Loading...
HomeMy WebLinkAboutHPA - PLN General - 3/9/2011 4�: �.> Washington HYDRAULIC PROJECT APPROVAL Coastal Department of 48 Devonshire Road -. FISH and RCW 77.55.021(10),(12)-See appeal process at end of HPA Montesano,WA 98563 -r WILDLIFE (360)249-4628 Issue Date: March 09,2011 Control Number: 122981-1 Project Expiration Date:April 30,2011 FPA/Public Notice#: N/A PERMITTEE AUTHORIZED AGENT OR CONTRACTOR Jeff Mitchell PO Box 310 Belfair,WA 98528 Fax:360-275-3050 Project Name: Expedited - Culvert Relocation Project Description: Relocate culvert from underneath Mitchell Lumber. Install 140' of 18" CMP with three new catch basins. PROVISIONS 1. Work below the ordinary high water line shall only occur between MArch 9, 2011 and April 30, 2011. 2. NOTIFICATION REQUIREMENT: The Area Habitat Biologist (AHB) listed below shall receive written notification (FAX or mail)from the person to whom this Hydraulic Project Approval (HPA) is issued (permittee) or the agent/contractor no less than three working days prior to the start of construction activities. The notification shall include the permittee's name, project location, starting date for work, and the control number for this HPA. 3. Work shall be accomplished per plans and specifications "Schematic Repair Plan" dated January 26, 2011, approved by the Washington Department of Fish and Wildlife, except as modified by this Hydraulic Project Approval. A copy of these plans shall be available on site during construction. CULVERT 4. The culvert shall be installed to maintain structural integrity to the 100-year peak flow with consideration of the debris likely to be encountered. 5. The culvert shall be installed in'the dry or in isolation from the stream flow. Diverting the stream around the work site may be used providing downstream of the original outlet, the stream shall not be dewatered. If needed; a cofferdam or similar device may be used to pond water to the outlet or the water pumped to the outlet. 6. The culvert shall consist of a single barrel and shall be 18 inches or greater. EQUIPMENT 7. Equipment used for this project shall be free of external petroleum-based products while working around the stream. Accumulation of soils or debris shall be removed from the drive mechanisms Page 1 of 4 Washington HYDRAULIC PROJECT APPROVAL Coastal Department of 48 Devonshire Road FISH and RCW 77.55.021(10),(12)-See appeal process at end of HPA Montesano,WA 98563 WILDLIFE (360)249-4628 Issue Date: March 09,2011 Control Number: 122981-1 Project Expiration Date:April 30,2011 FPA/Public Notice#: N/A (wheels, tires, tracks, etc.) and undercarriage of equipment prior to its working below the ordinary high water line. Equipment shall be checked daily for leaks and any necessary repairs shall be completed prior to commencing work activities along the stream. WATER QUALITY 8. If at any time, as a result of project activities, fish are observed in distress, a fish kill occurs, or water quality problems develop (including equipment leaks or spills), immediately stop work except for efforts to control leaks or spills or prevent toxic substances from entering the water and notify the Washington Military Department's Emergency Management Division at 1-800-258-5990, and to the Area Habitat Biologist listed below. Work shall not restart on the project until approved by the Area Habitat Biologist. 9. Fresh concrete or concrete by-products shall not be allowed to enter the stream at any time during this project. All forms used for concrete shall be completely sealed to prevent the possibility of fresh concrete from getting into the stream. 10. Every effort shall be taken during all phases of this project to ensure that sediment-laden water is not allowed to enter the stream. This may be accomplished by placing a series of low gravel bag dams downstream of the project. The gravel bag dams shall consist of burlap bags filled with pea gravel. The streambed and dams shall be overlain with filter fabric on the upstream side of the dams. Accumulated silt shall be removed with the filter fabric upon completion of the project and the burlap bags shall be slit to allow the pea gravel to disperse downstream. Where necessary, hand tools may be used to ensure stream flow and fish passage are not impeded by the gravel. 11. Erosion control methods shall be used to prevent silt-laden water from entering the stream. These may include, but are not limited to, straw bales,filter fabric, temporary sediment ponds, check dams of pea gravel-filled burlap bags or other material, and/or immediate mulching of exposed areas. 12. Wastewater from project activities and water removed from within the work area shall be routed to an area landward of the ordinary high water line. 13. All waste material such as construction debris, silt, excess dirt or overburden resulting from this project shall be deposited above the limits of flood water in an approved upland disposal site. 14. Extreme care shall be taken to ensure that no petroleum products, hydraulic fluid, fresh cement, sediments, sediment-laden water, chemicals, or any other toxic or deleterious materials are allowed to enter or leach into the stream. 