � i (E)GAS PIPING TO BE REMOVED KEYED NOTES: z r-� Q7 REMOVE(E)PACKAGED UNIT AND ALL ASSOCIATED CURBS,SUPPORTS,DUCTS INTO BUILDING,AND OTHER W RELATED ITEMS � cc Q REMOVE(E)PACKAGED UNIT AND ALL ASSOCIATED DUCTWORK,THERMOSTATS,DIFFUSERS,OMLLES,AND ROOF HVAC DEMO PLAN �T CTHER RELATED ITEMS. O O3 REMOVE GAS PIPING DOWN TO SHUTOFF VALVE AT METER AND CAP REMAINING LINE. SCALE: 1/8'-1'-0' © INFILL VENT OPENINGS BELOW EXISTING FLOOR GRILLES WITH RIGID FOAM INSULATION PER ARCHITECTURAL C DETAILS. iC E SPLIT-SYSTEM HEA 7 Q REMOVE INTERIOR AND EXTERIOR GRILLES.PROVIDE INSULATED AND SEALED SHEET METAL CAPS ON INTERIOR () TO AND EXTERIOR OPENINGS. PUMP TO BE REMOVED ©(E)FLOOR C-' © REMOVE DUCT ABOVE FLOOR.SEE ARCHITECTURAL PLANS FOR PLUGGING OF OPENING. uj RETURN GRILLES COMMUFJRATIONS TO BE REMOVED OFFICE COPAMUNICATIONS O7 REMOVE ASSOCIATED SUPPORTS,REFRIGERANT PIPING,AND CONDENSATE DRAIN Cn (TYP 17) OR oe FIRlT Al01 Am ' STORAGE COPY CENTER FIREARMSSTORAGE cUstoo AN LOMY� Q REMOVE DUCT BOOT THROUGH WALL REMOVE GRILLE.SEE ARCHITECTURAL PLANS FOR REPAIR OF OPENING. j ! 512 B11 BIG BOB 806 U a �._.(E)12XS I! Q J iO 14 6 (E)12:6 j I TO REMAIN TO REMAIN REMAIN I m TO 12X6 '�Z"'(E)IAXB LI �E�16%f0 I (E)16%8 a- ---------------------- 4 J' TO REMAI.�T TO REMAIN REMAIN ( 0 REMAIN } Q 3 l-- ,j�vyT(I g K - --- - - �,w -------- -- I W s (E)12XIO TO (E)THERMOSTATS It j RE)12FX10 TO REMAIN TO BE REMOVED II Q 0 a o (rvP.) ICI z 4 z N FW O 0 w ,,�j I A T J = o ii CIASSROOIA f.,AF'tTVRN DU CTS%TO M- �t CLASSROOM w 3 w 301 B03 BE REMOVED 803 ,^ STORAGE AOA :T I E-•, ,--( CAP AND O5 _ ABANDON(E) - j (E)HVAC UNIT TO RELIEF VENTS �� ---�- - BE REMOVEDQ (rYP.5) `-(E)GAS METER iii ma 810 S."1 FIRST FLOOR HVAC DEMO PLAN /m SCALE: 1/8''' D VEACH M-052 BUILDING B 'a0""A1°'°s ^ •-' HVAC DEMO PLANS DRAWING NOTES: 1. CONTRACTOR SHALL COORDINATE DUCT INSTALLATION AND OFFSET DUCTS AROUND BUILDING FEATURES,INCLUDING LIGHTS,PLUMBING, architects laiCW CONDUIT,FIRE SPRINKLER PIPING,AND OTHERS. "--"----' ---- -----'---'-----�----.' "---'_ 2. PROVIDE 45'CHAMFERED DUCT TAPS FOR ALL RECTANGULAR BRANCH °-ulna..c.wnw 5i 1'A° I� DUCTS. PROVIDE 45'CONICAL TAPS FOR ALL ROUND BRANCH DUCTS gwyaw.rrAan sews I I ., 'I eeo�u nlMt .- ................ -- -- 3. SPECIAL COORDINATION OF DUCTWORK AND DUCTWORK SHOP DRAWINGS ARE REWIRED,SEE SPECIFICATIONS. Kem F,,,K.ts 23053 PROM FLEXIBLE DUCT CONNECTIONS AT ALL DUCT CONNECTIONS TO FANS AND HVAC UNITS t✓a'e� 5. CONTRACTOR SHALL INVESTIGATE ALL EXISTING CONDITIONS AND REPORT ALL VARIATIONS FROM PLANS TO ENGINEER. 6. PROVIDE THERMOSTATS WHERE SHOWN AND WHERE REWIRED FOR a `� OPERATION OF HVAC EQUIPMENT.LOCATE THERMOSTATS AT ._..._. ACCESSIBLE LOCATIONS A MAXIMUM OF 48'ABOVE FLOOR FOR ADA ACCESS. ® 1 2 © 7. LOCATE HVAC EOUIPMENT NO MORE THAN 2'ABOVE THE CEILING FOR —„ ACCESS. 8. CLEAN ALL EXISTING DUCTS AND GRILLES SHOWN. t t 9. SEE CONTROL SEQUENCES ON SHEET M-003 AND SPECIFICATION �_.....I, 2"00 FOR HVAC CONTROL WORK. ID.AIR BALANCING CONTRACTOR SHALL VERIFY SUPPLY AIR FLOW, RETURN AIR FLOW,AND OUTSIDE AIR QUANTITIES FOR EACH NEW Cn ,VAC UNIT. ADJUST DAMPER POSITIONS AND FAN SPEED TO ACHIEVE AIR FLOWS LISTED ON SCHEDULES. z 11.REFRIGERANT LIOUID AND GAS UNESETS SHOWN AS SINGLE LINES FOR LI-) _.. CLARITY. _.. ___.. _.... 