Loading...
HomeMy WebLinkAboutStormwater Pollution Prevention Plan for COM2015-00013 - PLN General - 9/19/2013 Car�1 22.0 1 5 ood i 3 CO' " ,ro Construction Stormwater Pollution Prevention Plan for Iglesia Asemblea de Dios XXX State Route 300, Belfair Parcel No. 12331-32-00040 Mason County, Washington September 19, 2013 Project# 1363 BUILDING RECEIVED Prepared For: FEB 2 5 2015 Asemblea de Dios 4.26 YV. CEDAR 5B Internacional Agua Viva 160 NE Santa Maria Lane Belfair, Washington 98528 ,zee` wYDE`sT9 Prepared By: Envirotech Engineering 43045�� PO Box 984 .� ols R Belfair, Washington 98528 �sS�oNALT��G� Phone: 360-275-9374 Fax: 360-275-4789 Envirotech Engineering (Envirotech) has completed this construction stormwater pollution prevention plan (SWPPP) in conjunction with the stormwater management plan for for Iglesia Asemblea de Dios Agua Viva Property located along State Route 300(Parcel 12331-32-00040)in Belfair,Mason County,Washington. The following sections in this SWPPP includes Project Description, Existing Site Conditions, Adjacent Areas, Critical Areas, Soils, Erosion Problem Areas, Construction Phasing/ Schedule, Engineering Calculations, and the twelve (12) required SWPPP elements per the 2005 Department of Ecology Stormwater Management Manual. Project Description Information pertaining to the development of this project was provided by the proponent of the property. The proposed development includes developing a church building, ingress/ egress, parking lot,on-site septic systems, stormwater management facilities,and other ancillary features typical of this type of development. It is anticipated that the church building will ultimately cover approximately 9,000 square feet (sf),and the parking areas will encompass about 67,230 s£The total proposed impervious surface area is 76,230 sf. It is anticipated that the project will be done in 2 phases, however, the stormwater management facilities account for the completed project. The total land area that is anticipated to be disturbed as a result of development is 1.75 acres. Total cut and fill is expected to be approximately 3300 cy. See the accompanying stormwater management plans for an illustration of current and proposed site features. Existing Site Conditions The property is currently accessed from Gladwin Road,just south of NE State Route 300. The Project is vacant land with some land disturbance. NE Gladwin Beach Road extends along the southeast property line, and SR 300 extends along the northwest property line. Beyond the property,rural and semi-urban residential development exists.Vegetation on and near the Project consists primarily of secondary growth firs, huckleberry, salal, and other trees and shrubbery common to this area of the Pacific Northwest. Ascending grades are generally located to the northwest of the property beyond State Route 300. These slopes appear to have grades that reach to at least 40%. On-site slopes are relatively minor, and appear to range from nearly flat to approximately 15%. This topography continues downslope. Over-steepened slopes with grades in excess of 40% due to earth cuts along Gladwin Road were observed Stormwater runoff originating upslope from the anticipated development appears to primarily channel due to the upslope development. Runoff originating upslope of the property is mostly diverted away, however a significant amount may enter through the natural swale along the west Envirotech Engineering Iglesia Asemblea de Dios Ph.360-275-9374 Page 1 of 7 NE State Route 300,Belfair Fax:360-2754789 Parcel 12331-32-00040 September 19,2013 � 1 property line. Some scour and erosion was observed near the property, and away from the planned development. Adjacent Areas Adjacent areas include vacant land, and residential development. Hood Canal is located just beyond Gladwin Road, an access road