15. If high flow conditions that may cause siltation are encountered during this project, work shall stop until the flow subsides. Page 2 of 4 =, Washington HYDRAULIC PROJECT APPROVAL Coastal Department of 48 Devonshire Road FISH and RCW 77.55.021(10),(12)-See appeal process at end of HPA Montesano,WA 98563 WILDLIFE (360)249-4628 Issue Date: March 09, 2011 Control Number: 122981-1 Project Expiration Date:April 30,2011 FPA/Public Notice#: N/A PROJECT LOCATIONS Location#1 NE 23681 SR 3 WORK START: March 09, 2011 WORK END: April 30, 2011 WRIA: Waterbody: Tributary to: 15.0504 Unnamed Union River 1/4 SEC: Section: Township: Range: Latitude: Longitude: County: SE 1/4 �29 23 N �01 W N 47.45013 W 122.82808 Mason Location#1 Driving Directions NE 23681 SR 3, Site is.at the parking lot of Mitchell Lumber in Belfair. Stream is locally known as Mindy Creek. (Stream is south of 15.0504) APPLY TO ALL HYDRAULIC PROJECT APPROVALS This Hydraulic Project Approval pertains only to those requirements of the Washington State Hydraulic Code, specifically Chapter 77.55 RCW(formerly RCW 77.20). Additional authorization from other public agencies may be necessary for this project. The person(s)to whom this Hydraulic Project Approval is issued is responsible for applying for and obtaining any additional authorization from other public agencies(local, state and/or federal)that may be necessary for this project. This Hydraulic Project Approval shall be available on the job site at all times and all its provisions followed by the person(s)to whom this Hydraulic Project Approval is issued and operator(s) performing the work. This Hydraulic Project Approval does not authorize trespass. The person(s)to whom this Hydraulic Project Approval is issued and operator(s) performing the work may be held liable for any loss or damage to fish life or fish habitat that results from failure to comply with the provisions of this Hydraulic Project Approval. Failure to comply with the provisions of this Hydraulic Project Approval could result in a civil penalty of up to one hundred dollars per day and/or a gross misdemeanor charge, possibly punishable by fine and/or imprisonment. All Hydraulic Project Approvals issued under RCW 77.55.021 are subject to additional restrictions,conditions, or revocation if the Department of Fish and Wildlife determines that changed conditions require such action.The person(s)to whom this Hydraulic Project Approval is issued has the right to appeal those decisions. Procedures for filing appeals are listed below. Requests for any change to an unexpired HPA must be made in writing. Requests for new HPAs must be made by submitting a new complete application. Send your requests to the department by: mail to the Washington Department of Fish and Wildlife, Habitat Program, 600 Capitol Way North, Olympia,Washington 98501-1091;e-mail to HPAapplications@dfw.wa.gov;fax to(360) 902-2946; or hand-delivery to the Natural Resources Building, 1111 Washington St SE, Habitat Program, Fifth floor. Page 3 of 4 Washington HYDRAULIC PROJECT APPROVAL Coastal 48 Devonshire Road Department of �;. FISH and RCW 77.55.021(10),(12)-See appeal process at end of HPA Montesano,WA 98563 WILDLIFE (360)249-4628 Issue Date: March 09,2011 Control Number: 122981-1 Project Expiration Date:April 30, 2011 FPA/Public Notice#: N/A APPEALS INFORMATION If you wish to appeal the issuance, denial, conditioning,or modification of a Hydraulic Project Approval(HPA), Washington Department of Fish and Wildlife (WDFW)recommends that you first contact the department employee who issued or denied the HPA to discuss your concerns.Such a discussion may resolve your concerns without the need for further appeal action. If you proceed with an appeal,you may request an informal or formal appeal.WDFW encourages you to take advantage of the informal appeal process before initiating a formal appeal.The informal appeal process includes a review by department management of the HPA or denial and often resolves issues faster and with less legal complexity than the formal appeal process. If the informal appeal process does not resolve your concerns,you may advance your appeal to the formal process.You may contact the HPA Appeals Coordinator at(360)902-2260 for more information. A. INFORMAL APPEALS:WAC 220-110-340 is the rule describing how to request an informal appeal of WDFW actions taken under Chapter 77.55 RCW. Please refer to that rule for complete informal appeal procedures.The following information summarizes that rule. A person who is aggrieved by the issuance, denial, conditioning,or modification of an HPA may request an informal appeal of that action.You must send your request to WDFW by mail to the Washington Department of Fish and Wildlife HPA Appeals Coordinator, 600 Capitol Way North, Olympia,Washington 98501-1091;e-mail to HPAapplications@dfw.wa.gov;fax to(360) 902-2946;or hand-delivery to the Natural Resources Building, 1111 Washington St SE, Habitat Program, Fifth floor.WDFW must receive your request within 30 days from the date you receive notice of the decision. If you agree, and you applied for the HPA, resolution of the appeal may be facilitated through an informal conference with the WDFW employee responsible for the decision and a supervisor. If a resolution is not reached through the informal conference,or you are not the person who applied for the HPA,the HPA Appeals Coordinator or designee will conduct an informal hearing and recommend a decision to the Director or designee. If you are not satisfied with the results of the informal appeal,you may file a request for a formal appeal. B. FORMAL APPEALS:WAC 220-110-350 is the rule describing how to request a formal appeal of WDFW actions taken under Chapter 77.55 RCW. Please refer to that rule for complete formal appeal procedures.The following information summarizes that rule. A person who is aggrieved by the issuance, denial,conditioning, or modification of an HPA may request a formal appeal of that action.You must send your request for a formal appeal to the clerk.of the Pollution Control Hearings Boards and serve a copy on WDFW within 30 days from the date you receive notice of the