12.PROVDE METAL JACKET OVER PIPING INSULATION FOR ALL OUTSIDE EXPOSED PIPING. Q ROOF HVAC PLAN 13.ALL PIPING ON ROOF TO BE SUPPORTED PER DETAIL 1/M-501. SCALE: 1/8'-1'-0' KEYED NOTES: Q SEE OUTDOOR UNIT DETAIL 4/M-501. (E)SPLIT-SYSTEM AIR LJJ CONDITIONER TO REMAIN BC-1A(ABOVE CEILING) OO INSTALL PER ENERGY RECOVERY VENTILATOR DETAIL BN-501• (Fa 12x12 CD (El exe CD BC-tB(ABOVE CEILING) Q,,�, (E1 tOx1D co (F)lzxlz co 50 CFM (E)12x12 CO ` 20 CFM 2y(fM T 25 CFM 25 CFM O3 POINT OF CONNECTION TO EXISTING DUCTWORK. V� 40 CFM (E)10X70 CD r, - t0 IToa - 180 CFM `At5 }yMFI O T ' � © SEE ROOF PIPING PENETRATION CURB DETAIL 8/M-501. (n F LE STORAUE V 5 BT F OFFICE STAFF U=F.CE S AFF OFFICE 45 CFM. IT a00!A t6 g CLASSROOM A B A77 A- Alt O5 PROVIDE SHEET METAL COVERS INSULATED WITH C14 E IS V 06PI Av At I 1 xt 1 RCP 1O �"L' EXISTING RELIEF GRILLE OPENINGS PAINT TO MATCH EXISTING J WAITING ��/p'/�) - CEILINGS.SEE DETAIL 2/M-502. Q g 11 (E)16xB 'V' a f l'Y 6 27 O -O p�F CFMi UL'-tY� '—RC RLu 5 CFM AIN �6'e ,L VO• 1 8 SOCy(E1 71t7 CO (E)11%10 - 26 25 © PROVIDE LINESET COVERS ON ALL REFRIGERANT AND _ Q t O O 1 12 J !� 21�6 I 6 MP 6 CONDENSATE PIPING EXPOSED TO SIGHT WITHIN THE BUILDING NDOOR H S C HP I _OT C O EXTENDING FROM THE POINT a CONNECTION TO THE INDOOR Q = _......... UNIT TO THE POINT OU PENETRATION INTO CONCEALED WALL OR I EN r 7 1 25 CFM TO REMAIN v CEIUNG SPACE.SEE WALL-MOUNTED HEAT PUMP INSTALLATION RECEPTION T�..... _ p_ RG R e I4 0 O I8XIOREMAIN (6�yP-10 8 DETAILS 1/IA-502. (E)6x6 CO 15 �j/"?bOX1�tV V TO REMAIN O45 FIt:E- Q Q y ® 00 CFM 5 ]IIQI�O - (E)8%8 n MCV _'T Q7 ROUTE REFRIGERANT AND CONDENSATE PIPING HORIZONTALLY 0/! p N 100 C (73 xi0 !I TO)REMAI S ,�-N�(I� 5"j I t4 6 TEIAAIN �`Q 50 0� 19 K.. (E)75%75 W WALL TO MINIMIZE DEMOLITION OF EXISTING CEILING. a (n K N 1 `� 4 OFFIC`CCE� - 35 GEM © SEE DETAIL 1/1I-302 SECTION MEW'A'. z oN LOBBY TO REMAIN I... _ O ate 6 F (E)6xB E 1 6 (E)IBxe i 10'r , OT 2 6'4 3 (E REMAIN O SEE DETAIL 1/M-502 SECTION MEW'B'. Z O a z TO REMAIN G Z 6 8 10 6�� �6 0��� ® SEE DETAIL I/M-502 SECTION MEW'0'. C� p II 10' 18 Q(El 70zio CD SEE DETAIL SECTION MEW V. J EE a¢ 6 T Q3 T 8....- .- 6-.O�.T 6 T p— 6 IF)12X8 CEG L 1/M-302 (El 1595 CF 8 4 O I B LDCK AD ROAM )1 81-1/2- = Q 3 J 95 CF 6 Q IS () 0 - 4 2 7 n00 12X8 © CONO.ON TO EXISTING MOP SINK. 8 _ O6 6X6 CO E EMA J TO REMAIN 4456CrV O" 27 1 TO REMAIN ® PROVIDE SHEET METAL CAPS INSULATED WITH R-38 ON EXISTING N :� ASST tsxls rc 4 wll- 8 ll 7IS T (E)12%10 EXHAUST FAN CURBS STAFF CON NCE COMMANDER CFM COMMANDER REM$AFFIOFFICE STAFF OFFIC= ;TAPE OFFICE STAFF OFFICE �,. !' �I� i0 REMAIN L Sot A A03 A04 ADS A06 A02 1 6 BT me }y❑ TWO 12%12 TO WITH BY BETWEEN ([1UOX10 C0 _ 6xS CO, 1 -� , - ` 4 f 1 BF%�Fc ® WAIL-MWN1E0 MtF TOUCHSCREEN CONTROLLER 25 CF1A(TYP.6) ,5.,FM 20 FU (F)6X6 W 60 CFM FIRST FLOOR HVAC PLAN //T 8%8 CD 4.3- 4 SCALE. 