DETERMINATION OF NONSIGNIFICANCE
(WAC 197-11-340)
SEP2016-00117
Description of Proposal: NON PROJECT SEPA REVIEW FOR OLD BELFAIR HIGHWAY
SEWER COLLECTION SYSTEM DESIGN
Proponent: MASON COUNTY PUBLIC WORKS
Location of Proposal: NE OLD BELFAIR HWY BELFAIR
Parcel Number: 123290060010
Legal Description: CO RD R/W S 39/81 (OLD BELFAIR HWY)
Directions to Site: PUBLIC MEETING: December 13, 2016 5.30 to 7:30 p.m. North
Mason Library 23081 NE SR 3; Belfair, WA
i
Lead Agency: Mason County
The Lead Agency for this proposal has determined that it does not have a probable significant
adverse impact on the environment. An Environmental Impact Statement (EIS) is not required
under RCW 43.21 C.030(2)(c). This decision was made after review of a completed
Environmental Checklist and other information on file with the Lead Agency. This information is
available to the public upon request.
Please contact Kell McAboy at ext. 365 with any questions. This DNS is issued under WAC
197-11-340(2). The Lead Agency will not act on this proposal for 14 days from the date shown
below, when the determination is final. Comments must be submitted to Dept. of Community
Development, 615 W Alder St, Shelton WA 98584 by 12/19/2016. Appeal of this determination
must be filed within a 14-day period following this final determination date, per Mason County
Code Chapter 15.11 Appeals.
Authorized Local G rnment Official Date
la3a��-oo - co_oold
SEPA Environmental Checklist: Non-Project Mason County Permit Center Use:
SEP Z.D 1 U - oU 1 1 -1
❑ Single Family DNS: $385 Date Rcvd:
Other DNS: 0 to 9.99 acres: $630 RECEIVED
10 to 20 acres: $755
Over 20 acres:_$945_ NOV 0 7 2016
❑ DS/EIS: $2,525+70 Per hr
615 W. Alder Street
4
4
SEPA ENVIRONMENTAL CHECKLIST
Purpose of checklist:
Governmental agencies use this checklist to help determine whether the environmental impacts of your
proposal are significant. This information is also helpful to determine if available avoidance, minimization
or compensatory mitigation measures will address the probable significant impacts or if an environmental
impact statement will be prepared to further analyze the proposal.
Instructions for applicants:
This environmental checklist asks you to describe some basic information about your proposal. Please
answer each question accurately and carefully, to the best of your knowledge. You may need to consult
with an agency specialist or private consultant for some questions. You may use "not applicable" or
"does not apply" only when you can explain why it does not apply and not when the answer is unknown.
You may also attach or incorporate by reference additional studies reports. Complete and accurate
answers to these questions often avoid delays with the SEPA process as well as later in the decision-
making process.
The checklist questions apply to all parts of your proposal, even if you plan to do them over a period of
time or on different parcels of land. Attach any additional information that will help describe your proposal
or its environmental effects. The agency to which you submit this checklist may ask you to explain your
answers or provide additional information reasonably related to determining if there may be significant
adverse impact.
Instructions for Lead Agencies:
Please adjust the format of this template as needed. Additional information may be necessary to
evaluate the existing environment, all interrelated aspects of the proposal and an analysis of adverse
impacts. The checklist is considered the first but not necessarily the only source of information needed to
make an adequate threshold determination. Once a threshold determination is made, the lead agency is
responsible for the completeness and accuracy of the checklist and other supporting documents.
Use of checklist for nonproject proposals: JtLep
For nonproject proposals (such as ordinances, regulations, plans and programs), complete the applicable
parts of sections A and B plus the SUPPLEMENTAL SHEET FOR NONPROJECT ACTIONS (part D). Please
completely answer all questions that apply and note that the words "project," "applicant," and "property or
site" should be read as "proposal," "proponent," and "affected geographic area," respectively. The lead
agency may exclude (for non-projects)questions in Part B - Environmental Elements—that do not
contribute meaningfully to the analysis of the proposal.
SEPA Environmental checklist(WAC 197-11-960) July 2016 Page 1 of 15
Background heI A. Backg d I pl
1. Name of proposed project, if applicable: hg
Belfair Sewer Old Belfair Highway Collection System Area Design
2. Name of applicant: hf e
Mason County Public Works
3. Address and phone number of applicant and contact person: hf elpl
Mason County Public Works
100 W. Public Works Drive
Shelton, WA 98584
Attn: Bart Stepp, PE, Deputy Director/Utilities &Waste Management
(360) 427-9670 x652
4. Date checklist prepared: 1hel
11/03/16
5. Agency requesting checklist: hf e
Washington Department of Ecology
6. Proposed timing or schedule (including phasing, if applicable): h[ e
July 2017— Funding award by Ecology for design of Old Belfair Highway Collection System
July 2017—October 2018— Design and permitting of Old Belfair Highway Collection System
July 2019— Funding award by Ecology for construction (projected)
October 2019—October 2020—Construction of Old Belfair Highway Collection System
7. Do you have any plans for future additions, expansion, or further activity related to or
connected with this proposal? If yes, explain. hf gM
This proposal is for the design of a sewer collection system area. A construction phase
project would occur after design is completed. There are additional Belfair collection
system areas anticipated for the future but they are not part of this project.
8. List any environmental information you know about that has been prepared, or will be
prepared, directly related to this proposal. hf elpl
An environmental assessment was completed in 2009 for the Water Reclamation Facility
and initial collection system area which the Old Belfair Collection System would connect
with. It was approved by EPA on 10/14/09 with a Finding of No Significant Impact.
9. Do you know whether applications are pending for governmental approvals of other
proposals directly affecting the property covered by your proposal? If yes, explain. lbpjpj
No
10. List any government approvals or permits that will be needed for your proposal, if known.
hel
No permits are needed for us to complete the design of this collection system. For construction
Department of Ecology will need to approve the design of the collection system before
construction could begin, an HPA Permit will be needed from Washington Department of Fish
SEPA Environmental checklist(WAC 197-11-960) July 2016 Page 2 of 15
and Wildlife (F&W), a right-of-way permit will be needed from Mason County Public Works, land
use approval will be needed from Mason County Community Development, and the Department
of Ecology will need to issue a construction stormwater permit. In addition the County will need
to consult with local tribes and the Washington Department of Historical Preservation (DAHP)
and address any of their concerns prior to the start of construction.
11. Give brief, complete description of your proposal, including the proposed uses and the size
of the project and site. There are several questions later in this checklist that ask you to
describe certain aspects of your proposal. You do not need to repeat those answers on this
page. (Lead agencies may modify this form to include additional specific information on project
description.)JLpM
The Old Belfair Highway Collection System would eliminate 171 septic systems within the Belfair Urban
Growth Area by connecting 187 properties to the Belfair Sewer System. The department of Health has
identified septic systems as contributing to the declaration of a portion of the Lower Hood Canal as a
severe public health hazard. In 2012 the Belfair Water Reclamation Facility and Phase 1 of the collection
system went into service. The funding application to the Department of Ecology is to complete the
engineering design and permitting for the Old Belfair Highway Collection System Phase.
12. Location of the proposal. Give sufficient information for a person to understand the precise
location of your proposed project, including a street address, if any, and section, township, and
range, if known. If a proposal would occur over a range of area, provide the range or
boundaries of the site(s). Provide a legal description, site plan, vicinity map, and topographic
map, if reasonably available. While you should submit any plans required by the agency, you
are not required to duplicate maps or detailed plans submitted with any permit applications
related to this checklist. hf elpl
The collection system area is generally the area within the Belfair Urban Growth Area that is north of NE
Roy Boad Road, State Route 3, and west of the railroad tracks. The collection system would connect
with the existing Belfair System System on Old Belfair Highway about 500' north of the intersection of Old
Belfair Highway and State Route 300. The general legal description of the area would be parts of
sections 20, 21, 28, and 29 of Township 23N, Range 1 W. A site plan is attached with this checklist.
B. ENVIRONMENTAL ELEMENTS hf eM
1. Earth hf @jpJ
a. General description of the site: hf elpl
(circle one): Flat, rolling, hill , steep slopes, mountainous, other
b. What is the steepest slope on the site (approximate percent slope)?1hel
30% - based on soil map
c. What general types of soils are found on the site (for example, clay, sand, gravel, peat,
muck)? If you know the classification of agricultural soils, specify them and note any
agricultural land of long-term commercial significance and whether the proposal results in
removing any of these soils. hf e
The soils in the area are generally sandy loams with some gravel here and there. For the construction
phase of the project some soils would be removed to install piping, manholes, and lift stations.
Construction would occur within existing right-of-way so existing agricultural areas would not be disturbed.
SEPA Environmental checklist(WAC 197-11-960) July 2016 Page 3 of 15
d. Are there surface indications or history of unstable soils in the immediate vicinity? If so,
describe. hf e
There are some slopes in the project area which could have landslide or erosion
potential. The steepest slopes are on the north and east edge of the proposed collection
system. The existing roadway system is generally on the western side of the proposed
area with parcels on the east side served by roads running west and south to Old Belfair
Highway. Construction would occur within existing roadways. The collection system
design would take into account any steep slopes that the sewer mains go through to
mitigate any potential soil issues.
e. Describe the purpose, type, total area, and approximate quantities and total affected area of
any filling, excavation, and grading proposed. Indicate source of fill. 1hel
A 2011 quantity estimate projected 25,000 cubic yards of trenching for the sewer pipe.
Three lift stations are proposed which would add another 1,000 cubic yards for a total of
around 26,000 cubic yards of excavation. Backfilling in these areas would be crushed
rock or native material, depending on the location and depth of excavation. The crushed
rock would meet Washington State Department of Transportation Specifications.
f. Could erosion occur as a result of clearing, construction, or use? If so, generally describe.
hel
Construction of the lift stations will result in some clearing and excavation that could lead
to erosion. The pipe trenching could cause erosion but the contractor would be required
to backfill every day so large lengths of exposed trenches would not occur.
g. About what percent of the site will be covered with impervious surfaces after project
construction (for example, asphalt or buildings)? hf e
The sewer piping will not increase impervious surface areas as it will be covered with whatever
material existed prior to installation of the pipe. For most of the existing roadways this would be
pavement or gravel. Service laterals running to individual parcels would be covered with existing
landscaping of the property. The proposed lift stations are expected to increase the impervious
area. Total increase of impervious area is less than 5,000 square feet.
h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any: 1LgjpJ
County will obtain an Ecology Stormwater NPDES Permit for project construction. Contractor will
be required to comply with NPDES Permit and implement erosion control BMP's according to
approved erosion control plans.
