HomeMy WebLinkAboutBLD2019-00029 Final Replace Propane Tank - BLD Permit / Conditions - 4/17/2019 INSPECTION CARD
Mason Couhty
r � g
615 W. Alder St. Bldg. 8, Shelton, WA 98584
360-427-9670 ext 352
www.co.mason.wa.us
PERMIT# COM2019-00029 PROJECT ADDRESS 320 NE HIGHWAY 300 BELFAIR MASON COUNTY,WA 00000
PARCEL# 123294200040 PROJECT DESCRIPTION TANK FOR TANK REPLACEMENT 500 GAL PROPANE TANK
OWNER CHARLOTTE HENNINGSEN ADDRESS P O BOX 205 PHONE
CONTRACTOR SUBURBAN PROPANE ADDRESS PO BOX 206 PHONE
CONTRACTOR LICENSE SUBURPL044DA LENDER
INSPECTION INSP DATE Comments INSPECTION INSP DATE Comments
Rough-Plumbing Inspection BLD-Final Inspection
Mechanical Inspection
Mason County
Mason County - Division of Community Development
1 ay 615 W.Alder St. Bldg. 8
• Shelton,WA 98584
360-427-9670 ext 352
www.co.mason.wa.us
F
9-00029 MECH/PLUMB - COMMERCIAL
ESCRIPTION: TANK FORTANK REPLACEMENT 500 GAL ISSUED: 04/04/2019
TANK
ESS: 320 NE HIGHWAY 300 BELFAIR MASON COUNTY EXPIRES: 10/01/2019
PARCEL: 123294200040
APPLICANT: MAY MOBILE MARINE INC OWNER: CHARLOTTE HENNINGSEN
13440 REINDEER LN SW P O BOX 205
PORT ORCHARD,WA 98367 BELFAIR,WA 98528
y
GENERAL CONTRACTOR'S LICENSE: SUBURBAN PROPANE License: SUBURPL044DA
PO BOX 206 Expires: 03/16/2021
WHIPPANY,NJ 07981
FEES: Paid Due
Mechanical Fees $80.00
State Fee-Commercial $25.00
Mechanical Base Fee $30.00
Final Inspection $80.00
Totals : $215.00
FIXTURES
City Mechanical Fixtures
1 Propane Tank(s)
REQUIRED INSPECTIONS
Rough-Plumbing Inspection BLD-Final Inspection
Mechanical Inspection
CONDITIONS
Printed by:Nicole Norris on:04/04/2019 09:26 AM
Page 1 of 3
Mason County
Mason County - Division of Community Development
615 W.Alder St. Bldg. 8.
Shelton, WA 98584
360-427-9670 ext 352
www.co.mason.wa.us
MECH/PLUMB - COMMERCIAL COM2019-00029
* Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries,
Contractor Compliance Division.There are potential risks and monetary liabilities to the homeowner for using an
unregistered contractor. Further information can be obtained at 1-800-647-0982.The person signing this condition is either
the homeowner, agent for the owner or a registered contractor according to WA state law.
" All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building
Official may grant a one time extention of 180 days, upon the receipt of a written extension request prior to permit expiration.
Letter must indicating that circumstances beyond the control of the permit holder preventing action from being taken. No
more than one extension may be granted.
All construction must meet or exceed all local and state ordinances in addition to the International Codes requirements as
adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted
classification. Any non-approved change of use or occupancy would result in permit revocation.
* All furnace installations shall meet the minimum efficiencies set forth in the current edition of the Washington state energy
code(WSEC). any portion of the mechanical system that is altered or replaced shall meet the minimum standards set forth
in the WSEC and international mechanical code.
* The demolition and disposal of debris must meet the regulations of Mason County and Olympic Region Clean Air Agency
(ORCAA).
It is unlawful for any person to cause or allow the demolition (or major renovation)of any structure unless all asbestos ?
containing materials have been identified and removed from the area to be demolished. Work shall not commence on an '
asbestos project or demolition project unless the owner or operator has obtained written approval from ORCCA.2490 B
Limited Lane NW, Olympia WA 98502, 360.586.1044/800.422.5623 www.orcaa.org
* CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING
DEPARTMENT AND THE ADOPTED BUILDING CODE.
The construction of the permitted project is subject to inspections by the Mason County Building Department. All
construction must be in conformance with the international codes as amended and adopted by Mason County. Any
corrections, changes or alterations required by a Mason County Building Inspector shall be made prior to requesting
additional inspections.