bordering the southeast side of the property. Site disturbance is not expected to disturb adjacent areas if all provisions in the stormwater management plan are followed. Currently, only residential areas and roads are near the project that have the potential to be directly affected by the site disturbance. The Hood Canal could be indirectly affected by the development. Downstream drainage appears to leave the property near the southwest corner, cross Gladwin Road,and into the shoreline buffer.This project is within the Hood Canal watershed. Critical Areas This project is not anticipated to disturb any critical area. Aquifers are not known to be located adjacent to Hood Canal.Critical slopes are away from the project area,and not downstream of the drainage path. Records, research and site observations did not reveal existing wells or septic facilities near the planned drainage enhancements that would be problematic. Soils Soils within the upper 0 feet to 9 feet of natural ground were primarily observed to be moist, brown and grey poorly graded sand(SP). According to the "Soil Survey of Mason County," by the United States Department of i 1 site oils are primarily described as Everett Agriculture, Soil Conservation Service, the upland s p y gravelly loamy sand,Ee 5— 15%slopes. According to the USDA Textural Classification System, the site soils are primarily classified as medium sand. Some areas had an upper 2 foot layer of loamy sand. Soil structure may be described as granular. From the water well report(s) and knowledge of the general area, permanent groundwater is at least 30 feet directly below the property at the lowest building pad location. Perched groundwater at shallow depths was not observed on-site, nor indicated on the well reports. However, some groundwater may flow through the site in some locations during winter months. Based on the fines content, erodibility of the site soils is considered to be low to moderate. However, soils on disturbed steep slopes are more apt to erode than disturbed soils on flatter slopes. Based on the fines content and fraction of clay within the fines content, settleability of the site soils is expected to be moderate to fast. Permeability is expected to be high for this site due significance of moderate density,poorly graded granular soils. Envirotech Engineering Iglesia Asemblea de Dios Ph.360-275-9374 Page 2 of 7 NE State Route 300,Belfair Fax:360-2754789 Parcel 12331-32-00040 September 19,2013 According to the 2005 Stormwater Management Manual for Western Washington prepared by the Washington State Department of Ecology Water Quality Program, infiltration rates are determined per the USDA Textural Classification of the soils,and an appropriate factor of safety. Based on the soils consisting predominantly of gravelly loamy sand, and utilizing a factor of safety of 2,site infiltration for stormwater facilities should be 6 inches/hour. Erosion Problem Areas There are no identified or mapped erosion hazard areas for this property. While the soil characteristics provide a low to moderate erodibility factor, the steeper slopes could exacerbate erosion. Construction Phasing Construction phasing for this project is expected, such as adding additional building space and parking areas after the initial development is complete. The following includes the recommended construction sequence and procedure for project development: 1. Delineate clearing and easement limits. 2. Construct all required temporary erosion control features. 3. Clear vegetation required for site development. 4. Perform initial earthwork and rough grading for constructing the access, parking, building pads, stormwater management facilities, etc.If necessary, exposed soils in stock piles must be protected with plastic covering or County approved method. _ 5. Complete final grading of the subgrade, and materials placement per the plans and specifications. This includes dredging sediments from temporary sediment facilities, if necessary. 