2. Air hf jpJ
a. What types of emissions to the air would result from the proposal during construction,
operation, and maintenance when the project is completed? If any, generally describe and
give approximate quantities if known. 1hel
Construction vehicles would exhaust combustion engine emissions. Upon completion of
the project electricity would be used operate pumps within the system. Emissions may
be created in the creation of the electricity. Vehicles would be used by employees for
maintenance and repair of the system.
b. Are there any off-site sources of emissions or odor that may affect your proposal? If so,
generally describe. 1hel
Carbon dioxide and nitrous oxide are emitted from wastewater by organisms consuming
wastewater nutrients during the biological process of wastewater treatment.
SEPA Environmental checklist(WAC 197-11-960) July 2016 Page 4 of 15
c. Proposed measures to reduce or control emissions or other impacts to air, if any: hf elpl
Currently the septic systems used by property owners in Belfair are pumped out and land applied.
Septage when land applied releases methane in the air as part of its decomposition. Converting this
area to sewer from septic will eliminate this release of emissions. The elimination of 171 septic tanks
will also eliminate the need for septic pumping trucks to visit the area reducing vehicle emissions.
3. Water 1hel
a. Surface Water:
1) Is there any surface water body on or in the immediate vicinity of the site (including
year-round and seasonal streams, saltwater, lakes, ponds, wetlands)? If yes, describe
type and provide names. If appropriate, state what stream or river it flows into. 1hel
Irene Creek and Viola Creek travel through the proposed Old Belfair Highway Collection System
Area. They empty into Union River which generally runs north to south just west of the proposed
collection system area. There are some ponds in the area as well.
2)Will the project require any work over, in, or adjacent to (within 200 feet)the described
waters? If yes, please describe and attach available plans. hf e
New sewer mains will need to be installed within existing roadways that cross these
creeks. Work may be done by typical pipe excavation or boring using trenchless
technologies. A draft plan of the collection system is included with this application which
shows the creek crossings. Any excavated material would be existing roadbed material.
3) Estimate the amount of fill and dredge material that would be placed in or removed
from surface water or wetlands and indicate the area of the site that would be affected.
Indicate the source of fill material. hf e
No fill or dredge material would be used in surface water or wetland areas. If a creek crossing
isn't bored then the pipe would be placed within existing roadway prism already crossing the
creek.
4)Will the proposal require surface water withdrawals or diversions? Give general
description, purpose, and approximate quantities if known. h[ elpl
No
5) Does the proposal lie within a 100-year floodplain? If so, note location on the site plan.
hf eM
No
6) Does the proposal involve any discharges of waste materials to surface waters? If so,
describe the type of waste and anticipated volume of discharge. fhel
No. The Belfair Water Reclamation Facility does not discharge effluent to surface waters.
Effluent is land applied and infiltrated into the ground from a storage pond.
b. Ground Water:
1)Will groundwater be withdrawn from a well for drinking water or other purposes? If so,
give a general description of the well, proposed uses and approximate quantities
withdrawn from the well. Will water be discharged to groundwater? Give general
description, purpose, and approximate quantities if known. hf elpl
No
SEPA Environmental checklist(WAC 197-11-960) July 2016 Page 5 of 15
2) Describe waste material that will be discharged into the ground from septic tanks or
other sources, if any (for example: Domestic sewage; industrial, containing the
following chemicals. . . ; agricultural; etc.). Describe the general size of the system, the
number of such systems, the number of houses to be served (if applicable), or the
number of animals or humans the system(s)are expected to serve. hI elpl
None. This project if constructed would remove septic tank ground discharge from the
area by sending sewage to the Belfair WRF.
c. Water runoff(including stormwater):
1) Describe the source of runoff(including storm water) and method of collection
and disposal, if any(include quantities, if known). Where will this water flow?
Will this water flow into other waters? If so, describe. hf e
No additional runoff will be created by the underground sewer mains. The new
impervious area created by the lift stations will create a minimal amount of new
stormwater runoff that will be treated on-site and infiltrated.
2) Could waste materials enter ground or surface waters? If so, generally describe. hI elpl
No. Stormwater runoff at the lift stations will be treated according to Department
of Ecology regulations before being infiltrated into groundwater.
3) Does the proposal alter or otherwise affect drainage patterns in the vicinity of the site? If
so, describe. hf elpl
No
d. Proposed measures to reduce or control surface, ground, and runoff water, and drainage
pattern impacts, if any: hf elpl
None
4. Plants hf e
a. Check the types of vegetation found on the site: hf elpl
_x_deciduous tree: alder, maple, aspen, other
_x_evergreen tree: fir, cedar, pine, other
_x_shrubs
_x_grass
_x_pasture
_x_crop or grain
Orchards, vineyards or other permanent crops.
_x_wet soil plants: cattail, buttercup, bullrush, skunk cabbage, other
_x_water plants: water lily, eelgrass, milfoil, other
other types of vegetation
b. What kind and amount of vegetation will be removed or altered? hf elpl
Roadside vegetation and landscaping will be removed for installation of the sewer mains
and the sewer laterals for the individual parcels. These areas will be replanted upon
completion of the sewer mains with grass and shrubs.
SEPA Environmental checklist(WAC 197-11-960) July 2016 Page 6 of 15
c. List threatened and endangered species known to be on or near the site. hf elpl
The 2009 Environmental Assessment lists two state-listes plant species. The Adder's tongue
(Ophioglossum pusillum)and few-flowered sedge (Carex pauciflora) have been observed in
the project vicinity.
d. Proposed landscaping, use of native plants, or other measures to preserve or enhance
vegetation on the site, if any: hf e
Any disturbed vegetation in roadway areas due to sewer main installation would be
replaced with grass and/or shrubs as appropriate. Property owners will repair
landscaping damaged from service lateral installation according to their tastes. Some
landscaping of lift stations may occur depending on the site.
e. List all noxious weeds and invasive species known to be on or near the site. lbpjpj
The typical invasive weeds found in Mason County are prevalent within the proposed
project area. This includes Himalayan Blackberry, Scotchbroom, etc. Any invasive
weeds in the way of construction will be removed.
5. Animals h( e
a. List any birds and other animals which have been observed on or near the site or are known
to be on or near the site. hel
Examples include:
birds: hawk, heron, eagle, son birds, other:
mammals: Ideer, bea , elk, beaver, othe :
fish: bass, Isalmon, trout, herring, shellfish, othe
b. List any threatened and endangered species known to be on or near the site. hl elpl
The 2009 environmental assessment listed the following threatened or endangered
species in the Belfair Area: Puget Sound Chinook, Hood Canal Summer Chum, Puget
Sound Steelhead, Marbled Murrelet, and Bald Eagle.
c. Is the site part of a migration route? If so, explain. hf elpl
The area is part of the Pacific Flyway.
d. Proposed measures to preserve or enhance wildlife, if any: hf e
None
e. List any invasive animal species known to be on or near the site. 1hel
None known
6. Energy and Natural Resources hf elpl
a. What kinds of energy(electric, natural gas, oil, wood stove, solar)will be used to meet
the completed project's energy needs? Describe whether it will be used for heating,
manufacturing, etc. hI e
Electricity will be used to power the lift stations and grinder pumps needed to run the
collection system. Lift stations will have emergency generators that would most likely be
powered by diesel.
SEPA Environmental checklist(WAC 197-11-960) July 2016 Page 7 of 15
b. Would your project affect the potential use of solar energy by adjacent properties?
If so, generally describe. 1hel
No
c. What kinds of energy conservation features are included in the plans of this proposal?
P P P
List other proposed measures to reduce or control energy impacts, if any: 1hel
The design of the collection system will use gravity to the greatest extent possible. This
reduces the need for more lift stations which minimizes electrical usage of the system.
The Belfair Water Reclamation Facility where the sewage will end up is a LEED certified
facility that incorporates many energy saving features in its design.
7. Environmental Health [hel
a. Are there any environmental health hazards, including exposure to toxic chemicals, risk
of fire and explosion, spill, or hazardous waste, that could occur as a result of this proposal?
If so, describe. h� e
Lift station or grinder pump failure could result in overflow of untreated sewage onto the ground.
Lift stations will have redundant pumps and emergency generators to prevent overflows.
1) Describe any known or possible contamination at the site from present or past uses.
hel
None is known.
2) Describe existing hazardous chemicals/conditions that might affect project development
and design. This includes underground hazardous liquid and gas transmission pipelines
located within the project area and in the vicinity. hf elpl
Cascade Natural Cas provides natural gas service to the area. The collection system
will be designed to avoid any conflicts with natural gas mains and services.
3) Describe any toxic or hazardous chemicals that might be stored, used, or produced
during the project's development or construction, or at any time during the operating
life of the project. hf e
Emergency generators located at lift stations will be powered by diesel fuel that will be
housed in generator fuel tanks.
4) Describe special emergency services that might be required. hf e
No special emergency services are expected.
5) Proposed measures to reduce or control environmental health hazards, if any: hf e
Project will reduce environmental health hazards by eliminating septic tanks and
drainfields in the area that are contributing to water quality degradation of Union River
and Lynch Cove.
b. Noise h
1)What types of noise exist in the area which may affect your project (for example:
traffic, equipment, operation, other)? hf e
During construction typical noise from work trucks, excavators, dump trucks, etc. will
occur. Once construction is done the project will create almost no noise except for
when emergency generators at the lift stations are operated.
SEPA Environmental checklist(WAC 197-11-960) July 2016 Page 8 of 15
2)What types and levels of noise would be created by or associated with the project on a
short-term or a long-term basis (for example: traffic, construction, operation, other)? Indi-
cate what hours noise would come from the site. 1hel
Construction noise would occur during the day on workdays with hours limited from 7 AM
—8 PM. Exercising of emergency generators would occur during the day but during an
emergency the generators could operate any time of the day.
3) Proposed measures to reduce or control noise impacts, if any: !]el
Lift stations and grinder pumps will be located underground which minimizes noise from
operations. Generators will have sound attenuating enclosures.
8. Land and Shoreline Use hf elpl
a. What is the current use of the site and adjacent properties?Will the proposal affect current
land uses on nearby or adjacent properties? If so, describe. hf e
The current use of the area is a mixture of residential, commercial, and agricultural
lands. The proposal will not alter any of these uses.
b. Has the project site been used as working farmlands or working forest lands? If so, describe.
How much agricultural or forest land of long-term commercial significance will be converted to
other uses as a result of the proposal, if any? If resource lands have not been designated,
how many acres in farmland or forest land tax status will be converted to nonfarm or
nonforest use? hf elpl
Some of the properties to be served by sewer have been used as farmland but almost all
of the project area is zoned residential. One parcel is zoned as Long Term Agricultural.
Completion of the collection system would allow some undeveloped parcels to develop
according to the zoning regulations in place for the Belfair UGA.
1)Will the proposal affect or be affected by surrounding working farm or forest land normal
business operations, such as oversize equipment access, the application of pesticides,
tilling, and harvesting? If so, how: hf pjp
No. The proposal will not affect or be affected by surrounding land practices.
c. Describe any structures on the site. hf e
Current structures within the roadway are existing utility lines and the roadway prism.