1/8'-+'-0' Bp SD VEACH M-101 BUILDING A ,TU Fwxc a«s .s+svn vM asnl HVAC PLANS cs,a F,eansl mover. DRAWING NOTES: 1. CONTRACTOR SHALL COORDINATE DUCT INSTALLATION AND OFFSET KM DUCTS AROUND BUILDING FEATURES,INCLUDING UGHTS,PLUMBING ter. CONDUIT,FIRE SPRINKLER PIPING,AND OTHERS. architects 2. PROVIDE 45'CHAMFERED DUCT TAPS FOR ALL RECTANGULAR BRANCH DUCTS. PROVIDE 45'CONICAL TAPS FOR ALL ROUND BRANCH DUCTS. .. .... n 3. SPECIAL COORDINATION OF DUCTWORK AND DUCTWORK SHOP DRAWINGS ARE REQUIRED.SEEEE SPECIFICATIONS. XLB AeMtie 2]M 4. PROVIDE FLEXIBLE DUCT CONNECTIONS AT ALL DUCT CONNECTIONS TO FANS AND HVAC UNITSNA 5. CONTRACTOR SHALL INVESTIGATE ALL EXISTING CONDITIONS ANDAA� REPORT ALL VARIATIONS FROM PLANS TO ENGINEER. J, ; a s, 6. PROVIDE THERMOSTATS WHERE SHOWNAND WHERE REWIRED FOR (� OPERATION OF HVAC EQUIPMENT.LOCATE THERMOSTATS AT ACCESSIBLE LOCATIONS A MAXIMUM OF 48'ABOVE FLOOR FOR ADA � ACCESS. 7. LOCATE HVAC EQUIPMENT NO MORE THAN 2'ABOVE THE CEILING FOR SS. ACCE B. CLEAN ALL EXISTING DUCTS AND GRILLES SHOWN. 9. SEE CONTROL SEQUENCES ON SHEET M-005 AND SPECIFICATION '. 230900 FOR HVAC CONTROL WORK. 4 10.AIR BALANCING CONTRACTOR SHALL VERIFY SUPPLY AIR FLOW, RETURN AIR FLOW,AND OUTSIDE AIR QUANTITIES FOR EACH NEW (n HVAC UNIT, ADJUST DAMPER POSITIONS AND FAN SPEED TO ACHIEVE ` AIR FLOWS LISTED ON SCHEDULES. 11.REFRIGERANT LIQUID AND GAS UNESETS SHOWN AS SINGLE LINES FOR uj CLARITY. 12.PROVIDE METAL JACKET OVER PIPING INSULATION FOR ALL OUTSIDE ,7 EXPOSED PIPING. Q 13.ALL PIPING ON ROOF TO BE SUPPORTED PER DETAIL 1/L1-501. ROOF HVAC PLAN /fin S SCALE: 1/8'-1'-0" ` KEYED NOTES: cc— Q SEE OUTDOOR UNIT DETAIL 4/M-501. G O INSTALL PER ENERGY RECOVERY VENTILATOR DETAIL 6/M-SOt. (El 7x7 CD (E1 6X6 CO _. _ (E)12%12 CG (F1 Two CD (Fl 14%14[Xl 20 CFM 15 CFM j 70 CFY�( 100 CFM f00 CFM `, O POINT OF CONNECTION TO EXISTING DUCTWORK. N (ET 10X10 CD (E)12X6 (E)12X8 1'_�LrpMMUNICATIONS(TV - 20 CFM TO REMAIN TO REMAIN0 REMAIN \ Q4 SEE ROOF PIPING PENETRATION CURB DETAIL 8 OFFICE COMMUNICATIONS /M-501. �+! STORAGE cor'v CENT ER =IREAgMS 1FR[St ;G~S LOBBY QS PROVIDE SHEET METAL COVERS INSULATED WITH R-38 ON V O HtJ Htt nto ITwe t I 8011 R•j 1 SE g 2Ho S4 20NG.3-C. 11'L-*-^ .t,O EXISTING RELIEF GRILLE OPENINGS.PAINT TO MATCH EXISTING O 6 l8 12X6 CEILINGS.SEE DETAIL 2/M-502. 0 rn �"O7' 7 9 © lO NE i TO REMAIN © PROVIDE LINESET COVERS ON ALL REFRIGERANT AND = 3 _ CONDENSATE PIPING EXPOSED TO SIGHT WITHIN THE BUILDING G 10 h11 I O 8"m (E)16X8 EXTENDING FROM THE POINT OF CONNECTION TO THE INDOOR =O 8 6 ijE1,REMgI 9 (E)1 0 y 250 CFM 110 REMAIN UNIT TO THE POINT OF PENETRATION INTO CONCEALED WALL OR T IU "U g•�, TT TO AlREMN t20 OB•e'.� L'O' CEILING SPACE.SEE WALL-MOUNTED HEAT PUMP INSTALLATION LlJ yl~' RCP-1 �1 1 1 ( I I .!l 6X6 CD DETAILS 1/M-502. W r y O 6X6 CD OS.Lr' _ i 1 ---- C—��� .76X8 C 4 I.- ` �r,-/ 20 CFM Q7 ROUTE REFRIGERANT AND CONDENSATE PIPING HORIZONTALLY ON Q p 20 Cl 'TT 1 L� �1 WALL TO MINIMIZE DEMOUTIW OF EXISTING CEILING. 1 I�'L 1I ®Q� plyl 11 >t7 1 Z �O 1fiX6 WSG ` O 1 T 3 1 1 1 SEE DETAIL 1/M-502 SECTION VIEW'A'. Q GI N 225 CFM(TYP 6 '13 I ® 1 1 8X/0 1 t O©�e za 6 HP 0 as ©nela ,B 6 n�� t>�2E©1z%to 6 F— — �a SEE DETAIL 1/IA-SDz sEcnaH VIEW •e'. Z � a� 0 +BX10 WEQ /6%G OH-2 x�j (E)12X10 36%10 400 CFM Ill VEQXI VIED -a 6"e 5 (E)12X10 ® SEE DETAIL 1/Ill SECTION VIEW'E'. O Z O w TO REMAIN 400 CFM t8X16 00 CFM TO TO REMAIN J = G J6a 16XIO UP 1-1/2'COND.DN TO EXIST FLOOR GRAIN. W O d (ABOVE BOILING) 6•0 Y RC/RL To Uni 2 ® WALL-MOUNTED VRF TOUCHSCREEN CONTROLLER = Q M a CLASSROOM CLASSROOM 1B HP-2H CLASSROOM 801 802 O40 CFM I..B03... STORAGE O:. :::::::•O 80,... 413,M4 FIRST FLOOR HVAC PLAN BID SLR SCALE: 1/8'.V-0' V EACH M-102 BUILDING B tR1M PaeecAnA awBT,e.