Loading...
HomeMy WebLinkAboutCOM2006-00052 Final Chiropractic Office with Two Office Spaces - COM Permit / Conditions - 5/15/2007 MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Inspection Line(360)127-7262 Phone: (360)427-9670,ext.352 Mason County Bldg. 3 426 W. Cedar P.O. Box 186 h Shelton,WA 98584 COMMERCIAL BUILDING PERMIT COM2006-00052 OWNER: JAMES SCOTT RECEIVED: 4/27/2006 CONTRACTOR: LICENSE: EXP: .�(�� ISSUED: 3/31/2009 SITE ADDRESS: 131 NE ROY BOAD RD BELFAIR ` EXPIRES: 9/30/2009 PARCEL NUMBER: 123294190200 LEGAL DESCRIPTION: TR 20 OF NE SE LOT: A OF SP#139 AF#300741 PROJECT DESCRIPTION: DIRECTIONS TO SITE: CHIROPRACTIC OFFICE plus TWO OFFICE SPACES (A NEXT TO SAFEWAY BEFORE FRIENDLY USED CAR LOT BUSINESS. Chiropractic office, B, &C) Gene ral.lnformation Construction&Occupancy Information Type of Use: COMMERCIAL Insp.Area: No.of Units: 3 Type of Constr.: VB Type of Work: NEW Fire Dist.: 2 No. of Bathrooms: 3 Occ. Group: B Valuation: $ 293,303.00 No.of Stories: 1 Occ. Load: 26 Building Height: 20 Pre-Manufactured Unit Information Square Footage Information Make: Length: Lot Size: Model: Width: Building: 3,036 Year: Serial No.: Basement: Parking Spaces: Setback Information Shoreline&Planning Information Front: S 10.00 Ft. Shoreline: Ft. Rear: N 8.00 Ft. Slope: Ft. Water Body: Shoreline Desig.: Not Applicable Side 1: W 83.00 Ft. SEPA?:Unknown Comp. Plan Desig.: Urban Growth Area Side 2: E 76.00 .Ft. Fire Protection System Information Auto Fire Alarm System?: Emergency Key Box?: 9 Y Y Standpipe?: Auto Fire Sprinkler System?: Access Road?: Fire Extinguishers?: Fixed Fire Suppression System?: Fire Hydrants?: Fire Lanes?: COM2006-00052 Please refer to the following pages for conditions of this permit. 1 of 6 Plumbing Fixtures Mechanical Fixtures FEES Type Qty. Type Qty. Type By Date Amount Receipt Hosebibs 2 Furnace<100K 3 Plan Check Fee r MH 4r9719nna 0.1 ?75 RR R1?nnRnn Kitchen Sink 1 Ventilation Fan 3 Planning Review Fee r.MH 4n7i?nns nn' R1?nnAnn Lavatories 3 Heat Pump 3 Non-Res.Energy Code ni r c;17?1?nni; .P.riR nn R1?nnF;nn Water Closets(Toilets) 3 UFC Plan Check Fee ni r. c;n,?nnna ';R7R n� R17nnRnn Water Heaters 1 Building State Fee ni r. F/9?1?nnR Ad Fn R19nnann Building Permit Fee ni r. S1q?1gnnR nRn 1.9; R17nnRnn Mechanical Fee ni r. i;»?i?nnR OFF IN R1gnnRnn Mechanical Base Fee ni r 5i79nnnR .503 Fn R1?nnann Plumbing Fee ni r. s;17919nni; RR1 nn R17nnRnn Plumbing Base Fee ni r. gig?nnni; "n nn R1?nnsnn ADJUST—Plan Check ni r. c;/?,?/?nnR S7R dd R1?nnsnn EH Plan Review AnR Aiglignna T7.r,nn R1?nnAnn Total $4,671.45 CASE NOTES FOR COM2006-00052 CONDITIONS FOR COM2006-MO52 1) By d ' 'on, propane t and heatpumps are structures, which must meet setback conditions. Please check your"Approved Site Plan"to en re t e structur eet the setback conditions listed. 2) ALL CONSTRUCTI MUST MEET OR EXCEED ALL LOCAL CODES AND THE INTERNATIONAL COD QUIRE NT AND OCCUPANCY IS LIMITED TO THE PERMITTED AND APPROVED CLASSIFICATION. ANY CHANGE O U O C ANCY WOULD RESULT IN PERMIT REVOCATION. CHANGE OF USE MUST BE APPROVED PRIOR TO CHANGE. x 3) Final o upancy approval this project is subject to the removal of the manufactured home, shown on the roposed site plan, located appr im ly TO"west a proposed structure. X 4) A ba report for each HV system, prepared in accordance with generally accepted engineering standards, shall be submitted to the Mason Co u B ' ing Dept.prior a final inspection and available for the Mason County Building Inspector during the final inspection. X COM2006-00052 2 of 6 5) Chang approved bui ing plans.that affect compliance to the current Washington State Energy Code(WSEC), ventilation and Indoor Air *. (dual' C e (VN ), iiP ' /Mechanical Codes and/or Mason County Regulations shall be approved prior to construction. X 6) Prior t Approval,pproval, all upland areas disturbed or n wl r d etion activities shall be seeded, vegetated or given an equivalent type of ero o n protection (silt fencing or straw matting). X 7) The approved building site plan specifies that the exist g manufactured structure located