Loading...
HomeMy WebLinkAboutPAR2018-00045 - PAR Letters / Memos - 1/7/2019 f P Y \ MASON COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT Building Division Mason County Bldg. 8, 615 West Alder Street, Shelton, WA 98584 www.co.mason.wa.us (360)427-9670 Belfair(360)275-4467 Elma (360)482-5269 MASON COUNTY PRE-SUBMISSION CONFERENCE NOTES • BUILDING DEPARTMENT REPRESENTATIVE: Tricia Woolett (360) 427-9670 ext. 281 E-Mail: tw@co.mason.wa.us • DATE: January 7", 2019 • PROJECT/ PROJECT TRACKING NUMBER: PAR2018-00045 • PARCEL NUMBER: 12329-42-00020 • SITE ADDRESS: 290 NE State Route 300, Belfair WA 98528 • PROJECT REPRESENTATIVE (S): Brian Petersen 360.710.0855 DESCRIPTION & SIZE OF PROJECT/OCCUPANCY CLASSIFICATION & USE: Office (Occupancy 8), Retail (Occupancy M), Bakery (B or A-2 Occupancy) Taproom (Occupancy A-2). ALL COMMERCIAL SUBMITTALS ARE BY APPOINTMENT, PLEASE CALL 360.427.9670 EXT. 352 TO SCHEDULE A APPOINTMENT. COMMENTS: Discussion topics: Phased development, deferred submittals, firewalls (occupancy separation, exiting and property lines), accessibility and Washington State Energy Code and possible future tenant improvements. THE FOLLOWING MUST BE INCLUDED ON THE PLANS: • Code Analysis: Must be supplied in the construction plans and completed by a Washington State Licensed Design Professional for the scope of work. • SETBACKS TO PROPERTY LINES: Provide a site plan, drawn to scale. Clearly identify all structures including fences, parking and other similar items, with setback dimensions on site the plan. • DISTANCES TO OTHER STRUCTURES: Site plan, drawn to scale shall clearly identify distances, where required include fire-resistive details, including continuity, & tested assembly details. • FIRE RESISTANCE FOR EXTERIOR WALLS: When applicable include fire-resistive details, including continuity, &tested assembly details. • IDENTIFY TYPE OF CONSTRUCTION & PROVIDE ALLOWABLE AREA CALCULATIONS WHERE NEEDED. See Chapter 5, IBC • FIRE-RESISTIVE RATED CONSTRUCTION & TYPE OF CONSTRUCTION: Where required demonstrate compliance. Identify the location of the assembly, compliance to continuity requirements and construction details: Exterior Wall (IBC704), Fire Wall (IBC705), Fire Barrier (IBC706), Shaft Enclosures (IBC 707), Fire Partitions (IBC 708), Smoke Barriers (IBC 709), Smoke Partitions (IBC 710), Horizontal Assemblies (IBC 711), Penetrations (IBC 712), Fire Resistant Joint Systems (IBC 713), Fire- Resistance Rating of Structural Members (IBC 714), Opening Protection (IBC 715), Duct and Air Transfer Openings (IBC 716), Concealed Spaces (IBC 717), ETC, • NUMBER OF EXITS REQUIRED/OCCUPANT LOAD:(IBC 1004): Table 1004 is used to determine occupant load used to evaluate the structure for exiting purposes, plumbing fixture requirements, and other code related concerns. Include design calculations, demonstrating how occupant loads were calculated, on building plans. • EXIT PLAN: Clearly identify the exit path and exit signage on construction plans. • ENGINEERING REQUIRED: Structures that do not comply with prescriptive specifications of the 2015 International Code (IBC) shall be designed in accordance with Chapter 16 of the IBC. Referencing Washington State RCW 18.08.410 - Structures 4000 sq. ft or more shall have all plan pages reviewed and stamped by a Washington State