Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
RLC98-0247 - RLC Inspections - 12/1/1998
MASON COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT Planning Division 411 N. Fifth, P.O. Box 578, Shelton, WA 98584 (360) 427-9670 DATE: 12/01/98 TO: RAYMOND ANDERSEN 370 NE UNION RIVER ROAD BELFAIR WA 98528 .RE: MOBILE HOME (SECOND RESIDENCE) Case No. : RLC98-0247 Parcel No. : 123292300060 Dear Applicant: As part of this department' s review on your permit application, a Resource Lands and Critical Areas (RLC) site inspection was performed on your property. Below you will find comments made regarding the proposed development and its critical values. In some cases, setbacks for development from steep slopes, streams, wetlands, and waterbodies must be included in your specific proposal; these setbacks are included as part of the comments listed below. This information is based on County and State regulations as they exist to date. These regulations may change and may affect the requirements for development of the subject property. Please contact me at (360) 427-9670 or (360) 275-4467, ext. if you have any questions. Sincerely, Land Use Planner Department' of Community Development COMMENTS: Union River and associated floodplain on east side of property; house site is on fourth terrace up from the river, more than 30 feet above the river high water level and 600 feet from the river; no steep slopes over much of the property, except at the bank of the river. RLC, rev. 09/26/96 a RESOURCE LANDS & CRITICAL AREAS CHECKLIST Permit Number 1v RLC# Owner " Parcel Number -2,3 —©LI)666 1 d/-,tSaltwater/Lake 20 z acres Designation Name of Waterbod _ 0/2.��Rivers, streams, or creeks Type of Water 3. Lakes or ponds less than 20 acres in size E3 4� Wetlands: Areas that are inundated or saturated by surface water that Wunder normal circumstances support vegetation adapted for life in such conditions as the following: Marshes, bogs, and swamps. 5. 11 Alopes greater than 15% or 8.5° If so, what percentage 6.GAFloodplain 7. ��JJG/14eismic Hazard Area El 8. O"aquifer Recharge Area 0- 9. Landslide Hazard Area n, 10. Comprehensive Plan Designation Comments: Authorized Signature Date i I I DRAWINGS & ADDITIONAL FINDINGS• I 1 J V 1 3 i I6b r Cob �[Al I DRAWINGS & ADDLLIONAL FINDINGS: ebb ��� /" � 11 ► Ill `�% -c�• RM95 11 II t ZONE II B ZONE B / union River RM93 3 r NEB 2 ~24 11 U. 11 11 a ZONE A2 11 29 J RM91 O J 28 ' 14 IIZONE r ZONE B B I( 13 LIMIT OF DETAILED ZONE B STUDY rr Belfair 300 ZONE A i i i I a 32 33