adjacent to the proposed project will not be modified. C3ST se to the existingstructure would require de-certification from Labor& Industries and separate building permit and approval by the Mty Building D rtment for the new, proposed use. X _- 8) COTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE AUILDING CODE. The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conform' gnce with the internatignal codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Maso ou i ing InspXfor shall be made prior to requesting additional inspections. X 9) All buildin permits shall hav a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure to re est a final in or to obtain approval will be documented in the legal property records on file with Mason County as being non-co is t _ 't aso finances and building regulations. X 10) THE FO N A ION SYSTEM SHALL BE PLACED ON UNDISTURBED, NATIVE SOIL. An inspection performed by a Mason County Building Inspectdt,it recommended prior to foundation preparation to verify soil conditions. A soils investigation report, prepared in accordance to 2003 InternaPent Building Code ection 1802, maybe required prior to foundation pour when soil conditions are questionable. X 11) Llinn stairs must et the same setback conditions as any permitted structure; and, must be shown on your site plan. Please check your " S Plan"to e s re these structures are shown and meet the setback conditions listed. X 12) P or surface/su surface drainage control must be implemented with new construction or development on site and MUST NOT adversely iacent parcels. Under the requirements of Mason County Stormwater Ordinance, either private ditches and drains will meet requirements of the stormwater ordinance or prior approval will be granted to use an existing utility and drainage easement dedicated for that specific purpose. For further information regarding this ordinance and the REQUIREMENT to obtain an ACCESS PERMIT.for the installation/construction of a driveway or access nnecting from a Mason County Road, Contact the Mason County Public Works Department prior to construction at Ext 450. For any construct n hich is propo4d to be located within 25'of a Mason County road right of way, it is suggested to contact that office to review future planned w rk a your project. X 13) Water qu li o oIV 41,e d ed to the detriment of the aquatic environment as a result of this project. X 14) All appro i�addition, lans are required to be on-site for inspection purposes. If inspection is called for an ns are not on site,Approval WILL NOT be granted. a reinspection fee, based on the current fee schedule, minimum one-hour w' be d c y the Mason County Building Department prior to any further inspections being performed or approvals granted. X COM2006-00052 3 of.6 15) PURSUANT TO INTERNATIONAL CODE, ALL SITES MUST HAVE APPROVED NUMBERS OR ADDRESSES PROVIDED IN SUCH A ` POSITION AS TO BE PLAINLY VISIBLE AND LEGIBLE FROM THE STREET OR ROAD FRONTING THE PROPERTY. MASON COUNTY BUILDING DEPARTMENT REQUIRES THAT THIS BE COMPLETED PRIOR TO CALLING FOR ANY SITE INSPECTIONS. A REINSPECTION FEE, BASED ON RATES AS ADOPTED BY THE JURISDICTION AND THE INTERNATIONAL CODE WILL BE ASSESSED IF OW NT CTOR FAILS TO POST ADDRESS ON SITE PRIOR TO REQUESTING INSPECTIONS. X 16) Pres re treated wood manufactured after January 1, 2004 may contain high concentrations of copper which could quickly corrode metal fasten s, c nnect s, and flashing. Install metal connectors approved for contact with the new types of pressure treated material. X 17) All pro rty lines s all be clearly identified at the time of foundation inspection. X 18) Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division. There are pote ial risks and mon ary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1-800-647 9 e erson gning this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. X 19) Per 2003 IRC-SECT R905-REQ' IREMENTS FOR ROOF COVERINGS-R905.1 Roof covering application. Roof coverings shall be applie cordance wi the applicable provisions of this section and the manufacturer's