�w.crw. HVAC PLANS R.x+n.am wr:>n PLATE HEAT GALVANIZED K� E%CHANGER UNISTRUT FACE AND BYPASS EXHAUST FAN DISCHARGE HOOD OUTDOOR HEAT PUMP architects DAMPERS ELECTRICAL INTAKE HOOD CONDUIT UV RESISTANT i ` rPusnc BASE J 1l0 5]!U O EA XM6 Aulea a 2JOW UNIT BASE RAIL 1 Z SUPPLYNT�CLIP INSULATED REFRIGERANT CA O i SCREW TO UNIT BASE PIPES W/WATER TIGHT 12'X16'BASE yy ' ` //ROOF CURB.SEE JACKETy�%. SEALED TRANSITION _ / DETAIL 7/M-501. --_-- _-- BOLT UNIT TO SUPPORT OTH 1/4•GALVANIZED ROOF TOP PIPE SUPPORTS h I I -I ROOF DECK PROVIDE A MINR/UM OF TWO 1 4Y%3' . I STEEL BC.TS.4 PER UNIT / RETURN AIR DUCT DUCT SOUND ; LAG SCREWS TO STRUCTURE IN EACH NOT TO SCALE M-501 5EE PLAN FOR SIZE LINING SUPPLY AIR DUCT SUPPORT.CAULK TO SEAL. SUP"FOR SIZE ENERGY RECOVERY UNIT DIAGRAM DIVERSITEC WICKSURC OR EQUAL SIZED PER UNIT. NOT TO SCALE M- 1 --ROD'OEH`X ADJUSTABLE GLENS, WEATHER STRIP SEAL OUTDOOR HEAT PUMP INSTALLATION DETAIL q H HVAC UNIT NOT TO SCALE M-501 REFRIGERANT PIPE-U/INSULATION Z LLI 1. 20'MAX. INSULATIW PROTECTION CURB,FURNISHED WITH HVAC UNIT - TO POINT OF SHIELD 20 GA.S5.FLASHMC Q FASTEN TO NAILER AT TOP DRAINAGE RIGID INSULATION I CONDENSATE DRAIN,SLOPE HOLD-DOWN STRAP,2'WIDE X 16 Ufll2 I7.IIN.1/6'/FOOT,SAME SIZE GAUGE GALV.STEEL FASTEN WITH c (3)i10 S.M.$CREW$TO UNIT 6: ANCHOR CURB TO BLOCKING W/ AS UNIT CONNECTION OUTING C cuRB(TYP.4 vucEs). 1/4"0%3'LAG SCREWS O 24"MAX O.C. LESS THAN 0' plpE HANGER SUPPORT `— ROOFING,SEE ARCH.PLANS ';x ANCHOR BLOCKING TO ROOF JOISTS W/ 2 C j r 1/4.06-LAG SCREWS O 24-MAX O.C. NTS M-501 C 'ROOF DECK PUMPED CONDENSATE DETAIL Lu / NOT TO SCALE M 5 1 } / \ NOTES- CANTS, CANTS,CUT AS REO'D(TYP.)J `TREATED 4X BLOCKING TO ALLOW UNIT TO 1, SIZE HANGER COMPONENTS AND FASTENERS PER SMACNA HVAC Q SIT LEVEL(WITHIN MFR'S TOLERANCES) DUCT CONSTRUCTION STANDARDS,CHAPTER 5.FOURTH EDITION. 2. WIRE HANGERS ARE NOT ACCEPTABLE HVAC UNIT MOUNTING DETAIL TRAPEZE HANGERS 3. PROVIDE SHOP DRAWINGS INDICATING TYPES AND LOCATIONS OF = q 7 STRAP HANGERS DUCT HANGERS. i STRAPSjj;� ANGLE OR Rap 4. HANGER ATTACHMENTS TO STRUCTURE SHALL BE OF TYPES AND ZO allANGER SIZES ALLOWED BY SMACNA HVAC DUCT CONSTRUCTION STANDARDS,SJZ SCREWS MAY BESPREAD MAY BE GREATEROMITTED IF THAN 60 IN.IF FOOT OF FOURTH EDITION. wHANGER LOOPSSTRAP IS PLACED UNDER A 5. SEISMIC BRACING SHALL BE REWIRED FOR ALL DUCTS THAT ARE SEAL PER ROOFING BOTTOM REINFORCEMENT SUSPENDED MORE THAN 24•BELOW STRUCTURE.BRACING SHALLMETAL CAP WTH MANUFACTURERS MEET THE CURRENT SMACNA SEISMIC RESTRAINT MANUAL aFLASHING STANDARD DETAIL EWS IN.(MIN) F Qw(S) GUIDELINES FOR MECHANICAL SYSTEMS. V Z O TREATED 2X12 SLEEVE a O CURR HANGERS MUST NOT ROOFING.SEE SEAL WATER TIGHT DEFORM DUCT SHAPE ROD REINFORCEMENT MAY BE Z F a 2 ARCH.PLANS LOAD RATED USED FOR ATTArHMFNT C) Z O w FASTEN ER$ RODS IF IT QUALIFIES FOR ROOF DECK REFRIGERANT PIPING BOTH DUTIES. p HANGER STRAPS DO NOT EXCEED Lu (n ALLOWABLE LOAD LIMITS BANG OF SAME = Q 3 a CANTS,OJT AS SIZE A$HANGER N N FILL GAP WITH STRAP NUTS REO'D(TYP.) INSULATION ALTERNATE LOCATION ROOF PIPING PENETRATION CURB DETAIL r� BAND ONE HA F ROUND (VERIFY UPPER TRAPEZE 36 IN.CIA. 24 IN.DIA. MAY BE USED IF DUCT LOAD CAPACITY) NOT TO SCALE M-01 MAX. MAX SHAPE IS MAINTAINED ANGLES DUCT HANGER ATTACHMENTS Nis "-M-sD1 aroso M-501 IVEACH= HVAC DETAILS ROUTE HORIZONTALLY ALONG CEILING WHERE SHOWN TO MINIMIZE WORK ABKM OVE EXISTING TO CEILINGS fK (E)ROOFING (E)ROOFING architects (E)CEILING OR CEILING TRIM I (WHICHEVER IS LOWER) `-�MIN a-1 4'CLEAR e:s co� N.c,nsw sm.:m R / • apwoA.w.a..A.cem� (E)RELIEF DUCT - -- --- -- --- �,_ (E)RELIEF DUCT h� -'-TO IN..CEIL(I.)S PENETRATION iep av^ewu f� WALL-NOUNTED FITTING.