Loading...
HomeMy WebLinkAboutRevise Monument Sign Structure - COM Letters / Memos - 11/9/2021 Ar hit t West North Mason RFA Fire Station (20013) C eC S Architects Supplemental Instructions - 05 t.208.66Z94o2 Issue Date: 11.09.2021 architectswest.com OWNER CONTRACTOR DISTRIBUTION Ix North Mason Regional Fire Authority Trico Companies Mark Kim, Trico X 460 NE Old Belfair Hwy 15066 Josh Wilson Rd Joylyn_Thurman, Trico X Belfair, WA 98528 Burlington, WA 98233 Becky Blankenship, Hill Int. X Renee Wassenaar, NMRFA X Scott Coffer, NMRFA X CONTRACT FOR: GENERAL CONSTRUCTION Marcus Valentine, AWI X CONTRACT DATE: June 24, 2020 Field X The work shall be carried out in accordance with the following supplemental instructions issued in accordance with the Contract Documents without change in the Contact Sum or Contract Time. Prior to proceeding in accordance with these instructions, indicate your acceptance of these instructions for minor change to the Work as consistent with the Contract Documents and return a_ copy to the Architect. ITEM DESCRIPTION 1 Revise the monument sign structure detail 10 on sheet A10.11 from a cast-in-place concrete sign base to the attached CMU sign base with a cast concrete cap. Provide electrical conduit as required for the sign requirements light and reader board Verify reinforcement with structural. ATTACHEMENTS 2 PGs ASI 06—A10.11 Details 10 and 15 ARCHITECT CONTRACTOR Architects West, Inc. Trico Companies 210 E. Lakeside Ave 15066 Josh Wilson Rd Coeur d'Alene, ID 83814 Burlington, WA 98233 SIGNATURE: SIGNATURE: DATE: DATE: 11.09.2021 ASI#6—11/09/2021 Page 1 of 1 North Mason RFA Fire Station 21