installation instructions. X 20) Per 20006C-SECTION 1609-WIND LOADS- 1609.1 Applications. Buildings, structures and parts thereof shall be designed to withstand the minimum WI ads prescribed herein. Decreases in wind load shall not be made for the effect of shielding by other structures. Per FIGURE 1609 BASI W PEE (3-SECOND GUST)the wind speed for Mason County is 85 MPH. X 21) Approved imension and setbacks on submitted site plan. Setbacks are measured from the furthest projection of the structure. X 22) Recycla materials&Solid Waste Storage: Space shall be provided for the storage of recycled materials and solid waste. The storage area shall be designe t the ne s of the occupancy, efficiency of pick-up, and shall be available to occupants and haulers.X 23) The spaces ide ' ed as"B"and "C"on the building plans are approved as office spaces. If a tenant other than the Scott Family Chiropractic office will be using the space-a"Tenant Review Application" must be submitted and approved prior to occupancy or use by other than the Scott Family Chiropractic ffice. X 24) The mech ical system for which energy consumption, performance, or mode of operation are regulated by the 2001 Washington State Energy Code (WSEC)and Ventilation And Indoor Air Quality Code(VIAQ)shall be tested to ensure that control devices, equipment and systems are calibrated, adjusted and operate in accordance with approved plans and specifications. Drawings and notes shall require commissioning in accordance with WSEC section 1416.4. Lighting controls shall be tested to ensure that control devices, components, equipment and systems are calibrated, adjusted and operate in accordance with the approved p ns and specifications. A complete report of test procedures and results shall be prepared and filed with the owner. D hall1gfibire commissioning in accordance with WSEC 1513.7. X ell COM2006-00052 4 of 6 25) PER TITLE 14 MASON COUNTY BUILDING CODE-CHAPTER 14.17, STANDARDS FOR FIRE APPARATUS ACCESS ROADS- 14.17.110: A fire apparatus access road in excess of 14% grade and more than 150'to new residential or commercial structures will require an automatic fire spin system install d. Contact the Mason County Fire Marshal at(360)427-9670, extension 273, for further information. x 26) A se rate Fire permit and approval are required for the installation of a Mason County approved automatic fire alarm system. The system shall co ly to NFPA 72 standards and shall be installed and monitored by an approved UL certified monitoring station. The Fire permit shall be accompanied with proposed plans and and approved by the Mason County Fire Marshal. The system shall be inspected and approved by the Fire Marshal prior to the final occupancy inspection. 2A10BC fire extinguishers shall be installed in each tenant space and located not more than 75-feet travel distance in approved locations. Fire extinguishe s shall be mounted not more than 48-inches from the finished floor to the top of the extinguisher. X 27) This p i c to a agement zone. Please contact a fire warden at(360)427-9670 ext. 459 for further information. X This permit beco s null and void if wo ruction authorized is not commenced within 180 days,or if construction or work is suspended for a period of 180 days at any time after work is commenced. Evidence of Conti ion of work is progress inspection with'i . he 180 day period. Final inspection must be approved before building can be occupied.Proof of continuation of- work is by means of a pro ss inspection.The neror the agent on the o hers behalf,represents that the information provided is accurate and grants employees of Mason County access to the above described pr erty and structure for view and insp ctio / OWNER OR AGENT: //G% DATE: O COM2006-00052 5 of 6 n O t N CONCRETE MECHANICAL MANUFACTURED HOME � O rn Footings/setbacks Date By Ribbons Gas Piping o Interior Date By Interior-Date By Date By D NExterrar Date 6y Exterior-Rate B Set-up Point Load I Isolated Footings INSULATION Date By � BG I BLAB INSULATION Date By Data By FIRE DEPARTMENT Foundation Walls Floors