The parcels to be served by the collection system have homes and outbuildings on them
d. Will any structures be demolished? If so, what? hf elpl
No.
e. What is the current zoning classification of the site? hf elpl
The proposed collection system area includes R-4, R-5, LTA, GC-BI, and MU zoning
designations.
f. What is the current comprehensive plan designation of the site?1hel
The vast majority of the area is designated as residential.
g. If applicable, what is the current shoreline master program designation of the site? hf e
Not applicable
SEPA Environmental checklist(WAC 197-11-960) July 2016 Page 9 of 15
h. Has any part of the site been classified as a critical area by the city or county? If so, specify.
hel
The proposed collection system area contains streams and potential wetlands. It is
unknown at this time whether construction would impact any wetlands. Any stream
crossings would occur within existing roadway prisms.
i. Approximately how many people would reside or work in the completed project?1hel
The collection system area would serve 187 parcels, 171 of them with existing septic
systems in place. Based on 171 septic systems, approximately 350 people live in the
area. Upon maximum development of the area 500—600 people could live in the area.
j. Approximately how many people would the completed project displace?1hel
Zero
k. Proposed measures to avoid or reduce displacement impacts, if any: 1hel
None needed
�. Proposed measures to ensure the proposal is compatible with existing and projected land
uses and plans, if any: 1hel
The proposed collection system area is within the Belfair UGA, which anticipates urban
development. Providing sewer service to areas allows for urban densities which is
compatible with project land uses in the area.
m. Proposed measures to reduce or control impacts to agricultural and forest lands of long-term
commercial significance, if any: 1hel
None. This project will not create impacts on significant agricultural or forest lands.
9. Housing 1hel
a. Approximately how many units would be provided, if any? Indicate whether high, mid-
dle, or low-income housing. 1hel
This proposed project does not create any housing units. Completion of the project
though would allow for additional residential development in the proposal area.
b. Approximately how many units, if any, would be eliminated? Indicate whether high,
middle, or low-income housing. 1hel
Zero
c. Proposed measures to reduce or control housing impacts, if any: 1hel
None needed
10. Aesthetics 1hel
a. What is the tallest height of any proposed structure(s), not including antennas; what is
the principal exterior building material(s) proposed?1hel
Lift station generators are less than 10'. Single story buildings may be constructed to
house lift station electrical panels. These buildings will be CMU walls and metal roofs
less than 20' high.
b. What views in the immediate vicinity would be altered or obstructed?1hel
No views would be altered or obstructed.
SEPA Environmental checklist(WAC 197-11-960) July 2016 Page 10 of 15
b. Proposed measures to reduce or control aesthetic impacts, if any: hf elpl
Any lift station buildings will be painted earth tone colors to blend in with the landscape.
11. Light and Glare hf elpl
a. What type of light or glare will the proposal produce? What time of day would it mainly
occur? hf pM
None
b. Could light or glare from the finished project be a safety hazard or interfere with views? hf elpl
No
c. What existing off-site sources of light or glare may affect your proposal? hf elpl
None
d. Proposed measures to reduce or control light and glare impacts, if any: hf elpl
None
12. Recreation hf elpl
a. What designated and informal recreational opportunities are in the immediate vicinity? hel
Creeks in the area allow for informal fishing and recreation. Undeveloped fields also
provide informal recreational opportunities.
b. Would the proposed project displace any existing recreational uses? If so, describe. hf elpl
No
c. Proposed measures to reduce or control impacts on recreation, including recreation
opportunities to be provided by the project or applicant, if any: h[ elpl
None
13. Historic and cultural preservation hf elpl
a. Are there any buildings, structures, or sites, located on or near the site that are over 45 years
old listed in or eligible for listing in national, state, or local preservation registers ? If so,
specifically describe. 1hel
There may be eligible structures within the proposed project area. The proposed project
would not impact any of these structures other than providing them with sewer service.
b. Are there any landmarks, features, or other evidence of Indian or historic use or occupation?
This may include human burials or old cemeteries. Are there any material evidence, artifacts,
or areas of cultural importance on or near the site? Please list any professional studies
conducted at the site to identify such resources. h( elpl
The 2009 Environmental Assessment stated that a Twana winter village was located
along the Union River a mile above the mud flats of Hood Canal. This village would be
close to the proposed collection system area but the Union River is outside of the
proposed project area.
SEPA Environmental checklist(WAC 197-11-960) July 2016 Page 11 of 15
c. Describe the methods used to assess the potential impacts to cultural and historic resources
on or near the project site. Examples include consultation with tribes and the department of
archeology and historic preservation, archaeological surveys, historic maps, GIS data, etc.
heI
As part of the permitting process for the collection system design the County will consult
with the tribes and the Department of Archeology and Historic Preservation.
d. Proposed measures to avoid, minimize, or compensate for loss, changes to, and disturbance
to resources. Please include plans for the above and any permits that may be required. hf e
If any conflicts are found during consultation with the tribes or DAHP the county will alter
the design to minimize conflicts with historical resources.
14. Transportation hI e
a. Identify public streets and highways serving the site or affected geographic area and
describe proposed access to the existing street system. Show on site plans, if any. h( e
The main road into the area is NE Old Belfair Highway. Streets accessed by NE Old
Belfair Highway include NE Newkirk Rd, NE McKnight Rd, NE Jake Dr, NE Riverhill Dr,
NE Mahonia Dr, NE Riverhill Ln, and NE Towne Ln.
b. Is the site or affected geographic area currently served by public transit? If so, generally
describe. If not, what is the approximate distance to the nearest transit stop? hf e
Mason Transit has a transfer station about a '/4 mile south of the proposed area. Mason
Transit Route 3 goes along the Old Belfair Highway.
c. How many additional parking spaces would the completed project or non-project proposal
have? How many would the project or proposal eliminate? hf e
This proposal would not create or destroy any parking spaces.
d. Will the proposal require any new or improvements to existing roads, streets, pedestrian,
bicycle or state transportation facilities, not inc!,uding driveways? If so, generally describe
(indicate whether public or private). hf elpl
The proposal would not improve any transportation facilities but roadways would need to
be repaved after installation of the sewer mains.
e. Will the project or proposal use (or occur in the immediate vicinity of)water, rail, or air
transportation? If so, generally describe. hf e
No
f. How many vehicular trips per day would be generated by the completed project or proposal?
If known, indicate when peak volumes would occur and what percentage of the volume would
be trucks (such as commercial and nonpassenger vehicles). What data or transportation
models were used to make these estimates?1hel
The lift stations would create the need for an operator to make 1 trip every 2 to 3 days
for normal operation and maintenance. Any repairs would be infrequent but would
require a few additional trips by operators or contractors.
g. Will the proposal interfere with, affect or be affected by the movement of agricultural and
forest products on roads or streets in the area? If so, generally describe. h
No
SEPA Environmental checklist(WAC 197-11-960) July 2016 Page 12 of 15
h. Proposed measures to reduce or control transportation impacts, if any: hf e
None needed.
15. Public Services h
a. Would the project result in an increased need for public services (for example: fire protection,
police protection, public transit, health care, schools, other)? If so, generally describe. 1tPjPJ
No
b. Proposed measures to reduce or control direct impacts on public services, if any.Y f hel
pl
None needed
16. Utilities [help]
a. Circle utilities currently available at the site: hf elpl
electricity, natural as, water, refuse service, telephon , sanitary sewer, septic s ste
other cabl
b. Describe the utilities that are proposed for the project, the utility providing the service,
and the general construction activities on the site or in the immediate vicinity which might
be needed. JLpM
The proposal will create a sewer system operated by Mason County. The lift stations
and grinder pumps will need electrical service too operate. General construction activities
g p p p t es
• include general excavation, shoring, pipe installation, concrete building construction,
electrical work, traffic control, concrete work, paving, and landscape restoration.
C. Signature lbelo
The above answers are true and complete to the best of my knowledge. I understand that the
lead agency is relying on them to make its decision.
Signature:
Name of signee Bart Stepp
Position and Agency/Organization Deputy Director/Utilities and Waste Management for
Mason County Public Works
Date Submitted: 11/3/16
SEPA Environmental checklist(WAC 197-11-960) July 2016 Page 13 of 15
D. supplemental sheet for nonproject actions 1t@jpJ
(IT IS NOT NECESSARY to use this sheet for project actions)
Because these questions are very general, it may be helpful to read them in conjunction
with the list of the elements of the environment.
When answering these questions, be aware of the extent the proposal, or the types of
activities likely to result from the proposal, would affect the item at a greater intensity or
at a faster rate than if the proposal were not implemented. Respond briefly and in
general terms.
1. How would the proposal be likely to increase discharge to water; emissions to air; pro-
duction, storage, or release of toxic or hazardous substances; or production of noise?
Proposal will not increase discharges to water or air increase hazardous substance use.
By creating a sewage collection system, the project will reduce discharge of sewage into
groundwater which is degradating water quality in Union River.
Proposed measures to avoid or reduce such increases are:
No increases will be created.
2. How would the proposal be likely to affect plants, animals, fish, or marine life?
Improving the water quality of Union River by eliminating septic systems should improve
the life of fish and marine life in the area.
Proposed measures to protect or conserve plants, animals, fish, or marine life are:
Construction will be located within existing roadway prisms which are already developed
and will not disturb any existing habitats.
3. How would the proposal be likely to deplete energy or natural resources?
The proposal would use some electricity for operation of lift station and grinder pumps.
But it would also reduce the use of septic pumping trucks in the area which would
reduce vehicle trips.
Proposed measures to protect or conserve energy and natural resources are:
The sewage sent from the collection system area to the Belfair WRF will be treated to
reclaimed water standards allowing the water to be used for non-potable uses that could
be used by industry or agriculture which would save water resources in the area.
4. How would the proposal be likely to use or affect environmentally sensitive areas or
areas designated (or eligible or under study)for governmental protection; such as parks,
wilderness, wild and scenic rivers, threatened or endangered species habitat, historic or
cultural sites, wetlands, floodplains, or prime farmlands?
The proposal is not anticipated to affect environmentally sensitive areas except for creek
or wetland crossings within existing roadway prisms.
Proposed measures to protect such resources or to avoid or reduce impacts are:
Vegetated areas disturbed by sewer main installation will be replanted to an existing or
better state. Construction within creek crossings will be done during the dry season.
SEPA Environmental checklist(WAC 197-11-960) July 2016 Page 14 of 15
5. How would the proposal be likely to affect land and shoreline use, including whether it would
allow or encourage land or shoreline uses incompatible with existing plans?
The proposed project is not within shoreline areas so it would have no affect on
shoreline. The proposed area is within the Belfair UGA so installation of the sewer
collection system would support land use development that is compatible with land use
plans.
Proposed measures to avoid or reduce shoreline and land use impacts are:
Project will be constructed according to Mason County standard specifications for sewer
construction.
6. How would the proposal be likely to increase demands on transportation or public
services and utilities?
The proposal would not increase demands on transportation. The collection of
additional sewage going into the Belfair WRF would increase demands on the treatment
plant but the plant was designed to serve this area when it was built.
