Loading...
HomeMy WebLinkAboutCOM2021-00039 Storage Bldg #18 - COM Inspections - 10/1/2024 INSPECTION CARD Mason County r 615 W. Alder St. Bldg.8, Shelton, WA 98584 360-427-9670 ext 352 www.co.mason.wa.us PERMIT# COM2021-00039 PROJECT ADDRESS 2744 E Spencer Lake Rd Shelton, WA 98584 PARCEL# 221293490020 PROJECT DESCRIPTION CONSTRUCT MINI STORAGE BUILDING #18 OWNER ALFRED JONES ADDRESS 2494 E PICKERING RD PHONE 360.463.3486 CONTRACTOR ADDRESS PHONE CONTRACTOR LICENSE LENDER INSPECTION INSP DATE Comments INSPECTION INSP DATE Comments Setback Inspection D RQugh--Wumbing-lnspsctiou_ Footing Inspection Iyt , tX Mee#erticai#nspettran-- F.g4Lattation-Wall-Pre-Pony Insulation-insptrMn— SheacwaUAP-specti— BLD-Final Inspection Framing Inspection a (-tom }Y VL4.t C. + 3-Z 2 7- DEL S t µ.j a G �✓C w4 r 1 l_Z 3_2 Z J—n— MASON COUNTY 360-427-9670 Shelton ext.352 COMMUNITY SERVICES 36 60-482-52 Be lm ext.352 q0) 360-482-5269 Elma ext.352 Building, Planning,Environmental Health,Community Health 615 W.Alder St. Bldg.8 - Shelton,WA 98584 www.co.mason.wa.us CORRECTION/INSPECTION REPORT PERMIT/CASE NUMBER: Cat,"20 (•—G11D39 ADDRESS/LOCATION: 2-7W 6 [4,ke , Sltzh6il FINDINGS: or Flb ti O z 4 0� llcc o v 12.eek OteVt- Fho✓.�O& Five Items listed above must be corrected to gain compliance. ❑ THIS IS NOT A COMPLETE INSPECTION ❑ This structure has been inspected by Mason County Building Department and the items listed above are in VIOLATION of Mason County laws and/or ordinances. ❑ Call for re-inspection when corrections are made before proceeding with any further work. ❑ Make corrections, items will be checked on the next i specti n.. ❑ OK to Y OGC(/ ��O „S GJ (� ✓rlG�/l Date: .�Z—2 2 ❑ Please contact our office regarding possible Department: i p structural damage incurred by recent Inspector: "natural/man made"disasters.This is NOT a • CORRECTION NOTICE. DO NOT REMOVE THIS TAG MCC14.12 Mason County Mason County - Division of Community Development 615 W.Alder St. Bldg.8 Shelton,WA 98584 360-427-9670 ext 352 www.co.mason.wa.us FPROJECT 1-00039 NEW COMMERCIAL PERMIT ESCRIPTION: CONSTRUCT MINI STORAGE BUILDING#18 ISSUED: 07/06/2021 ESS: 2744 E SPENCER LAKE RD SHELTON EXPIRES: 01/02/2022 PARCEL: 221293490020 APPLICANT: JONES,ALFRED W OWNER: ALFRED JONES 2494 E PICKERING RD 2494 E PICKERING RD SHELTON,WA98584 SHELTON,WA98584 360.463.3486 VALUATIONS: FEES: Paid Due S-1 IIB Storage, moderate 3120.00 $295,432.80 IFC Plan Check Fee $745.66 $0.00 hazard Technology Surcharge $75.71 $0.00 Plan Check Fee $1,491.31 $0.00 State Fee-Commercial $25.00 $0.00 Building Permit Fee $2,294.32 $0.00 Planning Commercial Review $380.00 $0.00 Fee Total: $295,432.80 Totals : $5,012.00 $0.00 REQUIRED INSPECTIONS Setback Inspection Rough- Plumbing Inspection Footing Inspection Mechanical Inspection Foundation Wall-Pre-Pour Inspection Insulation Inspection Shearwall Inspection BLD-Final Inspection Framing Inspection CONDITIONS Printed by:Ariane Paysse on:07/06/2021 09:19 AM Page 1 of 4 ID Mason County K Mason County - Division of Community Development 615 W.Alder St. Bldg.8 Shelton, WA 98584 360-427-9670 ext 352 www.co.mason.wa.us NEW COMMERCIAL PERMIT COM2021-00039 * Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1-800-647-0982. The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. * Approved per dimensions and setbacks on submitted site plan. Setbacks are measured from the furthest projection of the structure. * All construction must meet or exceed all local and state ordinances in addition to the International Codes requirements as adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in permit revocation. * Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and MUST NOT adversely impact adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either private ditches and drains will meet requirements of the stormwater