(TYP.)SEE SECTION VIEWS. (E)VAULTED CEILING' ^ HVAC UNIT 5-J/e-%3-i/B-UNESET COVER XM191FmleCte 7JDOJ ALTERNATE UNESET LDCATION - rLH I SYSTEM.RECTORSEAL SUMDUCT (E)WALL ti� OR APPROVED EOUAL SHEET METAL CAP W/R-JB-" (E)CEILING SHEET METAL CAP W/R-38 ALTERNATE DISCONNECT TEE FITTING ♦V��:�!P INSULATION.PAINT TO MATCH INSULATION.PAINT TO MATCH LOCATION CONDENSATE PUMP L ADJACENT CEILING ADJACENT CEILING DISCONNECT SWITCH PER -(E)WALL ELECTRICAL FINISH TO MATCH LINESET COVER. FLAT CEILING VAULTED CEILING FRONT VIEW RELEIF VENT CAPPING DETAILS 1 (E)ROOFING (ems NOT TO`;GALE 1. ALL REFRIGERANT AND CONDENSATE PIPING EXPOSED TO SIGHT WITHIN THE BUILDING CONTROL WIRING,RG,RL,& SHALL BE PROVIDED WITH UNESET COVERS (E)BEAM COND.PIPING TO CENTRAL EXTENDING FROM THE POINT OF CONNECTION SYSTEM.(TYP.) TO THE INDOOR UNIT TO THE POINT OF (E)SHEETROCK CEILING (E)ACT CEILING PENETRATION INTO CONCEALED WALL OR CD LING SPACE.RECTORSEAL SUMDUCT OR - CONTROL WIRING,RG,RL.& APPROVED EOUAI. CEILING INLET ADAPTOR COND.PIPING TO INDOOR UNIT 2. UNESET COVERS SHALL BE SELECTED TO N (TYP.) MATCH EXISTING WALL OR TRIM COLOR AS CLOSELY AS POSSIBLE.PROVIDE BROWN Z RIGID UNESET COVER -" (E)WALL UNESET COVERS FOR LINESEIS INSTALLED ON j TO INDOOR UNIT.SEE BRICK WALLS,AND.1.LINESET COVERS C FRONT NEW FOR UNESETS INSTALLED ON SHEETROCK C WALLS. SECTION VIEW'A' O d -(E)ROOFING C (E)BEAM (E)BEAM W (E)SHEETROCK CEILING (E)ACT CEIUNG (E)SHEETROCK COLING } (E)VAULTED CEILING - ROUTE ALONG CEILING (n CEIUNG INLET ADAPTOR (E)TRIM AS SHOWN ON PLANS. `. SEE SECTION NEW RIGID LINESET COVER , - WALL INLET ADAPTOR Q J N 70 iNDOOFRONT NSEE -...(E)WALL EW RIGID UNESET COVER (E)WALL TO INDOOR UNIT.SEE FRONT NEW = 3 SECTION VIEW'B' SECTION VIEW'D' n- o p Lu a -o N N (E)ROOFING (E)ROOFING Q F N �v v U N Q O O ON ..._„ (E)BEAM Z F- (E)BEAM C) (E)SHEETROCK CEILING (WALLA NLETD Q ADAPTOR CEILINGV (E)ACT CEILING O Z w --ROUTE ALONG CEILING FLEXIBLE JOINT.ROUTE I —I = o AS SHOWN ON PLANS, TIGHT TO WALL/CELNG W C) 3 d SEE SECTION NEW'S' (E)TRIM WALL INLET ADAPTOR - RIGID LINE ET COVER- \\ (E)WALL RICID UNESET COVER (E)WALL TO INDOOR UNIT.SEE TO INDOOR UNIT.SEE FRONT NEW FRONT VIEW SECTION VIEW'C' SECTION VIEW'E' WALL-MOUNTED HEAT PUMP INSTALLATION DETAILS q V3 M24 NOT TO SCALE M- BID 50 IVEACHM M-502 HVAC DETAILS CONT. NEUDORFER ENGINEERS - AN Cteg! COMPANY CERTIFICATION PAGE PROJECT NAME: WSP -Shelton Academy HVAC System Improvement The data presented in this report is a record of system measurements and final adjustments that have been obtained in accordance with the current edition of the NEBB Procedural Standard for Testing, Adjusting and Balancing of Environmental Systems. The measurements shown, and the information given, in this report are certified to be accurate and complete, at the time and date information was gathered. Any variances from design quantities, which exceed NEBB tolerances, are noted in the TAB report project summary. SUBMITTED & CERTIFIED BY: NEBB TAB FIRM Neudorfer Engineers, LLC. TAB PROFESSIONAL William C. Neudorfer REG NO. 3856 CERTIFICATION EXPIRATION DATE 12/31/2024 -- ��.es Eng1nee't's 0 WIL C. NEUDORFER . ERTIFICATION 41 3856 Exp.12/31/24 ,y4 dronic fie`' Project 2024-0647 Page 25 of 29 ` NEUDORFER ,. , ENGINEERS a , y, ar.