HomeMy WebLinkAboutEnvironmental Checklist - SEP Application - 5/24/1989 ENVIRONMENTAL CHECKLIST
�2. Name of applicant: -LL)A.A) L 7).4NiFS
3. Address and telephone number of applicant and contact person:
�0 56/ 433 SgLIC44L. AX 4852e
`3�ou.e� '�Av►�C?S zoo-Z75"sy79
4. Date checklist prepared:
5. Agency requesting checklist:
6. Proposed timing_ or schedule (including phasing, if applicable):
j l liolleL / .��
-': L r - -
,�f.fG��.�,�n�►.s7�uTiD�7 1 CSGT. 89
�
ap, ,�-�u,s;,L)eu Is ocr 8y
7. Do you have any plans for future additions, expansion, or further
activity related to or connected with this proposal? if yes, explain.
IlfoT, Ar •r-Ki s Tri�t�
8. List any environmental information you know about that has been
prepared, or will be prepared, directly related to this proposal.
NbNe Ar r►a;s Time
9.. Do you know whether applications are pending for governmental
approvals of other proposals directly affecting. the property covered by '
your
)J proposal? 1f yes, explain.
10. List any government approvals or permits that will be needed for your
proposal, if known.
11. Give brief, complete description of your proposal , including the
proposed uses and size of the project and site. There are several
questions later in this checklist that ask you to describe certain aspects
of your proposal. You do not need to repeat those answers on this page.
a� opera& .4 3 � C4rt LVOV. C 2 Roweg. SPAT 1.1 Aw•rraafi7se, W-45AS,it&$
!4 DE•rA1•L sheP . -Bw1Ui1PJy 5;3,e, is Sy'X 361.FJtode.Z.t S93c, N5 X lei' X Izai
tjlu use WA rI /�,�o,�,*,,,4 A4 S ELF fd WA At&U 7144 Ar DRAWS
?b STzAM -P ��1s -�a ��45it AAM 'TbTALL :Sc � C' f ;N Zzn/;r Ae
� � y �x � ED
AU,4o Ev,� J%. �
-2-
ENVIRONMENTAL CHECKLIST
12. Location of the proposal . Give sufficient information for a person
to understand the precise location of your proposed project, including a
street address, if any, and section, township, and range. If a proposal
would occur over 'a range of area, provide the range or boundaries of the
site(s). Provide a legal description, site plan, vicinity map.
gc. FaiQ, eowref-ol: Rod 3oAD R� , OLD BE1.Fi�r�2>�yww�� N16RrN Sher�e 2J. .
.24, V0P 23Al. � 9 ?2s83
TO BE COMPLETED BY APPLICANT..
B. ENVIRONMENTAL ELEMENTS
1. Earth
• (a) .General " description of the site (circle one): flat rolling, h111y, .
steep slopes; mountainous, other
(b) What. is the steepest slope on the site (approximate percent slope)? Z
(c) What general types of soils are found on the site (for example, clay,
sand, gravel, peat, muck)? If you know the classification of agricultural
soils, specify them and note any prime farmland. 54oi — Gyai/eL, tVILL
(d) Are there surface Indtcatlons or history of unstable soils In the.
immediate vicinity?• If so, describe. .L
_ 1 2 .L�.s +rvri, t4 C�aNa�.
' li .-SEEK;' plt66 �l .brl T'N• N Eli
Acc Iv ss. rrna Ne���2cPoSED 5 hem n1�
E11T `.'JiV:` Jt►Z .
(e) Describe the purpose, type, and approximate quantities of any filling
or grading proposed. Indicate source of fill.
Ru SAME A s TN6 5rarE L"ri s,
(f) Could erosion occur as a result of clearing, construction, or use? if
so, generally' describe.
(g) About what percent of the site will be covered with impervious
surfaces after project construction (for example, asphalt or buildings)?
4 4L C 0-6 7- POOM10 'Lds
-3-
ENVIRONMENTAL CHECKLIST
(h) Proposed measures to reduce or control erosion, or other impacts to
the earth, if any:
2. Air --
(a) What types of emissions to .the air would result from the proposal
( i.e.•, dust, automobile, odors, industrial wood smoke) during construction
and when the project is completed? If any, generally describe and give'
approximate quantities if known. N09AA oDogS AeA1 &AacnPP,,A/J buie/N4
l`164 'A 04 '�'d2(wt14I. 4u.�l e E Mi i 'IbAJI o Doi¢3 TU ;nJ4 6OE9JJ7iorl• y
-- =(b) -�'Are. there -an•y -off-sIts sources of •emmisslons or cdor•:that may affect '
your' proposal? _ If '.so,'•generally- des_cribe. ', -
(c) Proposed measures to reduce or control omissions or other impacts to
f• air, If any:
ArOA1e
-3. Water
Surface .