Proposed measures to reduce or respond to such demand(s)are:
The Belfair WRF was designed to take in sewer flows from the proposed collection
system area so the Belfair sewer system is ready for this new sewer demand.
7. Identify, if possible, whether the proposal may conflict with local, state, or federal laws or
requirements for the protection of the environment.
This proposal does not conflict with local, state, or federal laws. This project is being
proposed to increase protection of the environment by eliminating the use of 171 septic
tanks within the Belfair UGA. Eliminating these septic systems is expected to improve
the water quality of Union River and Lynch Cove.
SEPA Environmental checklist(WAC 197-11-960) July 2016 Page 15 of 15
WATER QUALITY COMB[ :INANCIAL ASSISTANCE
Organization: I County-Utilities and Waste Management Department RECEIVED WQC-20 iCoUW 00136
General Information NOV 0 7 2016
Project Title Belfair Sewer Old Belfair Highway Collection System 615 W. Alder Street
Project Short Description This funding application is to complete the engineering design and permitting for the Old Belfair
Highway Collection System. Building this collection system will eliminate 171 septic systems in the
Belfair Urban Growth Area. In 2012 the Belfair Water Reclamation Facility and the Initial Connection
Collection System went into service. The Old Belfair Highway Collection System would send sewage
to the Belfair Water Reclamation Facility (WRF).
Project Long Description The Old Belfair Highway Connection Project will improve water quality and public health by replacing
existing on-site residential septic systems with a wastewater collection system that will transport
wastewater to the Belfair Water Reclamation Facility. It will also provide economic benefits by
allowing for development within the Belfair UGA and providing a source of reclaimed water to use
for non-potable water uses.
Water quality benefits
The project will reduce anthropogenic sources of nitrogen, other nutrients, and fecal coliform
bacteria to Union River and Hood Canal. Many of the septic systems that serve the Old Belfair
Highway area are more than 20 years old and do not meet current on-site wastewater system
design regulations. Under the proposed project around 171 septic systems would be
decommissioned, and the wastewater would instead be treated at the Belfair Water Reclamation
Facility and applied to forested land. This project would reduce fecal coliform and nitrogen loading in
the lower Hood Canal and help reduce the anoxic conditions that contribute to Hood Canal fish kills
and threats to listed chinook, chum, steelhead, and coho. The proposed project is consistent with
priority C3 of the Puget Sound Partnership Action Agenda, Prioritize and complete upgrades to
wastewater treatment facilities to reduce pollutant loading, as it facilitates the use of advanced
wastewater treatment in nutrient-sensitive Hood Canal.
Public health benefits
Failing on-site septic systems were the main reason DOH declared the Lynch Cove portion of Hood
Canal a severe public health hazard in 2002 (see Exhibit A). By improving water quality in the Lower
Hood Canal, this project will decrease the risk to human health and allow continued, safer
recreational use of the canal. The risks to human health, and the opportunities for human exposure,
are high given the numerous recreational opportunities Hood Canal provides. As shown in Exhibit B,
prohibited shellfish beds are concentrated in an area affected by discharge from the Belfair UGA. As
distance increases from the project area, the 303(d) water quality category in Hood Canal improves,
a direct result of the distance from Belfair. Exhibit C shows a map of 303d listings near the Old
10/21/2016 Page 1 of 7
WATER QUALITY COMBII INANCIAL ASSISTANCE
Organization: County-Utilities and Waste Management Department WQC-20 CoUW-00136
General Information
Belfair Highway Project Area. Eliminating the point-source discharges from the 171 existing septic
systems will help prevent any further restrictions on existing shellfish beds and support an upgrade
of the remaining "Prohibited" shellfish beds in Lynch Cove to "Approved."
Economic Benefits
The reclaimed water generated by the Belfair Water Reclamation Project will support the backbone
for infrastructure in Belfair as mandated by the Growth Management Act. The availability of low-cost
reclaimed water source will eliminate the amount of water taken from local water resources to
support industry and economic development in Mason County. The proposed laterals will utilize the
existing Belfair Water Reclamation Project. This wastewater collection and treatment system is
substantially more reliable than inspecting, repairing, and replacing as necessary the individual
on-site septic systems in the Belfair UGA.
Table L-1 of the Funding Guidelines lists the MHI of Mason County as $49,538. Table L-1 also says
the County is not eligible for Preconstruction Hardship funding. But the Belfair Sewer System area
has a lower MHI than the overall County. Exhibit I shows the MHI's of the Belfair Sewer two census
blocks. Estimating that half the residents live in each census block, the MHI for the Belfair Sewer
System would be $37,873 which would qualify for hardship funding.
Financial Benefits
Adding more users to the Belfair Sewer System will increase utilization of the Belfair WRF facilities
and provide a broader financial base for the utility. Increasing the size of sewer systems provides an
economy of scale which can benefit users by helping to stabilize system user rates.
Total Cost $1,500,000.00 Total Eligible Cost$1,500,000.00
Effective Date 7/1/2017 Expiration Date 12/31/2018
Project Category Nonpoint Source Activity
On-Site Sewage System
Stormwater Activity0
Stormwater Facility
Wastewater Facility
Will Environmental Monitoring Data No
be collected?
10/21/2016 Page 2 of 7
WATER QUALITY COMBII 1NANCIAL ASSISTANCE
Organization: County-Utilities and Waste Management Department WQC-20 CoUW-00136
General Information
Ecology Program Water Quality
Overall Goal The goal of the project is to construct the Old Belfair Highway Collection System portion of the
Belfair Sewer System. The benefits for this project are:
1) Eliminate 171 septic systems which will reduce nutrient loading in the Union River and Hood
Canal. This is a goal of the Union River TMDL.
2) Connection of these properties to the Belfair Sewer System will generate reclaimed water that
can be used for non-potable water users to help stimulate economic development in the Belfair
area.
3) Increasing the number of connections to the Belfair Sewer System will increase the economies of
scale for funding of the sewer system.
4) Construction of the collection system will allow for development of the area as Mason County
through an ordinance (#91-07) heavily restricts subdivision or development using on-site septic
systems within the Belfair Urban Growth Area. Attached Exhibit D is a copy of Ordinance 91-07.
10/21/2016 Page 3 of 7
I
WATER QUALITY COMBI ]NANCIAL ASSISTANCE
Organization: P County-Utilities and Waste Management Department WQC-20._ .___CoUW-00136
Funding Request-Wastewater Project
Total Eligible Cost: $1,500,000.00
Loan Request
* What is the loan amount you $750,000.00
are requesting?
* What loan term do you prefer? 5 years v 20 years
IMPORTANT NOTICE. Wastewater projects may only request loan. However, Ecology may provide special
funding in the following cases: (1) projects that meet the criteria for"green project reserve" may receive up
to 25% forgivable loan; (2) preconstruction projects in hardship communities may receive up to 50%
forgivable loan; and (3) construction projects in hardship communities may receive a combination of
forgivable loan and grant. Ecology will determine eligibility for special funding when developing funding
packages.
Other Funds
* Do you have any secured v Yes No
funds committed to this
project?
If Yes, complete the Secured
Funds Table, and include any
secured matching funds if
known.
Secured Funds Table
Source* Type* Amount Committed*
State/Federal agency:
State/Federal agency:
State/Federal agency:
10/21/2016 Pa e 4 of 7
9
WATER QUALITY COMBII 1NANCIAL ASSISTANCE
Organization: P County- Utilities and Waste Management Department WQC-20 CoUW-00136
Funding Request-Wastewater Project
Interlocal contributions:
Interlocal contributions:
Local agency: Belfair Sewer System Cash $647,000.00
Funds
In-kind contributions: Labor costs for In-kind $103,000.00
employees to manage project
Other
10/21/2016 Page 5 of 7
WATER QUALITY COMBI 'INANCIAL ASSISTANCE
Organization: County-Utilities and Waste Management Department
WOC-20 CoUW-00136
Recipient Contacts
Project Manager Bart Stepp
Contact Information
Bart Stepp
Deputy Director for Utilities
100 W Public Works Drive
Shelton, Washington 98584
(360) 427-9670 x652
(360) 427-7772
bstepp@co.mason.wa.us
Authorized Signatory Bart Stepp
Contact Information
Bart Stepp
Deputy Director for Utilities
100 W Public Works Drive
Shelton, Washington 98584
(360) 427-9670 x652
(360) 427-7772
bstepp@co.mason.wa.us
Billing Contact Bart Stepp
Contact Information
Bart Stepp
Deputy Director for Utilities
100 W Public Works Drive
Shelton, Washington 98584
(360) 427-9670 x652
10/21/2016 Page 6 of 7
i
WATER QUALITY COMBI INANCIAL ASSISTANCE
Organization: P County- Utilities and Waste Management Department WQC-20 __CoUW-00136
Recipient Contacts
(360) 427-7772
bstepp@co.mason.wa.us
Other recipient signatures on printed agreement
Name Title
Terri Jeffreys Chair of County Commissioners
10/21/2016 Page 7 of 7
WATER QUALITY COMBINED FINANCIAL ASSISTANCE
Organization: Mason County - Utilities and Waste Management Department WQC-2018-MaCoUW-00136
Location Information
?wide Yes v, No
Ecology Region Southwest 100%
County MASON 100%
Congressional District District 06 100%
Legislative District District 35 100%
WRIA 15 - Kitsap 100%
Latitude (expressed in decimals) 47.46
Longitude (expressed in decimals) -122.83
Facility Site ID
Facility Site Link
10/21/2016 Page 1 of 1
WATER QUALITY COMBI INANCIAL ASSISTANCE
Organization: P County-Utilities and Waste Management Department WQC-20 CoUW-00136
Scope of Work-Task 1 Project Admin: 1
Task Number 1
Task Title Project Administration/Management Task Cost $103,000.00
Task Description A. The RECIPIENT shall carry out all work necessary to meet ECOLOGY grant or loan administration
requirements. Responsibilities include, but are not limited to: maintenance of project records; submittal of
requests for reimbursement and corresponding backup documentation; progress reports; and a recipient
closeout report (including photos).
B. The RECIPIENT shall maintain documentation demonstrating compliance with applicable procurement,
contracting, and interlocal agreement requirements; application for, receipt of, and compliance with all
required permits, licenses, easements, or property rights necessary for the project; and submittal of
required performance items.
C. The RECIPIENT shall manage the project. Efforts include, but are not limited to: conducting,
coordinating, and scheduling project activities and assuring quality control. Every effort will be made to
maintain effective communication with the RECIPIENT's designees; ECOLOGY; all affected local, state, or
federal jurisdictions; and any interested individuals or groups. The RECIPIENT shall carry out this project in
accordance with any completion dates outlined in this agreement.
Task Goal Statement Properly managed and fully documented project that meets ECOLOGY's grant or loan administrative
requirements.
Task Expected Outcomes * Timely and complete submittal of requests for reimbursement, quarterly progress reports, and
RECIPIENT closeout report.