�cegra com o•Hv Warranty Project: Warranty of Services: Neudorfer Engineers, LLC. warrants that the air balancing evaluated during this performance evaluation is operating at the specified levels as documented within this report. At and only this time, and makes no other warranties, stated or implied, concerning the continued performance, operation, or safety in the use of this equipment past this time. Neudorfer Engineers warrants air balancing for 1 year from the date of substantial completion. Neudorfer Engineers reserves the right to correct errors or omissions in the collections of data. Warranty Procedures: For all warranty items, Neudorfer Engineers requires written request. The written request should be specific to the areas of concern, such rooms, or equipment, and the type of issue the occupants are experiencing. Once written notification is received, Neudorfer Engineers will schedule a Technician. It is recommended that an Owner or A/E Representative be on site at that time. Voided Warranty and Additional Charges: If a complaint issue is due to a mechanical equipment failure, control or maintenance related, the return trip may be subject to a service charge, not covered under warranty. Neudorfer Engineers reserves the right to resolve any TAB issue. If a third party or competing Test& Balance Commissioning firm test or adjust any equipment, all project warranty is voided. (This is typical standard for the Mechanical industry, as Manufacture, Mechanical and Control Contractor voids all warranty when a competing firm tests or manipulates their systems.)Any return trips to the job site are subject to a service charge and a purchase order will be required before returning to the job site. Document Archiving An electronic file of all test documents will be kept on file until the end of the Warranty period. During that time an electronic copy of the test data will be provided at no charge. Any additional hard / bound copies requested will be subject to a fee. Page 26 of 29 • .Alk . . Pursuant to the agreement between Integra Testing Services, LLC and/or its subsidiaries ("Integra Testing") and Client, all systems shall be tested, adjusted, and balanced in accordance with the project plans and specifications and to the optimum performance capabilities of the equipment. Testing and balancing shall be done in accordance with the standards published by the Associated Air Balance Council (AABC) and/or the National Environmental Balancing Bureau (NEBB). If Integra Testing fails to comply with the specifications or pre-determined scope for any reason other than equipment malfunction or inadequacy which prevents proper balancing of the systems, Integra Testing's Quality Control Team will investigate and, if warranted, will provide supervisory personnel to assist in the rebalancing of the air or hydronic system(s). The rebalancing of any of the air or hydronic systems will be