1) !:Is there any surface irater body on or in the Immediate vicinity of, the
site (including year=round and seasonal streams, saltwater,- lakes, ponds, '
wetlands)?* if yes,, describe type and provide names...-._If appropriate; state:-.
what stream or river it flows. into.
2) Will the project require any work over, in, or adjacent to (wlthn 200 .
feet) the described waters? If yes, please describe and attach avallable
plans.
3) Estimate the amount of fill and dredge material that would be placed '
in or removed from surface water or wetlands and indicate the area of the
site that would be affected. Indicate the source of fill material.
IVOi;E
-4-
S3rlr�' �13ff1�o °�+Ob a•,F56 . � a� � (rl w�is�� y/w2�3L71� a( s7/` •egljosep
Alleleue6 •os 41 LsJe;ew eoe;jns jo punoj6 je4ue sIQlJe4em a+sew pin00 (Z
'Zf-49 (V'I74y, 1.9'1 Grioxwor,& 7tfwvl? v 3s F"O(P. isgP2 �f�L
.NC,vmrjl 'P!tP.473p a70 3t" 33N.CN9 f1�1rQ-�( �JQ Wtvaus a
y L
Q4(r1 Pam IVI$*4 q 3N1 UWI)f ' . -0 ( af. j",7*30.7.7r(n 3a►dyL •egljosep
•os ; I LJe;ew Jey.;o o.�ul Mol ; ' .1e,�ew s iq4 1.1111 Lwo l; Je4.ew s 144 I l lw
e-Iegx • (uwou'l ; l 'sel4.14.uenb epnloul ) Aue ;1 ',IQsodslp pue uol;.oelloo
;o poq..em pue (je4.ew mio4s 6ulpnloul ) ;;ounj }o a»nos eq-� egllosea ( 1
(-ie4.ew mio4s. Gulpnloul) ;;ouna Je.;Qpl (o)
•ewes o; pe�oedxe eiQ (s)ae;sAs�ey.&�ssueonq
Jo slemlue ;o jegmnu eq4 jo •(elgeolldde 41) pewJes eq o; sesnoq ;o jegmnu
sq4 •sme;sAs guns ;o jegmnu ego -•me.�sAs eg.. ;o ezls juieue6 eq} egljosep
o( •o;e ! Iejn4.lnol.t6e sleolmego 6ulwollo; eg4. 6ululQ4.uoo •leti4sppul
:e6ewes o
I;semop :e I dmexe �o; ) Aue ; I •seo�nos �eq;o �o sXue; :al;de•s
moi; punoi6 eq; o;ul pe6.J2g3slp eq IIIw 44eq.� lelje;em a;sew egl.Josep (Z
•QfV •uwoug -
41 se14.1;u2nb e+Qmlxo.tdde pue •esodind •uol.�dljosep 1e.Jeua6 ewlq LJe;aw
punoj6 o; pe6jegoslp eq -je;ew . 111A Jo •uwa.Jpq;lw eq je').ew punoi6 111M (I
q
r
lid 74 f -SJ►1'N14' S�'otl t!��r?�.d5 t'1'�t��`3� '-'��?t�D►�/ �„r:• '' . .../.y- p:� � ' -. - : -
f�/` • - yr, j.,�yr•'_ �-•�C� � �•?�_.'7w�:� rry� �•
N'tl,YO °+ 7"473 - VA
rl. ►3.c ( =� "? !�ri�' *�?_ �sS } 1.:: oML
-
;o emnlow pe;edlol+ue pue a;sew ;o edA+ eq;. egljosep •os ; I. Lsje;ew
eoe;ins o4 slelie;eW a;sew 10 •se6Je40slp Aue' ewloA'ul l2sodoid eq; seop (g
•ueId e.�Is eq.& uo u014.e001
e4ou •os if Luleldpool ; -eeA-ool Q ulg4.jA ell lesodoid eg4. seoQ (§
i�N717T 39 r77!M Z[ 'V'M 1y
•uwou-I if selj14.uenb e;emlxojdde pue •esodind •uol;dljosep 12Jeue6 ewlg
LsuolsJewlp .ro sleweJpq{ lM J04ew eoe;jns eiinbei lesodoid eq; II1M (v
1SI1A03H0 1Y1N3WNONIAN3
ENVIRONMENTAL CHECKLIST
(d) Proposed measures to reduce or control surface, ground, and runoff
water impacts, If any: SELF (wtaLbecY Au,4* w sa j 4,doo 6u 7,As) 4
Fr LrVQ;nl3 S`/Sr$m F6 4 tFb w ee WA".