decision.You may serve WDFW by mail to the Washington Department of Fish and Wildlife HPA Appeals Coordinator,600 Capitol Way North, Olympia,Washington 98501-1091;e-mail to HPAapplications@dfw.wa.gov;fax to(360)902-2946; or hand-delivery to the Natural Resources Building, 1111 Washington St SE, Habitat Program, Fifth floor.The time period for requesting a formal appeal is suspended during consideration of a timely informal appeal. If there has been an informal appeal,you may request a formal appeal within 30 days from the date you receive the Director's or designee's written decision in response to the informal appeal. C. FAILURE TO APPEAL WITHIN THE REQUIRED TIME PERIODS: If there is no timely request for an appeal,the WDFW action shall be final and unappealable. ENFORCEMENT: Sergeant Jackson (29) P2 Habitat Biologist for Director Gloria Rogers 360-249-1293 WDFW CC: Page 4 of 4 �-TRANSOLYMPIC . ENGINE'ERING, NG PD.,Box,849 _ Montesano,wA 98563. P 360-339 5660 Ct 360-701 0158; _ cv���..rra»sdlYmzic:cam January:26,2011 Mr.°leff Mitchell - ,Mitchell Lumber 23681.NE-State Route 3 Belfair,WA 98528 Re Mitchell Lumber,Sink Hole,and:Related Orainage,Problems; 17951E,SR,106,Belfair,WA 98528 Dear.Mr-Mitchell. Thursday;January 13,20111 vssited•your business at 23681 NE State Route 3, Belfair,INA,snMason'sF County,at your`request There is a problem`with sinkholes developing since recent highway �... construction;along SR 3,which is in front of: business ;The purpose_of this visit was to evaluate the- your: - - :nature of the problems,try to determine the causes,recornmend,repairsand p_ossiblesolutio.ns YoU_., were present and hadpreviously authorized my visit: You should understand that:this report andahe conclusions contained herein are the results of a visual ,examination ofFthe property _ No plans were available for the home,-the culvert, the,road or the site: No calculations, measurements,stests, etc--other than those described'below;.have been made -As,a result,.=the report and its conclusions afp�circurnscribed_by the inherent Ilmitation&;'of the methods used = Site.DEiservation.._ Based"011 my site visit,the,following,tems were noted: 1. ' Your business es situated on`.the:west side of-SR 3 Th'e business fronts the,highwiay right of. 2: :There-is a cast In place concrete culvert,:approximately 24 inches square,-that crosses onto :your property:from-the rigYt`of way It has an open_botfom and is draining_areas from the right of vray and hills eastof the right ofway. 3. The.culvert was probably installed]n the eariy.,1900s Iti crosses beneath the'southeast corner, ` of your-buildirg It;�s`not in=.an easement., 4. The condition;of the culvert'is fragile,consistent with itsage 5 ;The culvert was damaged this summer dunng a construction:project to install newt sewers:in; the SR 3 right of wavAhis past summer Detours; heamequiprnent, trucks, rollers and paving . ._machines were working irrimediately m front of your building and over"the culvert 6.` The county"installeda smaller 1S ductile iron culvert In their"right'of way and several catch basins.: They_connected it to the,existing,culvert.that runs below:your building close to the -edge ofthe right.of way. 7._ The-coup s new, 18.culve a .rt ears;to b d "� e un r i e sxed�_basetl=on the observa io i ty. - _ PP. :. -... . . - -, . t n by state o'fficiafsthat.tFaere is frequent backvrater iinahe view catch`basm5_and cu.ivert. " 8 Downsteeam.;of your.building, to the:southwest,-tfie culvert.transitions-from:a square'concrete box to`an 18"'round,concrete.culvert a 24" round concrete culvert,`_a 24" steel culvert antl aheri to:a 32"_steel Culvert_Eyentuallythe`culvertempties Into-.Mindy Creek. ' 9 7 You obtained.a.video of t:he:cuivert. li shows the oor condition of the.culvert cracks.in h p , the walls of thd�round and concrete box culverts, and:poor,jolnt conditions. Soil;_,yoids and debris, are vlsiljle in theioints; There lvert,: 10 The boz=culvert had been rEpaieed,in the past:_,You mentioned than rt f ad to .e repaired in.the mid..1990s when the top failed a result of vibrations from_the adjacent highway traffiEioading. , 1 As noted irS.item 9,the culvert,contatns-fish The Washington Department of�Fish`and Wildlife . rioted thattliere have,been several,stream restoration_--projects upstream and downstream'of ✓ the culvert 6y�1aw,the culvert should_be,replaced by a_fish"passable structure; 12 You noticed that sinkholes were'developing=in March of 2010'around a curb`inlet Mthe east e of'yaur budding;_ You have been In contact with Mason County; the Washington State" Department ,of Transportation and,the Department..of Fish_=and Wildlife 'to address the . sinkholes 4 . 13:They have not taken resRgn$ib lity.for the damage_or.the`stnkholes 14. The sinkholes_:aresafety'hazards You have,coned and marked them with barricades to protect the public 15 -You.tried to:repair,theainkhvles yourself.with bags.of concrete.; Theucontmu_ed vibrations and'. `.;incr-ased flow resulted to further damage and er other,'sinkhole ; 16: They tgnld you that you are responsible for repairs and,need to obtainan HPA permit;to repair: -the culvert., You have,done so:, 17. You'lvant to temporarily repair the culvert;to keep problems from recurring until there a a netiv urt � ainh Vert crossfshpassage c h t e ing below your building;is abandoned: -Concidsions"and-Recommendations:`. - It appears that, the-old culvert, possibly Weakened due to age, has.been subjected to; loads snd vibrations from the sewer; constrOctibri in`SR 3-.This caused new cracks tO,open"and/or has.Worsened. 