* Properly maintained project documentation
Recipient Task Coordinator Bart Stepp, PE
Deliverables
Deliverable# Description Due Date Received? EIM Study ID Latitude Longitude Location Address
1.1 Quarterly Progress 10/1/2017
Reports
10/21/2016 Page 1 of 5
WATER QUALITY COMBII INANCIAL ASSISTANCE
Organization: County-Utilities and Waste Management Department WQC-20 CoUW-00136
Scope of Work-Task 1 Project Admin: 1
1.2 Recipient Closeout 10/15/2018
Report
1.3 Project Outcome 10/15/2018
Summary Report
Task Number 2
Task Title Pump Station, Collection System, & Laterals Design Task Cost $1,240,000.00
Task Description Task 2: Design of Pump Stations, collection mains, and sewer lateral services
2.1 Design Consultant Selection
County will issue a Request For Proposals (RFP) from qualified design consultants to complete the survey,
design, and permitting of this project. County will review RFP's and select the most qualified consultant.
County will then enter into negotiations on a scope and fee with the consultant to complete the design and
permitting for the project.
2.2 Lateral sewer easement location analysis and description
Identify and analyze the existing and potential easement availability and location, based on title reports
(ordered from a local title company) and existing mapping.
2.3 Topographic project survey
Complete a topographic and site survey of the project area and pump station sites (see Exhibit C).
2.4 Design pump stations and lateral sewer projects (see Exhibit C).
The 187 lateral sewers shown in Exhibit C will accommodate 184 connections to remove >171 equivalent
septic systems from operation. The pump stations are necessary and flow from these connections has
been determined necessary to keep both the system's pumps and the biological treatment process at the
treatment plant operational. Soils studies, Surveys and easements will be a part of this subtask. Contract
documents for construction of the pump stations, collection mains, and lateral sewers will be completed in
this sub-task.
2.5 Complete Project Documents
Consultant will complete a set of drawings, specifications, and contract documents suitable for going out to
bid for construction of the collection system.
Total Task 2 Cost: $1,240,000
Task Goal Statement Complete survey and the engineering design of new collection system for the Old Belfair Highway area of
the Belfair Sewer System.
10/21/2016 Page 2 of 5
WATER QUALITY COMBI' 'INANCIAL ASSISTANCE
Organization: County- Utilities and Waste Management Department WQC-20 CoUW-00136
Scope of Work-Additional Tasks: 2-Pump Station,Collection System, &Laterals Design
Task Expected Outcomes A deliverable of drawings, specifications, and contract documents that would allow the County to go out to
bid for construction of the collection system.
Recipient Task Coordinator Bart Stepp, PE
Deliverables
Deliverable# Description Due Date Received? EIM Study ID EIM System Link Latitude Longitude Location
Address
2.1 Select consultant 9/1/2017
for design and
enter into contract
with consultant
2.2 Lateral sewer 12/1/2017
easement analysis
and descriptions
2.3 Project survey 1/1/2018
completion
2.4 Complete design of 6/1/2018
pump stations,
collection mains,
and laterals
2.5 Complete full set of 9/1/2018
project documents
including drawings,
specifications, and
contract documents
for bidding.
10/21/2016 Page 3 of g 5 �
WATER QUALITY COMBI 'INANCIAL ASSISTANCE
Organization: P County-Utilities and Waste Management Department WQC-20 CoUW-00136
Scope of Work-Additional Tasks: 3-Permitting and Community Outreach
Task Number 3
Task Title Permitting and Community Outreach Task Cost $157,000.00
Task Description Task 3: Permitting and Community Outreach
3.1 Conduct outreach to and coordination with landlocked property owners that need to connect to
the sewer collection system. Outreach would include mailers, workshops, and public hearings. Exhibit E
provides examples of outreach conducted during the Belfair Sewer System Initial Phase. Similar outreach
methods would be used for the Old Belfair Highway Connection Project.
3.2 Obtain permits needed to allow construction. This would include permits from Ecology (construction
stormwater, design approval), right-of-way permits from Mason County, SEPA, land use approval from
Mason County, and Hydrologic Permit Approval from Flsh and Wildlife among other permits. These
permits would require public hearings as well as approvals from various agencies.
Total Task 3 Cost: $157,000
Task Goal Statement Complete outreach and permitting necessary for public and regulatory approval for the collection system
project.
Task Expected Outcomes Receive permit approvals for the project from all appropriate agencies. Generate public support for the
project to allow County Commissioners to move forward with funding for project construction.
Recipient Task Coordinator Bart Stepp, PE
Deliverables
Deliverable # Description Due Date Received? EIM Study ID EIM System Link Latitude Longitude Location
3.1 Community 7/1/2017 Address
outreach with
affected owners.
Obtain all
necessary
10/21/2016 Page 4 of 5
WATER QUALITY COMBI INANCIAL ASSISTANCE
Organization: I County- Utilities and Waste Management Department WQC-20 CoUW-00136
Scope of Work-Additional Tasks: 3-Permitting and Community Outreach
easements.
3.2 Obtain all permits 9/1/2018
necessary for
construction.
10/21/2016 Page 5 of 5
WATER QUALITY COMBINED FINANCIAL ASSISTANCE
Organization: Mason County - Utilities and Waste Management Department WQC-2018-MaCoUW-00136
Scope of Work Summary
Title Task Cost
Project Administration/Management $103,000.00
Pump Station, Collection System, & $1,240,000.00
Laterals Design
Permitting and Community Outreach $157,000.00
Total $1,500,000.00
Total Eligible Costs
(from the General Information Form)
$1,500,000.00
10/21/2016 Page 1 of 1
WATER QUALITY COMBII INANCIAL ASSISTANCE
Organization: P County-Utilities and Waste Management Department WQC-20 CoUW-00136
Subcategory
*Are you applying to refinance debt for a wastewater facility Yes v No
project that has been completed (i.e., standard refinance)?
*Are you willing to accept a SRF loan to pay for part of the v Yes No
project and may the project or a portion of the project meet
EPA's GPR criteria and do you want to be considered for GPR
subsidy?
Is this a wastewater facility project that includes Yes v, No
Construction tasks for which you are seeking funding and is
the population of the community that will pay for the project
less than 25,000 and do you want to be considered for
Financial Hardship subsidy?
10/21/2016 Page 1 of 3
WATER QUALITY COMBI INANCIAL ASSISTANCE
Organization: t County-Utilities and Waste Management Department WQC-20 CoUW-00136
Task Costs and Budget
Describe the process used to estimate the cost of the project.
When Mason County applied for funding in 2011, ESA, Inc. was hired to complete the application and as part of that created a design
and construction cost estimate that included material quantities based on a preliminary site plan created by ESA, Inc. The current cost
estimate was created by taking the quantities from that estimate and applying current material costs to come up with a construction
cost. Unit costs were based on a review of the WSDOT bid analysis webpage, recent cost estimates, and engineering experience.
The pipe bedding, pipe trenching, and pipe backfill bid items from the 2011 cost estimate were eliminated because the WSDOT bid
costs for piping includes bedding, trenching, and backfill.
Using the new construction cost, a design phase cost was estimated based on a percentage of the construction cost. Design was
20%, permits 2%, soil studies 1%, survey and easements 3%, county administration 2%, and community outreach 1% of construction.
When you add 6% for construction administration and material testing you arrive at a total design and administration cost of 34% of
construction cost for design and construction phases. This is a reasonable percentage given the large area and scope of the project.
There are several known creek crossings and wetland areas that will need to be dealt with as part of this project. Mitigation and/or
permitting for these crossings could cause substantial costs for a project.
This approach is appropriate to determine the design phase cost of the project. The construction cost estimate, however, is in 2016
dollars. As the project schedule anticipates construction in 2020, the 2020 construction cost estimate is higher. If you assume average
inflation of 2.5% over the next 4 years and add in a 10% contingency at this planning level cost estimate, the 2020 construction cost
estimate is $6.56 Million instead of the $5.46 Million in our 2016 cost estimate.
Describe the process used to determine that this project is the lowest cost solution to the problem.
If the proposed project is not the lowest cost, describe the other benefits or considerations such as feasibility, community acceptance, or
coordination with other projects that influenced the decision making process.
In 2007, due to water quality issues in the Hood Canal and the amount of on-site septic systems in the Belfair Area, Mason County
amended their sewer regulations regarding the use of on-site septic systems in the Belfair UGA (Exhibit D, attached as upload). This
ordinance eliminated the creation of new lots using on-site sewage disposal systems, required existing on-site systems to connect to sewer
if the system was within 500 feet, and required any new subdivisions to install community drainfields with sewer systems that would connect
to the Belfair System once it is within 500 feet.
In 2012 the Belfair Sewer System which consisted of the Belfair Water Reclamation Facility and the initial connection collection system was
put into operation. The proposed Old Belfair Highway Connection System would pump into the initial connection system. Creating a larger
system will help build an economy of scale that will help pay for the Belfair Sewer System.
The only other option to eliminate the on-site septic systems would be to install holding tanks at each property, eliminate the drainfields, and
require property owners to haul out the sewage through pumping trucks. While this would have a lower initial construction cost, the long term
cost of continuous hauling of sewage makes this a costlier solution to centralized sewage treatment.
10/21/2016 Page 2 of 3
WATER QUALITY COMBI'i INANCIAL ASSISTANCE
Organization: County-Utilities and Waste Management Department WQC-20 CoUW-00136
Task Costs and Budget
Upload a detailed budget for the project and any supporting documentation, including engineers estimates, cost analysis, etc.
Attachment Description Attachment
Old Belfair Highway Connection Cost Estimate _Upload/44347-1017160IdBelfairHwyCostEsti mate.pdf
10/21/2016 Page 3 of 3
WATER QUALITY COMBINED FINANCIAL ASSISTANCE
Organization: Mason County - Utilities and Waste Management Department WQC-2018-MaCoUW-00136
Project Information
t is the population served by the Project? 230
What is the population served by the System? 900
What is the population served by the Applicant? 62,320
Project Length in months: 17
(The difference between the effective date and the expiration date on the General Information Page)
Estimated Initiation of Operation Date 11/1/2020
Project Start Date 7/1/2017
(The date the actual work will start, or if interim refinance, the date the work started)
Please identify all 12 digit HUCs in which the project work will be done.
HUC Code Percentage
171100180101 100%
10/21/2016
Page 1 of 3
WATER QUALITY COMBINED FINANCIAL ASSISTANCE
Organization: Mason County - Utilities and Waste Management Department WQC-2018-MaCoUW-00136
Water Body and Water Quality Needs Addressed
-k all type(s) of water bodies that this project targets:
vo Freshwater rivers
Freshwater lakes
vo Freshwater wetlands
vo Ground water
Direct marine water
Saltwater estuary
Other(specify):
Check all the resource protection and regulatory requirements that this project addresses:
Endangered or threatened salmonids
Other Endangered Species Act protected species (specify):
Protection of shellfish habitat
National Pollutant Discharge Elimination System (NPDES) permit requirements
State Waste Discharge Permit
Other (specify):
Check all the water quality parameters that this project targets:
issolved oxygen
ment
• Nitrogen
• Fecal coliform
Phosphorus
Temperature
pH
Other (specify):
Identify the water bodies, any impairments (Category 4A, 4B, and 5 waters), and listing parameters
that your project will address.