4. Plants
(a) Check or .circle types of vegetation found on the site:
deciduous tree: alder, maple, aspen, other
evergreen tree: fir, cedar, pine, other
shrubs
_ grass
crop or grain
wet soil plants: cattail, buttercup, bullrush, skunk cabbage, other
- water plants: water illy, eelgrass, milfoil, other
other types _of vegetation
(b)' What kind and- amount-of vegetation will be removed -or altered?
89 RemilED, Ae" wu;CL ac LAND Scj1NY
WAj * + o )'acM1e
TFoJ7c i2 L
e � -
(c) List threatened or endangered species known to be on or near the-
site.
�c A)
(d) Proposed landscaping, use of native plants, or other measures to
preserve or enhance vegetation on the site, If any:
-Bea( .i d c&rAJL) scyjmo?only
S. Animals ,
(a) Circle any birds and animals which have been observed on or near the
site or are known to be on or near the site:
birds: hawk, heron, eagle, songbirds, other:
mammals: deer, bear, elk, beaver, other:
fish: bass, salmon, trout, herring, shellfish, other:
(b) List any threatened or endangered species known-., to be on or near the
site.
(c) Is the site part of a migration route? If so explain.
A10
(d) Proposed measures to preserve or enhance wildlife, if any:
NaA/e .
-6-
ENVIRONMENTAL CHECKLIST
6. Energy and Natural Resources_
(a) What kinds of energy (electric, natural gas, oll, wood stove, solar)
will be used to meet the completed project' s energy needs? Describe
whether It will be used for heating, manufacturing, etc. ZSO Vo4t$1 3P1 AS-4�
Fo WeW_-& Rak) 79FE Ff�cLc ki,u r.AA1d WORN-41 //S%l gate mF�c,��
AND ,Fi}C&Lresi
(b) Would your project affect the potential use of solar energy by
adjacent properties? if so, generally describe.
(c) What kinds of energy conservation features are included in the plans
of this proposal? List other. proposed measures to reduce. or control energy
impacts, if any: .
7. Environmental Health
(a) Are there any environmental health hazards, including exposure to
toxic chemicals, risk of fire and explosiori,"' spIII , or hazardous waste,
that could occur as a result of this proposal? If so, describe.
1) Describe special emergency services that might be required.
tJ O 11)e-
2) Proposed measures to reduce or control environmental health hazards,
if any: N/aA!`°. $eIaa�. TEt 317
(b) Noise
i) What types of noise exist in the area which may affect your project
(for example: traffic, equipment, operation, other)?
/V6 Ili
�
2) What types and levels of noise would be created by or associated with
the project on a short-term or a long-term -basis ( for example: traffic
construction, operation, other)? Indicate what. -hours noise would come from
the site. I�e12y 14 1iJ14 A. 710is FO2 w4v /4RFa4•
-7-
ENVIRONMENTAL CHECKLIST
3) Proposed measures to reduce or control noise impacts, if any:
NOAIC
S. Land and Shoreline Use
(a) What is the current use of the site and adjacent properties?
IBA12rz L.4.ND
(b) Has the site been used for agriculture? If so, describe.
(c) Describe�iany structures on~the site.
NoAj
(d) Will any structures be demolished? If so, what? '
(e) What is the current zoning classification of the site?
l'S(L 2/11. ,
(f) What is the current comprehensive plan designation of the site?
Utikgowd i r- RNA.
} (g) If applicable, what is the current shoreline master program
! designation of the site?
(h) Has any part -of- the site been classified as an "environmentally
sensitive" area? If so, specify.
AJO
( 1) Approximately how many people would reside or work in the completed
project? 2 "03 .
(j) Approximately how many people would the completed project displace?
/Voue— _
(k) Proposed measures to avoid or reduce displacement impacts, if any:
W MIA .