2 L TR'r4 0LYMPI '1:ek s ENGINEERING INC. _existing cracks. The efficiency of the'new storm system upstream of`the culvert,.the' smootherjg' inch pipe, the lack of,a.gravel om►bott to slowdown and infiltrate the flow prior to it. reaching:your site has probably-increase d the.quantity,.velocity and,energy of the water running in the. culvert. i This:increased:energy washes through the--breaks,:and cracks of the old culvert and:carries,;awaythe fine soils that,sumo nd it. It also washes away'some'!of the,;grave!_:bedding in "the bottom"of.the existing'culvert,,This:leaves voids:around'the culvert and.below-.the pavement surfaces;`Vibrations=and loading from _vehicles_:caused the unsupported flexible pavement.' to fail.and: settle, resulting, in `sinkholes`on the surface. Theses nkholes are;-safe4} hazards: In_addition, several of the conditions leading,:to tho--sinkholes remain.uncorrected. They_can lead;to-further pro.blems;such as undermining the building foundation and floor. _ t_'recommend tfiat the drainage system be.repaired'.assnort as-Qossrble`with.a,tightline pipe to channel :the-flowfroni the newly-repaired culvert that the County installed to the`connection point beyond your . .. building. The culvertbelow your building shouId'be.abandoned and.backfilled with°lean.concrete"'or _controlled density fill`to completely,;elrrninate,any voids below the parking lot or the building -Given:. the weakened:condition of°:the oId,culvert; if-do'?temporaN repairs a;nd allow the'culvert`to remain.: lielow:your;buildrng:and sidewalk„.you risk ;mare undermining and;,sinkholes,at any time Th&. permittingancl design-ofthe-new fish passage oroiect by:`the state and.county may be'delayed, further extending your=nsk . ,; The size;of the tight lirie,pipe 5hould,be determined by an analysis of-the tributary basin Ahe runoff, from tlir= appropriate design storm. Connections-to the existing'system t� l[ need to be,-made;at -manholes due to the size:of.the pipe.:Three man holes,Would be necessary to complete the repair. -'When the new,'fish passage stream enhancement protect is d esigned„the design should incorporate _ new lineslo carry the.runoff,away from'and throughyour pr.,ope-rty in accordance with.eurrentdesigr standards The new lines should be placed in aeparate; recorded easements so that each'property owner-:and the Stab?',of Washington have.clearly defined responsibilities fo!maintain the drainage_. system:. 'I have,attached,copies of pictures from my site,visit for you r review, as;well as.a schematic.design fora the repairs If you have any questions or,l.can be of furtf ter help,'pleas—d:call meat(360)339;5660 : :Sincerely Yo"urs,, Transolympic Engineering;Inc.. Mark) Cerngang, PEWS_E . . Principal Engineer. 33a2a �' (0 < At*ach' 'pGISTG4' !.2 r 3. TRANSOL.YMPIC .' Gr ENIGINEERING 11NI TI k, . AIR 4:�c rf► a R - 1 Figure 1: Barricaded and coned sinkhole. This is looking south from the sidewalk. SR 3 is to the left. Note the proximity of the lane where. The grated inlet rests on top of the old box culvert. The older sinkhole to the south was repaired prior to the new one opening. rr. Figure 2: View from western edge of SR 3 looking west. Note pavement patch from previous repair and concrete plug of previous sinkhole. Note the temporary asphalt berms channeling runoff to the grate. Sinkhole is immediately below barricade behind short cone. See Figure 3 for view into sinkhole. 4 TRANSOLYMPIC ENGINEERING,NC. f: r..i l Figure 3: View of sinkhole. Note cracked and broken culvert walls and yellow gas utility line in vicinity of sinkhole. 1 ' Ar- iM � Figure 4: View looking down into the top of the grated inlet over box culvert. Note the hole on top of the box culvert that is approximately 12 inches below surface. Inlet and grate situated directly over box culvert. 5 TRANSOLYM PIC 1 � ENGINF_ERI VG,INC. Figure 5: View looking to the southwest from the catch basin which is approximately 56' from the connection point of the new 18" ductile iron line to the concrete box culvert. Note location of the cone over sink hole behind vehicle. Box culvert runs beneath the southeast corner of the building. i( r t •.4 Figure 6:View from southeast building corner looking northeast towards the sinkhole locations and the catch basin beyond vehicle shown in Figure 5. 6 TRANSOLYMPIC ENGINEERING.INC. 3 • � I 1I s r G. 01 q s r Figure 7: Aerial view showing relationship of building to SR 3, running to the east of the building frontage. Photo was taken prior to construction activities. The southeast building corner is shown. The sinkhole locations are at the face of sidewalk approximately in the midpoint of the parking along the east side of the building. See attached schematic design for proposed repairs. 7 TRANSOLYMPIC ENGINEERING.INC. Washington HYDRAULIC PROJECT APPROVAL Coastal Department of 48 Devonshire Road t r• , FISH and RCW 77.55.021(10),(12)-See appeal process at end of HPA Montesano,WA 98563 WILDLIFE (360)249-4628 Issue Date: March 09, 2011 Control Number: 122981-1 Project Expiration Date:April 30,2011 FPA/Public Notice#: N/A PERMITTEE AUTHORIZED AGENT OR CONTRACTOR Jeff Mitchell PO Box 310 Belfair,WA 98528 Fax: 360-275-3050 Project Name: Expedited - Culvert Relocation Project Description: Relocate culvert from underneath Mitchell Lumber. Install 140' of 18" CMP with three new catch basins. PROVISIONS 1. Work below the ordinary high water line shall only occur between MArch 9, 2011 and April 30, 2011. 