provided at no additional cost to the building owner. Reported items documented outside of design tolerances with reason are not included in this warranty. If a complaint issue is due to a mechanical equipment failure, control or maintenance related issue, the return trip may be subject to a service charge which is not covered under this warranty. Third party adjustments made to the system prior to invocation of warranty also voids this warranty. This Guaranty is valid for one year from the date of submission of a test and balance report and may only be invoked in writing by the building owner, architect, or engineer of record. The Guaranty is limited to the terms and conditions as stated herein. Response to complaints will be provided within 10 business days of initial complaint. Integra Testing Services I mvwAntegratesting.com Page 27 of 29 BRANOM Measure.Test,Automate, Branom InstrumentCompany 5 610 4th Ave 5, Seattle WA 98108 United States Ceetilkate ofCaibradon VIM 13162 CiKtomer nFwc Neudorfer Englrwers LLC Address 5516 IstAveS'SPattlaWashingtonttJ$ "ICt$ - Poo! SEA.01 kutriAWntOwrlptiom TSIPJnarEBT-.721-- — — -- Serlal H"P0.1-cf; 907(S014 Celibratron Dater Cmtomer MD NIA Calfbratlon Due Cor4tIoil Fauid Jrr TOItran-e Branum 0r4dat 4: S4o23S: C;mMGn Lett; In Tokrinre Te5tProcedureused; 61C�Oa5 { >rr j Temperature{'F: Hum kiity f%k 342 i$Ww By: Urw Vldales Asset Auet Sa9ai Numbar Cal Due Date Ametek;IK-6541VC 75585 Per°1 i i�G2q IX of readfrig±(�.i)Oi[rL H20 Calibration Results: Appllec VY-IUt M.2suradVakte Lower Urnit HlgherLknit LWOMmore m4mweISawxs Pau/Fall 0 -10.iM933 -0•t}Ol O.t701 nrti Measure Pass 4 9.93 190 4,01 lnurr Measure Fa55 b.n 6.9i9 7.001 irrvrc r••tea Lire Pass 10 14)-00 9.91? lOAdf :s1rC flaaturc Pa55 i5 1 5'2 14.419 1sAB1 Irwyc PVA H ranm��.!�i.�rri I C<.nk.+r'�!rve+rh.[+rb k�.�+.c Rrmn��r mr�e«er�x d.,r I ruuan��r.�r.-a:�re�ra n a.nn:n c v e rar re.a rC i I r.Wh�tr_eca�.»raSn r e�rw tie u�Fe fLilfn:l Y�iM�t W=l.•d ui H+RT��.TMr�e,-IYk��n eN� 1 e Inr I�t�mf nl I!?M lctir r�`w H dryp yyt n M M�e{�Nu'ef.K.M In rtt w7Mul�•.rtirTNPVN of EtxKm krtw rt+�V.CmpitY.iM1 f1:�ItF.e.7cM rRiP L�`02=i Phone:+1206-762-6050 Email;sates@branorfl,cont Website-htt,ps;//igww,branom.eom Thank you for the opportunity to quote your equipment requirements. Page: t I 1 Page 28 of 29 ENG • 1V ENGINEERS yea ra AN[_c Sg COM-Y Terms and Abbreviations AHU Air Handling Unit FH Fume Hood OED Open Ended Duct ACU Air Conditioning Unit FHT Fume Hood Test OSA Min. Outside Air Minimum ACCU Air Cooled Condensing Unit FG Floor Grille OAT Outside Air Temperature Adj.P.D. Adjusted Pitch Diameter F.E. Floor Exhaust or Return pD/pp Pressure Drop AFMS Airflow Monitoring Station FLA Full Load Amperage PF Power Factor AMP Amperage FM Flow Meter PHC Preheat Coil AVG. Average FPB Fan Powered Box PH Phase(s) BD Balance Damper FPM Feet Per Minute PICV Press. Independent Control Valve BET Building Envelope Test FS PMP Circulating Pump BHP Brake Horsepower FSCAL Flow Sensor Calibration Pp Perforated Plate BMS Building Management System FSD Fire Smoke Damper PSI Pounds Per Square Inch BOS Bottom of Sheave FSR Floor Supply Register PSIA PSI Absolute BSC Bio Safety Cabinet FT Feet, Foot PSIG PSI Gauge BTU British Thermal Unit FTHD Feet of Head PT Pitot