Water Body Name Listing Detail ID Map Link
Union River 14839 Link
Union River 6958 Link
Great Bend/Lynch Cove 6937 Link
Great Bend/Lynch Cove 6939 Link
Belfair Creek 6963 Link
Are you addressing a TMDL? v Yes No
TMDL Name
10/21/2016 Page 2 of 3
WATER QUALITY COMBINED FINANCIAL ASSISTANCE
Organization: Mason County - Utilities and Waste Management Department WQC-2018-MaCoUW-00136
Water Body and Water Quality Needs Addressed
n River Bacteria TMDL
10/21/2016 Page 3 of 3
WATER QUALITY COMBI 'INANCIAL ASSISTANCE
Organization: P County-Utilities and Waste Management Department WQC-20 CoUW-00136
Wastewater Facility Project Information
Check all the type(s) of wastewater facility project that apply:
Wastewater treatment system
Large Onsite System (LOSS)
Water reclamation and reuse
Combined Sewer Overflow (CSO) correction
Wastewater collection system
Infiltration and Inflow (1/1) correction
Septic system elimination and conversion to sewer
Other (specify):
Permits:
Do you have a discharge permit for this project?Yes v No
If yes, provide the following
Permit Number
BOD (mg/1)
TSS (mg/1)
Planning/design stage completed
Check only one of the four options below that represents the present proposal
Identify all prerequisite planning documents
Include attachments as necessary
Project Type: Prerequisites to Apply for Funding - Upload Copies of Ecology's
Approval/DeterminationLetters
Planning (Ste 1 Prerequisites
p ) No
Design (Step 2) Ecology's letter approving the site specific planning for the project (Engineering Report
or General Sewer Plan).
Ecology determination of SERP letter
10/21/2016 Page 1 of 14
WATER QUALITY COMBI INANCIAL ASSISTANCE
Organization: F County- Utilities and Waste Management Department WQC-20 CoUW-00136
Wastewater Facility Project Information
Click here to see SERP Guidelines
Construction (Step 3) Ecology's letter approving the site specific planning for the project (Engineering Report
or General Sewer Plan).
Ecology determination of SERP letter
Ecology's letter approving the plans and specifications for the project.
Design and construction (Step 4) Ecology's letter approving the site specific planning for the project (Engineering Report
or General Sewer Plan).
Ecology determination of SERP letter
Attachment Description Attachment
62207 DOE Facility Plan Approval _Upload/44261-Exhi bit-H_SupplementLtr.pdf
72209 DOE Initial Phase Construction Approval _Upload/44261_2-Exhi bit-K_C ontract_Approval_Ltr.p
df
10/21/206 g 1 Page
WATER QUALITY COMBI-'-- 71NANCIAL ASSISTANCE
Organization: P County- Utilities and Waste Management Department WQC-20 CoUW-00136
Green Project Reserve(GPR)
GPR Category: List the GPR designation (e.g., Section 3.2-1a) and describe Dollar Amount of the
Check all that apply how your project meets the designation. Project Related to GPR
Category
Green Infrastructure Section 0.2-1 to 0.2-3 - The Belfair WRF system is used to restore $500,000.00
water quality to the Union River and Lynch Cove in the Hood
Canal. Elimination of septic systems will restore water quality.
Energy Efficiency
Water Efficiency Section 2.2-6 - Projects to replace potable sources with $500,000.00
nonpotable water. The reclaimed water generated by the proposed
project and the Belfair System will provide a water resource for
future users.
Environmental Innovative Section 4.2-1 -The Project will expedite water quality benefits and $500,000.00
sustainable water resource management in Belfair by facilitating
sewer connections to properties that otherwise would not connect.
Upload any applicable documentation to support your GPR claim.
Attachment Description Attachment
INTERNAL USE ONLY
Does the applicant meet the criteria for green project reserve? Undetermined
GPR Category GPR Designation Dollar Amount Comment
Green Infrastructure
Energy Efficiency
10/21/2016 Page 3 of 14
WATER QUALITY COMBII 1NANCIAL ASSISTANCE
Organization: IN County-Utilities and Waste Management Department WQC-20 CoUW-00136
Green Project Reserve(GPR)
Water Efficiency
Environmental Innovative
Comment
10/21/2016 Page 4 of 14
WATER QUALITY COMBI 'INANCIAL ASSISTANCE
Organization: l' County-Utilities and Waste Management Department WQC-20 CoUW-00136
Water Quality and Public Health Improvements
Name the water body(ies) the project will improve or protect and describe the current regulatory requirements and available
planning documents for the water body. Include a description of any NPDES permitting requirements, TMDLs, or local watershed
plans.
The project area is located within the Union River watershed which empties into Lynch Cove in the Hood Canal. Union River has 303D
listings for temperature and bacteria. Lynch Cove has multiple 303D listings for bacteria. The east portion of Lynch Cove where the Union
River empties into was closed to shellfish harvesting in 1987 due to nonpoint source pollution. Completion of the Old Belfair Highway
Connection Project would eliminate 171 on-site septic systems which are contributing to the non-point source pollution problems in the
Union River and Lynch Cove thereby improving water quality in those waterbodies.
The Union River has a TMDL for bacteria. The TMDL study was completed in October of 2001. The detailed implementation plan for the
TMDL was completed in August of 2003. The executive summary of the implementation plan stated the Union River would meet water
quality requirements by 2007 but this has not happened. An effectiveness study was undertaken in 2008 and 2009 to evaluate TMDL
effectiveness and published in 2010. The effectiveness study took samples at five TMDL monitoring sites along Union River, three additional
sites on Union River, an additional site at Little Mission Creek, and one additional site at Big Mission Creek. The results of the study showed
seven of the eight Union River sample sites did not meet annual water quality standards. When the critical period of May - December was
looked at all eight sample sites did not meet water quality standards. The sites at Little Mission and Big Mission Creek did meet water quality
standards.
Describe how the project area is connected to this water body and how implementation of the project will meet regulatory
requirements or support the water quality planning efforts listed above. Reference the specific requirements or recommendations
that the project will address and discuss how the project will reduce or prevent the pollutants listed from entering the waterbody.
All projects in the Puget Sound Region must include the elements of the Puget Sound Action Agenda that will be supported by the
proposed project.
The water quality problem addressed by the proposed project is severe enough to contribute to a public health hazard, shellfish harvesting
closures, degradation of threatened salmonid habitat, and fish kills.
Public Health Hazards
The on-site wastewater (septic) systems in the Belfair Urban Growth Area (UGA) are sources of fecal coliform bacteria and increased
nutrient loads in Hood Canal, contributing to shellfish harvesting closures and Hood Canal's listing as an impaired water body on the state's
303(d) list. Union River is also an impaired water body due to fecal coliform bacteria and has a TMDL. The Washington State Department of
Health (DOH) has identified these on-site wastewater systems, many poorly functioning or failing, as contributing to the declaration of a
portion of the Lower Hood Canal as a severe public health hazard. (Exhibit F, Seattle Times, People Helping Suffocate Hood Canal
Scientists Say, 2008). The existing on-site septic systems transmit bacteria and viruses from insufficiently treated wastewater into Lower
Hood Canal. These contaminants can be spread to humans via ingestion or direct water contact from swimming and wading. Bacterial or
viral illnesses caused by wastewater-contaminated groundwater and surface water include gastrointestinal problems and other illnesses,
such as hepatitis A and cholera (ESA Adolfson, MSA, and O'Neal and Associates, 2007).
10/21/2016 Page 5 of 14
WATER QUALITY COMBII INANCIAL ASSISTANCE
Organization: A County- Utilities and Waste Management Department WQC-20 CoUW-00136
Water Quality and Public Health Improvements
Degradation of Threatened Salmonid Habitat
Salmonids and other threatened fish resources are present in Hood Canal nearly year-round and are at risk due to poor water quality
conditions, particularly low levels of dissolved oxygen. There are three salmonid stocks that are listed as threatened in accordance with the
federal endangered Species Act in the Lower Hood Canal basin: Hood Canal summer run chum salmon, Puget Sound Chinook, and Puget
Sound steelhead. The Hood Canal summer-run chum salmon evolutionarily significant unit (ESU) occurs within the project vicinity in the
Union River and was listed by NOAA Fisheries as threatened in March 1999. They enter the canal from early August through late
September and spawn in the lower 3 miles of Union River.
Fish Kills
Anthropogenic sources of nitrogen contribute to algal blooms in Hood Canal, causing low dissolved oxygen conditions that have been linked
to significant fish kills in 2002, 2003, and 2006 (ESA Adolfson, MSA, and O'Neal and Associates, 2007). Poorly functioning on-site septic
systems are a known source of nitrogen in Hood Canal. One estimate states human sewage accounts for 60 percent of the total
anthropogenic nitrogen load to Hood Canal (Puget Sound Action Team, 2007).
The project will substantially improve water quality and public health benefits by replacing existing on-site residential septic systems with a
wastewater collection system that will transport wastewater to the Belfair Water Reclamation Facility.
Water quality benefits
The project will reduce anthropogenic sources of nitrogen, other nutrients, and fecal coliform bacteria to Union River and Hood Canal. Many
of the septic systems that serve the Old Belfair Highway area are more than 20 years old and do not meet current on-site wastewater
system design regulations. The proposed project would decommission around 171 septic systems within the Belfair UGA. The wastewater
would be treated to Class A standards at the Belfair WRF and applied to forested land. This project would reduce fecal coliform and nitrogen
loading in the lower Hood Canal and help reduce the anoxic conditions that contribute to Hood Canal fish kills and threats to listed Chinook,
chum, steelhead, and coho. The proposed project, in conjunction with the Belfair Water Reclamation Facilities Project, is consistent with
Priority C3 of the Puget Sound Partnership Action Agenda, Prioritize and complete upgrades to wastewater treatment facilities to reduce
pollutant loading, as it facilitates the use of advanced wastewater treatment in nutrient-sensitive Hood Canal.
The project will provide long-term sustainability of water quality benefits by eliminating the need for 171 on-site septic systems in the Belfair
UGA. The reclaimed water generated by the Belfair Water Reclamation Project will support infrastructure in Belfair as mandated by the
Growth Management Act. The availability of low-cost reclaimed water source will reduce the amount of water taken from local water
resources to support industry and economic development. The proposed laterals will utilize the existing Belfair Water Reclamation Facility.
This wastewater collection and treatment system is more reliable than inspecting, repairing, and replacing individual on-site septic systems
in the Belfair UGA.
Describe the measure and method that will be used to determine the water quality benefit and overall success of the project.