6. Maintain all temporary erosion and sediment control facilities, as needed, in order to provide the required protection of downstream water quality. Additional temporary erosion control shall be rendered throughout the duration of the project,if necessary. 7. Provide permanent erosion control in order to stabilize the project. 8. Remove temporary erosion sedimentation control facilities after construction is complete, and the site is sufficiently stabilized. Construction Schedule Some clearing has already occurred.Construction of the first phase is expected to occur no earlier than November 2013. Successive phases are not known. Wet season erosion control will most likely be required for this project. However,wet season construction constraints are not necessary for critical areas. Envirotech Engineering Iglesia Asemblea de Dios Ph.360-275-9374 Page 3 of 7 NE State Route 300,Belfair Fax:360-275-4789 Parcel 12331-32-00040 September 19,2013 Engineering Calculations A sediment pond will be utilized for this project, and sedimentation due to construction runoff is anticipated to be retained on site. Significant diversions and waterways were not utilized for this project. Stormwater accumulated from a 2yr-24hr temporary erosion storm event will be easily accommodated.Calculations are attached to this report. Operation and Maintenance An operation and maintenance schedule for construction activities are provided below within the Specific Construction SWPPP Items. An operation and maintenance schedule for all proposed stormwater facilities and BMP's are provided under a separate cover. An operation and maintenance Declaration of Covenant will be required to cover all privately owned and maintained stormwater facilities. Specific Construction SWPPP Items The following 12 items are addressed herein per the 2005 Department of Ecology Stormwater Manual. 1.0 Mark Clearing Limits Clearing limits shall be delineated on-site by the owner/contractor. Activities are not permitted beyond the designated clearing limits without prior approval and/or permits. 2.0 Establish Construction Access Construction access shall be limited to a single entrance to access the project during construction. A stabilized construction access adjacent to State Route 300 shall be built per the erosion control plans. In our opinion, the existing access off of Gladwin Road may be used as the stabilized construction access. 3.0 Control Flow Rates Properties and waterways located downstream from the construction site is protected from erosion by adhering to the stormwater management manual by containing all construction runoff on-site due to the 2yr 24hr storm event. Due to this, a downstream analysis is not necessary for this project during construction. Temporary retention/ detention stormwater facilities, shall be functional prior to the construction of site improvements. Additional or different stormwater flow control may be necessary if current designed facilities are not functioning as intended. If permanent infiltration ponds are used for flow control during construction,these facilities should be protected from siltation during the construction phase. 4.0 Install Sediment Controls Sediment controls deemed adequate for this project are naturally vegetated terrain, designed Envirotech Engineering Iglesia Asemblea de Dios Ph.360-275-9374 Page 4 of 7 NE State Route 300,Belfair Fax:360-2754789 Parcel 12331-32-00040 September 19,2013 sediment ponds,and silt fencing. See the stormwater management plan for locations and details. 5.0 Stabilize Soils Soil stabilization is necessary for this project.Temporary seeding and permanent soil stabilization requirements are provided in the stormwater management plans. This also includes stabilizing all exposed and unworked soils from runoff and wind erosion. 6.0 Protect Slopes Both natural and fill slopes shall be protected per the stormwater management plans. This includes stabilizing with vegetation,and maintaining natural vegetation. 7.0 Protect Drain Inlets There are no existing drain inlets that will be influenced by this project. Proposed inlets shall be protected with inlet barriers,or other approved alternative,per the erosion control plan. 8.0 Stabilize Channels and Outlets All designed channels and outlets, if any, shall be stabilized with vegetation, riprap, or other appropriate means. See the stormwater management plans for locations and details. 9.0 Control Pollutants Pollution generated from construction must be controlled at all times. Control of pollutants other than sediments includes the following: 1. All pollutants other than sediments, including waste materials and demolition debris,that occur on-site shall be handled and disposed of in a manner that does not cause contamination of stormwater.Woody debris may be chopped and spread on site. 2. Cover, containment and protection from vandalism shall be provided for all chemicals, liquid products,petroleum products,and non-inert wastes present on the project site. 3. Maintenance and repair of heavy equipment and vehicles involving oil changes,hydraulic system drain down, solvent and de-greasing cleaning operations, fuel tank drain down and removal, and other activities which may result in discharge or spillage of pollutants to the ground or into stormwater runoff must be conducted using spill prevention measures, such as drip pans. Contaminated surfaces shall be cleaned immediately following any discharge or spill incident. Emergency repairs may be performed on-site using temporary plastic placed beneath and, if raining,over the vehicle. 4. Wheel wash or tire bath wastewater shall be discharged to a separate on-site treatment system or to the sanitary sewer, if available. 5. Application of agricultural chemicals including fertilizers and pesticides shall be conducted in a manner, and at application rates that will not result in loss of chemical to stormwater runoff.Manufacturers' recommendations for application rates and procedures shall be followed. 6. BMP's shall be used to prevent or treat contamination of stormwater runoff by pH modifying sources. These sources include, but are not limited to, bulk cement, cement Envirotech Engineering Iglesia Asemblea de Dios Ph.360-275-9374 Page 5 of 7 NE State Route 300,Belfair Fax:360-275-4789 Parcel 12331-32-00040 September 19,2013 kiln dust,fly ash,new concrete washing and curing waters,waste streams generated from concrete grinding and sawing, exposed aggregate processes, and concrete pumping and mixer washout waters. Stormwater discharges shall not cause or contribute to a violation of the water quality standard for pH in the receiving waters. 7. Construction sites with significant concrete work shall adjust the pH of stormwater if necessary to prevent violations of water quality standards. 10.0 Control Dewatering Although dewatering will not be likely for this project, special provisions are required to be followed when dewatering. The outlet for dewatering shall be located in a position as to prevent sediments and pollution from leaving the site.This may be accomplished by pumping water into a sedimentation pond,or other standard control. 11.0 Maintain BMP's All temporary BMP's must be inspected and maintained accordingly.This includes the following: Stabilized Construction Entrance The stabilized construction entrance shall be inspected at reasonable increments. Increased usage of the construction entrance warrants more frequent inspections. Additional rock shall be added periodically to maintain proper function of the pad. Temporary Sediment Traps/Permanent Infiltration Ponds If used, temporary sediment traps are to be inspected after each rainfall event, and daily during prolonged rainfall.The accumulation of sediments that reaches no more than 1-foot in depth shall be removed and used as appropriate on-site fill or disposed in an approved off-site dump. Side slopes, weir and other sediment trap features shall be immediately repaired, if necessary. Permanent infiltration ponds shall be inspected periodically, and maintained as necessary, for a build-up of sedimentation,debris from trees or other vegetation,or any other foreign debris. Silt Fence All silt fencing shall be inspected immediately after each rainfall and at least daily during prolonged rainfall.Any required repairs shall be made immediately. Permanent Vegetation Permanent vegetation shall initially be inspected regularly to insure establishment and healthy growth. Once established, vegetation may need to be periodically fertilized for continuous growth.Vegetation shall be re-established in areas, if necessary. While active construction is in process,all temporary erosion and sediment control facilities shall be inspected and immediately maintained if necessary per the requirements provided above. In the event that construction activities are discontinued for at least 4 consecutive days, the owner shall be responsible for the inspection, and immediate maintenance if necessary, of all temporary Envirotech Engineering Iglesia Asemblea de Dios Ph.360-275-9374 Page 6 of 7 NE State Route 300,Belfair Fax:360-2754789 Parcel 12331-32-00040 September 19,2013 erosion and sediment control facilities immediately after storm events, and at least once every 7 days. In addition to the aforementioned inspection and maintenance schedule, the owner shall install additional erosion and sediment control facilities if proposed erosion and sediment control measures prove to be inadequate. Construction Road/Parking Area Stabilization Inspect stabilized areas regularly, especially after large storm events. Crushed rock, gravel base, hog fuel, etc. shall be added as required to maintain a stable driving surface and to stabilize any areas that have eroded. Following construction, these areas shall be restored to pre-construction condition or better to prevent future erosion. Dust Control Respray area as necessary to keep dust to a minimum. Concrete Handling Containers shall be checked for holes in the liner daily during concrete pours and repaired the same day. Maintenance Responsibility Inspection, maintenance, and financial liability of all temporary/ permanent erosion and sedimentation control facilities shall ultimately be the responsibility of the owner's utilizing the facilities.Currently,the following proponent is in charge of this responsibility: Asemblea De Dios Internacional Agua Viva 160 Santa Maria Lane Belfair,Washington 98528 Furthermore, the owner shall establish a Certified Erosion and Sediment Control Lead (CESCL) for construction observation and oversight of the project to ensure compliance with the ESC components of the approved Drainage and Erosion/ Sediment Control Plans. This designation currently belongs to: Asemblea De Dios Internacional Agua Viva 160 Santa Maria Lane Belfair, Washington 98528 12.0 Manage the Project The designated manager for this project is: Asemblea De Dios Internacional Agua Viva 160 Santa Maria Lane Belfair,Washington 98528 Envirotech Engineering Iglesia Asemblea de Dios Ph.360-275-9374 Page 7 of 7 NE State Route 300,Belfair Fax:360-2754789 Parcel 12331-32-00040 September 19,2013 APPENDIX A CALCULATIONS Single Event Hydrograph Method Input trapezoidal storage Design Storm 2yr-24hr w, bottom width (ft) 40 P, precipitation depth (in) 3.8 I, length of pond (ft) 100 CN, pre-existing curve number 30 run, horizontal component of side slope (ft) 3 CN, proposed curve number 98 rise, vertical component of side slope (ft) 1 Al, proposed area of change (sf) 60000 (must have consistent CN) A2, area left unchanged (sf) 0 (must have consistent CN) L1, flow length (ft) 300 L2, flow length (ft) 0 s1, slope (ft/ft) 0.05 s2, slope (ft/ft) 0 R, hydraulic radius 0.1 n, Manning's roughness coeff. 0.4 f, infiltration rate (in/hr) 6 d, subsurface distance (ft) 3 distance from bottom of pond to impermeable, water, or different soil surface Out ut SCS Curve Number Equations S= 23.33 Max. natural detention due to infiltration, storage, etc. Pre-Existing (in) S=1000/CN-10 S= 0.20 Max. natural detention due to infiltration, storage, etc. Proposed (in) Qd = 3.57 Runoff depth over area (in) V= 17828.05 Runoff volume (cubic feet) k= 0.80 time of concentration velocity factor(ft/sec) k=(1.49`R^0.667)/n v1= 0.18 velocity of flow(ft/sec) v=k"SQRT(s) v2= 0.00 velocity of flow(ft/sec) TOTt=L/ 60*v 27.88 Travel time (min) ( ) Tt2= 0.00 Travel time (min) Tc= 27.88 Time of concentration (min) Tc=Tt1+Tt2+....Ttm w= 0.15 routing constant w=dt/(2Tc+dt) Santa Barbara Urban Hydrograph Method Add Snowmelt Factor to hyetograph if elevation is above 1000 feet 6ZZ 0 6ZZ 0 ttZ'O 6ZO'O 6ZO'O L6t 0 000'0 000,0 000,0 0000 000 0 L89 0 L£0 0 900,0 £ 9 £ZZ O EZZ O EtZ 0 6ZO'O 6Z0'0 Z9t 0 000,0 000,0 000,0 0000 000,0 9990 LEO'0 2000 Z'9 VLZ'0 VLZ'O ZtZ 0 6ZO 0 6ZO'O E£t 0 0000 000,0 000,0 000,0 000'0 9Z9 0 L£0 0 2000 0,9 ZOZ'O ZOZ'O Ot7Z'O 6ZO'O 6ZO 0 tOt 0 000,0 0000 000,0 000,0 0000 t69 0 L£O 0 9000 8't t6L 0 t6L'O EOZ 0 tZ0'0 tZO'0 9LE 0 000'0 0000 000'0 000,0 000'0 Z99 0 LZO 0 L00'O L't 06L'O 06L'O ZOZ'O tZO 0 tZO'O 09E 0 0000 000'0 0000 0000 000,0 9E9 0 LZO'O L00 0 9 t 98 L'0 98 L'0 OOZ'O VZO'O tZ0'0 9ZE 0 000,0 000,0 000,0 0000 000,0 609 0 LZO'O L00 0 £'t 6L L'O 6L L'O 66 L 0 tZO 0 tZO'0 ZOE 0 000'0 000'0 000,0 000,0 0000 E8t 0 LZO 0 L00'0 Z t LLL'0 LLL 0 L6L'O tZO 0 tZO'0 8LZ 0 000,0 0000 0000 000,0 0000 99t 0 LZO 0 L00 0 0'b 09L'O 09L 0 b66'O EZO 0 £ZO 0 99Z 0 000,0 0000 000,0 0000 000'0 6Zt 0 LZO'O L00 0 8 £ Z9L'0 Z9L'0 t9L 0 OZO 0 OZO 0 L£Z 0 000'0 0000 0000 000,0 000,0 EOt 0 EZO 0 900,0 L E LtL'O Zt7VO Z9VO 6L0'0 6L0'0 Z6Z'0 000,0 000'0 000,0 000,0 000,0 O2£'0 £ZOO 900,0 9'E LVL'0 Lt,VO 69L 0 6L0'0 6LO 0 Z6L 0 0000 000,0 0000 000,0 0000 19£ 0 EZO 0 900,0 £ E tEL'0 tEL'0 L9L 0 6L0 0 6LO 0 ELL'0 000,0 000,0 000'0 000,0 000,0 tCE 0 EZO'O 900,0 Z £ 9Z VO 9Z L 0 £9 L 0 8 L0 0 8 L0'0 t9 L 0 000 0 0000 000,0 000,0 000,0 Z LE 0 EZO 0 900,0 O'£ tLL'O tLL'O 6t,VO MO SLO'0 9EL 0 000'0 0000 0000 0000 000,0 68Z 0 EZO 0 900,0 8'Z 90L'0 90L'0 LZL'0 9LO'O 9LO 0 8L L 0 000,0 000'0 000'0 000'0 000'0 99Z 0 6L0'0 900,0 L'Z 860'0 860'0 LLL 0 tL0 0 tL0'0 tOL'0 000'0 000,0 0000 000,0 000,0 LbZ 0 6L0 0 9000 9 Z L60'0 L60'0 E L L O tL0 0 tL0'0 060'0 000,0 0000 0000 000'0 000,0 8ZZ 0 6L0 0 900,0 CZ Z80'0 Z80'0 80L'0 ELO'O ELO 0 9L0 0 000'0 0000 000,0 000,0 000,0 60Z 0 6L0'0 900,0 Z'Z ZLO'O ZL0 0 ZOVO ZLO 0 ZLO 0 E90 0 0000 000'0 000,0 000,0 000'0 06L 0 6L0'0 900,0 O'Z 090'0 090 0 960'0 L LO'O L LO'0 L90,0 0000 000,0 000,0 0000 000,0 LLL'0 6L0'0 900,0 8 L 090,0 090'0 LL0'0 600'0 600 0 6E0 0 0000 0000 000,0 000,0 000'0 Z9 L 0 9 LO 0 t00 0 L'L Zt0'O Zt0'0 990'0 800 0 800'0 L£0 0 000,0 000,0 000,0 000,0 000'0 LE L 0 9 LO 0 t00 0 9'L tE0'O tE0 0 990,0 L00 0 L00 0 EZO'O 000,0 000'0 000,0 000'0 000'0 ZZL'0 9LO'O t00'0 £,L 9Z0 0 9Z0 0 0900 9000 9000 9L0'0 0000 000,0 0000 000,0 000,0 90L 0 9L0'0 t00'0 Z L 9L0'0 9L0'0 Ot0 0 9000 900'0 OL0'0 000,0 000,0 000,0 0000 000'0 L60'0 9L0'0 t00 0 0'L 2000 900,0 8Z0 0 E00 0 £00 0 900,0 0000 000,0 000 0 000,0 000,0 9L0 0 9 L0 0 t00'0 8,0 Z00'O Z00'O tW 0 Z00 0 Z00'O Z00 0 0000 0000 000,0 000,0 000,0 L90 0 9 LO 0 t00 0 L 0 0000 0000 L00 0 000,0 000,0 0000 0000 0000 000'0 000,0 000'0 9t0 0 9LO 0 t00 0 9'0 000'0 000'0 000'0 000,0 000,0 0000 000,0 0000 0000 000,0 000,0 OE0 0 9LO 0 t00 0 E 0 000,0 000,0 000,0 000,0 000,0 0000 000'0 000,0 000,0 000,0 000,0 9L0'0 9LO'O t00'0 Z 0 0000 000,0 000,0 000,0 000'0 0000 000,0 000,0 0000 0000 000'0 0000 0000 0000 0,0 (sIo) ate�j (s}o) ate�l (sIo) (ui) (ui)}4oun�j(ui)j4oun�j (s;o) ate (slo) (ui) (ui)I;oun�j (ui).4oun�l (ui) (ul) ( oap) uoitngialsia (jq) mold -saa mold -sa(] 11 poun�l }ol aaoul wnooy mold -sa(] 11 jjounH -tol -aaoul 'wnooy uie�j nooe uie�l afoul Ilejuie�j VI adAi awil letol suogipuoo pasodoid suoitipuoO 6uitsIX3 ZbZ'0 ZVZ'O LZZ'O LZO'O LZO'O 96 L'Z 000'0 000'0 000'0 000'0 000'0 VZV'Z LZO'O L00'0 £'L L 617Z'0 6VZ'O LZZ'0 LZO'O LZO'O 89L'Z 000'0 000'0 000'0 000'0 000'0 L6E'Z LZO'O L00'O Z'L L 89Z'0 89Z'O LZZ'0 LZO'O LZO'O L17L'Z 000'0 000'0 000'0 000'0 000'0 OL£'Z LZO'O L00'O 0'L L ZLZ'O ZLZ'O 9ZZ'O LZO'O LZO'O VLL'Z 000'0 000'0 000'0 000'0 000'0 Zl7E'Z LZO'O L00'O 8'OL L8Z'0 L9Z'O LLZ'O £EO'O ££0'0 L80'Z 000'0 000'0 000'0 000'0 000'0 9L£'Z ££0'0 600'0 L'OL E8Z'0 E8Z'O LLZ'O E£0'O E£0'0 1790'Z 000'0 000'0 000'0 000'0 000,0 Z8Z'Z £EO'0 600'0 9'OL 98Z'0 98Z'O LLZ'O £EO'0 ££0'O OZO'Z 000'0 000'0 000'0 000'0 000'0 8t7Z'Z EEO'O 600'0 £'OL 68Z'0 69Z'O LLZ'O E£0'O ££0'0 L86'L 000'0 000'0 000'0 000'0 000'0 92'Z E£0'0 600'0 Z'OL 96Z'O 96Z'O LLZ'O £EO'O E£0'O 1796'L 000'0 000'0 000'0 000'0 000'0 L8 L'Z £EO'0 600'0 O'O L £OE'0 £0£'O 9LZ'O £EO'O ££0'0 LZ61 000'0 000'0 000'0 000'0 000'0 817VZ ££0'0 600'0 8'6 9 L£'0 9 LE'O 9LZ'O ££0'0 £EO'O 999'L 000'0 000'0 000'0 000'0 000'0 17 L L'Z EEO'0 600'0 L'6 L££'0 L££'0 9LZ'O E£0'0 E£0'0 999'L 000'0 000'0 000'0 000'0 000'0 L80'Z ££0'0 600'0 9'6 99£'0 99£'O 9LZ'O £EO'O EEO'O 28'L 000'0 000'0 000'0 000'0 000'0 L'VO'Z ££0'0 600'0 E'6 06£'O 06£'O 9LZ'O E£0'O EEO'0 88L'L 000'0 000'0 000'0 000'0 000'0 VL0'Z ££0'0 600'0 Z'6 01717'0 01717'0 9LZ'0 ££0'0 £EO'0 99L'L 000'0 000'0 000'0 000'0 000'0 L86'L £EO'0 600'0 0'6 L L9'0 L L9'0 9LZ'O EEO'0 ££0'0 ZZL'L 000'0 000'0 000'0 000'0 000'0 L176'L EEO'O 600'0 8'8 Z89'0 Z89'0 OZt7'0 090'0 090'0 6891 000'0 000'0 000'0 000'0 000'0 VL61 L90'0 £LO'0 L'8 £99'0 £99'0 OZb'0 090'0 090'0 8£9'L 000'0 000'0 000'0 000'0 000'0 E98'L L90'0 £LO'0 9'8 99L'0 99L'O OZb'0 090'0 090'0 989'L 000'0 000'0 000'0 000'0 000'0 Z Le,L L90'0 ELO'0 £'8 LL8'0 LL8'0 E99'0 890'0 890'0 SET 000'0 000'0 000'0 000'0 000'0 Lkl 890'0 8L0'0 Z'8 £ti6'O £176'0 b178'0 LOL'0 LOL'0 OLtl'L 000'0 000'0 000'0 000'0 000'0 £69'L EOL'0 LZO'O 0'8 E08'O £08'0 1799'L ZOZ'O ZOZ'0 69£'L 000'0 000'0 000'0 000'0 000'0 069'L 90Z'0 b90'0 81 999'0 999'0 990'L LZL'0 LZL'0 L9L'L 000'0 000'0 000'0 000'0 000'0 98£'L 6ZL'0 17£0'0 L'L 917VO 9t7t'O 899'0 L90'0 L90'0 Otto'L 000'0 000'0 000'0 000'0 000'0 99Z'L 890'0 8LO'0 91 L6E'O L6£'0 999'0 L90'0 L90'0 £L6'0 000'0 000'0 000'0 000'0 000'0 L8 L'L 890'0 8 LO'0 £'L 69E'0 69£'O £07'0 090'0 090'0 906'0 000'0 000'0 000'0 000'0 000'0 6LL'L L90'0 £LO'0 Z'L 9££'0 9££'0 ZLb'O 6VO'O 6170'0 L98'0 000'0 000'0 000'0 000'0 000'0 890'L L90'0 ELO'0 O'L EO£'O £0£'O L LVO 6170'0 6b0'O L08'0 000'0 000'0 000'0 000'0 000'0 L L0'L L90'0 £LO'0 8'9 Z8Z'0 Z8Z'O L6Z'O 9£0'O 9£0'0 89L'O 000'0 000'0 000'0 000'0 000'0 996'0 9£0'0 OLO'O L'9 6LZ'O 6LZ'O 06Z'O 9£0'O 9£0'0 EZL'O 000'0 000'0 000'0 000'0 000'0 OE6'0 9£0'0 0 LO'0 9'9 17LZ'0 t7LZ'O 69Z'O 9E0'O 9£0'0 889'0 000'0 000'0 000'0 000'0 000'0 V68'0 9£0'0 OLO'O E'9 L9Z'O L9Z'O 88Z'O 9£0'O 9£0'0 1799'0 000'0 000'0 000'0 000'0 000'0 898'0 9£0'0 OLO'0 Z'9 69Z'O 69Z'O L9Z'O b£0'0 VETO 6L9'0 000'0 000'0 000'0 000'0 000'0 ZZ8'0 9E0'0 OLO'0 0'9 917Z'0 9vZ'0 98Z'0 VCO'O ti£0'0 1789'0 000'0 000'0 000'0 000'0 000'0 98L'O 9£0'0 OLO'0 8'9 LEZ'O LEZ'O 9VZ'O OEO'O 0£0'0 099'0 000'0 000'0 000'0 000'0 000'0 6bL'O L£0'0 800'0 L'9 tr£Z'O 17£Z"0 9bZ'O 6ZO'O 6ZO'O LZ9'0 000'0 000'0 000'0 000'0 000'0 8LL'0 LEO'0 900'0 9'9 Stage-Storage Relationship Stage-Storage Relationship Stage, h Storage ft cubic