HomeMy WebLinkAboutFIR2004-00065 Final Firework Stand - FIR Permit / Conditions - 12/26/2004 MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Inspection Line(360)127-7262
Mason County Bldg. 3 426 W. Cedar P.O. Box 186 Phone: (360)427-9670,ext.352
Shelton,WA 98584
FIRE PROTECTION PERMIT FIR2004-00065
APPLICANT: DAVID COOPER RECEIVED: 11/24/2004
CONTRACTOR: LICENSE: EXP: ISSUED: 12/8/2004
SITE ADDRESS: 23881 NE STATE ROUTE 3 BELFAIR EXPIRES: 6/8/2005
PARCEL NUMBER: 123294100081
LEGAL DESCRIPTION: TR 8-A OF NE SE 23881 NE STATE ROUTE 3 BELFAIR
PROJECT DESCRIPTION: FIREWORK STAND PERMIT
GENERALRMA System Information
Type of Use: STND Sprinkler Heads: Audible Switches: Pull Stations:
Fire District: 2 Flow Switches: Visual Devices: Door Releases:
Hood&Duct?: N Pressure Switches:: Smoke Detectors: Duct Detectors:
Dry Chemical?: N Zones: Heat Detectors:
Wet Chemical?: N
Sprinkles'?: N
Standpipe?: N SQUARE FOOTAGE FEES _
Monitoring Company. First Floor: Type Amount Due Amount Paid
Monitoring Phone No.:()- Second Floor:
Auto Fire Alarm?: Third Floor;: Fireworks Stand Permit $100.00 $100.00
Total: $100.00 $100.00
F!R2004-00065 Please refer to the following pages for conditions of this permit. 1 of 3
CASE TES N
FIRMo4-OW65
� � N
G
Ln t O
i CONDITIONS FOR
IT FiR2004.0DM
m
N
m nKmjtg)f lhe'Mason Coustty Standards for the Operation of Reta F irrics s(set attacd)• o
rn mirirts+u B4 °c
A n
Inspection byfhe Fire Marshal required!efore opening. trneawwor cis
rs nei mnrrranoed w+lttrn 180 days,or it arnstrodlon or weak s s ended �n beaor' ProM�cflno wstan of.mvk is
Tlds peRsiQbeoarrres>xdl ardvaidifv►akQr constructbn rnvrithin tie 180 day PMU- F'! t inspection mstbo approved es d Mayon CDX4 a OM'lat�ra above
carrmenced. Evidence of cozr6nuatlorr ai work ssa p�ogr flint#je tntorrrrak]an povided iaaocw&and grants e�ploYe c
tW nmards ci a Progress�°n'�an�r°rtiza rR rn the usvners h64ratf•reprewts
desc i bed Property and sonsctrue ew and i n c!
l}l+iE: h•
m OMEROR AGWP -
rn p
a PLEASE INITIAL ALL CONDI ONO,SIGN,
M DATE AND EITHER FAX TO 360427-7798
OR MAIL TO MASON COUNTY D.C.D.
PO BOX t B6,SHELTON,WA 98584.
360 427-9670 X352
o •
z
x
cc
LL
4SEX0196-M-09£
'wsvlA-lN0n3H3'sal xOg Oa
'0'V0AMD NOSVW Ol 11YW Ito
Wl'al'-M OLXVJ BUB ONH31VO
'r s'sN W=3'1W'MllNl3Srgld
s
Ql
0.
0
0
U
•� 2of3.
z ir><corrditlerts of#"p"mit.
0 Piease refer to the lclbmfrg pages
FIR200"0065
o .
0
CONCRETE MECHANICAL MANUFACTURED HOME
0
CD c Footings 1 Setbacks Date By Ribbons
Date By Gas Piping- Date By
Foundation Walls Date B y Set-up
Date By INSULATION Date By
B G I Slab Insulation Floors Final
Date - By Date B y Date B y
FRAMING Walls FIRE DEPT
Date By Date By Date By
PLUMBING Attic OTHER
Groundwork Date By
Date By WALLBOARD NAILING
-v
D.W.V. Date By
Date By FINAL IN PECTIO
`D rater Line Date p By
o Date By ( Date By
nl�s
co
0
o � O
CL O b
r,; O
N O v
01 O
N
W
O
-n
W