Date By Date By Data By DECKS FRAMING Walls Date By Date By Date By PROPANE TANKS PLUMBING vault Date By Date By OTHER Groundwork Attic Date By Date a..._ By Type: Oats By o.W.V DRYWALL Type: n Int.Brace Wall 0 Date By Date By 9 Date By FINAL INSPECTION N Water Line Fire Seperation o 0 Date By Data By Date By Pass or Request Inspect. c Type of Insp. Fail Date Gate Dane By mments N r 11-114 S 51 k� 0 rn 1 O Cn Rom= CONCRETE MECHANICAL n �,. MANUFi4CTURED HOME o Data l ��F"' By O rn Footings!Setbacks Gas Pi ing G Ribbons o Interior Date By Interior-Date By Date By L% cri Exterior Date L By Exterior Rake B Set-up > Point Load!isolated Footings INSULATION Date By m Date By BG!SLAB INSULATION Cn Data By FIRE DEPARTMENT Foundation Walls Floors Date By Dale BY Data By DECKS FRAMING Walls Date By Date - By �� Data f_' �. By %1 PROPANE TANKS PLUMBING vault Dato By Date sy OTHER G roundvrork Attic Date qi ` (� By(� Date By Type: Date By D.w.rr DRYWALL `Type. O Date ` �� 13y /� Int.Braco Wall Date BY E Date/_ -ems BY / N FINAL INSPECTION o � Water Line 7 Fire Separation p Data -/ By Date By Date By � 0 Pass or Request Inspect. Type of Insp. Fail Date date Done By Comments N r t��G3 zZ OG l z�0 v LIU- , L �� c.✓�i'c. trjt'�( •! -rVt n X,4 s p, p 6wr- t4 ed weld'1�j St qA, IT �i 3 rF S"v G 7/-4 6Of /z 7�_ s G c fOf or s /QD %mod---- / s� cA-sr 5 s:�.. Dt , ��ii �� UN t,r j4 s �t vt�i�C�� vt1t"7��7 f,7L-5 _`� � ilkD Of y ? ..::,..:.. . oo: ana-1 -tatil & --C:o�ojig . .,:::I:n.c. Lic#HI�Q�l< HCOZ7J:J ;... . 1836.1 ;S.tatc.Rt..;1::06 Phone: (360) 275-4992; Pax: (360) 275-9605 April 5,2006 Attn:Jim Jim Scott 5371 NE Northshore Rd Belfair,Wa 98528 360-275-8498 RE:New Construction Unit A-1940 sq ft Unit B-825 sq ft Unit C-825 sq ft Site: Scott Family Chiropractic 3 complete heat pump systems to be installed A1vIERICAN STANDARD: _ R it ARR American Standard 3.5 Ton Standard Air Handler American Standard 3.5 Ton,13 Seer Heat Pump R22 20TKTW Heat Strip "Unit BRR American Standard 2.5 Ton Standard Au Handler American Standard 2.5 Ton, 13 Seer Heat Pump A.1.2 15KW Heat Strip **Unit CRR American Standard 2.5 Ton Standard Air Handler American Standard 2.5 Ton 13 Seer heat pump R22 15KW Heat Strip **All systems completed with:** Refrigerant Pipiug/Condensate removal Venting:of baths **Roof jacks by others,fans by others** Shoemaker registers and grills(white or blown) Honeywell Touchpad programmable thermostat(3) Cutting Start;test One-year parts and labor warranty provided by Hood Cana]Heating&cooling,Inc live-year factory limited parts warranty 3ad . f y 1140 �' 3 C Company STARTUP SHEET Technician Job Name: Address' City- Date. 1 I.D.Model# Strip Heat Model# I.D.Serial# Serial# O.D.Model# Coil Model# O.D.Serial# Serial# Belt# Size Orifice# TXV# Filters# Size ❑EAC Size ❑ UV Light ❑Humidifier Type _ ❑Zoning M# #of Zones Bypass Size ❑Fresh Air System ❑OSA Damper T stat ❑Electronic ❑Electro-mechanical Anticipator Setting ❑ Condensate Pump ❑ P-Trap Economizer Min Pos Setting Y ❑Upflow, ❑ Downflow ❑Horizontal FURNACE or AIR HANDLER AIR CONDITIONER or HEAT PUMP ❑NAT Line Press IWC❑ El P,22 LP Line Press IWC ❑Oil ❑ R410A 1"Stage Manifold IWC AT OF Fan Spd Volts LI4 2= OD Temp OF 2'Stage Manifold IWC AT OF Fan Spd Ll-L3= ❑ Check Deftest Vent Size Vent Length #Elbows 12-113= ❑ Proper Clearances ❑I pipe ❑2 pipe High Alt.SW# ❑Crankcase Heater ❑Hard Start Kit ❑Unconfined Space ❑ Confined Space Fuse or Breaker Size ODT Set Point Combustion Air Source Size ❑ Cool Mode ❑Heat Mode Ll 1.2 13 I.1 L2 13 - Fan RLA Actual YI Comp RLA Actual Y2 Comp RLA Actual Vari-Speed Dip Switch Yl Fan FLA Actual Switch 1 2 3 4 5 6 7 8 9 10 11 12 Y2 Fan FLA Actual 01 . 