licensed design professional. The review shall include a code evaluation addressing life-safety, plumbing & mechanical evaluation, and structural analysis. (ref. RCW 18.08.410) ALL PLAN PAGES SHALL BE STAMPED AND SIGNED BY THE DESIGN PROFESSIONAL, including plumbing and mechanical pages. • ACCESSIBILITY REQUIRED: YES, must include compliance information and plan details including design details and analysis demonstrating compliance to Chapter 11 and details demonstrating compliance to ANSI 117.1-2009, in effect at the time of submittal. Include information demonstrating compliance for restrooms, employee work areas, parking spaces, accessibility to structure, drinking fountain, signage, etc. Construction plans will NOT be accepted without compliance details include on the plans. • PLUMBING SYSTEMS (Chapter 29 Washington Amendment to IBC): Using IBC Chapter 10, determine occupant load. The number of plumbing fixtures is determined based upon the occupant load. Plumbing fixtures need not be provided for unoccupied buildings. Permitted building shall comply. On plans, include design calculations for the following: water closets (M/F), Lavatories, Drinking Fountains, etc. Referencing IBC/WAC 2902.2 separate plumbing fixtures shall be required for each sex, except when the calculated occupancy load is 15 or less, and then unisex fixtures shall be allowed. Plumbing fixture count can be for the entire facility, including all structures) for compliance purposes. Provide design calculations demonstrating how the fixture count was determined on construction plans. • NON-RESIDENTIAL ENERGY CODE: ALL enclosed spaces are required to meet the Non- Residential Energy Conservation Code (IECC/WSEC). Provide completed compliance forms. Forms are available at: Envelope: http://neec.net/sites/default/files/neec codes/forms15/env15-v1.xlsm Mechanical: http://neec.net/sites/default/files/neec codes/forms12/MECH12-v3a.xlsm • LIGHTING: All non-residential structures shall comply with IECC/WSEC lighting requirements. Complete compliance forms and provide a lighting plan that includes switching locations. Forms are available at: Lighting: http://neec.net/sites/default/files/neec codes/forms15/LTG15-v1.xlsm J • Ventilation Code compliance: Must provide calculations and compliance documentation. • COMMERCIAL KITCHEN: Show compliance to Chapter 5 of the International Mechanical Code when a kitchen is included in the project. • GEOTECH REPORT REQUIRED? YES X / NO • OIL SEPARATOR: REQUIRED when vehicle repair work is performed. Identify location and provide construction details. • PROVIDE a SPACE FOR STORAGE OF RECYCLED MATERIAL & SOLID WASTE (WAC51-50-009): Identify the location on site plan. • SPECIAL INSPECTION: Referencing IBC Chapter 17, Section 1704.1.1. When required a Statement of Special Inspections must be prepared by registered design professional in responsible charge. A completed Special Inspection Agreement form must be submitted prior to permit issuance. • INTERIOR FINISHES: Include information demonstrating compliance to Interior finishes required in IBC Chapter 8. • STORAGE SPACES: Identify material stored, anticipated quantities, height, and if hazardous, include MSDS sheets for each product. • STORAGE RACKS: greater than 5'9" shall be permitted either with the proposed project or