All building permits shall have a final inspection performed and approved by Mason County Building Department prior to
permit expiration.The failure to request a final inspection or to obtain approval will be documented in the legal property
records on file with Mason County as being non-compliant with Mason County ordinances and building regulations.
Owner/Agent is responsible to post the assigned address and/or purch 1.ase and post private road signs in accordance
with Mason County Title 14.28 and 14.17.
. _. ., .�__- --- - - __.M _..__
" Fuel piping shall be inspected after the installation of fuel piping is complete, and before the attachment of fixtures,
appliances, or shut-off valves. At the time of inspection the test pressure shall be no less than 10 psi held for no less than
15 minutes. Appliances to be attached to the fuel piping system shall not be used until the final inspection has been
performed and approved by a Mason County building inspector.
Printed by:Nicole Norris on:04/04/2019 09:26 AM
Page 2 of 3
Mason County
Mason County - Division of Community Development
615 W.Alder St. Bldg. 8
r,1v3t`` Shelton,WA 98584
360-427-9670 ext 352
www.co.masonma.us
MECH/PLUMB - COMMERCIAL COM2019-00029
I hereby certify that I have read and examined this application and know the same to be true and correct.
All provisions of Laws and Ordinances governing this type of work will be complied with whether
specified herein or not. The granting of a permit does not presume to give authority to violate or cancel
the provision A any other state/local law regulating construction or the performance of construction.
Issued By:
Contractor or Authorized Agent, Date:
Printed by:Nicole Norris on:04/04/2019 09:26 AM
Page 3 of 3
MASON COUNTY DEPARTMENT OF COMMUNITY SERVICES
www.co.mason.wa.us
SITE PLAN INSTRUCTIONS
A complete, accurate, and detailed site plan is important to avoid delays in the review and approval of your pro-
ject. A sample site plan and topography are located on the inside of this form. An easy to use grid, which can
be used to draw your site plan on, is also located inside. The following items will be required, if applicable, to
complete the building permit application package. Additional information may be needed depending upon
individual site conditions. For more information see submittal standards and instructions on the back of this form.
DCn ' :stn �D' o G7 �; 0ca `:o p _aE, 'un -uo,
f � m o one ., m � � m � ; o_c -^ � � . � m o
v o m 3 o a , �, o
;Submittal o � mm : m � 0z � moo' om 0� ,G _ � ��� .'co <.
Rei ulrementS °�' m 0, •` o ra m °. v,
,
� � o (D � � _ m
Building°Permit Application°Forni`
4
Site Plan 1 1 1 1 1 1 1 1
"'Septic Records V V
Septic Permit Application 3
&Septic Design
Wate"r Adequacy Form
4 p,
Construction:Plans== 3 3 3 3 3 3
:..
Energy Code
Application Form Heated
,Septic'Pumpers Report X X X X X X
m Existing systes older han 3 years.''
ProVo
perty LmesFlagged,
Geotechnical;Study :
See in§tructioris.on:back 3 3 3 3 3 3 3 3
M '
Plumbing/Mechanical
,Application Form
Engmeered Calculations* 0 2 2 2 2 2 2
Floor,Plan VOv
w
SEPA'+
Road Access,Permit ` ® ♦ ,,
Fire Apparatus Access Road
Small Parcel'Stormwater
',ApplicationM/orksheet. ,, :,,;
The number in the table indicates the number of copies required if applicable.
Required for submittal of a complete application.
X A pumpers report may be required when a septic system is existing and has been installed for three or more years. The report,
dated within the last three years,shall include the size and condition of both tank and baffles.
• Additional information and permits may be required by the Planning Dept. call extension 352 for information.
If applicable, needed when site conditions require additional information.
❑O Engineered plans shall have design information&details transferred onto plans. One copy of the plans and calculations shall be
wet-stamped. Revised 09/04/2013
320 N E H 300 Legend
u .
9
'to budding
12t7 v Fropolie to F -300
320 WA
r a Bell Power Equipment
7
Proposed site for 1_D d Propane 7
I IIIIIIIIIMIUIw a .� � ropo ropy
r
.. �
re�° ► °` a ,. .' ., .,
T'
z
Api
F
tow
vs
r
ti
IMo lo��ls V11�ouri� � -
Ind -
XL
_ {r g 8 -