2. NOTIFICATION REQUIREMENT: The Area Habitat Biologist (AHB) listed below shall receive written notification (FAX or mail)from the person to whom this Hydraulic Project Approval (HPA) is issued (permittee) or the agent/contractor no less than three working days prior to the start of construction activities. The notification shall include the permittee's name, project location, starting date for work, and the control number for this HPA. 3. Work shall be accomplished per plans and specifications "Schematic Repair Plan" dated January 26, 2011, approved by the Washington Department of Fish and Wildlife, except as modified by this Hydraulic Project Approval. A copy of these plans shall be available on site during construction. CULVERT 4. The culvert shall be installed to maintain structural integrity to the 100-year peak flow with consideration of the debris likely to be encountered. 5. The culvert shall be installed in'the dry or in isolation from the stream flow. Diverting the stream around the work site may be used providing downstream of the original outlet, the stream shall not be dewatered. If needed, a cofferdam or similar device may be used to pond water to the outlet or the water pumped to the outlet. 6. The culvert shall consist of a single barrel and shall be 18 inches or greater. EQUIPMENT 7. Equipment used for this project shall be free of external petroleum-based products while working around the stream. Accumulation of soils or debris shall be removed from the drive mechanisms Page 1 of 4 Washington HYDRAULIC PROJECT APPROVAL Coastal Department of 48 Devonshire Road FISH and RCW 77.55.021(10),(12)-See appeal process at end of HPA Montesano,WA 98563 WILDLIFE (360)249-4628 Issue Date: March 09,2011 Control Number: 122981-1 Project Expiration Date:April 30,2011 FPA/Public Notice#: N/A (wheels, tires, tracks, etc.) and undercarriage of equipment prior to its working below the ordinary high water line. Equipment shall be checked daily for leaks and any necessary repairs shall be completed prior to commencing work activities along the stream. WATER QUALITY 8. If at any time, as a result of project activities, fish are observed in distress, a fish kill occurs, or water quality problems develop (including equipment leaks or spills), immediately stop work except for efforts to control leaks or spills or prevent toxic substances from entering the water and notify the Washington Military Department's Emergency Management Division at 1-800-258-5990, and to the Area Habitat Biologist listed below. Work shall not restart on the project until approved by the Area Habitat Biologist. 9. Fresh concrete or concrete by-products shall not be allowed to enter the stream at any time during this project. All forms used for concrete shall be completely sealed to prevent the possibility of fresh concrete from getting into the stream. 10. Every effort shall be taken during all phases of this project to ensure that sediment-laden water is not allowed to enter the stream. This may be accomplished by placing a series of low gravel bag dams downstream of the project. The gravel bag dams shall consist of burlap bags filled with pea gravel. The streambed and dams shall be overlain with filter fabric on the upstream side of the dams. Accumulated silt shall be removed with the filter fabric upon completion of the project and the burlap bags shall be slit to allow the pea gravel to disperse downstream. Where necessary, hand tools may be used to ensure stream flow and fish passage are not impeded by the gravel. 11. Erosion control methods shall be used to prevent silt-laden water from entering the stream. These may include, but are not limited to, straw bales, filter fabric, temporary sediment ponds, check dams of pea gravel-filled burlap bags or other material, and/or immediate mulching of exposed areas. 12. Wastewater from project activities and water removed from within the work area shall be routed to an area landward of the ordinary high water line. 13. All waste material such as construction debris, silt, excess dirt or overburden resulting from this project shall be deposited above the limits of flood water in an approved upland disposal site. 14. Extreme care shall be taken to ensure that no petroleum products, hydraulic fluid, fresh cement, sediments, sediment-laden water, chemicals, or any other toxic or deleterious materials are allowed to enter or leach into the stream. 15. If high flow conditions that may cause siltation are encountered during this project, work shall stop until the flow subsides. Page 2 of 4 Washington HYDRAULIC PROJECT APPROVAL Coastal Department of 48 Devonshire Road FISH and RCW 77.55.021(10),(12)-See appeal process at end of HPA Montesano,WA 98563 WILDLIFE (360)2494628 Issue Date: March 09,2011 Control Number: 122981-1 Project Expiration Date:April 30,2011 FPA/Public Notice#: N/A PROJECT LOCATIONS Location#1 NE 23681 SR 3 WORK START: March 09, 2011 IWORK END: April 30, 2011 WRIA: Waterbody: Tributary to: 15.0504 Unnamed Union River 1/4 SEC: Section: Township: Range: Latitude: Longitude: County: SE 1/4 �29 23 N �01 W N 47.45013 W 122.82808 Mason Location#1 Driving Directions NE 23681 SR 3, Site is at the parking lot of Mitchell Lumber in Belfair. Stream is locally known as Mindy Creek. (Stream is south of 15.0504 APPLY TO ALL HYDRAULIC PROJECT APPROVALS This Hydraulic Project Approval pertains only to those requirements of the Washington State Hydraulic Code, specifically Chapter 77.55 RCW(formerly RCW 77.20). Additional authorization from other public agencies may be necessary for this project. The person(s)to whom this Hydraulic Project Approval is issued is responsible for applying for and obtaining any additional authorization from other public agencies(local, state and/or federal)that may be necessary for this project. This Hydraulic Project Approval shall be available on the job site at all times and all its provisions followed by the person(s)to whom this Hydraulic Project Approval is