( 1 ) Proposed measures to ensure the proposal is compatible with existing
and projected land uses and plans, If any:
-8-
' ENVIRONMENTAL CHECKLIST
9. Housing_
(a) Approximately how many units. would be provided, if any? Indicate
whether high, middle, or low-income housing. .
N f
(b) Approximately how many units, if any, would be eliminated? Indicate
whether high, middle, or low-income housing.
PIA
(c) Proposed measures to reduce or control housing impacts, if any:
10. Aesthetics := :.. _.: ;. . ...`
(a) What is the. taIlost- height• of any proposed structure( s) ,- not
including'-antennas; , rhat . is the prl'nclpal exterior building material (s)
proposed? l
' .��; . : _ Gvoo-cJ 7}'lec0i0►L � C e n�e�vT�C'uyt Cre�>:.. •
(b) What views in the immediate vicinity would be altered or obstructed?
AAON't
(c) Proposed measures to reduce or control aesthetic impact, If any:
11. Light and Glare
(a) What type of light or glare will the proposal produce? what time of
day would -it mainly occur?
(b) Could light or glare from the finished project be a safety hazard or
interfere with views?
(c) what existing off-site sources of light or glare, may affect your .
proposal? No� '
r11 e- .
(d) Proposed measures to reduce -or control light and glare impacts, if
any:
12. Recreation
(a) What designated and informal recreational opportunitIes 'are in the
immediate vicinity?
A14)0 6 B 64 AAIX STAR P.Aer( y jog�lc��s p"A) A)agrIl Skme 1d y o
9- J'
ENVIRONMENTAL CHECKLIST
(b) Would the proposed project displace any existing recreational uses?
If so, describe.
AJO
(c) Proposed measures to reduce or control impacts on recreation,
including recreation opportunities to be provided by the project or
applicant, if any: -
13. Historic and Cultural Preservation
(a) Are there any .places or objects listed on, or proposed for, national,
state, or local preservation- registers known to be on or next to the site?
- If so, generally describe.
(b) Generally describe any landmarks or evidence of historic,
archaeological, scientific, or cultural importance known to be on. or next
to the site.
JOA)e
(c) Proposed measures to reduce or control impacts, if any:
A)1*4 -
14. Transportation
(a) Identify public streets and highways serving the site, and describe
proposed access to the existing street system. Show on site plans, If
any• /ZOy l�oAA Rc1. -- OLD 3rzX4 2, $JtSwAL,� •
(b) is site currently served by public transit? If not, what is the
approximate distance to the nearest transit stop?
N D O UA)K AMUJ Al
(c) How many parking spaces would the completed project have? How many
would the protect eliminate? 1 ]— W6WI40 Ak FL.1M' 10�4rc iNJ PAR;eJPJL/
SILLt LWOU td AWO 17 spots T'o S fcppp2T TN-E .bus Ness J
-lo- �
ENVIRONMENTAL CHECKLIST
(d) Mill the proposal require any new roads or streets, or improvements
to existing roads or streets, not including driveways? If so, generally
describe ( Indicate whether public or private). �e5 �iLL, Lure A
iN'lire IraY>/i rt.�ie. oLcQ, �ELFAiR. 14� �,c3/J,y/Aad A F�rs _S db Ro
3* o J
(a) Mill the project use ,(or occur in the immediate vicinity of) water,
rail, or air transportation? If so, generally describe.
(f) How many vehicular trips per day would be generated- by the completed
project? If known, indicate when peak volumes would occur.
f.1.NbGNoW�IJ _
(g) Proposed .measures to- reduce or control transportation. impacts, if
any.
15. Public Services
(a) Mould the project result in an increased need for public services
(for example: fire protection, police protection, health care, schools,
other)? if so, generally describe.
#00 A)
(b) Proposed measures to reduce or control direct Impacts on public
services, If any. .
PJA Y.. -
• 16. UtliItIas
(a) Circle utilities currently available at the site: electricity, .
natural gas, a er, a use services telephone sanitary sewer, septic
system, other.
(b) Describe the utilities that are proposed for the project, the utility
providing the service, and the general construction activities on the site
or in the immedlate vicinity which might be needed. �L,ECrQIG •fpopoedete 0, lClpl'161V�
IQEATIa'�, k Lfl.' Cry L0411M.
C. Signature
The above answers are true and complete to the best of my knowledge. I
understand that t e lead a ancy Is relying on them to make its.. declsion.
�T Signature: .
Date Submitted: •
-11-