Project success will be measured by a fully operational wastewater collection and treatment system and reduced nutrient and bacterial
loading to Lower Hood Canal.
10/21/2016 Page 6 of 14
WATER QUALITY COMBII INANCIAL ASSISTANCE
Organization: P County- Utilities and Waste Management Department WQC-20 CoUW-00136
Water Quality and Public Health Improvements
The proposed project supports centralized wastewater treatment and reuse of treated water. The proposed pump stations and lateral sewer
lines improve the likelihood of success of a fully operational wastewater collection and treatment system. The system requires sufficient flow
to operate the collection system pumps, and to provide sufficient loading to the treatment plant's biological treatment process. Therefore,
one aspect of project success will be demonstrated by a fully operational wastewater collection system and satisfaction of Class A reclaimed
water standards. In addition to the technically driven need to have flow/loading for the pumps and treatment plant, it is also necessary for
Mason County to have a sufficient number of customers to sustain the operational costs of the utility.
Another measure of project success will be reduced nutrient loadings to the Union River and Hood Canal. This could be demonstrated by
taking samples in Union River at the same locations as the 2010 study by Ecology and comparing fecal coliform results. As this is just one of
many projects needed to achieve TMDL compliance in the Union River, this project is not expected to result in the Union River meeting
water quality requirements. But the goal would be to see a reduction in fecal coliform counts from the previous results.
Using the method described above, estimate the water quality and public health benefits that will be achieved through
implementing of the proposed project.
The project will provide long-term sustainability of water quality benefits by eliminating the need for 171 on-site septic systems in the Belfair
UGA.
Union River and the Lower Hood Canal will benefit from eliminating the pollutant loads from the existing on-site septic systems. The
elimination of the septic systems will reduce nitrogen in the Hood Canal and fecal coliform in the Union River that cause public health
hazards and threats to wildlife. The new sewer connections from the proposed Old Belfair Highway Connection Project will provide
additional flow and loading necessary for efficient operation of the wastewater collection and treatment system. Without the proposed Old
Belfair Highway Project, delays in water quality benefits will likely occur, as the 171 septic systems would continue to be used by property
owners.
The reclaimed water generated by the proposed Old Belfairy Highway Project and the Belfair wastewater and Water Reclamation Facilities
Project as a whole will support the backbone for infrastructure in Belfair as mandated by the Growth Management Act. The availability of a
low-cost reclaimed water source will eliminate the amount of water taken from local water resources to support industry and economic
development in Mason County. This is consistent with the water efficiency goals outlined in the guidelines for the Green Project Reserve
within the State Revolving Fund program. The proposed Old Belfair Highway project is consistent with the definition of an environmentally
innovative project in the guidelines for the Green Project Reserve, which manages water resources in a more sustainable way than the
existing on-site septic systems. This wastewater collection and treatment system is substantially more reliable than inspecting, repairing, and
replacing as necessary the individual on-site septic systems in the Belfair UGA
How long will the project provide a water quality benefit after the funding assistance ends?Who will be responsible for
maintaining this benefit during it's useful life?
Creating a permanent centralized sewer treatment system will provide water quality benefits indefinitely after the funding assistance ends.
10/21/2016 Page 7 of 14
WATER QUALITY COMBI 'INANCIAL ASSISTANCE
Organization: t County-Utilities and Waste Management Department WQC-20 CoUW-00136
Water Quality and Public Health Improvements
Mason County owns and operates the Belfair Sewer System and will be responsible for maintaining this water quality benefit in the future.
Will any measures be taken to reduce greenhouse gases as part of the project? What policies or measures has your organization
put in place to reduce greenhouse gas emissions apart from this project?
The Belfair Water Reclamation Facility completed in 2012 is a LEED certified building that incorporates low energy blowers and many water
saving features. The water saving features include the use of reclaim water for irrigation, flushing of toilets, and for fire flow.
Separate from this project Mason County has contracted with Johnson Controls, an Energy Services Company (ESCO), to identify and
implement energy saving measures at Mason County Facilities. Projects have already been completed on some downtown facilities. In
September 2016 Johnson Controls inspected the North Bay and Belfair WRF's and the Public Works Administration Facilities to determine if
there were energy saving projects available within those facilities. The analysis of those facilities is undergoing. Any energy savings projects
that are financially viable will be completed. Johnson Controls has also been tasked at looking at HVAC improvements for the Jail.
Upload a map or maps that show an aerial view of the project area, an estimated direction of flow for the project area, potential
locations for the proposed facility or activity, and how the project connects to the water body named above.
These maps do not need to be precise but they should help the reviewer with a general understanding of the area. If access to GIS software
is not available, screen shots or snips from Google Maps with arrows and text added using a paint program may be used.
Attachment Description Attachment
Old Belfair Highway Connection Plan _Upload/44724-BELFAIRS EWE R-P HAS E2-SERVICEAREAMAP
3-12-12.pdf
Belfair Sewer System Connection Zones Map _Upload/44724_2-Ord3008BelfairSewerSystem_ConnectionZone
s.pdf
Old Belfair Aerial Map _Upload/44724_3-10191601dBelfairAerial Map.pdf
10/21/2016 Page 8 of 14
WATER QUALITY COMBI 'INANCIAL ASSISTANCE
Organization: P County-Utilities and Waste Management Department WQC-20 CoUW-00136
Project Team
Fill out the following table to describe your Project Team, including staff, contractors, and partner agencies:
Team Member Key Responsibilities Qualifications/ Estimated Total Hours Who will take over the
Name/and or Title Experience Devoted to the Project person's responsibilities if
they are unable to work on the
project?
Bart Stepp, PE, Deputy Project Manager for 20 years of engineering 500.00 Jerry Hauth, PE, Public Works
Director/Utilities Mason County. Mr. Stepp experience, over 8 of that Director is Mr. Stepp's
would be the main contact as a municipal manager. supervisor and would take his
with Department of Mr. Stepp has worked as place in his absence.
Ecology and the primary a state regulator,
manager of the consultant engineering consultant,
work. and municipal manager.
He previously was the
Public Works Director for
Woodland, Washington
for over 4 years and the
City Engineer for La
Center, WA for 4 years
before that.
Jerry Hauth, PE, Public Provide review of Mr. Hauth has over 47 104.00 In the long term absence of Mr.
Works Director contracts and assist Mr. years of engineering Hauth, Melissa McFadden, PE,
Stepp as needed. Mr. experience. He has Deputy Director/County
Hauth is the primary worked as City Engineer Engineer would take his
contact with county and/or Public Works administrative role for this
elected officials regarding Director for multiple project. In a temporary absence
public works projects. entities over his career. Mr. Stepp would take over the
administrative roles of the
contract.
Jennifer Beierle, Public Ms. Beierle would review Over 17 years of 104.00 Kerry Schuffenhauer, who is in
Works Finance Manager contracts, track and experience as a financial the utilities finance division of
review payments, and analyst and Finance Public Works, will assist Ms.
track project finances. Ms. Manager with Mason Beierle and would fill in for her in
Beierle would assist Mr. County Public Works. Ms. her absence.
10/21/2016 Page 9 of 14
WATER QUALITY COMBI ]NANCIAL ASSISTANCE
Organization: P County-Utilities and Waste Management Department WQC-20 CoUW-00136
Project Team
Stepp with all financial Beierle has a bachelor's
related documents for this degree in accounting.
project.
Consultant Team Completion of surveying, The County will select a 3000.00 Mason County will hire an
engineering, and qualified consultant team experienced, qualified firm or
permitting. The consultant with experience in firms that have sufficient staffing
team selected by Mason surveying, engineering, to complete the project should
County will complete the soils, wetlands, and other some team members leave their
design and other pertinent specialties. firms.
documents necessary to Engineering disciplines
receive design approval needed will be civil,
by Department of Ecology electrical, structural, and
so that the County can mechanical. An architect
receive funding for may be needed for the lift
construction and put the stations as well as a
project out to bid. landscape architect.
To add a team member, fill out a row and SAVE. A blank row will appear. To remove a team member, clear the contents of the entire row
and SAVE. One blank row is always visible.
Describe similar projects that your project team or organization has completed. Note any deviations from the original proposal in
scope, budget, or schedule and briefly describe project success and lessons learned. If the project was funded by Ecology,
include the Ecology grant or loan number.
This proposed project is an extension of the Belfair Water Reclamation Facility and Initial Collection System planned and constructed by
Mason County in 2012. That project was funded by a combination of bonds and Department of Ecology Loans. The Department of Ecology
Loans used for that project are L0400005, L0800017, L1000026, L1100013, and L1200025. The total loan amount of all five loans is
$8,971,284.37. The bond amounts total $7,400,000.
The proposed project team of County Staff was not involved with the first Belfair System project but Mr. Stepp and Mr. Hauth have been
involved with numerous projects of similar size and complexity. Mr. Stepp was the project manager for the City of La Center when the
wastewater treatment plant was expanded and converted from a Sequence Batch Reactor plant to a Membrane Bioreactor Plant. That
project had a construction cost greater than $6,000,000 and was funded by a Public Works Trust Fund Loan. Mr. Stepp was also the project
manager for the City of Woodland for a $2,500,000 intersection project on a state highway that included water and sewer system
improvements. Mr. Stepp wrote the grant applications, assisted in design, negotiated all right-of-way acquisitions, and was the main
construction inspector for the project. Mr. Stepp also designed and inspected a $780,000 sewer main relining project for the City of
Woodland that was paid for by a Public Works Trust Fund loan by Department of Commerce.
10/21/2016 Page 10 of 14
WATER QUALITY COMBI :INANCIAL ASSISTANCE
Organization: r County-Utilities and Waste Management Department WQC-20 iCoUW-00136
Project Team
Mr. Hauth has over 40 years of engineering experience for Cities and Counties. He has worked on many projects larger and smaller than the
proposed Old Belfair Highway connection system project.
10/21/2016 Page 11 of 14
WATER QUALITY COMBI :INANCIAL ASSISTANCE
Organization: I County- Utilities and Waste Management Department WQC-20 iCoUW-00136
Project Planning and Development
Describe the process used by your organization to select the project for implementation. In your description please include:
(1)All criteria used to evaluate the value, feasibility and site suitability of the proposed project.
(2) Alternatives to the proposed project that were considered.
(3) A list of project stakeholders, their involvement in the decision-making process, and their level of support for the project.
(4) The plan to ensure long term project success and maintenance of the water quality benefits.
The decision making process that led to the proposed project incorporated extensive coordination with the Belfair community, as well as
regional and statewide leaders.
The Belfair Wastewater and Water Reclamation Facilities Project was developed through an extensive and formal project development
process that received support from local, regional, and statewide interests. Mason County notified each property owner needing to connect
with a letter in early 2008 and summer
2009.
Over the summers of 2010 and 2011, property owners were sent property-specific information, which included a map indicating the location
of the side sewer connection (example materials attached in Exhibit E). Outreach staff fielded nearly 80 calls from residents regarding side
sewer connections. During construction of the initial phase weekly emails were distributed for construction information, and where
appropriate, side sewer connection information is also included. The project has been an ongoing presentation topic at Mason County
Commissioners' meetings, particularly at 5th Tuesday meetings held in Belfair.