issued and operator(s) performing the work. This Hydraulic Project Approval does not authorize trespass. The person(s)to whom this Hydraulic Project Approval is issued and operator(s) performing the work may be held liable for any loss or damage to fish life or fish habitat that results from failure to comply with the provisions of this Hydraulic Project Approval. Failure to comply with the provisions of this Hydraulic Project Approval could result in a civil penalty of up to one hundred dollars per day and/or a gross misdemeanor charge, possibly punishable by fine and/or imprisonment. All Hydraulic Project Approvals issued under RCW 77.55.021 are subject to additional restrictions,conditions,or revocation if the Department of Fish and Wildlife determines that changed conditions require such action.The person(s)to whom this Hydraulic Project Approval is issued has the right to appeal those decisions. Procedures for filing appeals are listed below. Requests for any change to an unexpired HPA must be made in writing. Requests for new HPAs must be made by submitting a new complete application. Send your requests to the department by: mail to the Washington Department of Fish and Wildlife, Habitat Program,600 Capitol Way North, Olympia,Washington 98501-1091; e-mail to HPAapplications@dfw.wa.gov;fax to(360)902-2946;or hand-delivery to the Natural Resources Building, 1111 Washington St SE, Habitat Program, Fifth floor. Page 3 of 4 1 ash Washington HYDRAULIC PROJECT APPROVAL Coastal Department of 48 Devonshire Road w FISH and RCW 77.55.021(10),(12)-See appeal process at end of HPA Montesano,WA 98563 - WILDLIFE (360)2494628 Issue Date: March 09,2011 Control Number: 122981-1 Project Expiration Date:April 30,2011 FPA/Public Notice#: N/A APPEALS INFORMATION If you wish to appeal the issuance,denial, conditioning,or modification of a Hydraulic Project Approval(HPA), Washington Department of Fish and Wildlife(WDFW)recommends that you first contact the department employee who issued or denied the HPA to discuss your concerns. Such a discussion may resolve your concerns without the need for further appeal action. If you proceed with an appeal,you may request an informal or formal appeal.WDFW encourages you to take advantage of the informal appeal process before initiating a formal appeal.The informal appeal process f h HPA or denial and often resolves issues faster and with less legal includes a review by department management o the g complexity than the formal appeal process. If the informal appeal process does not resolve your concerns,you may advance your appeal to the formal process.You may contact the HPA Appeals Coordinator at(360)902-2260 for more information. A. INFORMAL APPEALS:WAC 220-110-340 is the rule describing how to request an informal appeal of WDFW actions taken under Chapter 77.55 RCW. Please refer to that rule for complete informal appeal procedures.The following information summarizes that rule. A person who is aggrieved by the issuance,denial, conditioning,or modification of an HPA may request an informal appeal of that action.You must send your request to WDFW by mail to the Washington Department of Fish and Wildlife HPA Appeals Coordinator, 600 Capitol Way North, Olympia,Washington 98501-1091;e-mail to HPAapplications@dfw.wa.gov;fax to(360)902-2946;or hand-delivery to the Natural Resources Building, 1111 Washington St SE, Habitat Program, Fifth floor.WDFW must receive your request within 30 days from the date you receive notice of the decision. If you agree,and you applied for the HPA, resolution of the appeal may be facilitated through an informal conference with the WDFW employee responsible for the decision and a supervisor. If a resolution is not reached through the informal conference, or you are not the person who applied for the HPA,the HPA Appeals Coordinator or designee will conduct an informal hearing and recommend a decision to the Director or designee. If you are not satisfied with the results of the informal appeal,you may file a request for a formal appeal. B. FORMAL APPEALS:WAC 220-110-350 is the rule describing how to request a formal appeal of WDFW actions taken under Chapter 77.55 RCW. Please refer to that rule for complete formal appeal procedures.The following information summarizes that rule. A person who is aggrieved by the issuance,denial,conditioning, or modification of an HPA may request a formal appeal of that action.You must send your request for a formal appeal to the clerk of the Pollution Control Hearings Boards and serve a copy on WDFW within 30 days from the date you receive notice of the decision.You may serve WDFW by mail to the Washington Department of Fish and Wildlife HPA Appeals Coordinator,600 Capitol Way North, Olympia,Washington 98501-1091;e-mail to HPAapplications@dfw.wa.gov;fax to(360)902-2946;or hand-delivery to the Natural Resources Building, 1111 Washington St SE, Habitat Program, Fifth floor.The time period for requesting a formal appeal is suspended during consideration of a timely informal appeal. If there has been an informal appeal,you may request a formal appeal within 30 days from the date you receive the Director's or designee's written decision in response to the informal appeal. C. FAILURE TO APPEAL WITHIN THE REQUIRED TIME PERIODS: If there is no timely request for an appeal,the WDFW action shall be final and unappealable. ENFORCEMENT: Sergeant Jackson (29) P2 Habitat Biologist for Director Gloria Rogers 360-249-1293 WDFW CC: Page 4 of 4 Washington HYDRAULIC PROJECT APPROVAL Coastal Department of 48 Devonshire Road FISH and RCW 77.55.021(10),(12)-See appeal process at end of HPA Montesano,WA 98563 WILDLIFE (360)249-4628 Issue Date: September 29,2010 Control Number: 121876-1 Project Expiration Date: November 28,2010 FPA/Public Notice#: N/A PERMITTEE AUTHORIZED AGENT OR CONTRACTOR Jeff Mitchell PO Box 310 Belfair,WA 98528 Fax:360-275-3050 Project Name: Expedited - Culvert Repair and/or Replacement Project Description: Replace and/or repair all or a portion of an existing culvert with no less than an 18 inch culvert. NOTE: This Hydraulic Project Approval (HPA) pertains only to the provisions of the Washington State Fisheries and Wildlife Codes. It is the permittee's responsibility to apply for and obtain any additional authorization from other public agencies (local, state and/or federal) that may be necessary for this project. PROVISIONS 1. Work below the ordinary high water line shall only occur between September 29, 2010 and November 28, 2010. 