separate building permit. Where required documents shall include design information demonstrating stability for seismic conditions. Special inspection may be necessary, reference IBC Section 1707.6 and 1705.3 (4.5), storage racks, provide compliance information. • MECHANICAL EQUIPMENT. Identify the location and type of mechanical equipment located within, and outside the structure. Address foundation and support systems for equipment. Where new equipment will be placed on site provide UL listing information and/or construction details shall be stamped by a Washington State licensed design professional. Where applicable include duct information and duct support compliance information. • FIRE MARSHAL REQUIREMENTS: Fire Marshal comments requirements including fire protection requirements and identify compliance information on the proposed building plans. Show the location of fire extinguishers and identify type. The following items must be completed for the project approval: • WATER SUPPLY & FIRE HYDRANT: Referencing IFC, Section 508; clearly identify fire hydrant location if one is located within 400 ft of the project. • FIRE FLOW: A copy of the approved method for determining fire flow is enclosed. Complete the Commercial fire-flow worksheet to identify fire flow and fire protection that may be necessary. Note that when fire flow is not available step 3 shall apply. See also requirements for IBC Table 503, allowable areas: 0-500 sq ft.: no protection (mitigation) needed. 501-5,999 sq ft.: Install a NFPA 72 addressable fire alarm system OR construct firewalls in accordance with IBC Section 706 to create maximum 2,000 sq ft fire areas. 6,000-12,000 sq ft.: Install NFPA 13 automatic fire sprinkler system OR install NFPA 72 addressable fire alarm system maximum 6,000 sq ft fire area with fire walls constructed in accordance with IBC Section 706, OR construct firewalls in accordance with IBC Section 706 to create maximum 2,000 ft fire areas. 12,000 sq ft. or more: Install NFPA 13 automatic fire sprinkler system. • EMERGENCY VEHICLE ACCESS: "Standards for Fire Apparatus Access Roads: adopted through Mason County Code Title 14 Section 14.17 is attached. Submit documents should clearly identify code compliance. • ADDRESSING: Referencing IFC, Section 505 and Mason County Code Chapter 14.28, all new buildings shall have an approved address. • AUTOMATIC FIRE ALARM: Referencing IFC, Section 907 and NFPA 72, when proposed provide information on plans that identifies your intent to install the alarm system. Automatic fire sprinkler system requires a separate permit. • SPRINKLER SYSTEM: Referencing IFC, Section 903 and NFPA 13, when proposed provide information on plans that identifies your intent to install the NFPA 13 fire sprinkler system. • KNOX BOX: Referencing IFC, Section 506 and access shall be required. Contact your local Fire District for detail to order your Knox box. • LAND MODIFICATION: Any grading, filling or excavation in combination that exceed 200 cu yards will require a Land Modification Permit. If the project exceeds 500 cu yards it will also need a SEPA. Depending on the scope of the project you may need an engineered Stormwater Plan and Geological report to accompany this application. • SPRINKLER SYSTEM: Verify that design calculations include additional load attributed