The intent of the proposed Old Belfair Highway Connection Project is to provide funding for pump stations and sewer laterals that will extend
to clusters of properties as shown on the conceptual plan that is attached to this application. Installation of these laterals will allow property
owners to build side sewers to connect to the laterals.
Local support and commitment for the project
Mason County is committed to a beneficial reuse program for the Belfair system. As noted above, Mason County worked with Belfair
property owners and residents throughout the planning, design and construction of the initial phase of the Belfair Wastewater and Water
Reclamation Facilities Project to ensure they are aware of the side sewer connection process. The media published several articles and
provided regular press releases through the Public Works Department and online website.
Throughout the project development process, local, regional, and statewide interests have been involved to benefit the success of the
project. At the local level, public meetings were held to update Belfair citizens and the surrounding community on project progress,
summarizes major findings, and solicits feedback and comments. This type of outreach will continue if funding is obtained for the Old Belfair
Highway Connection System.
The Belfair Wastewater and Water Reclamation Facilities Project has inspired several statements of support (provided in Exhibit G).
Mason County is extremely committed to supporting the Belfair community in the transition from septic systems to the sustainable
wastewater management system. Pictures of some key outreach activities are included in Exhibit E.
10/21/2016 Page 12 of 14
WATER QUALITY COMBI INANCIAL ASSISTANCE
Organization: P County-Utilities and Waste Management Department WQC-20 CoUW-00136
Project Planning and Development
Attachment Description Attachment
10/21/2016 Page 13 of 14
WATER QUALITY COMBI 'INANCIAL ASSISTANCE
Organization: I County-Utilities and Waste Management Department WQC-2C iCoUW-00136
Project Schedule
Describe the steps you have taken to be ready to proceed immediately with the project. Provide detailed information and
documentation on project elements such as status of designs, permits, interlocal agreements, landowner agreements, easements,
other secured funding, staff, or agency approvals.
If applicable, describe the environmental review completed such as:
National Environmental Policy Act (NEPA)
Environmental Review Process (SERP)
*State Environmental Policy Act(SEPA)
* Cultural Resource Assessment
July 1 - September 1, 2017 - Once funding is awarded complete necessary paperwork with Department of Ecology to use funds.
May 1 - September 1, 2017 - Solicit for RFP from qualified consultants, review RFP's, conduct consultant interviews, negotiate scope and
fee with selected consultant, and complete contract between County and Consultant after funding is approved by Ecology.
September 1, 2017 - June 1, 2018 - Complete surveying and design of the Old Belfair Highway Connection Project. This includes updates
and submittals as needed for SEPA, Facility Plans, and any other permits required.
February 1, 2018 - September 1, 2018 - Obtain all right-of-way and easements necessary for construction of this project.
April 1, 2018 - September 1, 2018 -Approval of the final design and permits by Department of Ecology and other permitting agencies. This
includes approval of SEPA, cultural resource assessment, and hydraulic permit approval.
September 1, 2018 - October 15, 2018 - County submits funding application to Department of Ecology for construction portion of Old Belfair
Highway Project.
July 1, 2019 - October 1, 2019 - Once funding is awarded complete paperwork with Department of Ecology necessary to approve use of
construction funds.
December 1, 2019 - March 1, 2020 -Advertise for bids, award the project to the lowest responsive and responsible bidder, and have
contractor mobilize equipment and materials.
March 1, 2020 - September 15, 2020 - Construction of Old Belfair Highway Connection Project (7.5 months).
Upload a Project Schedule that includes all tasks necessary to complete the project, including tasks that are not part of the
funding request.
Attachment Description Attachment
Old Belfair Highway Connection Project Schedule _Upload/45256-1019160ldBelfairHighwayProjectSchedule.pdf
10/21/2016 Page 14 of 14
UGA BOUNDARY FP��
w
y UM ONR/ 00 P 0o E D XI TING w STATION VFR �G� NOV u
W R �N . 1 UGA BOUNDARY ` GZSrte,1l�deeS�ra��
OLD BELFAIR HIGHWAY
U P P c `
TA 10 STATION
L 1 NO. 3
cc)
M It
1 z
POND��
v,
I �
w
LEGEND
AVITY SEWER ,
NHOLE •
SSU RI
EWE FO
RAVI Y SE ER ERVICE • • '4'q \
RES URE EWE SERVICE
EWA E PU P S TION • , II
O11c;; p
fC or G Approved By: Dravm By: Date: Scale:
11_p-i1 MASON COUNTY Ul11L11/ES AND WASTE WATER MANAGEMENT
4 y PM CS24
Engineering Services Associates „ w.t 1
PM Designed By 11-2-if Located on BeaidtAt Hood Cant eras. I'ff.1SE:
Checked By: NE 210 Cherokee Beach Road Veit. �SFIOIM
O'•!°o�.T�•P.r`` PM »'1"" Bel Air, 1►'a. 9BszB 36OJ z�'s-7sel JoD No. CONTEPTUAL SEWER SYSTEM L:11�c)l�T o�
No.Dat¢ By Ckd. Appr, Revision
S9ONeL G Approved By: r
RECEIVED
zk V 0 7 2016
a A
M
t- w
F
AlNn00 dMIN 6 15 W. A!der Street
..............
i
O u
CL IZ
X
LU M
LU
�1 ■�a r� �_ �i® \
WANP
e -�
�� it �\\� W)
N
1 w N
0
Hill
LU
U)
U) 0
LU
0 E
LU C)
co
U) Cc
0
E in
LL
—j
ui c
P E
o J p a:
MASON COUNTY
DEPARTMENT OF PUBLIC WORKS
100 W PUBLIC WORKS DRIVE
SHELTON, WASHINGTON 98584
Phone(360)427-9670 x450
Fax(360)427-7783
November 3, 2016 RECEIVED
MASON COUNTY
MISSION NOV 0 7 2016
Mason County Community Development
The mission of Mason 615 W. Alder Street
County Government is to 615 W Alder St.
provide essential& Shelton, WA 98584
mandated services which
will preserve & benefit the
health,safety,&welfare of
the general public in a Subject: Non-Project SEPA Review for Old Belfair Highway Sewer Collection System
professional and courteous Design
manner through the effective
and equitable management
of available public
To whom it may concern,
resources.
Mason County recognizes
that its employees& Mason County Public Works is submitting the attached SEPA checklist and related
volunteers are the documents to complete SEPA review of a non-project action consisting of
foundation upon which
these services are provided. completing the design for the Old Belfair Highway Sewer Collection System area.
The County has applied for grant/loan funding from the Washington State
Department of Ecology to hire a consultant to complete the design. The funding
r
application requires that SEPA be completed as part of this process.
Enclosed with this letter is a completed SEPA checklist, a site plan of the proposed
project area, a map of sewer collection zones in Belfair, and a copy of the funding
application completed for Department of Ecology.
You can contact me at (360) 427-9670 x652 or bstegp@co.mason.wa.us.
Sincerely,
Bart Stepp, PE
Mason County
Deputy Director/ Utilities and Waste Management
MASON COUNTY DCD SEPA Contact List
Sent SEPA to (check all that apply) on
yf Skokomish Tribal Nation, Nat. Res. Dept. � WA Department of Ecology
ATTN: Randy Lumper Environmental Review Section
N 541 Tribal Center Rd., Skokomish Nation, 98584 PO BOX 47703, Olympia, 98504-7703
rlumper@skokomish.org eparegister@ecy.wa.gov
�Skokomlsh Tribal Historic Preservation Officer WA Department of Commerce
ATTN: Kris Miller reviewteam@commerce.wa.gov
80 N Tribal Center Rd, Skokomish Nation, 98584
shlanayl @skokomish.org EO/U.S.Army Corps of Engineers
SEPA Reviewer-Jason Sweeney
Quinault Indian Nation PO Box C-3755, Seattle, 98124
ATTN: Mark Mobbs ,,, ason.t.sweeney@usace.army.mil
PO Box 189,Tahola, 98587
mmobbs@quinault.org WA Dept. of Fish and Wildlife
SEPAdesk@dfw.wa.gov
Squaxin Tribal Nation, Natural Res. Dept.
2952 SE Old Olympic HWY, Shelton 98584 1131"WA Dept.of Fish and Wildlife
jdickison@squaxin.us ATTN: Joshua Benton(360)602-0364
emarbet@squaxin.us (Habitat Biologist-Hood Canal Watershed)
szaniewski@squaxin.us 450 Port Orchard Blvd,Suite 290
sneil@squaxin.us Port Orchard,WA 98366
,loshua.Benton@dfw.wa.gov
The Confederated Tribe of the Chehalis
ATTN: SEPA Reviewer-Glen Connelly
420 Howanut Rd., Oakville, 98568 WA Dept.of Fish and Wildlife
onnelly@chehalistribe.org ATTN: Margie Bigelow
(Habitat Biologist-S Puget Sound Watershed)
WA DNR,South Puget Sound Region 2391 W Deegan Rd., Shelton,98574
950 Farman Avenue N, Enumclaw, 98022-9282 rgaret.bigelow@dfw.wa.gov
southpuget.region@dnr.wa.gov
WA Dept.of Transportation
WA DNR,Aquatic Resources ATTN: Dale Severson
PO BOX 47027, Olympia, 98504-7027 P.O. Box 47440, Olympia 98504-7440
and@dnr.wa.gov OR-SEPA-REVIEW@wsdot.wa.gov
�WA DNR,SEPA Center City of Shelton
ATTN: External Coordinator ATTN:Jason Dose
PO BOX 47015, Olympia, 98504-7015 525 West Cota St., Shelton 98584
sepacenter@dnr.wa.gov jasond@ci.shelton.wa.us
Olympic Region Clean Air Agency Port of Shelton
ATTN:Aaron Manley ATTN:Brandon Palmer
2940-B Limited Ln. NW, Olympia. 98502 21 West Sanderson Way, Shelton 98584
aaron.manley@orcaa.org BrandonP@portofshelton.com
Mason County Transit Ej"Office of Archaeology 8•Historic Preservation
ATTN: Mike Oliver ATTN: Lance Wollwage
PO Box 1880, Shelton, 98584 P.O. Box 48343, Olympia, 98504-8343
moliver@masontransit.org Lance.Wollwage@dahp.wa.gov
Mason County PUD#1 Tacoma Public Utilities-Real Property Services
ATTN: Steve Taylor ATTN: Dave Letterman
N 21971 Hwy 101, Shelton, 98584 3628 S 35th St, Tacoma, 98409-3192
sntaylor@mason-pudl.org dletterm@cityoftacoma.org
Mason Cty P.W.ATTN:
Mason Cty E.H.ATTN: Other:
School District:
Mason Cty Bldg ATTN: gent:
MC DCD last updated on 11/8/2016 Applicant: