HomeMy WebLinkAbout86-87 - Res. Assigning County Road Project Numbers RESOLUTION NO. 86-87
BEFORE THE BOARD OF COUNTY COMMISSIONERS of Mason County®Washingtort.
In the matter of initiating county road projects and assigning CRP numbers.
IT IS HEREBY RESOLVED THAT the roads listed below be improved as shown between the points indicated.
These projects are hereby declared to be public necessity and the county road engineer is hereby ordered and authorized to
report and proceed thereon as by law provided.(RCIV36.75.oJ0. 36.80.030..;6.80fl7o)(011rifmal Referenrel).
IT IS FURTHER RESOLVED that appropriations from the officially adopted road fund budget and based on the county
engineer's estimates are hereby made in the amounts and for the purposes shown:
(2) 131 44) 151 t61 47) 181 191
ROAD TYPE OF COST ESTIMATE I THOUSANDS)
ROAD NAME ANDIOR Pro®. CRP
:1
BRIDGE NUMBER LOG WORK cordsTRUCtIord item
NO. ISee Code) A N®.
N®
M.P. TO M.P. LOCAL
Agate Road 23910 0.03 1 .55 A X 8 17 061
Pickering Road 28850 1 .50 2.61 A X 6 22 13
Couny wide Culvert
Instal lations/198E --- --- --- C-drainaga X 6 3 14(
County wide Sign 15 3 14
Placements - 1988 --- --- H Y
TYPE OF WORK CODE 45) The construction is to be accomplished by contract
A. PRELIMINARY 'ENGINEERING F. CunBS&GUTTERS in accordance with RCW 36.77.020 et.seq.
9. RIGHT-OF-WAYG SIDEWALKS
C. GnADING.DRAINING.SURFACING H. TRAFFIC FACILITIES
D- LIGHT SIT SURF.TREATMENT 1. BRIDGE CONSTIALCrICIN (6) The construction is to be accomplished by county
E A.C.OR P.C.C.PAVEMENT J. PATM &TRAILSRCW fOrEesin accordancewith RC W 36.77.060 and`VAC
47.301 136-1 B.
ADOPTED this 22nd day of_December, 1987 BOARD OF COUNTY COMMISSIONERS OF
ATTEST Mason OUNTY,WASH.
rpers,,on
Clerk of the Board
erer
Z
cc: Co. Commissioners AA'1A
Engineers embe r
JOURNAL: Publ . 1t. 12/31/87 (Bill Rd. Dppt. )