HomeMy WebLinkAboutCOM2014-00126 Final Sign for Taco Bell - COM Permit / Conditions - 4/17/2015 t MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT inspection (�bu� ext. 352
����
Soy Phone: (360)42427-9670, ext. 352
Mason County Bldg. III
426 W. Cedar
Shelton, WA 98584
COMMERCIAL BUILDING PERMIT
COM2014-00126
OWNER: CADY BROTHERS LLC RECEIVED: 9/2/2014
CONTRACTOR: HANSON SIGN CO INC 360-613-9550 LICENSE: HANSOI*221J1 EXP: 5/8/2015 ISSUED: 11/25/2014
SITE ADDRESS: 23881 NE STATE ROUTE 3 BELFAIR EXPIRES: 5/25/2015
PARCEL NUMBER: 123294100081
LEGAL DESCRIPTION: PCL 3 OF BLA#04-37 PTN NE SE
PROJECT DESCRIPTION: DIRECTIONS TO SITE:
SIGNS FOR TACO BELL
General Information Construction &Occupancy Information
Type of Use: SIGNS Insp.Area: No.of Units: Type of Constr.: 8-FT
Type of Work: NEW Fire Dist.: 2 No. of Bathrooms: Occ. Group:
Valuation: No. of Stories: Exit Design. Load:
$ 7,200.00 Building Height:
Pre-Manufactured Unit Information Square Footage Information
Make: Length: Lot Size:
Model: Width: Building:
Year: Serial No.: Basement: Parking Spaces:
Setback Information
Shoreline&Planning Information
Front: Ft. Shoreline: Ft.
Rear: Ft. Slope: Ft. Water Body: Shoreline Desig.:
Side-1: Ft. SEPA?: Comp. Plan Desig.:
Side 2: Ft.
Fire Protection System Information
Auto Fire Alarm System?: Emergency Key Box?: Standpipe?:
Auto Fire Sprinkler System?: Access Road?: Fire Extinguishers?:
Fixed Fire Suppression System?: Fire Hydrants?: Fire Lanes?:
COM2014-00126 Please refer to the following pages for conditions of this permit. Page 1 of 5
r .�. Plumbing Fixtures Mechanical Fixtures rtto
Type Qty. Type Qty. Type By Date Amount Receipt
Plan Check Fee TIN q/?19n1a RQQ si S??niAnn
Sign Permit Review Tw gl7lgnia T.7n nn S7gniann
Building Permit Fee n r. in/7/9n1a ,Pi.r;i 7r, ,,i?niAnn
Building State Fee nl r. innr7n1a as r,n S19niAnn
Total $327.36
CASE NOTES FOR
COM2014-00126
CONDITIONS FOR
COM2014-00126
1) This permit is approved to construct signs used intended to serve the Taco Bell restaurant located on the same site on two parcels approved under
Mason County building permit COM2014-00085 in accordance with the Quit Claim Deed of Easement- Restrictive Covenant, recorded underAFN#
2028628.
Future construction or development is limited within the easement area, except signage or canopies normally appurtenant to drive through window
facilities
X 04ki
2) Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance
Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be
obtained at 1-800-647-0982. The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to
WA state law. X affij
3) All approved plans are required to be on-site for inspection purposes. If inspection is called for and plans are not on site, Approval WILL NOT be
granted. In addition, a reinspection fee, based on the current fee schedule, minimum one-hour will be charged and collected by the Mason County
Building Department prior to any further inspections being performed or approvals granted. X -?,fi(_J
4) Owner/Agent is responsible to post the assigned address and/or purchase and post private road signs in accordance with Mason County Title
14.28.
X OW 7
5) THE FOUNDATION SYSTEM SHALL BE PLACED ON UNDISTURBED, FIRM-NATIVE SOIL.
X &Ak-.7
6) The approved site plan is required to be on-site for inspection purposes. If inspection is called for and the site plan is not on site, Approval WILL
NOT be granted. In addition, a reinspection fee, based on the current fee schedule, minimum one-hour will be charged and collected by the Mason
County Bu'din Department prior to any further inspections being performed or approvals granted.