ft 16 0 0 14 2 9200 0 12 4 20800 0 6 34800 d 10 8 51200 08 10 70000 1° 12 91200 12 6 14 114800 d 4 vM ( 2 0 0 20000 40000 60000 80000 100000 120000 140000 Storage(cubic feet) Routing Curve for t=10 min Routing Curve for trapezoid retention 12.000 Stage, h Outflow Storage 0+2S ft O cfs S cfs cfs 10.000 0 0.5556 0.0000 0.5556 8.000 2 1.2187 15.3333 31.8854 4 2.1161 34.6667 71.4495 c 6.000 6 3.2478 58.0000 119.2478 F. a.000 8 4.6137 85.3333 175.2804 10 6.2139 116.6667 239.5472 2.000 12 8.0482 152.0000 312.0482 0.000 14 10.1169 191.3333 392.7835 0.0 50.0 100.0 150.0 200.0 250.0 300.0 350.0 400.0 450.0 Outflow+2 Storage(cfs) LEVEL POOL ROUTING TABLE 98£'L t?98'£ 0K*0 900'V Zt,9'£ b£Z'0 6ZZ'0 LL£'L £89'£ b£L'0 LL8'£ 99£'£ 6ZZ'0 £ZZ'0 8tIZ'L 66b'£ LZL'0 9Z9'£ 68L'£ £ZZ'0 VETO Z8L'L 9L£'£ OZL'0 9£ti'£ 6LO'£ KZ'O ZOZ'0 8 L L'L 6£L'£ K L'0 £9Z'£ L98'Z ZOZ'0 V6 L'0 1790'L OL6'Z LOL'0 LLO'£ £69'Z 176L'0 06L'0 886'0 008'Z OO L'0 006'Z 9Z9'Z 06 L'0 98 L'0 LZ6'0 9Z9'Z V60'0 6LL'Z 99£'Z 98L'0 6LL'0 998'0 8bt7'Z L80'0 9£9'Z 98L'Z 6LL'0 LLL'0 L6L'0 ZLZ'Z 080'0 Z9£'Z LZO'Z LLL'0 09L'0 6ZL'O LOL'Z 17LO'0 9LL'Z £98'L 09L'0 Z9L'0 L99'0 L£6'L 890'0 t700'Z 90L'L Z9 L'0 Li7V O 909'0 £LL'L L90'0 b£8'L 9179'L LtIVO LK'0 Z179'0 L09'L 990'0 Z99'L 98£'L L17 VO t1£L'0 ZWO Ltiti'L 6t,0'0 06t7'L L£Z'L ti£L'0 9Z L'0 bZtl'0 08Z'L £t70'0 £Z£'L 1780'L 9Z L'0 t,L L'0 OL£'0 LZ L'L 8£0'0 b9L'L 9176'0 b L L'0 90 L'0 8L£'0 t786'0 Z£0'0 9L0'L £L8'0 90L'0 860'0 89Z'0 9t,8'0 LZO'0 £L8'0 V89'0 860'0 L60'0 62'0 L LL'0 ZZO'0 ££L'O 099'0 L60'0 Z80'0 9LL'0 £89'0 9L0'0 009'0 917t"O Z80'0 ZLO'0 9£L'0 17917'0 VLO'0 8LI7'0 917£'0 ZLO'0 090'0 ZOL'0 69£'O OLO'0 OL£'0 09Z'0 090'0 090'0 £LO'O OLZ'O L00'O LLZ'0 98L'0 090'0 Z170'0 "O'0 £6L'0 900'0 96L'0 ZZL'0 Zt?0'0 17£0'0 8Z0'0 LZL'0 £00'0 0£L'0 LLO'O tl£0'0 9Z0'0 17MO tiLO'O L00'0 9L0'0 9£0'0 9Z0'0 9L0'0 900'0 9£0'0 000'0 9£0'0 ZLO'0 9L0'0 800'0 L00'0 £LO'0 000'0 £LO'0 £00'0 800'0 Z00'0 000'0 £00'0 000'0 £00'O 000'0 Z00'0 000'0 000'0 000'0 000'0 000'0 000'0 000'0 000'0 000'0 000'0 000'0 000'0 000'0 000'0 000'0 paseajoul aq;snw lg6ieq abets uay; `jja `jI 000'0 000'0 999'0 000'0 000'0 000'0 000'0 }t O NO) NO) sIO) (sIO) (sIO 96els (L+u)sZ+ (u)O (u)sZ+ (u)sZ (L+u)I (u)I (L+u)O (L+u)I+(u)I 9ZL'£ OL8'8 L17E'0 L2'6 8£L'8 L£Z'0 ZtiZ'0 L6L'£ 980'6 99E'0 Lbb'6 096'8 ZIVZ'O 6tZ'O 89Z"E 90£'6 179E'0 OL9'6 £9L'6 6VZ'O 89Z'0 ZZE'E 8Z9'6 ZLE'O 006'6 OL£'6 89Z'0 ZLZ'O tl8E'E ZtiL'6 08E'0 ZZL'OL 699'6 ZLZ'O L8Z'O Ltlt,'£ 096'6 88E'0 8£E'OL tLL'6 L8Z'0 E8Z'0 9L9'E M'OL L6E'O 099'OL Z66'6 £8Z'0 98Z'0 989,E 68E"O L 9017'0 96L'O L OZZ'O L 98Z'0 68Z'O 699,E 9Z9'0l 9Lb'0 Z10'L L 89VU 68Z'0 96Z'0 9EL'£ EL8'0 6 9Zt7'0 86Z'L L OOL'O L 96Z'0 £0£'0 OL8'£ 9ZL'LL 9£t7'0 L991L £176'OL EO£'O 9LE'0 Z88'E 8L£'L L tit7ti'0 ZZ8'L L 9L L'L L 9 L6'0 L££'O Lt,6'£ OZ9'L L NVO £LO'Z L 98E'L L LEE'0 99£'0 666,E 6£8'L L 69t7'0 86Z'Z L £99'L L 99£'0 06£'O EZO't, ZLO'ZL E917'0 t7LV'ZL 9V9'LL 06£'O 017t7'0 9L0'17 80L'ZL Z9b'0 699'ZL 6L91L Obb'O LL9'O 996,E 080'ZL 99t7"0 9£9'ZL Zt,b'L L L L9'0 Z89'0 698,E 968'L L Ltltl'0 8E£'ZL ZOL'L L Z89'0 £99'0 689'£ £b9'L L 6 Lti'0 E96'L L b99'0 L E99'0 99L'O 9£I7'£ 17L6'0 L L8£'0 L9£'L L 9EL'6 99L'0 LL8'O 660'£ ZZL'OL 1717E'0 9917'0L L99'8 LL8'0 Eb6'0 99L'Z 966'8 OOE'O 96Z'6 6t?9'L £176'0 £08'0 L L9'Z 6t78'L 69Z'O LL L'8 89L'9 E08'0 999'0 L9£'Z LZOI 617Z'0 9LZ'L 17LZ'9 999'0 9t7t"O 09Z'Z EZ9'9 9£Z'0 69L'9 9L6'9 917U'0 L6£'O L9 L'Z 09 L'9 EZZ'O £L£'9 9L9'9 L6£'0 69£'O 9L0'Z 0178'9 ELZ'0 £90'9 L9E'9 69E'O 9E£'0 L00'Z OL9'9 VOZ'O VLL'9 9£L'9 9£E'0 EO£'O LE6'L 6E£'9 L6 L'O 9£9'9 096't, £OE'0 Z8Z'O 698'L LK*9 06 L'0 LEE'9 9LL'17 Z8Z'O 6LZ'O 86L'L 996'tl £8 L'0 8K'9 969'17 6LZ'O bLZ'O 9ZL'L 8LL'b 9LL'0 E96't, ZLVv VLZ'O L9Z'0 999'L L89't, 89L'0 99L'7 6ZZ'17 L9Z'0 69Z'0 999'L L6E'tl L9L'0 69917 b9017 69Z'0 9bZ'O LZ9'L 9LZ'17 179L'0 69£'t? 988,E 9t7Z'0 L£Z'O 179VI OV017 817VO 88L'b LLL'£ L£Z'0 17£Z'0 III