HomeMy WebLinkAboutBLD19960 ReRoof - BLD Permit / Conditions - 3/13/1987 TYPE RE-ROOF
permit No. 19960 No. Floors Sq Ftg _
Owner VAUGHN, C.G. Tel 275-2094 Date 3-13-87
Address P 0 Box 181 Be air Zip
Contractor R L Hallet
Address E 50 Alderwood Rd Belfair Zip
Legal Description 29-23-1 Tr 3 of NW NE
Direction to project site
NE 341 Old Be air Hwy
Piumbing chanical Sevier TNbod Stove
Fireplace Deck Garage Carport
Basement Loft Other
26 squares shingles
Shorelines: Plumbing:
Setback: Mechanical:
Special Interior:
Conditions: FINAL:
Mobile me:
SHoke Detector:
Remarks:
Footing:
Setback:
Foundation
Walls: PER RA IT
Framing: ,� R„1 cv IPAVO N
Fi replace: U LZ�'�'O W'
Wood Stove: DATE
BUILDING PERMIT APPLICATION
MASON COUNTY
DEPARTMENT of GENERAL SERVICES
P.O. BOX 186 SHELTON, WASHINGTON 98584
426-5593 DATE ISSUE""1% 4e-?e7
A� 9-61 PERMIT NO.
NAME ] / MAILADDRESS Y&STATE ZIP PHONE
OWNER l/ L�c�i 0 % ` `"o S JS
DIRECTIONS
TO JOB SITE i'fwAe
�r
LEGAL .-,c,- L
DESCR. l `� 2-
AME MAIL ADDRESS CITY&STATE LICENSE NO. ZIP PHONE
CONTRACTOR
USE OF _$"'�J �LQ
BUILDING
CLASS OF NEW ADDITION ALTERATION REPAIR MOVE REMOVE
WORK ✓
DESCRIBE
WORK �j�-r✓C�
• O' O I
BEDROOMS DECKS CARPORT NOTICE
SEPARATE PERMITS ARE REQUIRED FOR PLUMBING, HEATING, VENTILATING OR AIR
BATHROOMS TOTAL SQ.FT. GARAGE CONDITIONING.
NO.OF STORIES BASEMENT ATTACHED THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION AUTHORIZED IS NOT
COMMENCED WITHIN 180 DAYS, OR IF CONSTRUCTION OR WORK IS SUSPENDED OR
TOTAL SQ.FT. FIREPLACE DETACHED ABANDONED FOR A PERIOD OF 180 DAYS AT ANY TIME AFTER WORK IS COMMENCED.
PERMANENT SHORELINE
SEASONAL
VCONFC
FIDAVIT CONTRACTORS AFFIDAVIT
T I AM EXEMPT FROM THE REQUIREMENTS OF THE CONTRACTORS I CERTIFY THAT I AM A CURRENTLY REGISTERED CONTRACTOR IN THE STATE OF
CERTIFY
LAW RCW 18.27,AND AM AWARE OF THE MASON COUNTY ORDINANCE WASHINGTON AND I AM AWARE OF THE ORDINANCE REQUIREMENTS REGULATING THE
S FOR WHICH THIS PERMIT IS ISSUED AND THAT ALL WORK DONE WILL BE WORK FOR WHICH THE PERMIT IS ISSUED AND ALL WORK DONE WILL BE IN
NCE THEREWITH. NO CHANGES SHALL BE MADE WITHOUT FIRST CONFORMANCE THEREWITH.NO CHANGES SHALL BE MADE WITHOUT FIRST OBTAINING
ROVAL FROM THE BUILDING DEPARTMENT. APPROVAL FROM THE BUILDING DEPARTMENT.
DATE �27 �2 X BY DATE
FOR OFFICE USE ONLY
DEPARTMENT Y SPPROVEDJO DEPARTMENT YESPPROVEDIO BUILDING VALUATION
HEALTH PUBLIC WORKS FEE
PLANNING FIRE BUILDING PERMIT
D.O.T. BUILDING PLAN CHECK ,
SPECIAL CONDITIONS BUILDING GROUP PRE-INSPECTION
SHORELINE
PLANNING
PLUMBING
MECHANICAL
STATE BUILDING FEE
STATE SURCHARGE
APPLICATION ACCEPTED BY I PLANS CHECK BY APPROVED FOR ISSUANCE PERMIT VALIDATION
TOTAL �d
BY CASH CK MO