ordinance or prior approval will be granted to use an existing utility and drainage easement dedicated for that specific purpose. For further information regarding this ordinance and the REQUIREMENT to obtain an ACCESS PERMIT for the installation/construction of a driveway or access connecting from a Mason County Road, Contact the Mason County Public Works Department prior to construction at Ext 450. For any construction which is proposed to be located within 25'of a Mason County road right of way, it is suggested to contact that office to review future planned work which may affect your project. * CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE ADOPTED BUILDING CODE. The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance with the international codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Building Inspector shall be made prior to requesting additional inspections. * When parcel development requires direct access to county road(s), a Road Access Permit or Approval must be granted by the Mason County Department of Public Works. For more information contact Public Works, at(360)427-9670, ext. 450 or 100 W Public Works Dr. Shelton. The building permit will not be finaled until the permit holder can show proof that the access permit from Public Works has been finaled and approved. * The international code requires a fire apparatus access road for every facility, building, or portion of a building that is more than 150'from an approved access road. Roads are required to meet the minimum Mason County Fire Marshal standards for Fire Apparatus Access Roads up to the point where such roads connect with a county maintained public road or to another fire apparatus access road which connects to a county maintained public road. * The foundation/footing must be placed on undisturbed, firm-native soil. * All RED stamped approved plans are required to be on-site for inspection purposes. If an inspection is called for and plans are not available on site, then approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and must be collected by the Building Department prior to any further inspections being performed or approvals granted. * Concrete encased grounding electrodes must be installed and used at each new building or structure that is built upon a permanent concrete foundation. In Mason County the electrical code is regulated by Washington State Department of Labor & Industries (L&I). For more information contact L&I for additional information. In Olympia call (360)902-6350 and in Bremerton call (360)415- 4000. * Owner/Agent is responsible to post the assigned address and/or purchase and post private road signs in accordance with Mason County Title 14.28 and 14.17. * WIND LOADS- Roof coverings shall be designed and tested to withstand the maximum basic wind speed. The basic wind speed for Mason County is 85 MPH. Printed by:Ariane Paysse on:07/06/2021 09:19 AM Page 2 of 4 Mason County Mason County - Division of Community Development 615 W.Alder St. Bldg.8 Shelton,WA 98584 360-427-9670 ext 352 www.co.mason.wa.us NEW COMMERCIAL PERMIT COM2021-00039 * REQUIREMENTS FOR ROOF COVERINGS. Roof coverings shall be applied in accordance with the applicable provisions of the current code and the manufacturer's installation instructions. A drip edge shall be provided at eaves and gables of shingle roofs. * The stamped approved site plan is required to be on-site for inspection purposes. If an inspection is requested and the approved site plan is not on site, approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and shall be collected by the Building Department prior to any further inspections being performed or approvals granted. * Pressure treated wood manufactured after January 1, 2004 may contain high concentrations of copper which could quickly corrode metal