Traverse BTUh BTU/Hour FTU Fan Terminal Unit RA Return Air BV Balance Valve GFH Gas Fired Heater RAT Return Air Temperature BVFM Balance Valve Flow Meter GFHC Gas Fired Heating Coil RAID Return Air Damper CAV Constant Air Volume GIRD Grille, Register, Diffuser RF Return Air Fan CBV Calibrated Balance Valve GPM Gallons Per Minute RG Return Grille CD Ceiling Diffuser HC Heating Coil RHC Reheat Coil CIF Correction Factor(also Ak) HEPA High Eff. Particulate Absorbing RH Relative Humidity CFLA Corrected Full Load Amps H.F. HEPA Filter RR Return Register CFM Cubic Feet Per Minute HOA Hand/Off/Auto Switch RPM Revolutions Per Minute C.E. Ceiling Exhaust HP Horsepower RTU Roof Top Unit CEF Ceiling Exhaust Fan HpS High Pressure Steam RVA Rotating Vane Anemometer CH Chiller HRC Heat Recovery/Reclaim Coil SA Supply Air CHWR Chilled Water Return HRU Heat Recovery Unit SAT Supply Air Temperature CHWS Chilled Water Supply HTR O.L. Overload Protection(Motors) SD Supply Diffuser C.R. Ceiling Return HVAC Heating,Ventilation&Air Cond. SEF Smoke Exhaust Fan CT Cooling Tower HWR Hot/Heating Water Return SF(Air) Supply Fan CU Condensing Unit HWS Hot/Heating Water Supply S.F. Service Factor(Electrical) CWR Condenser Water Return HX Heat Exchanger SHC Steam Heating Coil CWS Condenser Water Supply Hz Hertz,Cylcles per Second SNKL Snorkel Inlet CV Constant Volume ID Inside Diameter Sp-WC Static Pressure in.W.C. Cx Commissioning In/S Inches Per Second sq.ft. (Area)Square Feet DB Dry Bulb in.W.C. Inches Water Column SR Supply Register dB Decibel Level Kfactor Correction Factor of Free Area SWE Sidewall Exhaust dB(A) A Weighted Decibel Level KW Kilowatts SWG Side Wall Grille D.D. Direct Drive LAT Leaving Air Temperature SWR Sidewall Return/Register DDC Direct Digital Controls LD Linear Supply Diffuser SWS Sidewall Supply Des. Design LPS Low Pressure Steam TAB Test,Adjust,&Balance DIA Diameter LRD Linear Return Diffuser TDH Total Dynamic Head DNL Data Not Listed LSD Linear Slot Diffuser TOS Top of Sheave DOAS Dedicated Outside Air System LT Light Troffer TSP Total Static Pressure Dp Differential Pressure LWG Low Wall Grille TU Terminal Unit DTC Dual Temperature Coil LWR Low Wall Return UH Unit Heater DVA Demand Ventilation Air LWT Leaving Water Temperature ULPA Ultra Low Particle Air(Filter) EA Exhaust Air MAD Mixed Air Damper V Volts EAD Exhaust Air Damper MAU/MUA Make Up Air/Unit VAV Variable Air Volume EAT Entering Air Temperature MBH 1000 Btu's Per Hour VEL Velocity ECM Electronically Commutated Motor MVD Manual Volume Damper VD Volume Damper ECONA Economizer Air NA Not Applicable VFD Variable Frequency Drive EDH Eclectic Duct Heater N/ACC Not Accessible VP Velocity Pressure EF Exhaust Fan NC Noise Criteria VSC Variable Speed Controller EG Exhaust Grille NS Not Specified VVT Variable Volume Terminal EMCS Energy Mgt.Control System NPSH Net Positive Suction Head W Watts ER Exhaust Register NPSHA Net Positive Suction Head Avail. WB Wet Bulb ERV/ERU Energy Recovery Ventilator/Unit NPSHR Net Positive Suction Head Req. W.G. Water Gauge ESP External Static Pressure NZ Nozzle Ap Differential(Delta)Pressure EWT Entering Water Temperature OAD Outside Air Damper AT Differential(Delta)Temperature FCU Fan Coil Unit OBD Opposed Blade Damper VA Ventilation Air