to required fire sprinkler system. Sprinkler systems require a separate permit. • SUSPENDED CEILING SYSTEMS: Provide details and specifications relating to suspended ceilings where applicable. Please note we are in a D2 seismic region. Details shall be designed and approved for seismic loading in accordance to IBC Chapter 16. Where required designate special inspection plan. • STORMWATER MANAGEMENT: A Plan must be submitted in accordance with Mason County Code Title 14.48, Stormwater Management plans must meet WA State Department of Ecology's 2012 Stormwater Regulations. PERMITS REQUIRED FOR PROJECT: El BUILDING (each structure) o PLUMBING / MECHANICAL (each structure) o GRADING PERMIT (When greater than 200 cubic yards) o CHANGE OF USE/OCCUPANCY (When each Tenant is identified for use) o FIRE SUPPRESSION, See Fire Marshal comments (each structure) o SIGN (each business) o FENCE (Greater than 7'0" above grade) o RETAINING WALL(S) (one permit for all walls on parcel) ADDITIONAL NOTES: Current Code: 2015 IBC and 2015 IECC/WSEC. ADDITIONAL REQUIREMENT FOR PERMITING: WHEN YOU SUBMIT PERMITS, YOU WILL NEED TWO (2) COPIES OF YOUR SITE/PLOT PLANS, DRAWN TO SCALE, 11X17 PAPER SIZE, ALL NECESSARY PERMIT APPLICATIONS INCLUDING THREE (3) COMPLETE SETS OF BUILDING PLANS WITH CALCULATIONS WHEN REQUIRED. (NOTE: ALL PLAN PAGES SHALL BE STAMPED BY THE DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE WHEN: (1)THE STRUCTURE EXCEEDS 4000 SQ. FT., (2)THE STRUCTURE IS ENGINEERED/DESIGNED. • CONSTRUCTION PLANS, drawn to scale. Include floor plan, elevations, cross section, cross section, construction details, etc. • MECHANICAL PLAN, (If a deferred submittal must be indicated on plans at submittal) • PLUMBING PLAN AND (If a deferred submittal must be indicated on plans at submittal) • NON-RESIDENTIAL ENERGY CODE/VENTILATION & INDOOR AIR QUALITY CODE INFORMATION. • A PLAN REVIEW FEE WILL BE COLLECTED WHEN THE BUILDING PERMIT IS SUBMITTED. VALUATIONS ARE BASED UPON THE MOST RECENT BUILDING STANDARDS VALUATION DATA RECOMMENDATIONS AND THE PERMIT FEE WILL BE DETERMINED BASED UPON TABLE 1-A OF THE 1997 UBC. DESIGN CRITERIA: SEISMIC ZONE: D2 WIND SPEED: 85 MPH basic 110 ultimate, Exp. B (Unless proven otherwise) GROUND SNOW LOAD: 25 PSF REFERENCE CODE EDITIONS: Effective August 9, 2016 (Subject to change; new Codes to be adopted July 1, 2020) 2015 INTERNATIONAL BUILDING CODE(IBC), INCLUDING APPENDIX CHAPTERS C, E AND H, EXCLUDING H106; SECTIONS 101 THROUGH 107, PUBLISHED BY THE INTERNATIONAL CODE COUNCIL,AND EXCLUDING APPENDIX CHAPTERS A, B, D, F, G, I, J AND K AND;ADOPTING THE WASHINGTON STATE BUILDING CODE WAC 51- 50. 2015 INTERNATIONAL EXISTING BUILDING CODE(IEBC) 2015 UNIFORM PLUMBING CODE(UPC), PUBLISHED BY THE INTERNATIONAL ASSN. OF PLUMBING AND MECHANICAL OFFICIALS(IAPMO)AND ADOPTING THE WASHINGTON STATE BUILDING CODE WAC 51-56 AND WAC 51-57, EXCLUDING SECTIONS 102.4 AND CHAPTERS 12, 15, AND 16, PART I. 2015 INTERNATIONAL MECHANICAL CODE(IMC), PUBLISHED BY THE INTERNATIONAL CODE COUNCIL, AND THE 2009 INTERNATIONAL FUEL GAS CODE AS ADOPTED THROUGH THE WASHINGTON STATE BUILDING CODE WAC 51-52. 2015 INTERNATIONAL FIRE CODE(IFC) PUBLISHED BY THE INTERNATIONAL CODE COUNCIL, EXCLUDING APPENDIX A, D, AND K AND ADOPTING APPENDICES B,C,E,F, G AND ADOPTING THE WASHINGTON STATE BUILDING CODE WAC 51-54. 