fasteners, connectors, and flashing. Install metal connectors approved for contact with the new types of pressure treated material. * All building permits shall have a final inspection performed and approved by Mason County Building Department prior to permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with Mason County ordinances and building regulations. * All property lines shall be clearly identified at the time of foundation inspection. * All surface water and potential runoff must be controlled on site and shall not adversely affect any adjacent properties nor increase the velocity flow entering or abutting to any state or county culverting/ditching system or road way. * All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may grant a one time extention of 180 days, upon the receipt of a written extension request prior to permit expiration. Letter must indicating that circumstances beyond the control of the permit holder preventing action from being taken. No more than one extension may be granted. * All changes to"approved" building plans that effect compliance with the international codes as amended and adopted, or any other Mason County ordinance or regulation, must be reviewed and approved by Mason County prior to construction. * By definition, propane tanks and heatpumps are structures,which must meet setback conditions. Please check your "Approved Site Plan"to ensure these structures meet the setback conditions listed. * When parcel development requires direct access to state road(s), a Road Access Permit or Approval must be granted and approved by the Washington State Department of Transportation. For more information contact Washington State Department of Transportation, at(206)357-2620, ext. 630. * Residential developers and individuals shall be required to control erosion during construction. Removal of vegetation should be minimized and any areas disturbed should be restored to prevent erosion and other environmental impacts. * Application acknowledges that the structure is only permitted for a use consistent with the current zoning of the parcel. Parcel is Zoned Rural Commercial 2. * FIRE: FIRE: Post Address from the approach side of the building. 12" numbers contrasting with the back ground. Fire Extinguishers-Per IFC 906 Application of the County Fire flow worksheet,which may require a fire alarm and possible fire sprinklers. Printed by:Ariane Paysse on:07/06/2021 09:19 AM Page 3 of 4 Mason County _ Mason County - Division of Community Development 615 W.Alder St. Bldg.8 Shelton, WA 98584 360-427-9670 ext 352 www.co.mason.wa.us NEW COMMERCIAL PERMIT COM2021-00039 I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of Laws and Ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any othej state/local law regulating construction or the performance of construction. Issued By: r Contractor or Authorized Agent: Date: L2-1 Printed by:Ariane Paysse on:07/06/2021 09:19 AM Page 4 of 4 oI 9.9,34 - 'A I �mAMA �oruS 5Knu),-LA U- IM i m, Ara MATERIALS TEMP i CONSULTtNti,1NC. Pickering Mini Storage - COM2021-00039 - 22SO10 - Proprietary Anchors: Report #P273931 CLIENT gig image DATE 01/24/2022 PROJECT LOCATION 2744 E Spencer Lake Rd Shelton WA PERMIT - 'U-M. 39 Inspection Information: Inspection Date: Time Onsite: 10:15 Weather Fog 37*F 01/24/2022 am Conditions: Inspection Performed: Proprietary Anchors Field Data: Base Material: ®Concrete Thickness in inches: 4 Specified Compressive Strength in psi: 2,500 Hole Data in inches: Depth: 2 3/8 Dista Edgce 3 End Distance: 1 5/8" Diameter: 9/16 Spacing: 24, 16+- 0 Clean O Drilled O Cored Mechanical Anchor Data: Type: Hilti KB-TZ Length in inches: 3 3/4" Diameter in inches: 1/2 Torque(Ft.lbs.): 25 0 Setting Tool Present Adhesive Anchor Data: Product Name: N/A Batch#: N/A ____^_� Location: N/A Exp.Date/Shelf Life: N/A Number of anchors: 100 Anchor Length in Inches 3 3/4" Anchor Diameter in Inches: 1/2 0 Anchors installed in accordance with manufacturer's instructions,specifications,and corresponding evalution report(ER-1917) Reason for Inspection: ®Shown on plans or specs ❑ Intentionally omitted during original placement ❑ Re-inspection* ❑ Needs Engineer's review and acceptance* Remarks: MTC Special Inspector on site for Torque testing of HILTI Mechanical Wedge Anchors. Testing was done with a HILTI Torque Tool @ 25lbs.psi All Anchors are acceptable to Detail. Location: Building(s): 18& 19 Perimeter and Door ways as shown on Plans 24"0C Perimeter, 16" +-Doorways 1Sheet(s):S0.0,S3.1 etail: 5/S3.1 Slab on Grade As a muWal protection to c ients,the public and aureaNm,aM reports are saemided as Me oonfafantisl property of ciama.and audioozetion for pualn,aton of statements,oond.,ions or ertacLs from or reg—N our reports is reserved pand,,g our a ftao approval. Environmental•Geotechnical Engineering•Special Inspection a Non-Destructive Testing•Materials Testing Burl ingtonjOlympialBellinghamlSilverdaleITukwila 360.755.1990 www.mtc-ine.net Pickering Mini Storage-COM2021-00039-22S010,0112412022,#P273931,Page 1 of 3 MATERIALS TESTING&CONSULTING,INC. erical Down I ontactor:Allworth Construction To the best of MTC inspector's knowledge,the above-described work was performed in general accordance with project specifications and approved plans. Images: TYPICAL SLAB ON GRADE '' z I( 1 6- i «r� "m sau _. oe P01W.,rrrr [T1MCl+fCpT PEA PER;%M NVE5 .^'k',"_ XU- F}1F KAf:OHD Al �\ !, 54E OF eAXW;•;-r--'-q. WX ' CgflrktTE 5-0, f,,,•� •✓' `, I ..., *WL Il C k 4 r*rw c+utrt v+ froaG e<6TMFT.- ! nacast€t!!&Iffi Kam," �iF1Y71Ui�i 5 TYP. EXTEFt10R Wdt l fO+DrINc 01/24/2022 11:19.57 UPLOADED: 01/24/2022 11:19:5 - - . ra r ;-•,� � .fir. , a a y r � F UPLOADED: 01/24/2022 11:20:54 UPLOADED: 01/24/2022 11:20:56 Asa mutual Prot tiw to—..the W mic—wrselves.M reports are subl,h as Ne confdemial popery of cents,—authonzalan for publioaw of statements,contusions or evtracis from or r,qa ,g wr reports,reserveE panting our written approval. Environmental•Geotechnical Engineering•Special inspection•Non-Destructive Testing•Materials Testing Burl ingtonjOlympialBellinghamlSilverdaleITukwiIa 360.755.1990 www.mtc-inc.net Pickering Mini Storage-COM2021-00039-22S010,0112412022,#P273931,Page 2 of 3 MATERIALS TESTING&CONSULTING,INC. � v Ilk _ I f UPLOADED: 01/24/2022 11:23:08 UPLOADED: 01/24/2022 11:23:10 �k UPLOADED: 01/24/2022 11:24:56 REPORTED BY:Mark Hite REVIEWED BY:Michael Houser,Project Manager As a—W al prof o,clients,We PWblic and wmalvea,all re loft are wb1M1d as Na confid-ial property of clenis,and audwniet' for publication o/,'+elements,conclusions w extracts ft=or rnaMtg our reports is reserved pending wr vmden approval. Environmental•Geotechnical Engineering•Special Inspection•Non-Destructive Testing•Materials Testing Burl ington10lympial Bel Iingham]SilverdaleJTukwila 360.755.1990 www.mtc-ine.net Pickering Mini Storage-COM2021-00039-22S010,0112412022,#P273931,Page 3 of 3 CERTIFICATE OF OCCUPANCY Mason County, WA OWNERS NAME: JONES REVOCABLE LIVING TRUST OWNER'S ADDRESS: 2494 E PICKERING RD SHELTON WA, 98584 SITE ADDRESS: 2744 E SPENCER LAKE ROAD, SHELTON WA,98584 BUILDING PERMIT NUMBER: COM2021-00039 DESCRIPTION: MINI STORAGE BUILDING #18 BUILDING OFFICIAL: KELL ROWEN TELEPHONE NUMBER: (360) 427-9670 ext. 352 CODE/EDITTION: IBC 2018 USE OF STRUCTURE: STORAGE OCCUPANCY: s1 OCCUPANT LOAD: NIA TYPE OF CONSTRUCTION: 11B SPRINKLER SYSTEM REQUIRED: NO This structure has been inspected for compliance with the requirements of this code for occupancy and the use for which the proposed occupancy is classified. CONDITIONS OR STIPULATIONS: MUST MAINTAIN ALL STORM WATER SYSTEMS, FIRE PROTECTION SYSTEMS AND PERMIT CONDITIONS.