2. NOTIFICATION REQUIREMENT: The Area Habitat Biologist (AHB) listed below shall receive written notification (FAX or mail) from the person to whom this Hydraulic Project Approval (HPA) is issued (permittee) or the agent/contractor no less than three working days prior to the start of construction activities. The notification shall include the permittee's name, project location, starting date for work, and the control number for this HPA. 3. Work shall be accomplished per plans and specifications approved by the Washington Department of Fish and Wildlife, except as modified by this Hydraulic Project Approval. A copy of these plans shall be available on site during construction. CULVERT 4. The culvert shall be installed to maintain structural integrity to the 100-year peak flow with consideration of the debris likely to be encountered. 5. The culvert shall be installed in the dry or in isolation from the stream flow. Diverting the stream .around the work site using the ditch line may be used providing downstream of the original outlet, the stream shall not be dewatered. If needed, a cofferdam or similar device may be used to pond water to the outlet or the water pumped to the outlet. Page 1 of 4 r Washington HYDRAULIC PROJECT APPROVAL Coastal Department of 48 Devonshire Road FISH and RCW 77.55.021(10),(12)-See appeal process at end of HPA Montesano,WA 98563 WILDLIFE (360)249-4628 Issue Date: September 29,2010 Control Number: 121876-1 Project Expiration Date: November 28,2010 FPA/Public Notice#: N/A 6. The culvert shall consist of a single barrel and shall be 18 inches or greater. EQUIPMENT 7. Equipment used for this project shall be free of external petroleum-based products while working around the stream. Accumulation of soils or debris shall be removed from the drive mechanisms (wheels, tires, tracks, etc.) and undercarriage of equipment prior to its working below the ordinary high water line. Equipment shall be checked daily for leaks and any necessary repairs shall be completed prior to commencing work activities along the stream. WATER QUALITY 8. If at any time, as a result of project activities, fish are observed in distress, a fish kill occurs, or water quality problems develop (including equipment leaks or spills), immediately stop work except for efforts to control leaks or spills or prevent toxic substances from entering the water and notify the Washington Military Department's Emergency Management Division at 1-800-258-5990, and to the Area Habitat Biologist listed below. Work shall not restart on the project until approved by the Area Habitat Biologist. 9. Every effort shall be taken during all phases of this project to ensure that sediment-laden water is not allowed to enter the stream. This may be accomplished by placing a series of low gravel bag dams downstream of the project. The gravel bag dams shall consist of burlap bags filled with pea gravel. The streambed and dams shall be overlain with filter fabric on the upstream side of the dams. Accumulated silt shall be removed with the filter fabric upon completion of the project and the burlap bags shall be slit to allow the pea gravel to disperse downstream.. Where necessary, hand tools may be used to ensure stream flow and fish passage are not impeded by the gravel. 10. Erosion control methods shall be used to prevent silt-laden water from entering the stream. These may include, but are not limited to, straw bales, filter fabric, temporary sediment ponds, check dams of pea gravel-filled burlap bags or other material, and/or immediate mulching of exposed areas. 11. Wastewater from project activities and water removed from within the work area shall be routed to an area landward of the ordinary high water line. 12. All waste material such as construction debris, silt, excess dirt or overburden resulting from this project shall be deposited above the limits of flood water in an approved upland disposal site. 13. Extreme care shall be taken to ensure that no petroleum products, hydraulic fluid, fresh cement, sediments, sediment-laden water, chemicals, or any other toxic or deleterious materials are allowed to enter or leach into the stream. 