1111110 ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ Chart Head Pressure # Chart suction Pressure I Og ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 110 Head Pressure #_ OF Suction Line Temp '1 Liquid Line Temp. _ OF Suction Press #_ OF R/A DB at grill 'F Subcooling = O Superheat= 'F R/A WB at filter rack OF AIRFLOW NOTES R/A DB at filter rack OF S/A DB at closest register OF Gas Furnace DB AT OF CFM= BTUH(Output) (DB AT_�X 1.08 Primary Voltage 10 Electric Heat Ll—N= Ll—L2= CFM= a vX3.413 LI—G= LI—L3= (DB AT_�X 1.08 LI—24V COM= L 2—L3= 30 Electric Heat Secondary R to COM CFM= a X v X 3A I3 X 1.73 (DB AT )X 1.08 Strip Heat R/A Static KW Actual Volts S/A Static # Stage'; Actual Amps A/C Target=400 CVM per Tou Min.350—Max 450 CFM per Ton 3/9/2009 Case Activity Listing 3:15:27PM Case#: COM2006-00052 a v tq, yt Assn e ned Do . ;y:Activty. ,.'Description Date1 '';:Date2, ., I)ate3 ,Hold,. „„„D .Disp To: By Updated Updated By ._ COMA010 Application Received 4/27/2006 None DONE CMH 4/27/2006 CMH COMB201 EH More Info Letter 5/3/2006 None DONE TW 5/3/2006 TW NEED LETTER FROM DESIGNER ADRESSING FLOW AND WASTE STRENGTH COMB210 Water Adequacy 5/3/2006 5/3/2006 None DONE TW 5/3/2006 TW BELFAIR WATER DIST.PRIOR CONNECTION AS A CAR SALES LOT. COMB130 Planning Review 4/27/2006 7/7/2006 None DONE CMM CMM 7/7/2006 CMM Zoning is mixed use allowing for office space and residential development concurrently. COMB 120 WSEC Compliance Review 7/20/2006 None DONE DLC 7/20/2006 DLC Lighting and envelope incomplete. See building review notes.do 6/30/2006 COMB110 Building Plan Review 4/27/2006 7/20/2006 None DONE DLC DLC 7/20/2006 DLC 5/21/2006:Comment letter mailed to contractor and owner. The letter was also faxed to Hanley construction and e-mailed to owner and hanley const. To FM for review . 6/29/2006:Reviewed revisions submitted. The following comments apply: #2)DONE-Owner specified that the MH adjacent to the proposed structure will be removed when construction is completed. Conditions attached to the permit. #4: Incomplete. Walls marked as BWP are too small(<2'8"),not enough marked, elevation shows covered porch extends>6 beyond the bwl,need continuous footing at 50'intervals. #5:Hood Canal Heating&Cooling will provide ventilation calculations and a balance report at final. Condition added to permit. #6:Lighting still incon ect. Calculations used incorrect factor. Summary does not list ALL lights shown on plan.LMOR for Pete Johnson Electric at(360)620-7545. In addition compliance forms indicate prescriptive compliance however slav insulation is not shown on the proposed plans. #7 plumbing ok. Owne,James Scott will come in to discuss on 7/6/2006. A time was not set. 7/20/2006:All issues addressed. Unable to copy prints. request that Fire Marshal return to do for copy when Fire Marshal review is complete. -do 7/20/2006 Page 1 of 4 CaseActivity-rpt 3/9/2009 Case Activity Listing 3:15:28PM Case#: COM2006-00052 Assigned Mone A .<. .;� d,"9�' •^',.-r, w wb",x.y .�. .E .xr Actrvrt Descry tion: :Date 1 Date Date 3 Hold ry 3Dis To`° 'B U`dated .U`dated.B x COMB009 Fire Marshal Review 5/22/2006 8/4/2006 None DONE DLC 8/4/2006 DLC Per FM request:2Al0bc fire ext,monitored firealarm,separate permit and approval,fire apparatus access road. COMB201 EH More Info Letter 8/8/2006 None DONE ADR 8/8/2006 ADR A letter was submitted by Joyce Joynson dated August 3,2006. This letter and design form submitted by Joyce Johnson addressed the flows for the proposed commercial space,but does not address the waste strength. This is non residentail strength waste. I need to know what the proposed waste strength will be and if the pretreatment unit she has proposed will treat the non residential strength waste. COMA007 To Belfair When Ready To Issue 8/16/2006 None TAM 8/16/2006 TAM Please send to Belfair-please attach a copy of our fee ordinance-he didn't understand there would be additional fees on issuance. COMA100 Approved for Issuance 8/21/2006 None DONE CMH 8/21/2006 CMH COMB200 Environmental Health Review 4/27/2006 8/21/2006 None DONE ADR 8/21/2006 ADR 05/03/06 NEED LETTER FROM DESIGNER ADRESSING FLOW AND WASTE STRENGTH 8/8/2006 Letter from designer submitted,but waste strength was not addressed. The waste strength still needs to be addressed by a designer. 8/18/2006 Another letter came in from the designer. She addressed the letter for 3 60 gallons,but this system is only approved,for 240 gallons. Spoke with designer and she will be submitting another letter. 