X
COM2014-00126 Page 2 of 5
�7) ALL CONSTRUCTION MUST MEET OR EXCEED ALL LOCAL CODES AND THE INTERNATIONAL CODE REQUIREMENTS AND OCCUPANCY
IS LIMITED TO THE PERMITTED AND APPROVED CLASSIFICATION. ANY CHANGE OF USE OR OCCUPANCY WOULD RESULT IN PERMIT
REVOCATION. CHANGE OF USE MUST BE APPROVED PRIOR TO CHANGE. x fl4r&_2
8) Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and MUST NOT adversely
impact adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either private ditches and drains will meet requirements
of the stormwater ordinance or prior approval will be granted to use an existing utility and drainage easement dedicated for that specific purpose.
For further information regarding this ordinance and the REQUIREMENT to obtain an ACCESS PERMIT for the installation/construction of a
driveway or access connecting from a Mason County Road, Contact the Mason County Public Works Department prior to construction at Ext 450.
For any construction which is proposed to be located within 25' of a Mason County road right of way, it is suggested to contact that office to review
future planned work which may affect your project.
X CIV
9) Changes to approved building plans that affect compliance to the current Washington State Energy Code (WSEC), ventilation requirements),
Building/Plumbing/Mechanical Codes and/or Mason County Regulations shall be approved prior to construction.
X(41&J
10) CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE
ADOPTED BUILDING CODE.
The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in
conformance with the international codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a
Mason Co ty_Building Inspector shall be made prior to requesting additional inspections.
X
11) All property lines shall be clearly identified at the time of foundation inspection. X Ukj
12) All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The
failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being
non-compliant with Mason County ordinances and building regulations.
X rfi�,J
13) All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may extend the
time for action for a period not exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control
of the permit holder have prevented action from being taken. No more than one extension may be granted.
X cloia
14) Recyclable materials&Solid Waste Storage: Space shall be provided for the storage of recycled materials and solid waste. The storage area
shall be designed to meet the needs of the occupancy, efficiency of pick-up, and shall be available to occupants and
haulers.X
15) Approved er dimensions and setbacks on submitted site plan. Setbacks are measured from the furthest projection of the structure.
XiU
16)
All construction and demolition debris must be removed from the site area after project completion. Proper dispo�of construction debris must be
on land in such a manner that debris cannot enter or cause water quality degradation of State waters. X ee
17) Application acknowledges that the structure is only permitted for a use consistent with the current zoning of the parcel. Zoning is Belfair UGA
Festival Retail zone.
X &K.,
COM2014-00126 Page 3 of 5
r OWNER/ BUILDER acknowledges submission of inaccurate information may result in a stop work order or permit revocation. Acknowledgement of such is by
signature below. I declare that I am the owner, owners legal representative, or contractor. I further declare that I am entitled to receive this permit and to do the
work as proposed. I have obtained permission from all the necessary parties, including any easement holder or parties of interest regarding this project. The
owner or authorized agent represents that the information provided is accui ate anal grants employees of Mason County access to the above described property
and structure(s) for review and inspection. This permitlapplication becomes null &void if work or authorized construction is not commenced within 180 days or if
construction work is suspended for a period of 180 days. PROOF OF CONTINUATION OF WORK IS BY MEANS OF INSPECTION. INACTIVITY OF THIS
PERMIT APPLICATION OF 180 DAYS WILL INVALIDATE THE APPLICATION.
Signature Date
00,0�; Z q' 4W OWNER - REPRESENTATIVE - CONTRACTOR
Print Name (Circle one to indicate)
COM2014-00126 Page 4 of 5
O n
N CONCRETE MECHANICAL MANUFACTURED HOME Dv
o
Daip
Footings!Setbacks Gas Piping By Ribbons. W
o Interior Date By Interior-Date By Date By O
�
Exterior Date By Exterior-Date B Sot-up —I
Point Load I Isolated Footings INSULATION Data, By m
BG!SLAB INSULATION -•--------H-v- ------- �
Date _ By Data By FIRE DEPARTMENT Ch
Foundation Walls Floors Date By r—
Date By Date ay DECKS n
FRAMING Walls Date By
Date By Data By PROPANE TANKS
PLUMBING vault Date By
Date By OTHER
Groundwork Attic
Type:
Date By Date By Data By
o,w.v DRYWALL Type: O
Int.Brace Wall Late By
Date B 9y pat. By N
FINAL INSPECTION c
Water Line Fire Sepe ration
Date By Data By Date By O
0
Pass or Request Inspect.
Type of Insp. Fail Date Date Dare By Comments
CAIU I cv, a. o PlAns - LLo -o
s had h
�' i
o I h C h i
-A-o ,eat' 1
i • C LL)t -hon ..
PA04. LAM
CD
0