Loading...
HomeMy WebLinkAboutSPCC for BLD98-0623 - PLN General - 8/5/1998 r ' MASON COUNTY PUBLIC WORKS DIRECTOR/COUNTY ROAD ENGINEER Shelton,Washington 98584 DATE: Aug. 5. 1998 INTER-DEPARTMENTAL COMMUNICATIONS TO: Allan Borden, DCD - Planner Kelly Mayo, PAC - Bldg Inspector FROM: Alan A. Tahja, P/W- Co. Hydr. Engr. SUBJ: Spill Prevention Containment& Countermeasure Plan (SPCC) NAME: Wilson Oil ­51:D9W-0bZ3 LJ-V9b'o9 In the past weeks I have been in contact with several different people from the Environmental Protection Agency (EPA) regarding the applicability of the Code of Federal Regulations (CFR) Section 40 to the proposed Wilson Oil card lock facility to be located on the Benyon/Sandy's Deli property in Belfair. The people from EPA I've been conversing with include Carl Kitz, Bill Longston, Keith Cohon, Dana Stallcup, and Phil Haynes. The issue I've been trying to resolve is whether the proposed construction on the Benyon property, next to an existing fueling facility, raised the existing underground storage of fuel on the property over EPA's threshold of 42,000 gallons for requiring an SPCC Plan. This morning during a conference call with Mr. Mike Wilson representing Wilson Oil and Mr. Haynes of the EPA, Mr. Haynes stated that EPA's policy addressing two fueling facilities located side by side on a single property under different operators are considered two separate facilities. In the proposal at hand, each individual facility stores less then the 42,000 gallon threshold underlying the requirement for an SPCC Plan, and therefor an SPCC Plan is not required.. One last feature remains to be addressed, that being the creation and implementation of an Operation and Maintenance Covenant. Part of Ecology's plan for the Puget Sound Basin calls for ongoing maintenance programs within the basin jurisdictions. Mason County employs an Operation and Maintenance Covenant (O&M), that places the burden of ongoing maintenance on the facility owner. Attached please find a copy of the O&M Covenant form Ecology has approved for use by Mason County. The stormwater facility owner should be directed to complete the form, have their signature notarized, record the signed notarized document with the Mason County Auditor's office, and deliver a copy of the recorded instrument to Public Works for monitoring and administration. The project will be considered complete when the facilities are completed, inspected and accepted, and the O&M Covenant is in effect. The proponents should notify this office at some time near the completion of the stormwater features installation to schedule an inspection. File: H:\WP\STRMWTR\REVIEWS\WLSN-OIL.IDC l Following the completion and inspection of the stormwater control features, and after receipt of the recorded O&M Covenant I will notify your office that the stormwater features and documentation are complete and acceptable. Please feel free to contact me at County extension 461 if you have any questions regarding these findings or requests. Sin erely, .c 'Alan A.Tahja Encl: O&M Covenant Form cc: Carl Kitz-EPA Mike Wilson- Wilson Oil File: H:\WP\STRMWTR\REVIEWS\WLSN-OIL.IDC