8/21/2006 another letter was provided. This letter addressed both TSS and BOD5 for 240 gallons. COMA200 HOLD 4/27/2006 8/21/2006 Hold DONE CMH 8/21/2006 CMH NEEDS COMMERCIAL ACCESS PERMIT FROM PUBLIC WORKS PRIOR TO ISSUING. COMA650 Sent to Belfair 8/21/2006 None DONE CMH 8/21/2006 CMH COMA500 Issue Commercial Permit 8/24/2006 None DONE KKK 8/24/2006 KKK COMA540 Print Inspection Card 8/24/2006 None DONE KKK 8/24/2006 KKK COMA200 HOLD 8/21/2006 8/24/2006 Hold DONE KKK 8/24/2006 KKK CONTRACTOR'S LICENSE HAS EXPIRED-APPLICANT MUST SHOW PROOF THAT IT HAS BEEN REINSTATED OR MAKE OUT NEW APPLICATION WITHOUT CONTRACTOR'S NAME ON IT. Page 2 of 4 CaseActivity-rpt 3/9/2009 Case Activity Listing 3:15:28PM Case#: COM2006-00052 ssigne U dated" ted`B Actrv�t Descri ton D"ate,1 Date 2 Date 3 Hold Dis To B U da p rvr m.,. .,Y ,..� P _ a� �,„ m�� "o�d�.a P ,�,. IY, �.p p Y COMC110 Footing Inspection 9/7/2006 9/12/2006 None PASS TFR 9/13/2006 MRB COMC120 Underground Plumbing 9/22/2006 9/25/2006 None PASS LDK 9/26/2006 MRB HOLE ON BACK OF PERMIT WILL NEED SLAB INSUALTION AND INT FOOTING INSPECTION PRIOR TO POURING SLAB COMC116 Below Grade Insulation 9/27/2006 9/29/2006 None PASS LDK 10/5/2006 MRB AND INT FOOTING COMC100 Inspection 11/13/2006 11/16/2006 None PASS TFR 11/20/2006 MRB EXT NAILING COMC130 Plumbing Inspection 12/6/2006 12/7/2006 None FAIL TFR 12/12/2006 KLW SUPPLY TEST FAIL,SUPPLY UNDER 80 PSI-TOLD OWENR OUR METHOD OF FPMP AND THAT THEY WOULD NEED TO HAVE IT UNDER TEST AGAIN. COMC140 Framing/Plumbing/Mechanical 1/2/2007 1/3/2007 None FAIL RTB 1/8/2007 MRB MECH PASS SUPPLY PASS DWV AND FRAME FAILED 1.ELECTRICAL NEEDS TO BE SIGNED OFF BY L&I PRIOR TO INSPECTION 2.DWV NOT UNDER TEST COMC140 Framing/Plumbing/Mechanical 1/8/2007 1/9/2007 None PASS TFR 1/10/2007 MRB COMC145 Insulation Inspection 1/16/2007 1/17/2007 None FAIL RLS 1/26/2007 MRB UNIT A WALL INSULATION INSULATION INCOMPLETE AT FRONT WALL NO R-21 FROM TOP PLATE TO VAULT LINE ALSO R021 IS INSTALLED ON BACK SIDE OF TRUSS AT BACK OF RM FULL 1 1/2"VOID SPACE SO INSULATION WILL COME IN CONTACT WITH WALL BOARD IN UNIT 4 PER PAGE 4 OF APPROVED PLANS INSTALL 7/16 OSB FOR ALTERNATIVE BRACEWALL PANEL SEE PINK HIGHTLIGHTED ON PLANS OK TO WALL BOARD CEILING IN UNIT A COMC145 Insulation Inspection 1/16/2001 1/17/2007 None PASS RLS 1/26/2007 MRB WALL UNIT B AND C UNIT B WALL INSULATION PASS MECH FAILED NO DUCTING CONNECTED TO FAN HOUSING IN BATHROOM UNIT C PASSED WALLBOARD WALLS IN UNIT B AND C OK TO WALLBOARD CEILING IN UNIT C COMC145 Insulation Inspection 1/19/2007 1/22/2007 None PASS TFR 1/26/2007 MRB WALL Page of CaseActivity.-rpt 3/9/2009 Case Activity Listing 3:15:27PM Case#: COM2006-00.052 XssigneO Done ' ' ,U dated`d� u D "ToD t o�Actrvi cr ­_ ,COMC150 Wallboard Inspection 1/29/2007 1/30/2007 None PASS TFR 2/2/2007 MRB COMC157 Final Inspection-Failed 4/15/2007 4/17/2007 None FAIL TFR 4/18/2007 MRB 1.POST ADDRESS(PERMANENT)MIN 4"TALL#'S ON CONTRA-STING BACKGROUND 2.INSTALL ADA SIGN ON POST(HANDICAP)3.COMPLETE EXT ELECTRICAL TRIM OUT (LIGHT RT SIDE RM A)4.UNIT A IN ATTIC INSTALL LIGHT AND PLUG IN AT FURNACE UNIT B AND C 5.UNIT A AT SINK INSTALL PROTECTIVE SKIRIT UNIT B AND C 6.UNIT A AT TOILET PROVIDE HANDLE ON TANK ON ACCES SIABLE 7.UNIT B INSULATE UNDER FURNACES AND REFLUFF SIDE COMPRESS INSULATION TO LEFT OF FURNACE 8.IN ATTIC AT FURNACES INSTALL FIBERGLASS INSULATION UNDER ALL PLATFORMS INSTALL 2"RIDGED AND SECURE IN PLACE ON WORKING PLAT-FORM INSTALL SIGNAGE,ON ACCESS SIDE SAYING"CAT WALK BELOW INSULATION WITH ARROW"AND MOUNT ABOVE CAT WALK 9.PROVIDE BALANCE REPORT FOR EACH FURNACE PER CONDITION#4 10.PROVIDE COMPLIANCE TO CONDITION#22 ON PERMIT 11.INSTALL ALL FIRE EXT COMC157 Final Inspection-Failed 4/18/2007 4/19/2007 None FAIL TFR. 4/20/2007 MRB #5 AND 6 NOT DONE COMC155 Final Inspection-Passed 5/14/2007 5/15/2007 None PASS MAU 5/16/2007 MRB Page 4 of 4 CaseActivity..rpt 3/9/2009 Conditions Associated With 3:22:06PM Case COM2006-00052 Pertntt Condition iR Z StUS t item* , 'Chi By� Date By l C dd it 6500 ACCESSORY STRUCTURE NOT MET 7/7/2006 CNIM By definition,propane tanks and