14. If high flow conditions that may cause siltation are encountered during this project,work shall 9 Y 9 p J stop until the flow subsides. Page 2 of 4 Washington HYDRAULIC PROJECT APPROVAL coastal Department of 48 Devonshire Road FISH and RCW 77.55.021(10),(12)-See appeal process at end of HPA Montesano,WA 98563 WILDLIFE (360)249-4628 Issue Date: September 29,2010 Control Number: 121876-1 Project Expiration Date: November 28,2010 FPA/Public Notice#: N/A PROJECT LOCATIONS Location #1 NE 23681 SR 3 WORK START: September 29, 2010 WORK END: November 28, 2010 WRIA: Waterbody: Tributary to: 15.0504 Unnamed Union River 1/4 SEC: Section: Township: Range: Latitude: Longitude: County: SE 1/4 29 �23 N 01 W N 47.45013 W 122.82808 Mason Location#1 Driving Directions NE 23681 SR 3, Site is at the parking lot of Mitchell Lumber in Belfair. Stream is locally known as Mindy Creek. (Stream is south of 15.0504 APPLY TO ALL HYDRAULIC PROJECT APPROVALS This Hydraulic Project Approval pertains only to those requirements of the Washington State Hydraulic Code, specifically Chapter 77.55 RCW(formerly RCW 77.20). Additional authorization from other public agencies may be necessary for this project. The person(s)to whom this Hydraulic Project Approval is issued is responsible for applying for and obtaining any additional authorization from other public agencies(local, state and/or federal)that may be necessary for this project. This Hydraulic Project Approval shall be available on the job site at all times and all its provisions followed by the person(s)to whom this Hydraulic Project Approval is issued and operator(s) performing the work. This Hydraulic Project Approval does not authorize trespass. The person(s)to whom this Hydraulic Project Approval is issued and operator(s) performing the work may be held liable for any loss or damage to fish life or fish habitat that results from failure to comply with the provisions of this Hydraulic Project Approval. Failure to comply with the provisions of this Hydraulic Project Approval could result in a civil penalty of up to one hundred dollars per day and/or a gross misdemeanor charge, possibly punishable by fine and/or imprisonment. All Hydraulic Project Approvals issued under RCW 77.55.021 are subject to additional restrictions,conditions,or revocation if the Department of Fish and Wildlife determines that changed conditions require such action.The person(s)to whom this Hydraulic Project Approval is issued has the right to appeal those decisions. Procedures for filing appeals are listed below. Requests for any change to an unexpired HPA must be made in writing. Requests for new HPAs must be made by submitting a new complete application.Send your requests to the department by: mail to the Washington Department of Fish and Wildlife, Habitat Program,600 Capitol Way North, Olympia,Washington 98501-1091; e-mail to HPAapplications@dfw.wa.gov;fax to(360)902-2946;or hand-delivery to the Natural Resources Building, 1111 Washington St SE, Habitat Program, Fifth floor. Page 3 of 4 Washington HYDRAULIC PROJECT APPROVAL Coastal Department of 48 Devonshire Road FISH and RCW 77.55.021(10),(12)-See appeal process at end of HPA Montesano,WA 98563 WILDLIFEtv (360)249-4628 Issue Date: September 29,2010 Control Number: 121876-1 Project Expiration Date: November 28,2010 FPA/Public Notice#: N/A APPEALS INFORMATION If you wish to appeal the issuance, denial, conditioning, or modification of a Hydraulic Project Approval(HPA),you may request an informal or formal appeal. A. INFORMAL APPEALS:WAC 220-110-340 is the rule describing how to request an informal appeal of Washington Department of Fish and Wildlife(WDFW)actions taken under Chapter 77.55 RCW. Please refer to that rule for complete informal appeal procedures.The following information summarizes that rule. A person who is aggrieved by the issuance,denial,conditioning,or modification of an HPA may request an informal appeal of that action.You must send your request to WDFW by: mail to the Washington Department of Fish and Wildlife HPA Appeals Coordinator,600 Capitol Way North, Olympia,Washington 98501-1091;e-mail to HPAapplications@dfw.wa.gov;fax to(360)902-2946; or hand-delivery to the Natural Resources Building, 1111 Washington St SE, Habitat Program, Fifth floor.WDFW must receive your request within 30 days from the date you receive notice of the decision. If you agree,and you applied for the HPA, resolution of the appeal may be facilitated through an informal conference with the WDFW employee responsible for the decision and a supervisor. If a resolution is not reached through the informal conference,or you are not the person who applied for the HPA,the HPA Appeals Coordinator or designee will conduct an informal hearing and recommend a decision to the Director or designee. If you are not satisfied with the results of the informal appeal,you may file a request for a formal appeal. B. FORMAL APPEALS:WAC 220-110-350 is the rule describing how to request a formal appeal of WDFW actions taken under Chapter 77.55 RCW. Please refer to that rule for complete formal appeal procedures.The following information summarizes that rule. A person who is aggrieved by the issuance, denial,conditioning,or modification of an HPA may request a formal appeal of that action.You must send your request for a formal appeal to the clerk of the Pollution Control Hearings Boards and serve a copy on WDFW within 30 days from the date you receive notice of the decision.You may serve WDFW by mail to the Washington Department of Fish and Wildlife HPA Appeals Coordinator,600 Capitol Way North, Olympia,Washington 98501-1091;e-mail to HPAapplications@dfw.wa.gov;fax to(360)902-2946;or hand-delivery to the Natural Resources Building, 1111 Washington St SE, Habitat Program, Fifth floor.The time period for requesting a formal appeal is suspended during consideration of a timely informal appeal. If there has been an informal appeal,you may request a formal appeal within 30 days from the date you receive the Director's or designee's written decision in response to the informal appeal. C. FAILURE TO APPEAL WITHIN THE REQUIRED TIME PERIODS: If there is no timely request for an appeal,the WDFW action shall be final and unappealable. ENFORCEMENT: Sergeant Jackson (29) P2 Habitat Biologist for Director Gloria Rogers 360-249-1293 WDFW CC: Page 4 of 4