2015 INTERNATIONAL ENERGY CONSERVATION CODE(IECC), AS AMENDED BY WASHINGTON STATE BUILDING CODE WAC 51-11 To view the Mason County Building and Construction Code and adopted amendments go to the Mason County website at: www.co.mason.wa.us DATE ? t p) PURPOSEY of 000L�5 CUE COLUMN NOTES qbx 2.5 110� •'� I = �-e �- o�, 3ok� n o I rid m y- 5 co&,c SUMMARY MASON COUNTY COMMUNITY SERVICES PAR 20 1 8 - DOb`4Jr Building,Planning,Environmental Health,Community Health pp� 615 W.Alder St.—Bldg.8,Shelton,Wa 98584 DATE a Zo 1 V Phone:(360)427-9670 ext.352•Fax:(360)427-7798 PRE-APPLICATION CONFERENCE REQUEST FORM The purpose of the pre-submission conference is to identify and/or eliminate as many potential problems regarding a proposal. Representatives from the Fire Marshal's Office, Building Department, Environmental Health, Planning, and Public Works Departments may attend the meeting to discuss rules and regulations applicable to the proposed project. Topics covered during the meeting may include the comprehensive plan, land divisions, shoreline program, zoning, availability of sewer and potable water, development concepts, building construction, fire protection and life safety concerns of the proposed project. The pre-submission conference is intended as an informative meeting. The intent is to provide detailed information to the applicant in regards to codes and process. Incomplete applications will not be accepted. If application is deemed incomplete it will be returned. All Conferences are on Mondays (except holidays) To schedule a meeting,you must complete the requirements for submittal including the required eight(8)copies of detailed site plan(max. size I 1"x17"),as well as eight(8)copies of all other accompanied documents. To submit either by mail or in person at: Mason County Permit Assistance Center at 615 W Alder Street,Shelton WA 98584 by 3:00 PM on the Monday two weeks prior the proposed meeting. Owner: !� Name: L Z G- Mailing Address: /eD� �70 t35 L_�jt/Z �W Tg 15 Daytime Telephone: ,� _2/0 Email address: r hr-"A. a, �c o4r-- Fax number:� ?_f Representative: Name: Mailing Address: L> Daytime Telephone: rr N Email address: Fax number: Tax Parcel Number(12 digits):/2.3-29 - V6 •vo2c Site Address: 2 Rev.January 2018 D15� 46-V 7:E 3­<ro a----L FI-F-1.2 ♦Description of Project: i , -t , i *Square footage of structure: ♦ Use of building and rooms (i.e., office, warehouse, restaurant, sto ge, etc): *Occupancy classification per IBC, Section 302.1, and construction type: ♦ Will grading or excavation be included in the project? /,>,//, If so what is an estimate the amount of grading: cut cy ,, fill cy ♦ Will Forest Practices be included in the project? If so what is the estimated amount of logging: / board feet ♦ Are there any historical stormwater and/or geotechnical reports (prepared for previous development)? Please Indicate Yes ❑ No�, L ♦ Has the project been discussed during a previous Pre-Application Conference? If yes, please indicate date. ♦ Will the building have employees? Yes f ] No ❑ If yes, how many? ♦ What is the proposed source of water? (Please indicate): ❑ Proposed Individual Well, ❑ Existing individual well, ❑ Proposed water system, Existing Water System, Name of existing water system: ♦ What is the proposed source of sewage disposal? (Please indicate ❑ Existing onsite sewage system, El Proposed onsite sewage system, Existing sewer connection, ❑ Proposed sewer connection, Name of Sewer System connected to: ♦ Will the project include signage? Yes*No ❑ _ If Yes, describe; size, material and location: ♦ Is there a fire hydrant located within 400 feet? Yes [ No ❑ 11,_ es� include on site plan. The following items must be included (attached): ♦Provide two sets of proposal/plans including a floor plan. Max. paper size 11" x 17". ♦Provide Eight (8) copies of the site plan including all items required (see page 3) Provide specific comments or specific questions we can help you with: 0114 eCl 022.0--g, 7Z>,z2 —� 2 .J PCR51'E.;TIVE AERIAL LOOKIN NORTH BELFAIR COMMERCIAL DEVELOPMENT,BELFAIR,WA PROJECT p10-5148 I DECEMBER'3,201S I PROGRESS DESIGN PACKAGE him ( DR.BRIAN PETERSEN 3 ��✓� 'Y i PERSPEC T!VE I A[RIAL LOOKING SO iTi-i BELFAIR COMMERCIAL DEVELOPMENT,BELFAIR,WA I PROJECT&18-5149 I DECEIVER 13.2018 I PROGRESS DESIGN PACKAGE I N�Vi� I DR.BR AN PETERSEN 4 4 4 " I I , I I I ale� w ea �a uecno I esc s �f10� 1ueYNM 1 ewin I I ��1 I 1 � �;�,lat l•ae 14 I 3 iS 1 wow I i 1 i � r.aee.r uee i ' N FLOOR PLANS I LEVEL 1 & LEVEL 2 �ae s 3 o a z SCALE 1 d e,1,8'ON„K,7 BELFAIR COMMERCIAL DEVELOPMENT,BELFAIR,WA I PROJECT 418 F+,A8 I DECEMBER 13 2018 I PROGRESS DESIGN PACKAGE I I DR.BRIAN PETERSEN 7 BELFAIR COMMERCIAL DEVELOPMENT PROGRESS DESIGN PACKAGE DECEMBER 13, 2018 1 j � i tt �1 { 1 1 I OR.BRIAN BELFAIR COMMERCIAL DEVELOPMENT,BELFAIR,WA I FROJECT#18-51d8 I DECEMBER 13,2018 ( PROGRESS DESIGN PACKAGE ( I PETERSEN 1 r if KI I. I , PIERSPECTIVE ( EXI F-PIOR FROM STATE: R(-);I-rE 300 BELFAIR COMMERCIAL DEVELOPMENT,BELFAIR,WA I PROJECTa18-5148 DECEMBER 13 2018 I PROGRESS DESIGN PACKAGE ( I PETERSENBR PEN 2 I t » PERSPECTIVE 7XTE1`'!`-aR LOOKING NE DR.BRI BELFAIR COMMERCIAL DEVELOPMENT,BELFAIR,WA I PROJECT#18.5148 I DECEMBER 13 2018 I PROGRESS DESIGN PACKAGE I I PETERSEN 5 N1fO o�m mm mm IFNWTt TD" , TENANfA . T"MTC ROOF ECn r TRELLb 1E—TC H{.CdR ST.—SEM ROOFCA ,T I ESOE CONC —EN iEtE.ESCAPE ROOF ECN 0.0p1 ROOFNO.T P I ASET P - - --- - - - - o� t�;�, 4. - L_II E L_,---� O O6 16 32 84 SCALE:1'-0^:y32.ON 11X17 DR.BRIAN BELFAIR COMMERCIAL DEVELOPMENT,BELFAIR,WA I PROJECT#18-5148 I DECEMBER 13,2018 I PROGRESS DESIGN PACKAGE I I PETERSEN 8 F" IIORI GRIM 0 ROOF Ea E I P RIFLES %IOTECT11 IEMWIC ROOF 1] CAW)P,I P M 9 NG.1 P ROOF ECK FNFIBCME I r�•ua....+..s..aw- i _ -..__ _ 1tow1 61 L'!_•. ..' I (` •`�4 �._- SCALE:1'-0':3131 ON 11%17 BELFAIR COMMERCIAL DEVELOPMENT,BELFAIR,WA I PROJECT M•8 5148 I DECEMBER'3.2018 I PROGRESS DESIGN PACKAGE I ' PDR.BRIAN ETERSEN 9 E r I� w am , C ROOF CANOP,T P HORI-AL 0 FINI6 E CONC STAN NG SEAM TENANTC T- TRELLK 7F 7C RI 5l MG.T P ASE.T P ROOFNG.T P $-TO ROOF ECN NITCFIEN ROOF EO I � - - -- - -- - -- - - - 7l 11 - G 1Ir F ELEVATION I �I�TEz GI'��31 `� A SCALE:1'-0':Y37'01,4 11K17 OR.BR BELFAIR COMMERCIAL DEVELOPMENT,BELFAIR,WA I PROJECT h+.9-48 � DECEMBER 3 2018 I PROGRESS DESIGN PACKAGE I � I PETERSEN 10 ao l 11w ex on a"4 O FM CON[ am elG R=ON,OP.T P PTILINI PE A I M.T P ME,P- NOOFPr.T P 1 J E�.F\1A l Ci t�! I Vv I. BGLLE.;°O. " DR.BRIAN BELFAIR COMMERCIAL DEVELOPMENT,BELFAIR,WA I PROTECT 5'?-F'db I DECEMBER'3,20,8 I PROGRESS DESIGN PACKAGE I PETERSEN 11 x3R WLVYM�v GIUUR 4YIp(O[ 1MD gMIXUUY i 5[vGA iG uxGv05i iRURS MRIRRCQVY1llr 1IRx uGSfAY Gl Ei11�C,1 r (CuxG�v (��.i v ROOiRIG.