heatpunips are structures,which must meet setback conditions. Please check your"Approved Site Plan"to ensure these structures meet the setback conditions listed. X 2) 5003 ALL CONSTRUCTION NOT MET 5/22/2006 DLC ALL CONSTRUCTION MUST MEET OR EXCEED ALL LOCAL CODES AND THE INTERNATIONAL CODE REQUIREMENTS AND OCCUPANCY IS LIMITED TO THE PERMITTED AND APPROVED CLASSIFICATION. ANY CHANGE OF USE OR OCCUPANCY WOULD RESULT IN PERMIT REVOCATION. CHANGE OF USE MUST BE APPROVED PRIOR TO CHANGE. x 3) 1 APPROVAL SUBJECT TO REMOVAL OF I NOT MET 6/29/2006 DLC Final occupancy approval of this project is subject to the removal of the manufactured home,shown on the proposed site plan,located approximately 70"west of the proposed structure. X 4) 1 BALANCE REPORT FOR HVAC SYSTEMS NOT MET 6/29/2006 DLC A balance report for each HVAC system,prepared in accordance with generally accepted engineering standards,shall be submitted to the Mason County Building Dept.prior to the final inspection and available for the Mason County Building Inspector during the final inspection. X 5) 5030 Changes to Approved Plans NOT MET 5/22/2006 DLC Changes to approved building plans that affect compliance to the current Washington State Energy Code (WSEC),ventilation and Indoor Air Quality Code(VIAQ),Building/Plumbing/Mechanical Codes and/or Mason County Regulations shall be approved prior to construction. X 6) 60 Erosion Protection NOT MET 7/7/2006 CNIM Prior to final approval,all upland areas disturbed or newly created by construction activities shall be seeded, vegetated or given an equivalent type of erosion protection(silt fencing or straw matting). X 7) 1 EXISTING MANUFACTURED STRUCTUR NOT MET 7/20/2006 DLC The approved building site plan specifies that the existing manufactured structure located adjacent to the proposed project will not be modified. Change of use to the existing structure would require de-certification from Labor&Industries and separate building permit and approval by the Mason County Building Department for the new,proposed use. X 8) 5045 FIELD CORRECT NOT MET 5/22/2006 DLC CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE ADOPTED BUILDING CODE. The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance with the international codes as amended and adopted by Mason County. Any corrections,changes or alterations required by a Mason County Building Inspector shall be made prior to requesting additional inspections. X Page 1 of 4 CaseConditions..rpt 1 3/9/2009 Conditions Associated With 3:22:06PM Case#: COM2006-00052 i� Permit Condition -_ Status .Updated . a item# =Code , Title �, Status Changed By Tag Date By 9) �5600 _ FINAL INSPECTION REQUIRED NOT MET 5/22/2006 DLC All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration.The failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with Mason County ordinances and building regulations. X 10) 1 FOUNDATION ON FIRM NATIVE SOIL NOT MET 7/20/2006 DLC THE FOUNDATION SYSTEM SHALL BE PLACED ON UNDISTURBED,NATIVE SOIL. An inspection performed by a Mason County Building Inspector is recommended prior to foundation preparation to verify soil conditions. A soils investigation report,prepared in accordance to 2003 International Building Code,Section 1802,may be required prior to foundation pour when soil conditions are questionable. X 11) 6550 LANDINGS AND STAIRS NOT MET 7/7/2006 CMM Landings and stairs must meet the same setback conditions as any permitted structure;and,must be shown on your site plan. Please check your"Approved Site Plan"to ensure these structures are shown and meet the setback conditions listed. X 12) 5019 MCPW Development Requirements NOT MET 5/22/2006 DLC Provisions for surface/subsurface drainage control must be implemented with new construction'or development on site and MUST NOT adversely impact adjacent parcels. Under the requirements of Mason County Stormwater Ordinance,either private ditches and drains will meet requirements of the stormwater ordinance or prior approval will be granted to use an existing utility and drainage easement dedicated for that specific purpose. For further information regarding this ordinance and the REQUIREMENT to obtain an ACCESS PERMIT for the installation/construction of a driveway or access connecting from a Mason County Road, Contact the Mason County Public Works Department prior to construction at Ext 450. For any construction which is proposed to be located within 25'of a Mason County road right of way,it is suggested to contact that office to review future planned work which may affect your project. X 13) 34 No Degradation of Water Quality NOT MET 7/7/2006 CMM Water quality is not to be degraded to the detriment of the aquatic environment as a result of this project. X 14) 1001 PLANS REQUIRED ON SITE NOT MET 5/22/2006 DLC All approved plans are required to be on-site for inspection purposes. If inspection is called for and plans are not on site,Approval WILL NOT be granted. In addition,a reinspection fee,based on the current fee schedule, minimum one-hour will be charged and collected by the Mason County Building Department prior to any further inspections being performed or approvals granted.X 15) 1002 POST ADDRESS NOT MET 5/22/2006 DLC PURSUANT TO INTERNATIONAL CODE, ALL SITES MUST HAVE APPROVED NUMBERS OR ADDRESSES PROVIDED IN SUCH A POSITION AS TO BE PLAINLY VISIBLE AND LEGIBLE FROM THE STREET OR ROAD FRONTING THE PROPERTY.MASON COUNTY BUILDING DEPARTMENT REQUIRES THAT THIS BE COMPLETED PRIOR TO CALLING FOR ANY SITE INSPECTIONS. A REINSPECTION FEE,BASED ON RATES AS ADOPTED BY THE JURISDICTION AND THE INTERNATIONAL CODE WILL BE ASSESSED IF OWNER/CONTRACTOR FAILS TO POST ADDRESS ON SITE PRIOR TO REQUESTING INSPECTIONS.X Page 2 of 4 CaseConditions..rpt _ I 3/9/2009 Conditions Associated With 3:22:06PM Case#: COM2006-00052 Permit Condition - Stature -Updated item Title h, ��. , y Status Changed, By Tag Date By 24) 6000 WSEC-Commissioning Reports NOT MET 5/22/2006 DLC The mechanical system for which energy consumption,performance,or mode of operation are regulated by the - 2001 Washington State Energy Code(WSEC)and Ventilation And Indoor Air Quality Code(VIAQ)shall be tested to ensure that control devices,equipment and systems are calibrated,adjusted and operate in accordance with approved plans and specifications.Drawings and notes shall require commissioning in accordance with WSEC section 1416.4. Lighting controls shall be tested to ensure that control devices,components,equipment and systems are calibrated,adjusted and operate in accordance with the approved plans and specifications. A complete report of test procedures and results shall be prepared and filed with the owner. Drawing notes shall require commissioning in accordance with WSEC 1513.7. X 25) 260 Fire Protection Requirements NOT MET 8/4/2006 DLC PER TITLE 14 MASON COUNTY BUILDING CODE-CHAPTER 14.17, STANDARDS FOR FIRE APPARATUS ACCESS ROADS- 14.17.110: A fire apparatus access road in excess of 14%grade and more than 150'to new residential or commercial structures will require an automatic fire sprinkler system installed. Contact the Mason County Fire Marshal at (360)427-9670,extension 273,for further information. x 26) 270 Fire Marshal Comments NOT MET 8/4/2006 DLC A separate Fire permit and approval are required for the installation of a Mason County approved automatic fire alarm system. The system shall comply to NFPA 72 standards and shall be installed and monitored by an approved UL certified monitoring station. The Fire permit shall be accompanied with proposed plans and and approved by the Mason County Fire Marshal.The system shall be inspected and approved by the Fire Marshal prior to the final occupancy inspection. 2AIOBC fire extinguishers shall be installed in each tenant space and located not more than 75-feet travel distance in approved locations. Fire extinguishers shall be mounted not more than 48-inches from the fmished floor to the top of the extinguisher. X 27) 7000 SMOKE MANAGEMENT ZONE NOT MET 8/21/2006 CMH This parcel is located in a smoke management zone.Please contact a fire warden at(360)427-9670 ext.459 for further information. X Page 4 of 4 CaseConditions..rpt