�v Lx/'>A FA141 v 1nRX�� IXFRFSiA IAYNiC lI1Hl0 1HWiC RDRFFGI R ROR LR IX4M a I a B momIlEn ® a SCALE:1'-0'-1IS'ON BELFAIR COMMERCIAL DEVELOPMENT,BELFAIR,WA I PROJECT h18-5148 I DECEMBER:3 2018 I PROGRESS DESIGN PACKAGE I I PDR.BRIAN ETER EN 12 r s --------- ---- - - -- -� — — --- --- ----- ---- I, NOD —_—_—_— _— _ _---_ __--_— —__ —-- _ _— OCANOP -- NJLO T -8 o LEs EL N L U ao2a 08 ,e SCALE 1'-0'=1-ON11X11 BELFAIR COMMERCIAL DEVELOPMENT,BELFAIR,WA I PRr.6`P+=-S,aE I LIECEMBER 13,2018 I PROGRESS DESIGN PACKAGE I I OR.BRI PETERSEN 13 1 MASON COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT FIRE MARSHAL Mason County Bldg. III, 426 West Cedar Street, Shelton, WA 98584 www.co.mason.wa us Shelton (360)427-9670 Belfair(360)275-4467 Elma (360)482-5269 January 7,2019 Fire Marshal Notes: Permit:PAR2018-00045 Name: Intrepid Holdings LLC Phone:360-710-0855 BuildingConstruction:TypeUnknown O PjY yp 1 Building Class:B,M,A-mixed use Fire Marshal Review Notes: • All exit doors must swing in the direction of travel to exit(outwards)if calculated occupant load is over 49. IFC 1010 • Post illuminated exit signs on all exits. IFC 1008 • Provide emergency lighting per IFC 1008.2 • Fire extinguishers(minimum rating of 2A:1 OBC)shall be mounted not more than 5'above the ground. Travel distance cannot exceed 75'. 906.1 • Fire access provided as required Mason County Title 14(Attached). Fire lanes required to be painted red with white letters"FIRE LANE NO PARKING". This shall be approved by the Mason County Fire Marshal prior to final. • All electrical must be L&I approved and be approved prior to final inspection. • Fire Alarm System NFPA 72 shall be installed. If current system is installed provide annual fire alarm test records. • Knox box key access provided to local Fire District. Contact North Mason Regional Fire Authority at 360- 275-6711. IFC 506.2 • MSDS sheets to be posted in notebook for use/review. • A fire wall must meet the separation between occupancies per IBC 508.4. • Kitchen hood required. Deferred submittal allowed. Type 1 Hood and UL 300 suppression system required if cooking grease,Type lI hood required for all other cooking. • Locking hardware on doors must be single action with exception of main entrance for store fronts. Panic hardware required on all exits of an Assembly occupancy. • Posted signs above doors "THIS DOOR TO REMAIN UNLOCKED WHILE THE BUILDING IS OCCUPIED". • One stairway from floor 2 must be at least 48"between handrails. • Duct detectors required for any HVAC system over 2000 cfm. • Fire alarm system required if occupancy of Assembly occupancy is over 300. • Fire Sprinkler system required for assembly(A-2)if the fire areas is over 100 occupants,the rooftop is over 100 occupants,the square footage is over 5000 square feet. IFC 903.2.1.2,903.2.1.6-WA. • Exit travel distance shall conform with IFC 1006.2.1. • Number of exits shall comply with IFC 1006.3.1. Plan approval does not relieve the designer/contractor from complying with all applicable codes and requirements as adopted by Mason County and the State of Washington, not does it abrogate the requirements of the requirements of other authorities having jurisdiction. Reviewed by:Jeromy Hicks Secondary Review by: Date: Additional comments: